Sie sind auf Seite 1von 1

TRAINING MANUAL- PIPING

UNIT PLOT PLAN


Uhde India Limited

DOC No. : 29040-PI-UFR-0019


Rev.

: R0

Page

: 1

CONTENTS
Page
0.0

Cover Sheet

1.0

Introduction

23

2.0

Clearances

3.0

Pipe Berthing

4.0

Equipment Spacing

5.0

Platforms

6.0

Horizontal Exchanger

7.0

Vertical Exchanger

8.0

Access Provision

67

9.0

Check List for Plot Plans

78

Applicable Revision:
Prepared:

Checked:

Approved:

Date:
First Edition: R0
Prepared:

Date:

Date:

Checked:

Approved:

Date:
File Name: C- 19

Date:
Server:

PUNE: KUMUS 207

Directory: PUNE: Refer \ Pi \ Training Manual

Date:
VKO: KUMUS 209

VKO: Refer \ Training Manual

Das könnte Ihnen auch gefallen