Beruflich Dokumente
Kultur Dokumente
(GPM)
10
20
30
35
40
45
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
Consumption
(L/Day)
7.40
14.82
22.22
25.92
29.62
33.32
37.02
44.44
51.84
59.24
66.64
74.04
81.46
88.88
96.28
103.68
110.08
118.48
125.89
133.29
140.70
148.12
155.52
162.92
170.34
177.74
Adjustment at the
Dosing Pump
mL/min at inlet to
RW Tank or MMF
depending on the
H2S smell in the
water
1.2
1.5
1.7
1.9
2.2
2.4
2.6
3.0
Consumption
(L/Day)
1.7
2.2
2.4
2.7
3.2
3.5
3.7
4.3
Consumption (L/Day)
Flow
Rate
(GPM)
Consumption
(L/Day)
Adjustment at the
Dosing Pump mL/min
Flow Rate (GPM)
at inlet to RO Unit
FLAT 2 PPM ALWAYS
as per the flow rate RO
Consumption (L/Day)
BIOCIDE
Volume of Flow
Consumption
(L/month)
Flow
Rate
(GPM)
100
110
120
130
140
150
160
170
180
190
200
Adjustment at the
Dosing Pump mL/min for
the flow to BFW tank
14.0
15.4
16.8
18.2
19.6
21.0
22.4
23.8
25.2
26.6
28.0
Consumption (L/Day)
20.2
22.2
24.2
26.2
28.2
30.2
32.3
34.3
36.3
38.3
40.3
Flow
Rate
(GPM)
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
Adjustment at the
Dosing Pump
mL/min for the
flow to R.O. Plant
20.42
22.46
24.50
26.54
28.58
30.63
32.67
34.71
36.75
38.79
40.83
42.88
44.92
46.96
49.00
Consumption
(L/Day)
29.40
32.34
35.28
38.22
41.16
44.11
47.04
49.98
52.92
55.86
58.80
61.75
64.68
67.62
70.56
Flow
Rate
(GPM)
10
20
30
35
40
45
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
Adjustment at the
Dosing Pump
mL/min for the
BFW tank flow to Consumption
SG
(L/Day)
0.23
0.33
0.46
0.69
0.81
0.92
1.04
1.16
1.38
1.62
1.84
2.08
2.32
2.55
2.76
2.99
3.22
3.45
3.68
3.91
4.14
4.37
4.60
4.83
5.06
5.30
5.53
0.65
0.98
1.14
1.31
1.47
1.64
1.96
2.29
2.62
2.94
3.27
3.60
3.93
4.25
4.58
4.91
5.23
5.56
5.89
6.21
6.54
6.87
7.20
7.52
7.85