Sie sind auf Seite 1von 15

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

This drawing was produced electronically


and requires no signature.
It may not be amended manually

1) Cl. 5.22 of document no. DN02-DN-Z-KA-0003 )(LCI Requirements) to be complied.


This is previous comment.
Missing Info on Circuit Diagrams as below:
a) Component List
b) Reference Drawings (Company Document No.)

Index

Item

Ivar Aasen_LV
SENTRON
3101-01

Description

Page

1.

Table Of Content

2.

Main Air Circuit Breaker Overview

3.

690/110VAC Voltage Transformer

4.

Multi Instrument PAC 3200

5.

230VAC UPS Intake & Outgoing Miniature Circuit Breakers

6.

Main Air Circuit Breaker Motor Drive & Spare Contacts

7.

Closing Coil & Signal Lamps

8.

Shunt Trip Coil

9.

Under Voltage Trip Coil

10.

Siprotec Protection Relay

10

11.

Siprotec Binary Inputs

11

12.

Siprotec Binary Inputs

12

13.

Interlock to 11kV SWBD, ESD/PSD Trip Relay & Fault Contact

13

14.

Arc detection peripheral unit

14

15.

Arc detection central unit

15

ALL DRAWING REFERENCES ARE

PREFIXED: DN02-S09011-E-XKFOR EXTERNAL TERMINATIONS, REF.:

690V UTILITY SWBD - BLOCK AND TERMINATION DIAGRAM

DOC. NO.: DN02-S09011-E-XI-3101

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Drawing Title:

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Supplier

82EN0100A

5
20.09.14

Signature:

D.MITTAL

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

03I

DN02-S09011-E-XK-3101-01

+15A1R2

Sheets:

15

=3102-01/7.4

<>

<7>

MAIN BUSBAR A - 690V AC, 60Hz

L1

L2

L3

No. / Text

MOTOR DRIVE

CLOSING COIL

TRIP COILS

F1 : SHUNT, F4 UVT

FIRST SET MAIN C.B.

AUXILIARY CONTACTS

SECOND SET MAIN C.B.

AUXILIARY CONTACTS

READY TO CLOSE CONTACT

MAIN CIRCUIT

MAIN C.B. POSITIONS IN GUIDEFRAME.

THE SWITCHES OPERATES ONLY;

IN OUT POSITION : -S30

IN TEST POSITION : -S31,-S32

IN CONNECTED POSITION :

-S33, -S34 & -S35

/1 3.2

/1 3.2
X7:1

X7:3

/1 3.1
X7:4

X7:6

/1 3.1

/1 2.2
X6:6

X5:4

/6.2

/8.2
X5:10

X6:4

X6:2

/7.6

=3103-01/9.2

/1 1 .6

/1 1 .5
X6:12

X5:12

X6:10

/9.6

/9.6
X5:13

/8.2
X6:13

/1 3.1

<9>

-T01

Q1

X7:2

X7:5

X6:5

/1 2.2

/6.2

S23

S22

/1 3.2

S20

X5:5

X5:3

X5:9

/8.2

/7.7

X5:7

X6:3

/7.6

S4

=3102-01/7.4

=31 03-01 /9.2

/1 1 .6

X6:1

X6:11

X6:9

X5:11

S3

S2

S1

/9.6

/9.6

X6:14

/8.2

X5:2

/6.1

F4
U <

/1 1 .5

F1

X5:14

Y1

X6:8

"MECH
ON"
"MECH

OFF" S11

/7.1

SEALED

/7.1
X6:7

/6.1

<6>

<5>

X5:6

<4>

L1

L2

L3

-Q01

4000A

/7.7

<3>

X5:8

<2>

<1>

SEALED

This drawing was produced electronically


and requires no signature.
It may not be amended manually

X5:1

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

-T02

-X40

-T03

S1 .1

S1.1

S1.1

S2.1

S2.1

S2.1

L1.1

/3.1

L2.1

/3.1

L3.1

/3.1

01

02

03

I1 /4.3

I2 /4.3

I3 /4.3

4000A/1A, Cl1, 5VA

04

-X39

01

02

03

F20_I1

/1 0.1

F20_I2

/1 0.1

F20_I3

/1 0.1

04

F20_I0

-X41

01

02

03

04

I0 /4.3

CT'S FOR SWBD PROTECTION

(I>, I>>, Ip)

AND MEASURING

-PE

4000A/1A, Cl 5P30, 5VA

S1.2

S1.2

S2.2

S2.2

S2.2

/1 0.1

-PE

03I

/1 1 .3

BUS DUCT

82EV0100A

S1

100/1A

S2

11/0,72kV TRANSF.

08.09.201 4 DD

.
HFO

DET NORSKE

ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4
DD

HFO

SW

Issue

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

PE

Acceptance Code:

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

L3

L2

Drawing Title:

Supplier

IE2

/1 0.1

-PE

L1
.

IE1

/1 0.1

EXTERNAL CABLE

-PE

Tag no.: 82ET0100A

RE ISSUED FOR CONSTRUCTION

-T10

-S35

=3102-01/7.5

=3103-01/9.3

-S34

<10>

2
4

2
4

2
4

2
4
1

1
/7.1

/1 1 .4

-S33

-S32

-S31

CONNECTED

/1 1 .4

-S30

TEST
2
4

2
4

OUT

Ivar Aasen_LV
SENTRON
3101-01

<8> ACB POSITIONS

S1.2

10
CT FOR EARTH FAULT DETECTION

82EN0100A

Signature:

S09011

=82EN0100

Siemens Dwg. No.:

Area:

Scale

140

NTS
51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
2

DN02-S09011-E-XK-3101-01

+15A1R2

Sheet:

Sheets:

15

<1>

/2.6

No. / Text

690V INCOMING VOLTAGE

L1.2

/4.1

L2.2

/4.1

L2.1

L3.2

/4.1

690/110VAC TRANSFORMER

I >

I >

I >

13
21
33
41

L3.1

/2.6

SHORT CIRCUIT PROOF CABLES

0,11A-0,16A

Set 0,11A

/1 2.2
/6.3
/6.3
/6.4

14
22
34
42

-Q02

B
A

-VT01

690

PE

-PE

110
3

110

n
a

Ivar Aasen_LV
SENTRON
3101-01

<>

L1.1

/2.6

<2>

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

dn da

-X43

01

2U

/1 0.1

02

2V

/1 0.1

03

2W

/1 0.1

04

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE

ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01 E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Drawing Title:

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Supplier

82EN0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

03I

DN02-S09011-E-XK-3101-01

+15A1R2

Sheets:

15

<>

<1>

690 VAC VOLTAGE CABLE SIDE

MULTI INSTRUMENT

I >

I >

6
W

/1 2.2
/6.4
/6.5
/6.2

I >

0,11A-0,16A

Set 0,11A

14
22
34
42

-Q03

SHORT CIRCUIT PROOF CABLES

No. / Text

13
21
33
41

690 V AC

L1.2

/3.3

L2.2

/3.3

L3.2

/3.3

-VT02

690 V / 110 V

Copyright (C) Siemens AS All rights reserved

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

-X44

01

02

03

04

V1

V2

V3

VN

PE

DI-

11
12
13

<2>

Ivar Aasen_LV
SENTRON
31 01 -01

DI+

SENTRON PAC 3200


7KM21 1 2-0BA00-3AA0
1L1 .1

DO-

DO+

DO

DI

-P01

L/+

AUX supply

N/-

1 L1 .2 1L2.1 1L2.2 1L3.1 1L3.2

I1

/2.6

I2

/2.6

I3

/2.6

E
I0

/2.6

Acceptance Code:

1
.

03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

Supplier

HFO

DET NORSKE

ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Issue

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Drawing Title:

82EN0100A

Signature:

S09011

=82EN0100

Siemens Dwg. No.:

Area:

Scale

140

NTS
51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

03I

DN02-S09011-E-XK-3101-01

+15A1R2

Sheets:

15

<1>

<2>

<3>

<5>

<4>

<7>

<6>

<8>

13
21
/1 2.2
/6.5

F02:2

/6.1

F03:2

/7.1

F04:2

/1 0.6

F05:2

/8.2

F06:2

/1 5.1

F07:2

/9.1

F02:4

/6.1

F03:4

/7.1

F04:4

/1 0.6

F05:4

/8.2

F06:4

/1 5.1

F07:4

/9.1

-U01
AC

230V AC/24V DC

24VDC SUPPLY TO C.B.

PROTECTION DEVICE BINARY INPUTS

230VAC AUX.SUPPLY TO C.B.

MOTOR DRIVE

230VAC AUX SUPPLY TO C.B.

CONTROL

230VAC AUX SUPPLY TO C.B.

PROTECTION DEVICE

230VAC AUX SUPPLY TO

C.B. SHUNT TRIP COIL

230VAC AUX SUPPLY TO

ARC DETECTION DEVICE

DC

L+

14
22

13
21

I > I >

2A

I > I >

-F07

/1 2.2
/6.5

14
22

13
21

2A

I > I >

2A

-F06

/1 2.2
/6.5

14
22

13
21

I > I >
4

2A

-F05

/1 2.2
/6.4

14
22

13
21

I > I >
2

2A

-F04
2

-F03

/1 2.2
/6.4

14
22

13
21
14
22

3
4

I > I >

PE

2A

/1 2.2
/6.3

I > I >

L1

-F02

/1 2.2
/6.3

14
22

13
21

230VAC DUAL UPS AUX.SUPPLY

UPS/L2/+15A1R2

=3110-01/2.2

3A

No. / Text

230V AC

UPS/L1/+15A1R2

=3110-01/2.2

-F01

8
-X60

230VAC AUX SUPPLY TO

C.B. UVT TRIP COIL

0V

This drawing was produced electronically


and requires no signature.
It may not be amended manually

<>

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

0V_1

/1 1 .2

Ivar Aasen_LV
SENTRON
31 01 -01

24V+_1
/1 1 .2

+24V DC

-X60

24V+_2

/1 2.1

Acceptance Code:

1
.

03I
RE ISSUED FOR CONSTRUCTION
08.09.201 4 DD

.
HFO

DET NORSKE

20.06.201 4 DD

HFO

SW

01E
ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

82EN0100A

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I
ISSUED FOR CONSTRUCTION

Issue

Drawing Title:

Supplier

Signature:

S09011

=82EN0100

Siemens Dwg. No.:

Area:

Scale

140

NTS
51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

03I

DN02-S09011-E-XK-3101-01

+15A1R2

Sheets:

15

<1>

<>

<2>

No. / Text

230V AC

MAIN C.B. MOTOR DRIVE

F02:2

/5.2

SPARE AUXILIARY CONTACTS

12

11

10

21

33

41

21

33

-Q02

/3.2

-Q02

/3.2

-Q02

/3.2

-Q03

/4.2

-Q03

/4.2

34

42

22

34

-Q01 -S4

/2.2

22

X5:6

-X100

28

27

26

25

24

23

22

21

20

19

18

17

16

14

13

-X100

15

X5:5

C
21

21

21

21

21

21

21

-Q03

/4.2

-F01

/5.1

-F02

/5.2

-F03

/5.3

-F04

/5.4

-F05

/5.5

-F06

/5.6

-F07

/5.7

22

22

22

22

22

22

22

X5:1

41

42

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

/2.2

S11

X5:2

Ivar Aasen_LV
SENTRON
31 01 -01

-Q01

F02:4

/5.2

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01 E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Drawing Title:

Supplier

82EN0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

+15A1R2

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
6

DN02-S09011-E-XK-3101-01

Sheet:

Sheets:

15

<1>

<6>

<8>

<7>

F03:2

/5.3 -X30

<>

<9>

No. / Text

MAIN C.B. CLOSING LOOP

230V AC

2
C.B. CLOSE LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

EXTERNAL CABLE

=80EH0011A

2
4

+17

-S31

/2.1

-F20

/1 0.2

C11

BO1
C10

C9

5
INTERLOCK FROM OTHER C.B.

INCOMER B

BO5

11

E5

INCOMER B

X5:4

32

2
4
-S33

28 X5:3

C.B. CLOSED

SIGNAL LAMP

C.B. OPEN

SIGNAL LAMP

-H03

X1

-H02

X1

-H01

-X30

CUBICLE NO.: +24A1R2

-X30

16

-X30

CUBICLE NO.:+01A1R2

-X30

13

X1

/2.2

C.B. CLOSE LOCAL

SIGNAL LAMP, ACTIVATED

ONLY FOR 2/3 CHANGE OVER SEQUENCE

26

2
4

-Q01

-Q01

=3102-01/2.2
-S4

27 X6:1

-S33

-X30

=3103-01/2.2

X6:7

-X30

-Q01

=3103-01/2.2 -S2

-X30

X6:2

-X30

29

<5>

28

<4>

Y1

REMOTE BYPASS INTERLOCK 2/3

12

BUSTIE

=3102-01/2.2

C13

-X30

10

-F20

/1 0.2

4
INTERLOCK FROM OTHER C.B.

BUS TIE

X5:7

E6

EXTERNAL CABLE

-Q01

/2.2 -S3

-S2

X6:3

<2>

C14

C12

<3>

BO2

-F20
/1 0.2

3
CLOSING PERMISIVES

FROM UPSTREAM 11kV FEEDER

X5:8

CHANGES TO BE MARKED
AS APPLICABLE.

-Q01

/2.2

X6:4

-Q0X

-X30

15

-X30

X2

X2

X2

X6:8

14

F03:4

/5.3

Acceptance Code:

1
.

03I

RE ISSUED FOR CONSTRUCTION


08.09.201 4 DD

.
HFO

Drawing Title:

Supplier

SW

02I

ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

DET NORSKE

Issue

18

17

Ivar Aasen_LV
SENTRON
31 01 -01

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

82EN0100A

Signature:

S09011

=82EN0100

Siemens Dwg. No.:

Area:

Scale

140

NTS
51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

03I

DN02-S09011-E-XK-3101-01

+15A1R2

Sheets:

15

<1>

<3>

4
<5>

<4>

<6>

<8>

<7>

<>

<9>

230V AC

F05:2

/5.5 -X30

No. / Text

C.B. OPEN VIA SHUNT COIL

(50ms)

C.B. OPEN LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

C.B. OPEN

FROM ARC DETECTION UNIT

INSIDE INC. C.B. A

C.B. OPEN INTERTRIP FROM

UPSTREAM 11kV FEEDER

C.B. OPEN

FROM ARC DETECTION UNIT

INSIDE INC. C.B. B

C.B. OPEN

SPARE TRIP

-X80

-X46

EXTERNAL CABLE

11

10

-X80

12

-X30

-Q01

/2.2 S3

IN

A1

A2

-R2

-R3.1

4,7k

1,5k

X5:9

21

-X30

22

C.B. OPEN

SPARE TRIP

TRIP COIL SUPERVISION

TRIP COIL SUPERVISION

-R3.2

47k

X6:13

16

-X46

02

33k

15

E3

X2:1 6

BO4

-F30

-Q0X

31 X1:9

-F31

/1 4.2

-F20

/1 0.2

-K4

<U>

/.6

-R1

14

X2:15

E4

-X30

<2>

13

01

INC. B

=3102-01/15.2

X1:10 30

EXTERNAL CABLE

+17
=80EH0011A
+24A1R2

20

19

X5:10

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

-R3.3

1,5k

-Q01

/2.2

-R4

-R5

F1

1k

-X30

24

F05:4

/5.5

25

X6:14

23

Ivar Aasen_LV
SENTRON
3101-01

4,7k

-K4

14

/1 2.6 1 1

1 2

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Drawing Title:

82EN0100A

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Supplier

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
8

DN02-S09011-E-XK-3101-01

+15A1R2

Sheet:

Sheets:

15

2
<1>

4
<5>

<4>

<3>

<6>

<7>

<>

<9>

<8>

230V AC

-X46

15

14

10

-X90

11

No. / Text

F07:2

/5.7

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

C.B. OPEN VIA UVT COIL

(73ms)

C.B. OPEN LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

C.B. OPEN BY ESD TRIP

C.B. OPEN INTERTRIP FROM

UPSTREAM 11kV FEEDER

C.B. OPEN BY PSD TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

10

C.B. UNDER VOLTAGE TRIP COIL

X5:1 3 & 1 4 : MOMENTARY TRIP

X5:11 &12 : DELAY 0,2-3,2 SEC

EXTERNAL CABLE

+17

=80EH0011A

13

-K1 2

/13.6

E1

13

BO3

<2>

-X46

04

EXTERNAL CABLE

12

-X90

16

13

14

14

E2

-Q0X

-K11

/13.5

This drawing was produced electronically


and requires no signature.
It may not be amended manually

03

-F20

/1 0.2

X5:12

X5:1 3

X5:14

<10>

/2.2

F4

U<

E
X5:11

Ivar Aasen_LV
SENTRON
3101-01

-Q01
-Q01

F07:4

/5.7

Acceptance Code:

1
.

03I
RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

Drawing Title:

Supplier

SW

DET NORSKE
02I
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E
ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Issue

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

82EN0100A

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

03I

DN02-S09011-E-XK-3101-01

+15A1R2

Sheets:

15

2U

/3.4

2V

/3.4

-X45

01

2V_BUSA

02

2W_BUSA

03

F04:2

/5.4

04

F04:4

/5.4

2W

/3.4

IE1

/2.6

IE2

/2.6

DC L+
(AC)
LDC

COMMUNICATION PORT

System/service
interface
IEC 61850
IEC 61 870-5-103
Profibus DP
Modbus RTU
DNP 3.0

Ethernet Interface
DIGSI 4
RJ45

EL
OPT

Earthing at
rear of housing

Live Status Contact

Enter

Power Supply

BI11

BI10

BI9

BI8

BI7

BI6

BI5

Run

Error

BO5

BO4

BO3

BO2

BI4

OPERATION PANEL

Esc

BO1

BI3

BI1

VC, VN, Vsyn,VX

VA, VAB,Vph-n
VB, VBC

IN, INS

IC

SIPROTEC 7SJ8081

IA

BI2

-F20

C2

C1

D1 3
/1 2.6
D1 4
/1 2.6

/1 2.6
D12

/1 1 .3
/1 1 .3
/1 1 .4
/1 1 .4
/1 1 .4
/1 1 .4
/1 1 .5
/1 1 .5
/1 1 .6
/1 1 .6
/1 2.2
/1 2.2
/1 2.3
/1 2.3
/1 2.4

F20_I0

F1
F2
F3
F4
F5
F6
F7
F8

/2.7

F20_I1

C3
C4
C5
C6
C7
C8
D1
D2
D3
D4
D5
D6
D7
D8
D9

/2.7

F20_I2

E13
E14

=3103-01/3.5

F20_I3

E9
E11
E12

/2.7

=3103-01/3.5

D10
/1 2.4
D11
/1 2.4

EL

OPT

PE

B4

B3

B2

B1

E7
/1 3.7
E10
/1 3.7
E8
/1 3.7

E
C10
/7.5
C11
/7.5
C9
/7.5
C12
/7.4
C14
/7.4
C13
/7.4
E2
/9.1
E1
/9.1
E4
/8.2
E3
/8.2
E6
/7.1
E5
/7.1

Ivar Aasen_LV
SENTRON
3101-01

82EN0100 BUS A VOLTAGE

FOR SYNC. CHECK

/2.7

This drawing was produced electronically


and requires no signature.
It may not be amended manually

IB, IN2

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

COMMUNICATION TOPOLOGY

INDICATE OUTPUT SIGNAL DESCRIPTION.

Acceptance Code:

REF.DWG.NO.: DN02-S09011-E-XI-3102-01

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Drawing Title:

Supplier

82EN0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
10

DN02-S09011-E-XK-3101-01

+15A1R2

Sheet:

Sheets:

15

<>

<1>

<2>

<4>

<3>

No. / Text

<5>

24V+_1

/5.1

C.B IN CONNECTED POSITION

C.B. IN DISCONNECTED POSITION

2
4
-S32

/2.1

-Q01

/2.2 -S1

-Q01

/2.2 -S1

C.B. IN TEST POSITION

C.B. OFF

1 = OFF

C.B. ON

1=ON

X6:11

X6:9

-S30

/2.1

-S35

/2.2

2
4

2
4

X6:12

X6:10

-X35

C
D3

D1

BI5

-F20

/1 0.2

BI4

BI3

C8

BI2

C6

C4

-F20

/1 0.2

D4

-F20

/1 0.2

-F20

/1 0.2

D2

-F20

/1 0.2

C7

C3

C5

BI1

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Ivar Aasen_LV
SENTRON
3101-01

0V_1

/5.1

0V_2

/1 2.1

Acceptance Code:

1
.

03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

Drawing Title:

Supplier

SW

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4
DD

HFO

SW

Issue

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

82EN0100A

Signature:

S09011

=82EN0100

Siemens Dwg. No.:

Area:

Scale

140

NTS
51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
11

DN02-S09011-E-XK-3101-01

+15A1R2

Sheet:

Sheets:

15

<>

<1>

<2>

<3>

<6>

<5>

<4>

No. / Text

C.B READY TO CLOSE

24V+_2

/5.2

CONTROL VOLTAGE FAULT

13

INHIBIT SYNC. CHECK

UPS SUPPLY OK

C.B. TRIP SIGNAL FROM 2/3

TRIP SELECTOR SWITCH

TRIP COIL SUPERVISION OK

11

C.B. TRIP BY ESD / PSD

13

12
14
-K4

/8.6

17

11

4
12
14

=3103-01 /12.4

16
7

-S06

15

-X35

11

24

13

33

-F04

/5.4

-K12

-KB1

/13.6
=3110-01/2.4

BUSTIE

23

34

14
14

-Q03

+01A1R2
-X35

=3103-01/3.2

14

BUSTIE

-X35

-F03

/5.3

12
14

23

13
X6:6

13

+01A1R2

-Q01

/2.2 S20

11

24

14

-KA1

-K11

/13.5
=3110-01/2.4

-F02

/5.2

10

-X35

-X35

-X35

14

-F01

/5.1

X6:5

-X35

-F05

/5.5

14

12

13

-X35

-X35

13

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

-F06

/5.6

13

14

This drawing was produced electronically


and requires no signature.
It may not be amended manually

14

-F07

/5.7

BI9

D13

D12

D10

D9

14

D11

-Q03

/4.2

D14

D8

D6

13

BI7

BI8

13

-F20

/1 0.2

BI6

-F20

/1 0.2

BI11

-Q02

/3.2

-F20

/1 0.2

Ivar Aasen_LV
SENTRON
3101-01

D7

D5

14

-F20
/1 0.2

BI10

E
0V_2

/1 1 .6

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Drawing Title:

Supplier

82EN0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
12

DN02-S09011-E-XK-3101-01

+15A1R2

Sheet:

Sheets:

1 5

<1>

No. / Text

<6>

<5>

<4>

<3>

<2>

C.B. TRIPED SIGNAL TO

UPSTREAM 11kV FEEDER

C.B. TRIP COMMAND

(FROM ARC DETECTION UNIT)

TO UPSTREAM 11kV FEEDER A

C.B. TRIP COMMAND

(FROM ARC DETECTION UNIT)

TO UPSTREAM 11kV FEEDER B

ESD TRIP

DE-ENERGIZED TO TRIP, +24VDC

SIL3

PSD TRIP

DE-ENERGIZED TO TRIP, +24VDC

SIL3

E8

E7

-K12

/.6

E10

-K1 1

/.5

7SJ8081

A1 (+)
Y1

-F20

/1 0.2

A2 (-)
Y2

X1:1 4

A1 (+)
Y1

X1:1 3

-F30

/1 5.2

A2 (-)
Y2

X1:1 1

-F30

/1 5.2

X7:2

-Q01

/2.2 S23

X7:5

-Q01

/2.2 S22

X1:1 2

FAULT FROM SIPROTEC

HW COMMON SIGNAL FROM EACH SWBD

(SPARE SIGNAL)

EXTERNAL

CABLE

=80EH0011A

+17

=80EH0011B

1
2
3

-X70

-X65

EXTERNAL

CABLE

+18

-X

-X65

-X66

X7:1

X7:3

X7:4

EXTERNAL

CABLE

Ivar Aasen_LV
SENTRON
3101-01

<>

X7:6

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

EXTERNAL

CABLE

ESD NODE

PSD NODE

-X

E
DUE TO ONGOING DISCUSSION WITH REGARD TO ESD / PSD RELAYS, IT IS NOW CLEAR THAT PSD RELAY ON INCOMER IS NOT NEEDED.
ONLY ESD RELAY TO BE PROVIDED, WHICH CAN BE UTILISED FOR LOAD SHEDDING.

-K11

14
/9.2

24
/1 2.4

-K12

13

23

14
/9.4

24
/1 2.4

13

23

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Drawing Title:

Supplier

82EN0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
13

DN02-S09011-E-XK-3101-01

+15A1R2

Sheet:

Sheets:

15

<>

+02
-E01
1
2

Arc detection peripheral unit

Mounted in top compartment

of cubicle

Optic sensor

inside cubicles

busbar view

ARC DETECTION UNIT BUS Cable

X1

OFF

CH.07

CH.08

CH.09

ON

CH.10

ON

PE

OFF

Trip T1

DO +24VDC

X2

CH.05

CH.06
ARC CHANNELS

DO GND

ERROR

DI GND

TRIP

Serial A

COM

Serial B

ACT

CAN-L

POWER

+24V

OK

CH.04

CH.03

DI (24-48VDC)

CH.02

CH.01

CAN-H

VAMP 10L

OFF

OFF

COM1

OFF

COM2

COM2

COM1

X2:16

/8.2

X2:15
/8.2

X2:14

X2:13

X2:12

X2:11

X2:10

X2:9

X2:8

X2:7

X2:6

X2:5

X2:4

X2:3

X2:2

OFF

PE

X1:20

X1 :1 9

+04

-E01

1
2

X1:18

X1:16

X1:17

+01

-E01

1
2

X1:15

X1:13

X1:9

X1:8

X1 :7

X1:6

X1 :5

X1:4

DIP-switches

-F31

GND

X1:3

X1:1

X1 :2

<1>

+03
-E01
1
2

+05
-E01
1
2

X1:14

+07

-E01

X1:12

+09

-E01

1
2

X1:11

+11
-E01
1
2

X1:10

+13

-E01

1
2

+15

-E01

1
2

No. / Text

CHANGES TO BE MARKED.

<2>

X2:1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

<3>

ARC_BUS_1

/1 5.1

D
VMP_GND

/1 5.1

Ivar Aasen_LV
SENTRON
31 01 -01

VMP_+24V

/1 5.1

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Drawing Title:

Supplier

82EN0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

System:

DWG Size Drawing No.:

Rev:

82

A4

03I
14

DN02-S09011-E-XK-3101-01

+15A1R2

Sheet:

Sheets:

15

<>

TRIP COMMAND
TO 11kV UPSTREM FEEDER B

TRIP COMMAND
TO INC. C.B. B

TRIP COMMAND
TO 11kV UPSTREM FEEDER A

ARC DETECTED SIGNAL


TO BUS TIE CB

No. / Text

Arc detection central unit

Mounted in instr

compartment door of cubicle

ARC DETECTION UNIT BUS Cable

I>EXT.

PE

X1:20

X1:19

X1:18

X1:17

X1:16

X1:14
/1 3.4

X1:13
/1 3.4

X1:12
/1 3.3

X1:11
/1 3.3

X1:10
=3102-01/8.4

X1 :15

Trip Alarm

IF(NC)
IF(NO)
SELF-SUPERVISION

ON

PE

OFF

OFF

OFF

POWER SUPPLY

COM1

OFF

COM2

COM2

COM1

X3:18

X3:17

X3:16

X3:15

X3:1 4

X3:13

X3:12

X3:11

X3:10

X3:9

X3:8

X3:7

X3:6

X3:5

X3:4

OFF

X3:2

X3

GND

ERROR CODE

Trip T4

Us

I>INT.

Trip T3

Us

TEMP
CURRENT

Trip T2

GND

TRIP 4

RS_B

TEMP SET

Trip T1

GND

TRIP 3

Lb>OUT

ERROR

La>OUT

INFO

I>IN/OUT

TRIP 2

Lb>OUT

COM

La>IN

INSTALL

ON

CAN_L

TRIP 1

CAN_H

POWER

OFF

RS_A

RUN

X3:3

DIP-switches

X1

VAMP 221
MAIN UNIT

+24V

-F30

X1:9
=3102-01/8.4

<1>

X1 :8
=3103-01/15.5

X1:7
=3103-01/15.5

X3:1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

<2>

VMP_GND

/1 4.3

Ivar Aasen_LV
SENTRON
3101-01

VMP_+24V

/1 4.3

F06:2

/5.6

F06:4

/5.6

/1 4.6

ARC_BUS_1

Acceptance Code:

1
.
03I

RE ISSUED FOR CONSTRUCTION

08.09.201 4 DD

.
HFO

DET NORSKE
ISSUED FOR CONSTRUCTION

20.06.201 4 DD

HFO

SW

01E

ISSUED FOR REVIEW

20.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V UTILITY SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0100A

SW

02I

Issue

Drawing Title:

Supplier

82EN0100A

Signature:

S09011

=82EN0100

Area:

Scale

Siemens Dwg. No.:

140

NTS

51PO-04193.230-K-101-01

+15A1R2

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

03I

15

DN02-S09011-E-XK-3101-01

Sheets:

15

Das könnte Ihnen auch gefallen