4 x 210 MW : CSTPS : CHANDRAPUR

EVENT

ANALYSIS

1. Event No. 02

REPORT

Time 21:30 hrs.

UNIT NO. 3
Date 30.01.08

2. Operating conditions at the time of Event :


Load

Coal Cycles in service

Oil Support

195 MW

A,B,C,E,F

Nil

3. Nature of Event : Unit withdrawn to attend Economiser tube leakage.


4. Observations :

Suddenly feed flow increased, ID fan loading increased, abnormal sound at (LHS) Economiser
bottom area observed and also water spray observed on LHS of boiler at 34m level manhole,
hence set withdrawn.

5. Analysis

Economiser tube leakage in bottom bank area. Primary failure due to welding joint
failure.

6. Works carried out by maintenance section

Primary failure Economiser coil no.-1, tube no.-6


Secondary failure Economiser coil no.-1, tube no.-7
New distance piece put & welded in tube no. 6&7 hydraulic test taken found ok.

7. Works carried out for the restoration by operation :


Boiler lighted up

Time - 04:15 hrs.

Date 01.02.2008

T-A Set Synchronised

Time - 11:54 hrs.

Date 01.02.2008

8. Recommendations to avoid reoccurrence :


a) Short term Nil

b) Long term
Detail analysis of welding failure will be done. Proper care will be taken in O/H for ensuring
welding quality to avoid failure.
9. Remarks

Nil

General Manager-I