PBS : CHAPAINAWABGANJ PBS

FTNANCIAT, AND STATTSTICAI, REPORT


TO: THE RURAL ELECTRIFICATION BOARD

Month Ending

June 2011

PART-F: Plant and Consumer Data


THIS
DESCRIPTION

YEAR TO
DATE

MONTH

l- Services Connected

987

2- Services Removed

CUMULATIVE
FROM INCEPTION

8,528

89, I 12

3,447

3- Services in Place

/t/tilt/tilt/tilIilil

I I / I / I I / // / I t I / I // //

85,665

4- Idle Services (Services in Place but not Energized)

t/t//il/t/t/ilil

il il t

Iltt/ilililililItilil

5- Services Presently Energized (3-4-Disconnected)

ll/l/tIilIillIIIilII

/tililtilt/t/t/tilIil

80, I 20

t.142

9,636

92,121

1,053

9,008

90. I 52

666

9- Kilometers of Lines Constructed - REB

0.000

0.000

2,t32.989

l0- Total Kilometers PDB/DESA Lines Taken Over

0.000

0.000

524.234

0 000

0.000

636.416

742

t1.475

69 415

l.742

11.475

2,838.820

1 742

t0.7 s2

2,734 446

6- Houses Wired
T- \Hired House5 Inspected

t- Total No of Viltages

-(l$$

) in PBS Area & Electrified

l- Kilometers of PDB/DESA Lines Renovated

12. Kilometers of Lines Constrllcted - PBS


13. Total

Km ofLines Constructed (REB+PBS+**Taken Over)

14- Total Kilometers

+ Put

of Lines Energized

total no ofvillages

** In case Renovation is more than taken over renovation figure should