RELACION DETALLADA DEL GASTO

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO
Meta 00001-300422: CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO

C/P

02/11/09

1375

7,150.00

VARIOS TRABAJADORES

HABERES MES DE OCTUBRE 2009 OBREROS

UND

7,150.00

7,150.00

03/11/09

1391

6,150.00

547

001-003147

MAPRO PERU SRL

CEMENTO PORTLAND PUZOLANICO IP YURA

BSA

300

20.50

6,150.00

18/11/09

1454

511.20

576

001-004997

R.R. IMPORTADORA FERRETERA SRL

CINCEL DE ACERO PLANO

UND

39.00

117.00

BALDE DE PLASTICO X 5 GLN

UND

10

13.50

135.00

BROCHA DE 4"

UND

9.80

39.20

HOJA DE SIERRA N 18

UND

7.90

39.50

HOJA DE SIERRA N 24

UND

7.90

39.50

COMBO DE 4 LIBRAS

UND

47.00

141.00

FIERRO DE 3/8"

VAR

38

16.80

638.40

FIERRO DE 1/4"

VAR

10

8.80

88.00

ALAMBRE N 16

KG

20

7.50

150.00

ALAMBRE N 8

KG

10

7.50

75.00

CLAVO DE MADERA DE 3"

KG

2 1/2

6.90

20.70

CLAVO DE MADERA DE 5"

KG

7.90

39.50

CLAVO DE MADERA DE 4"

KG

7.90

31.60

250.00

250.00

18/11/09

1457

1,043.20

19/11/09

1467

250.00

27/11/09

1505

141.40

O/C

O/S

SUSTENTATORIO

FECHA

IMPORTE

DOCUMENTO

ITEM

FACT.

B/V

R.P.H.

PLANILLA

577

001-004999

0540
586

PROVEEDOR

DOC.

R.R. IMPORTADORA FERRETERA SRL

001-000161
001-000031

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

CHACONDORI CARPIO MARIO JAIME

ALQUILER DE MEZCLADOR DE CEMENTO

UND

ALVECO SRL

TARJETA DE KARDEX

UND

50

0.19

9.30

PAPEL BOND X 75 GM

MLL

24.50

24.50

LAPICERO PUNTA FINA

UND

0.40

2.40

CLIPS

CAJA

1.20

6.00

NOTA POST IT

UND

4.80

19.20

GRAPAS

CAJA

2.50

2.50

PAPEL CARBON

CTO

37.00

37.00

CUADERNO DE OBRA DE 50 FOLIOS

UND

28.50

28.50

FILE

DOC

3.00

6.00

FASTENER DE HOJALATA

DOC

3.00

6.00

GLN

21.80

109.00
35.20

27/11/09

1507

109.00

587

001-000028

ALVECO SRL

ASFALTO LIQUIDO RC-250

27/11/09

1522

189.70

599

001-004998

R.R. IMPORTADORA FERRETERA SRL

YESO POR 18 KG

BSA

8.80

LIJA N 100

UND

2.90

14.50

TECNOPOR DE 1" X 8

PCHA

35.00

140.00

27/11/09

1526

673.00

10

27/11/09

1539

1,650.00

30/11/09

1554

11

NOVIEMBRE

607

2,000.00

001-031468
0577

001-000046

SERVICENTRO EL MAJEO SCRL

PETROLEO DIESEL 2

GLN

65.98

10.20

673.00

MEDINA HUARHUACHI DAVID ALFREDO

APERTURA DE CAJA CHICA

UND

1,650.00

1,650.00

DUEAS VILCA ALESSANDRA ELIZABETH

RESIDENTE DE OBRA - MES DE NOVIEMBRE 2009

UND

2,000.00

19,867.50

2,000.00
19,867.50

.
12

14/12/09

1641

816.00

13

18/12/09

1713

11,610.00

14

21/12/09

1728

2,000.00

646

15

21/12/09

1741

2,486.25

658

002-000032

16

21/12/09

1743

60.00

660

17

28/12/09

1808

800.00

18

29/12/09

1812

3,600.00

DICIEMBRE

619

001-031641

SERVICENTRO EL MAJEO SCRL

PETROLEO DIESEL 2

VARIOS TRABAJADORES

HABERES DEL MES DE DICIEMBRE 2009 OBREROS

GLN

80

10.20

816.00

PLANILLA

11,610.00

11,610.00

DUEAS VILCA ALESSANDRA ELIZABETH


TINGO MOLLEAPAZA ROXANA NELLY

RESIDENTE DE OBRA - MES DE DICIEMBRE 2009

UND

2,000.00

2,000.00

TRANSPORTE DE CEMENTO

UND

2,486.25

002-000038

2,486.25

TINGO MOLLEAPAZA ROXANA NELLY

TRANSPORTE DE MATERIALES

UND

60.00

685

60.00

002-000096

LAGUNA REVILLA MAGALY

HORMIGON DE CONSTRUCCION

M3

20

40.00

800.00

688

002-001000

LAGUNA REVILLA MAGALY

HORMIGON DE CONSTRUCCION

UND

,,

``

``

SALAS MENDOZA BERTA

PERGOLAS DE 184 X 107

UND

1,500.00

1,500.00

DUEAS VILCA ALESSANDRA ELIZABETH

RESIDENTE DE OBRA- MES DE ENERO 2010

UND

2,000.00

2,000.00

VIVERO FLORENTINO EIRL

PALMERA MESICONA

UND

30.00

120.00

LENGUA DE SUEGRA

UND

10.00

40.00

NARDO

UND

10

10.00

100.00

PLANILLA
001-000105

21,372.25

19

05/02/10

0050

1,500.00

0023

20

05/02/10

0068

2,000.00

0021

21

2/5/2010

0071

530.00

15

002-003255
001-000110
001-000670

3,600.00

3,600.00
21,372.25

PECOSA

RELACION DETALLADA DEL GASTO


PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO
Meta 00001-300422: CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO

ITEM

FECHA

C/P

FEBRERO

IMPORTE

O/C

O/S

DOCUMENTO
FACT.

B/V

SUSTENTATORIO
R.P.H.

PROVEEDOR

DOC.

4,030.00

``

CONCEPTO

UNIDAD CANTIDAD

PRECIO
2.00

PARCIAL

PLATANITO

UND

COBIO

UND

3.00

24.00

MARMOLINA

UND

30.00

120.00

GRAN FAMILIA

UND

4.00

16.00

ROSA VERDE

UND

14.00

14.00

FILUS

UND

20.00

``

16.00

80.00
4,030.00

.
22

23

08/03/10

10/03/10

162

183

24

10/03/10

194-A

25

10/03/10

203

MARZO

4,100.00

1,065.00

71

38

LAGUNA REVILLA MAGALY

002-000110

001-005178

4,943.00

72

250.00

43

R.R. IMPORTADORA FERRETERA SRL

001-000279

CUELA TEJADA ANGELA JENNE


001-000160

10,358.00

HORMIGON

M3

20

35.00

ARENA FINA

M3

20

35.00

700.00

TIERRA DE CHACRA

M3

20

135.00

2,700.00

OCREO ROJO 230 BAYER

KG

20

16.00

320.00

OCREO NEGRO BAYER

KG

35

17.00

595.00

PLASTICO AZUL 1.10 GRUESO

25

6.00

150.00

BANCA MODELO CLASICO

UND

542.00

1,084.00
3,859.00

POSTE DOBLE LUMINARIA

UND

643.16

CHACONDORI CARPIO MARIO JAIME

ALQUILER DE MEZCLADOR DE CEMENTO

UND

250.00

``

``

700.00

250.00
10,358.00

.
RETENCION DE IMP. 4TA CATEGORIA

UND

500.00

500.00

RETENCION DE IMP. 4TA CATEGORIA

UND

546.00

546.00

001-005508

BANCO DE LA NACION-SUNAT
BANCO DE LA NACION-SUNAT
R.R. IMPORTADORA FERRETERA SRL

OL.EO MATE VERDE MILANO

GLN

48.00

336.00

001-005510

R.R. IMPORTADORA FERRETERA SRL

BASURERO GRANDE

UND

280.00

``

``

26

17/05/10

577

500.00

79125

27

17/05/10

576

546.00

98697

28

20/05/10

618

336.00

185

29

20/05/10

619

560.00

186

MAYO
TOTAL INVERSION

1,942.00
57,569.75

560.00
1,942.00
57,569.75

PECOSA

N DETALLADA DEL GASTO

UCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO


ASIGNACION
PRESUPUESTAL
2.6.23.6.3
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.5
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.5.5
2.6.23.5.5
2.6.23.5.5
2.6.23.6.4
2.6.23.6.6
2.6.23.6.5

2.6.23.6.4
2.6.23.2.4
2.6.23.2.6
2.6.23.6.5
2.6.23.6.5
2.6.23.6.5
2.6.23.6.5

2.6.23.6.5
2.6.23.6.5
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4

N DETALLADA DEL GASTO

UCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO


ASIGNACION
PRESUPUESTAL
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4

2.6.23.6.5
2.6.23.6.5
2.6.23.6.5
2.6.23.6.4
2.6.23.6.4
2.6.23.6.4
2.6.23.6.5
2.6.23.6.5
2.6.23.6.5

2.6.23.6.5
2.6.23.6.5
2.6.23.6.4
2.6.23.6.4

RELACION DETALLADA DEL GASTO


PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO
Meta 00001-300422: CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
ITEM FECHA

UNIDAD

CANTIDAD

###

1375

C/PPROVEEDOR

VARIOS HABERES MES DE OCTUBRE 2009 OBRER

CONCEPTO

PLANILLA

PRECIO
7,150.00

PARCIAL
7,150.00

13

###

1713

VARIOS HABERES DEL MES DE DICIEMBRE 2009

PLANILLA

11,610.00

11,610.00

26

###

360

HUAYHUAFORMATEO Y ENCHAPE DE PIEDRA LAJA EN

SER

6,093.00

6,093.00

27

###

361

CHUQUIYPIEDRA LAJA DE CANTERA CON CORTE

SER

4,914.00

4,914.00

###

439

VARIOS HABERES MES DE OBREROS

PLANILLA

4,060.00

4,060.00

2009
2100

EJECUCION MEFEJECUCION DOCDIFERENCIAS PIM


41240
41240
0
124788
36295
16330
19965
36295
77535
57570
19965
161083
77534.45

PRESUP INICIAL

106122.9 90 DIAS CALENDARIO

15904.7

4060.3

EJECUCION PRESUPUESTAL
PORCENTUAL
FTE. DE FTO.:
PROYECTO:
OBRA:

5: RECURSOS DETERMINADOS
2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO

PPTO. INICIAL:

2009-2010

AO:

ITEM
3
4
5
6

DENOMINACION
REMUNERACIONES
BIENES
SERVICIOS
OTROS

PPTO. EJECUTADO

18,760.00
32.59%
11,934.80
20.73%
25,224.95
43.82%
1,650.00
2.87%
57,569.75 100.00%

EJECUCION
A NIVEL DE PA

FTE. DE FTO.:
PROYECTO:
OBRA:
PPTO. INICIAL:
AO:
ASIGNACION
PRESUPUEST
2.6.23.2.4
2.6.23.2.6
2.6.23.5.5
2.6.23.6.3
2.6.23.6.4
2.6.23.6.5
2.6.23.6.6

EJECUCION PRESUPUESTAL
A NIVEL DE PARTIDAS GENERICAS

5: RECURSOS DETERMINADOS
2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
TO. INICIAL:
2009-2010
DENOMINACION
INFRAESTRUCTURA VIAL -COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL
INFRAESTRUCTURA VIAL -COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS
AGUA Y SANEAMIENTO-COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS
PLAZUELAS, PARQUES Y JARDINES -COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PER
PLAZUELAS, PARQUES Y JARDINES -COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIE
PLAZUELAS, PARQUES Y JARDINES -COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERV
PLAZUELAS, PARQUES Y JARDINES -COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTR
COSTO

TOTAL DE

LA OBRA

N PRESUPUESTAL
PARTIDAS GENERICAS

PRESUPUE
STO
EJECUTAD
O
11,610.00
2,000.00
189.70
7,150.00
11,934.80
23,035.25
1,650.00
57,569.75

EJECUCION PRESUPUESTAL
DEL COSTO
FTE. DE FTO.:
PROYECTO:
OBRA:

5: RECURSOS DETERMINADOS
2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO

PPTO. INICIAL:

2009-2010

AO:

ITEM

PRESUPUESTO TIPO DE CAMBIO


EJECUTADO
AL 29/10/2010
S/.
$
57,569.75

COSTO
REAL
$
-

UCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO

RESUMEN DEL MATERIAL


OBRA:

CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO


DIRECTA
2009-2010

MODALIDAD: ADMINISTRACION
AO:

ITEMS

PARTIDA

TOTAL

TOTAL
MATERIAL

MATERIAL
SOBRANTE

MATERIAL
EN OBRA

Nota: De acuerdo a Nota de Entrada a Almacn N 000 del


son 00 materiales que han sido internados como saldo de obra.
Observacin: Los agregados como hormign y/o piedra chancada
no se tiene ninguna anotacin de ingreso a obra o adquisicin del mismo

RELACION DETALLADA DEL GASTO EN PLANILLAS


PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

2007096: CONSTRUCCION DE PLAZA DE ARMAS


CONSTRUCCION DE LA PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

ITEM

FECHA

C/P

02/11/09

1375

7,150.00 VARIOS TRABAJADORES

13

18/12/09

1713

11,610.00 VARIOS TRABAJADORES

SUB TOTAL

IMPORTE

18,760.00

PROVEEDOR

CONCEPTO

HABERES MES DE OCTUBRE 2009 OBREROS


HABERES DEL MES DE DICIEMBRE 2009 OBREROS

PARCIAL

7,150.00
11,610.00
18,760.00

RELACION DETALLADA DEL GASTO EN ORDENES DE COMPRA


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
FINANCIAMIENTO 5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
MODALIDAD
2009-2010
AO
PROYECTO
OBRA

FECHA

C/P

03/11/09

1391

6,150.00

547001-003147

MAPRO PERU SRL

CEMENTO PORTLAND PUZOLANICO IP YURA

BSA

300

20.50

6,150.00

18/11/09

1454

511.20

576001-004997

R.R. IMPORTADORA FERRETERA SRL

CINCEL DE ACERO PLANO

UND

39.00

117.00

BALDE DE PLASTICO X 5 GLN

UND

10

13.50

135.00

BROCHA DE 4"

UND

9.80

39.20

HOJA DE SIERRA N 18

UND

7.90

39.50

HOJA DE SIERRA N 24

UND

7.90

39.50

COMBO DE 4 LIBRAS

UND

47.00

141.00

FIERRO DE 3/8"

VAR

38

16.80

638.40

FIERRO DE 1/4"

VAR

10

8.80

88.00

ALAMBRE N 16

KG

20

7.50

150.00

ALAMBRE N 8

KG

10

7.50

75.00

CLAVO DE MADERA DE 3"

KG

2 1/2

6.90

20.70

CLAVO DE MADERA DE 5"

KG

7.90

39.50

CLAVO DE MADERA DE 4"

KG

7.90

31.60

TARJETA DE KARDEX

UND

50

0.19

9.30

PAPEL BOND X 75 GM

MLL

24.50

24.50

LAPICERO PUNTA FINA

UND

0.40

2.40

CLIPS

CAJA

1.20

6.00

NOTA POST IT

UND

4.80

19.20

GRAPAS

CAJA

2.50

2.50

PAPEL CARBON

CTO

37.00

37.00

CUADERNO DE OBRA DE 50 FOLIOS

UND

28.50

28.50

FILE

DOC

3.00

6.00

FASTENER DE HOJALATA

DOC

3.00

6.00

GLN

21.80

109.00
35.20

18/11/09

27/11/09

1457

1505

IMPORTE

1,043.20

141.40

O/C

DOCUMENTO

ITEM

FACT.

577001-004999

586001-000031

PROVEEDOR

B/V

R.R. IMPORTADORA FERRETERA SRL

ALVECO SRL

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

27/11/09

1507

109.00

587001-000028

ALVECO SRL

ASFALTO LIQUIDO RC-250

27/11/09

1522

189.70

599001-004998

R.R. IMPORTADORA FERRETERA SRL

YESO POR 18 KG

BSA

8.80

LIJA N 100

UND

2.90

14.50

TECNOPOR DE 1" X 8

PCHA

35.00

140.00

.
7

27/11/09

1526

673.00

607001-031468

SERVICENTRO EL MAJEO SCRL

PETROLEO DIESEL 2

GLN

65.98

10.20

673.00

14/12/09

1641

816.00

619001-031641

SERVICENTRO EL MAJEO SCRL

PETROLEO DIESEL 2

GLN

80

10.20

816.00

2/5/2010

0071

530.00

VIVERO FLORENTINO EIRL

PALMERA MESICONA

UND

30.00

120.00

LENGUA DE SUEGRA

UND

10.00

40.00

NARDO

UND

10

10.00

100.00

PLATANITO

UND

2.00

16.00

COBIO

UND

3.00

24.00

MARMOLINA

UND

30.00

120.00

GRAN FAMILIA

UND

4.00

16.00

ROSA VERDE

UND

14.00

14.00

15

001-000670

RELACION DETALLADA DEL GASTO EN ORDENES DE COMPRA


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
FINANCIAMIENTO 5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
MODALIDAD
2009-2010
AO
PROYECTO
OBRA

ITEM

FECHA

C/P

10

10/03/10

183

IMPORTE

O/C

DOCUMENTO
FACT.

B/V

PROVEEDOR

CONCEPTO
FILUS

1,065.00

38001-005178

R.R. IMPORTADORA FERRETERA SRL

UNIDAD CANTIDAD

PRECIO

PARCIAL

UND

20.00

80.00

OCREO ROJO 230 BAYER

KG

20

16.00

320.00

OCREO NEGRO BAYER

KG

35

17.00

595.00

PLASTICO AZUL 1.10 GRUESO

25

6.00

150.00

UND

643.16

3,859.00

POSTE DOBLE LUMINARIA


11

20/05/10

618

336.00

185001-005508

R.R. IMPORTADORA FERRETERA SRL

OL.EO MATE VERDE MILANO

GLN

48.00

336.00

12

20/05/10

619

560.00

186001-005510

R.R. IMPORTADORA FERRETERA SRL

BASURERO GRANDE

UND

280.00

560.00

RELACION DETALLADA DEL GASTO EN ORDENES DE SERVICIO


PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

2007096: CONSTRUCCION DE PLAZA DE ARMAS


CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

FECHA

C/P

19/11/09

1467

250.00

0540

001-000161CHACONDORI CARPIO MARIO JAIME

ALQUILER DE MEZCLADOR DE CEMENTO

UND

250.00

250.00

30/11/09

1554

2,000.00

0577

001-000046DUEAS VILCA ALESSANDRA ELIZABETH

RESIDENTE DE OBRA - MES DE NOVIEMBRE 2009

UND

2,000.00

2,000.00

21/12/09

1728

2,000.00

646

001-000105DUEAS VILCA ALESSANDRA ELIZABETH

RESIDENTE DE OBRA - MES DE DICIEMBRE 2009

UND

2,000.00

2,000.00

21/12/09

1741

2,486.25

658

002-000032

TINGO MOLLEAPAZA ROXANA NELLY

TRANSPORTE DE CEMENTO

UND

2,486.25

2,486.25

21/12/09

1743

60.00

660

002-000038

TINGO MOLLEAPAZA ROXANA NELLY

TRANSPORTE DE MATERIALES

UND

60.00

60.00

28/12/09

1808

800.00

685

002-000096

LAGUNA REVILLA MAGALY

HORMIGON DE CONSTRUCCION

M3

20

40.00

800.00

29/12/09

1812

3,600.00

688

002-001000

LAGUNA REVILLA MAGALY

HORMIGON DE CONSTRUCCION

UND

3,600.00

3,600.00

05/02/10

0050

1,500.00

0023

SALAS MENDOZA BERTA

PERGOLAS DE 184 X 107

UND

1,500.00

1,500.00

05/02/10

0068

2,000.00

0021

RESIDENTE DE OBRA- MES DE ENERO 2010

UND

2,000.00

2,000.00

10

08/03/10

162

4,100.00

HORMIGON

M3

20

35.00

700.00

ARENA FINA

M3

20

35.00

700.00

TIERRA DE CHACRA

M3

20

135.00

2,700.00

BANCA MODELO CLASICO

UND

542.00

1,084.00

ALQUILER DE MEZCLADOR DE CEMENTO

UND

250.00

11

10/03/10

194-A

12

10/03/10

203

SUB TOTAL

IMPORTE

DOCUMENTO

ITEM

O/S

71

4,943.00

72

250.00

43

23,989.25

FACT.

B/V

R.P.H.

002-003255

002-000110

001-000279

PROVEEDOR

001-000110DUEAS VILCA ALESSANDRA ELIZABETH


LAGUNA REVILLA MAGALY

CUELA TEJADA ANGELA JENNE


001-000160CHACONDORI CARPIO MARIO JAIME

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

250.00
20,130.25

RELACION DETALLADA DE OTROS GASTOS


PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

2007096: CONSTRUCCION DE PLAZA DE ARMAS


CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

FECHA

C/P

26

17/05/10

577

500.00

79125

BANCO DE LA NACION-SUNAT

RETENCION DE IMP. 4TA CATEGORIA

UND

500.00

27

17/05/10

576

546.00

98697

BANCO DE LA NACION-SUNAT

RETENCION DE IMP. 4TA CATEGORIA

UND

546.00

SUB TOTAL

IMPORTE

DOCUMENTO

ITEM

1,046.00

FACT.

B/V

TICKET

PROVEEDOR

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL
500.00
546.00
1,046.00

RELACION DETALLADA DEL GASTO DE CAJA CHICA


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
FINANCIAMIENTO 5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
MODALIDAD
2009-2010
AO
PROYECTO
OBRA

ITEM

FECHA

C/P

27/11/09

1539

SUB TOTAL

IMPORTE

1,650.00
1,650.00

DOCUMENTO
FACT.

B/V

PROVEEDOR

MEDINA HUARHUACHI DAVID ALFREDO

CONCEPTO

APERTURA DE CAJA CHICA

UNIDAD CANTIDAD

UND

PRECIO

1,650.00

PARCIAL

1,650.00
1,650.00

CUADRO RESUMEN DE MATERIALES


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

ASIGNACION

ITEM

FECHA

C/P

03/11/09

1391

CEMENTO PORTLAND PUZOLANICO IP YURA

BSA

300

20.50

6,150.00

2.6.23.6.4

18/11/09

1457

FIERRO DE 3/8"

VAR

38

16.80

638.40

2.6.23.6.4

18/11/09

1457

FIERRO DE 1/4"

VAR

10

8.80

88.00

2.6.23.6.4

18/11/09

1457

ALAMBRE N 16

KG

20

7.50

150.00

2.6.23.6.4

18/11/09

1457

ALAMBRE N 8

KG

10

7.50

75.00

2.6.23.6.4

18/11/09

1457

CLAVO DE MADERA DE 3"

KG

2 1/2

6.90

20.70

2.6.23.6.4

18/11/09

1457

CLAVO DE MADERA DE 5"

KG

7.90

39.50

2.6.23.6.4

18/11/09

1457

CLAVO DE MADERA DE 4"

KG

7.90

31.60

2.6.23.6.4

27/11/09

1507

ASFALTO LIQUIDO RC-250

GLN

21.80

109.00

2.6.23.6.4

10

27/11/09

1522

YESO POR 18 KG

11

27/11/09

1522

TECNOPOR DE 1" X 8

12

28/12/09

1808

13

29/12/09

14
15

PRESUPUESTAL

BSA

8.80

35.20

2.6.23.5.5

PCHA

35.00

140.00

2.6.23.5.5

HORMIGON DE CONSTRUCCION

M3

20

40.00

800.00

2.6.23.6.5

1812

HORMIGON DE CONSTRUCCION

UND

3,600.00

3,600.00

2.6.23.6.5

05/02/10

0050

PERGOLAS DE 184 X 107

UND

1,500.00

1,500.00

2.6.23.6.5

2/5/2010

0071

PALMERA MESICONA

UND

30.00

120.00

2.6.23.6.4

CUADRO RESUMEN DE MATERIALES


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

FECHA

C/P

16

2/5/2010

0071

LENGUA DE SUEGRA

UND

10.00

40.00

2.6.23.6.4

17

2/5/2010

0071

NARDO

UND

10

10.00

100.00

2.6.23.6.4

18

2/5/2010

0071

PLATANITO

UND

2.00

16.00

2.6.23.6.4

19

2/5/2010

0071

COBIO

UND

3.00

24.00

2.6.23.6.4

20

2/5/2010

0071

MARMOLINA

UND

30.00

120.00

2.6.23.6.4

21

2/5/2010

0071

GRAN FAMILIA

UND

4.00

16.00

2.6.23.6.4

22

2/5/2010

0071

ROSA VERDE

UND

14.00

14.00

2.6.23.6.4

23

2/5/2010

0071

FILUS

UND

20.00

80.00

2.6.23.6.4

24

08/03/10

162

HORMIGON

M3

20

35.00

700.00

2.6.23.6.5

25

08/03/10

162

ARENA FINA

M3

20

35.00

700.00

2.6.23.6.5

26

08/03/10

162

TIERRA DE CHACRA

M3

20

135.00

2,700.00

2.6.23.6.5

27

10/03/10

183

OCREO ROJO 230 BAYER

KG

20

16.00

320.00

2.6.23.6.4

28

10/03/10

183

OCREO NEGRO BAYER

KG

35

17.00

595.00

2.6.23.6.4

29

10/03/10

194-A

BANCA MODELO CLASICO

UND

542.00

1,084.00

2.6.23.6.5

30

10/03/10

194-A

POSTE DOBLE LUMINARIA

UND

643.16

3,859.00

2.6.23.6.5

31

20/05/10

618

OL.EO MATE VERDE MILANO

GLN

48.00

336.00

2.6.23.6.4

32

20/05/10

619

BASURERO GRANDE

UND

280.00

560.00

2.6.23.6.4

SUB TOTAL

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

ASIGNACION

ITEM

24,761.40

PRESUPUESTAL

CUADRO RESUMEN DE UTILES


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

FECHA

C/P

27/11/09

1505

TARJETA DE KARDEX

UND

50

0.19

9.30

2.6.23.6.4

27/11/09

1505

PAPEL BOND X 75 GM

MLL

24.50

24.50

2.6.23.6.4

27/11/09

1505

LAPICERO PUNTA FINA

UND

0.40

2.40

2.6.23.6.4

27/11/09

1505

CLIPS

CAJA

1.20

6.00

2.6.23.6.4

27/11/09

1505

NOTA POST IT

UND

4.80

19.20

2.6.23.6.4

27/11/09

1505

GRAPAS

CAJA

2.50

2.50

2.6.23.6.4

27/11/09

1505

PAPEL CARBON

CTO

37.00

37.00

2.6.23.6.4

27/11/09

1505

CUADERNO DE OBRA DE 50 FOLIOS

UND

28.50

28.50

2.6.23.6.4

27/11/09

1505

FILE

DOC

3.00

6.00

2.6.23.6.4

10

27/11/09

1505

FASTENER DE HOJALATA

DOC

3.00

6.00

2.6.23.6.4

SUB TOTAL

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

ASIGNACION

ITEM

141.40

PRESUPUESTAL

CUADRO RESUMEN DE HERRAMIENTAS


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

FECHA

C/P

18/11/09

1454

CINCEL DE ACERO PLANO

UND

39.00

117.00

2.6.23.6.4

18/11/09

1454

BALDE DE PLASTICO X 5 GLN

UND

10

13.50

135.00

2.6.23.6.4

18/11/09

1454

BROCHA DE 4"

UND

9.80

39.20

2.6.23.6.4

18/11/09

1454

HOJA DE SIERRA N 18

UND

7.90

39.50

2.6.23.6.4

18/11/09

1454

HOJA DE SIERRA N 24

UND

7.90

39.50

2.6.23.6.4

18/11/09

1454

COMBO DE 4 LIBRAS

UND

47.00

141.00

2.6.23.6.4

27/11/09

1522

LIJA N 100

UND

2.90

14.50

2.6.23.5.5

10/03/10

183

25

6.00

150.00

2.6.23.6.4

SUB TOTAL

CONCEPTO

PLASTICO AZUL 1.10 GRUESO

UNIDAD CANTIDAD

PRECIO

PARCIAL

ASIGNACION

ITEM

675.70

PRESUPUESTAL

CUADRO RESUMEN DE ALQUILER DE MAQUINARIA


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

ITEM

FECHA

C/P

19/11/09

1467

ALQUILER DE MEZCLADOR DE CEMENTO

UND

250.00

10/03/10

203

ALQUILER DE MEZCLADOR DE CEMENTO

UND

250.00

SUB TOTAL

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

ASIGNACION
PRESUPUESTAL

250.00

2.6.23.6.5

250.00

2.6.23.6.5

500.00

CUADRO RESUMEN DE COMBUSTIBLE


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO
CODIGO

FECHA

C/P

27/11/09

1526

PETROLEO DIESEL 2

GLN

65.98

10.20

673.00

2.6.23.6.4

14/12/09

1641

PETROLEO DIESEL 2

GLN

80

10.20

816.00

2.6.23.6.4

SUB TOTAL

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

ASIGNACION

ITEM

1,489.00

PRESUPUESTAL

CUADRO RESUMEN DE SERVICIOS Y VARIOS


2007096: CONSTRUCCION DE PLAZA DE ARMAS
CONSTRUCCION DE PLAZA Y VIAS DE LA COMUNIDAD DE CHARCO
5: RECURSOS DETERMINADOS
ADMINISTRACION DIRECTA
2009-2010

PROYECTO
OBRA
FINANCIAMIENTO
MODALIDAD
AO

FECHA

C/P

30/11/09

1554

RESIDENTE DE OBRA - MES DE NOVIEMBRE 2009

UND

2,000.00

2,000.00

2.6.23.6.5

21/12/09

1728

RESIDENTE DE OBRA - MES DE DICIEMBRE 2009

UND

2,000.00

2,000.00

2.6.23.2.6

21/12/09

1741

TRANSPORTE DE CEMENTO

UND

2,486.25

2,486.25

2.6.23.6.5

21/12/09

1743

TRANSPORTE DE MATERIALES

UND

60.00

60.00

2.6.23.6.5

05/02/10

0068

RESIDENTE DE OBRA- MES DE ENERO 2010

UND

2,000.00

2,000.00

2.6.23.6.5

SUB TOTAL

CONCEPTO

UNIDAD CANTIDAD

PRECIO

PARCIAL

ASIGNACION

ITEM

8,546.25

PRESUPUESTAL

Das könnte Ihnen auch gefallen