Sie sind auf Seite 1von 10
Project dim PROPOSED EARTHWORKS, PILING AND SUB-STRUCTURE = WORK ume “San png | LOTS PIDZISi & PTD 282, DESARU, MUKIM PANTAT TIMUR, DAERAH KOTA TINGGL JOHOR ontrcton Sdn DARULTAKZIM, METHOD STATEMENT CIVIL & STRUCTURAL EARTHWORK & EXCAVATION WORKS rao ra “Ti farreaoe [ae a DESARU| MS | C&S | EW | 001 | 00 | [company | activity | DESIGNATION NAME SIGNATURE | DATE lM Prepared | QAQC Officer _| Mr. Ashare Ghazi Construction | By Sdn Bhd Robert Bird & | Reviewed | C&S Consultant Associates By | Remarks/ Comments By Consultant : (1 Aophicabie) Peremba Reviewed - By = L Remarks/ Comments Table of Contents Section 1.0 2.0 3.0 31 32 40 4.1 42 43 44 5.0 6.0 1.0 7 72 Titles / Subtitles Objective Scope of Work Resources Planning Machinery, Tools & Equipment Planning Manpower Planning Work Methodology Survey and Setting Out Excavation Works Back Filling Dewatering and Silt Trap Inspection and Test Safety, Health and Environment References Inspection Test Plan QC Documents or Relevant Checklist Page 30f7 30f7 4of7 50f7 Tof7 70f7 70f7 Document No: IJMC(B)/DESARUIMSICES/ W001 Rev O Page No. 2.of 7 SECTION 1.0 OBJECTIVES This method statement describes the method of construction to be used for excavation and earthworks at the proposed earthworks, piling and sub-structure work lots pid 2491 & pid 2492, desaru, mukim pantai timur, daerah kota tinggi, johor darul takzim SECTION 2.0 SCOPE OF WORK ‘This works shall consist of all the required excavation within the limits of the works. It shall include the removal of and proper utilization and hauling, or disposal of all excavated materials, and constructing, shaping and finishing of all earthworks over the entire extent of the works, in conformity with the drawings and the specification. Briefly, the works consist of: @ 0) © @ © © (8) Site clearing Relocation of existing utilities and services (if any) Backfilling and compaction Earth Cutting Protection and maintenance of earthworks Construct silt trap Construct temporary earth drain Document No: IJMC(UB)/DESARUMS/C&S/EW/001 Rev O Page No. 3 of 7 SECTION 3.0 RESOURCE PLANNING 3.1 Machinery / Tools / Equipment Ttem ‘Material Descriptions 1 Excavator / Backhoe 2 Dump Trucks 3 Bulldozer 4 20 ton Compactor 5 Water pump 5.1 | 2” diameter Robin-Engine (Petrol) pump 5.2 | 4” diameter diesel pump 5.3 | 6" diameter diesel pump Manpower Tiem ‘Manpower Deseriptions 1 Site Agent / Supervisor 2 Clerk-of-Work 3 Safety officer 4 ‘Surveyor & chainman 5 Excavator operator 6 Dump Truck operator 7 Compactor operator 8 General worker Document No: IMC(UB)/DESARU/MS/CASIEW/001 Rev O Page No. 4 of 7 SECTION 4.6 WORK METHODOLOGY 4.1 Survey and Setting Out 4.1.1 The center line setting out shall be carried out for Original Ground Level (OGL) at 10 meters interval lengthwise and pegs shall be placed at 10 meter intervals on each side of the center line and extend 10 meter beyond the unsuitable material (USM) area 4.1.2 A joint survey on the OGL shall then be carried out before topsoil removal. The toe level of the embankment fill slope can be obtained with reference to the Drawings for the typical section of embankment slope and the above OGL survey. 4,13 Survey pegs shall be placed at the centerline, toe limits with the slope batters (at ground level) offset reference points to the toe limits located at 5 meter away from the center line and also pegs at 3 meter away from the center line. 4.1.4 All the survey data shall be verified by the Engineer’s Representative at site before actual excavation commences. 4.2 Excavation Works 4.2.1 Stripping of the existing ground surface shall be carried out by an excavator and disposed away by dump trucks. This shall be carried out in compartments of 10 m x 20 m or as directed by the Employer's Representative at site on the actual limits of excavation, Excavation works shall proceed from the centerline towards the toe limits area as agreed upon, At the toe limits, the natural soil shall be checked on whether there is a necessity to 0 beyond these limits to a further 3 meters. The Employer's Representative shall decide at the site 42.2 For each compartment, a temporary sump measuring Im x 1m 0.6 m shall be built by the or manually at the low point. A 100 mm diameter water pump shall be used to pump out any ground water out of this compartment so that works can be carried out in the dry, manual labor shall be used where necessary to divert any localized water to this sump. 4.2.3 Before any earth filling can be carried out, the agreed survey level points are taken, ‘Document No: LIMC(JB)/DESARUIMS/CES/EW/001 Rev O Page No. 5 of 7 43 Back Filling 4.3.1 The initial depth of fill shall be 600 mm with by compaction of static roller at areas where depth of excavation is greater than 1.0 meter but for areas where depth of excavation is Jess than 1.0 m, thickness shall be 250 mm. This proposal is necessary to reduce yielding of the soil or movement of the excavated foundation when the vibratory roller is in operation on the next 250 mm layer compaction. The 250 mm layer of fill shall be subjected to approval based on trial compaction run. 43.2 For each compartment, earth fill thickness shall be laid until 50% of the average depth of cut from the original ground level or 300 mm whichever is lesser. This is to facilitate construction of the succeeding compartments and a gentle ramp shall be made to the next compartment when filling is required so as to allow for movement of lorry traffic. Soil layers are carried out and the results shall comply with the necessary requirements. The motor grader shall be used to provide the sufficient grading of the completed surface for any possible surface run-off. 4.3.3 When each compartment is nearing completion with the exception of the sump area, filling with sand shall be placed in the sump area up to the height of the fill that had been carried out for the particular compartment, Compaction shall be carried out by plate compactor. However, in case there is little or no water at the sump area, earth fill material shall be used and compaction carried out by plate compactor. Future backfilling and compaction at this sump area shall be earth fill materials. 4.4 Dewatering and Silt Trap 44.1 Prior to the commencement of excavation, areas designated as silt traps in the Logistic drawings shall be constructed to act as filters to control siltation from the storm-water runoff on site. The five (5) areas designated as silt traps are adjacent to the access ramps so that they can be easily drained into the connecting drainage system. Submersible ‘water pumps shall be used at the toe of temporary cut slopes to pump the runoff to the nearest silt trap via the temporary perimeter drains. As the excavation work progress, progressive localized excavated depressions will be allowed to collect surplus ground water or surface runoff from the rain, Document No: IIMCUB)/DESARUMS/CAS/EW/001 Rev O Page No. 6 of7 SECTION 5.0 INSPECTION AND TEST ‘All inspection and testing involved shall be accordance to the Inspection and Test Plan and the Project Quality Plan. As-built drawings shall be produced to the Engineer upon completion of the said works. The ‘Main Contractor shall inform the Engineer if the completed platform levels are different from the Engineer’s Specifications and drawings. SECTION 6.0 SAFETY, HEALTH AND ENVIRONMENT All health, safety, security and environmental measures shall be as per the IJM Contructions Occupational Health and Safety Plan and ITM Contructions Environmental Management System, Generally, the excavation and shoring works on site are relatively safe as the depth of excavation is not very deep. The proximity of the site to existing buildings is also reasonable also. The precautions to be taken during excavation shall be as follows: All temporary exposed cut slopes with 1:1 gradients shall be protected with polythene sheets after storms. This measure will control erosion arising from water runoff. SECTION 7.0 REFERENCES 7.1 Inspection Test and Plan Refer document (attached) (TP Ref. No.:1JMCUBYDESARUATP/C&S/001 (Rev.00) 7.2 QC Documents or Relevant Checklist Checklist ref. no.: EM/E/01 (Rev.00) Document No: LJMC(JBYDESARUMMS/C&S/EW/O01 Rev 0 Page No. 7 of 7 1JM CONSTRUCTION SDN BHD. PLANTATION HOTEL, DESARU CORNICE RESORT & CONVENTION CENTER. E: EARTHWORKS. Form ne: FMIEION (Re) INSPECTION REQUEST FOR EARTHWORKS _ Inspection Date: Time: .. RINRefs Drawing Ref... Subcom: ...... Location: .... Compaction Method: ‘Type of Fill Material: . INSPECTION ‘CORRECTIVE DESCRIPTION ‘Accept (A) / WORK Reject (R) (7 [_ CHECKED __] REMARKS Sb] Main 7 eR | @ [av | pate Con_| Com EXCAVATION — Setting Out for Excavation Excavation Limit . i ‘Temporary Earth Drain ‘Temporary Shoring _ BACKFILLING Layer Number/Reduced Level L Loose Thickness ‘Number of Passes ‘Compaction MDD/FDT COMMENTS: Prepared By: Checked By: Approved By: Sub-ConRep.( Main Con Rep. (HIM C) Consultant Rep. Name Name : Name: Dae: Date: Date * Noe: N/A as non-applicable. Delete where applicable z101 abeg oonie3 om DNIAOUEAY | waren | wn onto pereees any oS ‘ ‘ony yen pe eee capemomne pmea| Orn) Treo nour ore | mamas [tag etn swam sony aoa ree meee cane ali = Soa —— Re ee ‘swum —— i —— veers oe |1oXnasng * sosrasacing ansg| oa 7 sayy Aluung enst,, vexrds | _wmaemeg ’ Samy ma aun at pa ep voyauisds | neynney _oans nein sap yne ta wala ¢ a Sanlu ges boncpey nc sonmtomieds | ven SSemermary sss | romans oneE : itp smageqnnn | eaves sna oa oe eaeae operas | mag nang montis] stunner ngsy | cp © pees ee ered ee ee ee eee asenontns| cmos amin: : a aaa voneuinés | rumang potoung‘ssang ans] yom ung sweat Gavan || MNOWIW | umeanoseau f gonauna | sonaneas hz sea in-asy) Loyseoranumiveaatarionr 464 aut ‘WSLNO NOLLNSANOO ® LNOS3Y JOINNOO NWSAM "T4LOH NOLLWINVTd Pug UPS UoHINASUOD Wr 2)0z 603 mea wianosey PB AEH “eb eCe Balers T= OONO wonmatisea weTeN a wohuy 09H ung BuO OGD we aU LOR aN amyeutis Ta Re Renae Wa Ra poRORR Trapani eae pn vortourds rwmyewveg avons “sons a) tous somns sf aot rs. sew ay no Kim o4| 51 syneig vopess0g fas “wormayroig | _wweynmog _fotouns sans au swans 2a x9 pon 00051] pwn 66 51h poy " soneogeeds | _wemscea _fitauns osssndns 245 tans Suyzcmyoq) ste Ke 9) Asp eu #0100 1 eopegpods | _weypsueg _otouns* soda aus|_woposdopa way sms 0001 z soymupeds | wena _jodouns swag ans torsos somg0 es im Lotaung “onsdns ong owaunmon mor Aon 8 | ates pura xr amwe 01] ol = Era “GauiNDSY ONUSAE LINDY ecrisatl| sonvieioov | wNOUDzesNI30 24a | snow Nowawosaa_ |"! eh20%0 vo'8y) Looiseolaumvssaeriovini a oor ‘SSNOACTAD-SavET ‘SSIOW NOILWAWOKS ONY NUOMAINVS HOI NV Id ISAI @ NOUDSASNI ‘MANA NOLLN3ANOD ¥ LNOSY JOINAOO NAWSAd “LOH NOLLWLNVTd Ug UPS LoRONSUED WHT

Das könnte Ihnen auch gefallen