THESE ARE THE TOOLS/INSTRUMENTS

NECESSARY FOR ERECTION AND


COMMISSIONING IN SITE
ERECTION :
-

Jib crane
Ladder
Scaffolds
Standard set of spanner
Drill with appropriate diameter

COMMISSIONING :
-

Power supply : 220 V.c.a. 110 V.d.c. or other power supply for aux.
circuits requested
Adjustable power supply A.C./D.C. from 0 to 220 D.C. 15 Amps
the adjustable power supply is not strictly necessary if is available
the electric power above descripted
Micro ohmeter 100 Amps D.C. for main contact resistance measurement
Adjustable dielectric tester from 0 to 2kV A.C., in alternative Mega
ohmeter for dielectric test on aux. circuits
Time measurement tester for Open / Close C.B. time operations
All necessary for to fill SF6 , pressure reducer , 10 bar sample gauge ,
hose with DILO valve coupling

ONLY IF HV CABLE AND V.T. ARE PRESENTS :


-

SF6 suction device with hose DILO NW8 valve coupling


Empty SF6 bottles
Vacuum pump
Nitrogen with umidity < 30 p.p.m ( 1 bottle of cubic meter )