Siyana and ZTE don't have MS SLA Kpi already shared it with Furqan. Tx & Rx power report is already with Furqan Links with protection and non protection will provide the list(Link Protection status) spoke for Design Nodes utilization transmission report. Nodes with respect to vendor (regional distribution of Tx Nodes) BMR monthly and quality( Availability and Band) LTE throughput increasing any link congested? (TX POV) Threshold for expansion ? Huawei IP, MPLS is under you Transport havinig SDH, MPLS-TP DW. All Mobily NW is on Fiber or MW? Tranmission M. Zaidi (MW and IP)
Hasan will share
Already shared AlU and Huawei having MS. Already shared Already shared Tomorrow COB (Hasan) Firas(feras f.alfariss@mobily.com.sa) 3-Quarter report (Hasan/Tariq will share) Hasan will share
Managent system.
Exe manager
quarterly report share with sevice planning depart.