from a process that produces steel rods. The length of each rod in
the samples was determined. The results were tabulated and sample
means and ranges were computed. The results were:
Determine the upper and lower control limits and the overall means
for -charts and R-charts. Draw the chart and plot the values of the
sample means and ranges. Do the data indicate a process that is in
control? Why or why not?
Sample Sample
1
2
3
4
5
6
7
8
9
10
11
12
Solution:
xbar=
rbar=
For n=12
For n=12
For n=12
Mean (in.)
Range (in.)
10.002
0.011
10.002
0.014
9.991
0.007
10.006
0.022
9.997
0.013
9.999
0.012
10.001
0.008
10.005
0.013
9.995
0.004
10.001
0.011
10.001
0.014
10.006
0.009
10.0005
0.0115
Xbar + A*Rbar =
Xbar + A*Rbar =
D4*Rbar =
D3*Rbar =
X bar control c
10.007
10.005
10.003
X bar control c
10.007
10.005
10.003
10.001
9.999
9.997
9.995
9.993
9.991
9.989
1
From the above chart it is vissible that a lot of sample mean are outside cont
0.025
0.02
0.015
Rb
UC
ar
0.01
0.005
0
1
10
11
12
The Rbar chart also is showing a value outside control limits. So the variation
each rod in
ted and sample
overall means
alues of the
cess that is in
+ A*Rbar =
10.00365
+ A*Rbar =
9.997349
0.019861
0.00314
Sample
mean
UCL_line
LCL_line
10
11
12
mean are outside control limits so the process is not in state of control
hart
R bar
UCL_rb
ar
10
11
12
UCL_line
10.00365
10.00365
10.00365
10.00365
10.00365
10.00365
10.00365
10.00365
10.00365
10.00365
10.00365
10.00365
LCL_line
9.997349
9.997349
9.997349
9.997349
9.997349
9.997349
9.997349
9.997349
9.997349
9.997349
9.997349
9.997349
0.019861
0.019861
0.019861
0.019861
0.019861
0.019861
0.019861
0.019861
0.019861
0.019861
0.019861
0.019861
0.00314
0.00314
0.00314
0.00314
0.00314
0.00314
0.00314
0.00314
0.00314
0.00314
0.00314
0.00314