CaseHistory
Wedgefailureproblemshadbeen
encounteredinthepast.
Increasedcableboltingwasappliedto
improvestability
Back/HWSupport?
RockMassProperties
3jointsetswerepresent
JointsetAwasata30degreedip
RockUCS=100MPa
Inducedstress=50MPa
JointsetA:JRC10 =141mAmp=.7cm
Jointsurfacescannotbescratchedwitha
fingernail
RQD=100%
Factor A
Strength/stress
0.8
ce
e Fa
Stop
0.6
0.4
Max.
0.2
0
0
10
12
1.0
0.8
Factor B
0.6
0.4
0.2
0
0 10 20 30 40 50 60 70 80 90
True
and
Joint
TureAngle
AngleBetween
BetweenFace
Face
and
Joint
10
Factor C
Gravty Fall &
Slabbing
8
6
Face Dip
Sto
pe
4
C=8-6cos(Dip)
2
0
0
10 20 30 40 50 60 70 80 90
Dip of Stope Face
StopeGeometry
Stopeis14mwidebyapprox.53mlong.
Cableboltingwasdonewith3passes
Designastablecablesupport
DesignParameters
Jr=1.5
Ja=1.0
Q=17
A=0.1
N=0.8
H.R.=5.5m
3jointsets&100%RQD
B=.2
C=2.0
100/9/5.5=2
RQD/Jn/HR = 2.0
SpanDesign
(Wangetal.,2000)
ne
45
Po
t
Un entia
sta l
ble
Zo
Span (m)
40
35
30
Unstable Zone
25
20
15
10
Stable Zone
5
0
0
10
Stable
20
30
Potential Stable
40
50
60
Unstable
70
80
90
100
RMR
2 Months Later