ANALYSIS
1. Event No. 02
REPORT
UNIT NO. 3
Date 30.01.08
Oil Support
195 MW
A,B,C,E,F
Nil
Suddenly feed flow increased, ID fan loading increased, abnormal sound at (LHS) Economiser
bottom area observed and also water spray observed on LHS of boiler at 34m level manhole,
hence set withdrawn.
5. Analysis
Economiser tube leakage in bottom bank area. Primary failure due to welding joint
failure.
Date 01.02.2008
Date 01.02.2008
b) Long term
Detail analysis of welding failure will be done. Proper care will be taken in O/H for ensuring
welding quality to avoid failure.
9. Remarks
Nil
General Manager-I