Sie sind auf Seite 1von 1
ee Departinent of Trade abd ngusty 2 . Construction fndustry Authority ofthe Philipines dt al PUULIPPINE, CONTRACTORS ACCREDITATION BOARD "! Floor, Jupiter | Building, #56 Jupiter Strect i -Air Village, Makati C a on 1209 Telefax. No. (632) 12-20 www.dli.cavpht CIRCULAR NO. 001 Series of 2009 Implementation of the Second Stage of Adjustment on Allowable Ranges of Contract Costs and Single Largest Project Completed / Track Record Requirements During the regular meeting held on 18 February 2009, the Philippine Contractors Accreditation Board (PCAB) RESOLVED to implement the following Second Stage of Adjustment on the Allowable Ranges of Contract Costs (ARCC) and the corresponding Single Largest Project completed (SLP) or Track Record requirements: SizeRange License _— Single Largest Project / Reauired Allowable Range of Category Track Record Contract Cost Large B AAA Above Php150 M < or above Php300 M Large A AA ‘Above Php100 M up to Php150 M ” Up to Php300 M Medium B A Above Php50 M up toPhp100M Up to Php200 M Medium A B Above Php10 M up toPhp50M — Up to Php100 M ‘Small B c&D

Das könnte Ihnen auch gefallen