STC FTTH OLT Khaleej-01 Inst. PIP


HW Start Project with WO
Finalize the BoQ from STC
Appove the oficial Responsibility from STC
Kick-off Meeting with STC
OLT material order
OLT material manufacture and delivery
STC Exchange Site permission
OLT site Survey
OLT site Design and MOP
Submit OLT site MoP to STC
OLT site MoP approved by STC
OLT Site readiness and hand over to Huawei
OLT material delivery to site
Hardware Installation/Power connection
Hardware Self Test
Commissioning, Integration
Self-Test
OLT PAT

54 days
0 days
1 day
1 day
0 days
0 days
42 days
2 days
3 days
7 days
1 day
3 days
5 days
0 days
4 days
1 day
4 days
1 day
2 days

Project: STC FTTH Project-Mursalat-0


Date: Wed 9/29/10

Start

Finish

24 27 30

Tue 8/31/10 Sun 11/14/10


Tue 8/31/10
Tue 8/31/10
Tue 8/31/10
Tue 8/31/10
Wed 9/1/10
Wed 9/1/10
Wed 9/1/10
Wed 9/1/10
Tue 8/31/10
Tue 8/31/10
Tue 8/31/10
Wed 10/27/10
Wed 9/1/10
Sat 9/4/10
Sun 9/5/10
Tue 9/7/10
Sat 9/25/10
Sun 10/3/10
Mon 10/4/10
Mon 10/4/10
Tue 10/5/10
Sat 10/9/10
Sun 10/10/10
Sat 10/16/10
Wed 10/27/10
Wed 10/27/10
Sat 10/30/10
Tue 11/2/10
Wed 11/3/10
Wed 11/3/10
Sat 11/6/10
Tue 11/9/10
Wed 11/10/10
Wed 11/10/10
Sat 11/13/10
Sun 11/14/10

8/31

September 2010
11 14 17 20 23 26 29

October 2010
11 14 17 20 23 26 29

November 2010
10 13 16 19 22 25 28 1 4 7
STC FTTH OLT Khaleej-01 Inst

HW Start Project with WO


Finalize the BoQ from STC
Appove the oficial Responsibility from STC

9/1
8/31

Kick-off Meeting with STC


OLT material order
OLT material manufacture and delivery
STC Exchange Site permission
OLT site Survey
OLT site Design and MOP
Submit OLT site MoP to STC
OLT site MoP approved by STC
OLT Site readiness and hand over to Huawei
10/27

OLT material delivery to site


Hardware Installation/Power connection
Hardware Self Test
Commissioning, Integration
Self-Test
11/13

Task

Summary

Rolled Up Progress

Project Summary

Progress

Rolled Up Task

Split

Group By Summary

Milestone

Rolled Up Milestone

External Tasks

Notes: 1.The PIP is for STC FTTH 2010 only.


2. Huawei will adjust the PIP reference to the fact project.

OLT PAT