Sie sind auf Seite 1von 10

UND

METRADO

PRECIO UNITARIO

PARCIAL

1.00.00 CONSTRUCCION DE GALERIAS DE FILTRACION


1.01.00 TRABAJOS PROVISIONALES
1.01.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS


1.02.00 CONSTRUCCION CAMPAMENTO, OFICINAS Y ALMACEN PARA OBRA
1.02.01 CARTEL DE OBRADE 3.60X4.80m (GIGANTOGRAFIAS
TRABAJOS PRELIMINARES
1.02.02

LIMPIEZA Y DESBROCE DE TERRENO MANUAL

vje
und

2.00
1.00

4,343.24
5,224.00

8,686.48
5,224.00

und

1.00

1,227.99

1,227.99

604.10

0.69

416.83

ML

986.25

0.52

512.85

m3
m

21,112.46
623.00

4.55
1.19

96,061.69
741.37

1.03.03 CAMA DE ARENA E=0.15M. PARA TUBERIA


1.03.04 RELLENO DE ZANJA COMCTADO C/EQ. CON GRAVA 3-5MM.
RELLENO DE ZANJA COMCTADO C/EQ. CON MATERIAL PROPIO
SELECCIONADO
RELLENO DE ZANJA SIN CONPACTAR CON MATERIAL PROPIO

m
m3

623.00
623.00

5.78
57.93

3,600.94
36,090.39

m3
m

99.68
20,389.78

16.29
3.01

1,623.79
61,373.24

1.03.05 ENTIBADO CORRIDO DE ZANJAS 3.51-4.00m DE PROF.


1.04.00 SUMINISTRO E INSTALACION DE TUBERIAS

623.00

26.73

16,652.79

382.15

59.06

22,569.78

604.10

38.05

22,986.01

382.15

5.01

1,914.57

604.10

4.81

2,905.72

und
und
und
und
m

12.00
7.00
12.00
8.00
123.50

220.79
265.06
473.59
473.59
30.26

2,649.48
1,855.42
5,683.08
3,788.72
3,737.11

INSTALACION DE TRANSICION DE Fo FDO. CAMPANA -BRIDA 200MM


1.04.04.06 SUMINISTRO E INSTALACION DE VALVULAS

und

20.00

50.05

1,001.00

1.04.04.07 VALVULA MARIPOSA HIERRO DUCTIL BRIDADA DE 200 MM


1.04.04.08 VALVULA TIPO GUILLOTINA HIERRO DUCTIL BRIDADA DE 200MM
1.04.04.09 INSTALACION VALVULA MARIPOSA H.D. BRIDADA 200MM.

und
und
und

12.00
7.00
12.00

3,190.78
2,052.64
50.05

38,289.36
14,368.48
600.60

INSTALACION VALVULA TIPO GUILLOTINA H.D. BRIDADA DE 200MM


BUZONES
BUZON DE CONEXIN TIPO 1 DE 2.10X1.60m H=8.70M
BUZON DE CONEXIN TIPO 1 DE 1.40X1.60m H=8.70M

und

7.00

50.05

350.35

und
und

7.00
1.00

14,146.22
11,739.64

99,023.54
11,739.64

BUZON DE CONEXIN TIPO 1 DE 1.60X1.60m H=8.70M


BUZON DE DE ARANQUE D=1.24m. H=2.30M
RED DE CONDUCCION DE AGUA POTABLE
TRABAJOS PROVISIONALES
CINTA PLASTICA SEALIZADORA DE PELIGRO LIMITE DE OBRA
INCLUYE POSTES
TRABAJOS PRELIMINARES

und
und

4.00
1.00

11,950.12
1,745.67

47,800.48
1,745.67

13,463.06

0.94

12,655.28

LIMPIEZA DE TERRENO MANUAL


TRAZO, NIVELACION Y REPLANTEO DE OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN RIBERA DE RIO CON PROF. PROM
H=2.20m

m
ML

6,731.53
6,731.53

0.34
0.52

2,288.72
3,500.40

6,015.35

23.29

140,097.50

EXCAVACION DE ZANJA EN T. NORMAL CON PROF. PROM H=1.50m


REFINE Y NIVELACION DE FONDO PARA TUBERIA

m
m

716.18
6,731.53

4.93
1.19

3,530.77
8,010.52

1.05.01.02 CAMA DE APOYO PARA TUBERIAS, INCLUIDO ARENA 10CM

6,731.53

5.08

34,196.17

1.06.00 PROTECION SOBRE TUBERIA E=0.20M


1.06.01 RELLENO Y COMPACTADO DE ZANJAS C/MAT. PROPIO Hprom=0.80m
1.07.00 SUMINISTRO E INSTALACION DE TUBERIAS UF
1.07.01 TUBERIA PVC C-7.5 160mm / AGUA POTABLE
1.07.01.01 TUBERIA PVC C-10 160mm / AGUA POTABLE

ML
m

6,731.53
6,731.53

5.64
6.42

37,965.83
43,216.42

4,151.20

41.45

172,067.24

2,580.33

53.90

139,079.79

6,731.53

3.88

26,118.34

1.02.03 TRAZO, NIVELACION Y REPLANTEO DE OBRA


1.03.00 MOVIMIENTO DE TIERRAS
1.03.01 EXCAVACION C/EQUIPO T. CONGLOMERADO SATURADO H=7.50M.
1.03.02 REFINE Y NIVELACION DE FONDO PARA TUBERIA

1.04.01 TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 200 MM. UNION


HERMETICA
1.04.01.01 TUBERIA PVC CLASE A-7.5 UF 200 MM, RANURADA
INSTALACION TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 200
1.04.03
MM.
1.04.03.01 INSTALACION TUBERIA PVC CLASE A-7.5 UF 200 MM. INC.PRUEBA
HIDRAULICA
1.04.04 SUMINISTRO E INSTALACION DE ACCESORIOS
1.04.04.01 BRIDA DE ACERO DE 200 MM
1.04.04.02 BRIDA CIEGA DE ACERO DE 200 MM
1.04.04.03 TRANSICION EKS DE 8" (2000MM.)
TRANSICION FKS DE 8" (200MM.)
1.04.04.04 TUBO ACEROS SCH-40 1 1/2"
1.04.04.05

1.04.05
1.04.05.01
1.04.05.02
1.05.00
1.05.01
1.05.01.01

1.07.01.02

PRUEBA HIDRAULICA Y DESINFECCION DE REDES

1.07.01.04 DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C7.5/C-10,160mm


1.07.01.05
1.07.01.06

SUMINISTRO E INSTALACION DE ACCESORIOS


CODO PVC,UF,C-10, 160mm x 90

und

3.00

307.87

923.61

CODO PVC,UF,C-7.5, 160mm x 45

und

7.00

177.71

1,243.97

CODO PVC,UF,C-10, 160mm x 45

und

2.00

192.71

385.42

CODO PVC,UF,C-7.5, 160mm x 2230'

und

19.00

118.15

2,244.85

CODO PVC,UF,C-10, 160mm x 2230'

und

10.00

133.15

1,331.50

CODO PVC,UF,C-7.5, 160mm x 11.15

und

14.00

190.66

2,669.24

CODO PVC,UF,C-10, 160mm x 1115'

und

9.00

205.66

1,850.94

und

3.00

6,336.38

19,009.14

CAMARA DE VALVULA DE AIRE Y PURGA


CONSTRUCCION DE CAMARA DE AIRE DE CONCRETO ARMADO DE
1.60X1.60m. Hprom=4.20M.

UND

METRADO

PRECIO UNITARIO

PARCIAL

CONSTRUCCION DE CAMARA DE PURGA DE CONCRETO ARMADO


DE D=1.60m. Hprom=4.60M

und

2.00

5,616.63

11,233.26

CONSTRUCCION DE MACRO MEDIDOR DE CONCRETO

und

1.00

52,671.77

52,671.77

VALVULA DE AIRE 110mm FFD

und

3.00

2,401.82

7,205.46

VALVULA DE PURGA 110mm FFD

und

2.00

2,571.87

5,143.74

DADOS DE CONCRETO PARA ANCLAJE DE ACCESORIOS

und

65.00

64.39

4,185.35

DADO DE CONCRETO PARA CURVANO R=80.00m

und

45.00

89.03

4,006.35

26,929.10

0.94

25,313.35

LIMPIEZA DE TERRENO MANUAL

13,464.55

0.34

4,577.95

TRAZO, NIVELACION Y REPLANTEO DE OBRA

ML

13,464.55

0.52

7,001.57

EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom =1.10m

13,464.55

4.23

56,955.05

REFINE Y NIVELACION DE FONDO PARA TUBERIA

13,464.55

1.19

16,022.81

CAMA DE APOYO PARA TUBERIAS, INCLUIDO ARENA 10CM

13,464.55

5.08

68,399.91

PROTECCION SOBRE TUBERIA E=0.20M.

ML

13,464.55

5.64

75,940.06

RELLENO Y COMPACTADO DE ZANJAS C/MAT. PROPIO Hprom=0.80m

13,464.55

6.42

86,442.41

TUBERIA PVC UF C-7.5 63mm AGUA POTABLE

4,495.68

5.99

26,929.12

TUBERIA PVC UF C-7.5 75mm AGUA POTABLE

6,008.13

10.19

61,222.84

TUBERIA PVC UF C-7.5 110mm AGUA POTABLE

2,960.74

19.67

58,237.76

DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C7.5, 63mm

4,495.68

2.94

13,217.30

DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C7.5, 75mm

6,008.13

2.93

17,603.82

DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C7.5, 110mm

2,960.74

2.97

8,793.40

DADOS DE CONCRETO 0.20x0.20x0.40

RED DISTRIBUCION DE AGUA POTABLE


TRABAJOS PROVISIONALES
CINTA PLASTICA SEALIZADORA DE PELIGRO LIMITE DE OBRA
INCLUYE POSTES
TRABAJOS PRELIMINARES

MOVIMIENTO DE TIERRAS

SUMINISTRO E INSTALACION DE TUBERIAS UF

PRUEBA HIDRAULICA Y DESINFECCION DE REDES

SUMINISTRO E INSTALACION DE ACCESORIOS


TAPON PVC,UF, C-7.5, 75mm

und

13.00

43.89

570.57

TAPON PVC,UF, C-7.5, 63mm

und

11.00

20.08

220.88

CRUZ PVC,UF, C-7.5, 75mm

und

1.00

183.05

183.05

CRUZ PVC,UF, C-7.5, 63mm

und

2.00

101.45

202.90

TEE PVC-UF, C-7.5,110x110mm

und

4.00

180.02

720.08

TEE PVC-UF, C-7.5, 75x75mm

und

32.00

64.01

2,048.32

TEE PVC-UF, C-7.5, 63x63mm

und

10.00

38.41

384.10

CODO PVC, UF, C-7.5,110mm x 1115'

und

29.00

74.67

2,165.43

CODO PVC, UF, C-7.5,110mm x 2230'

und

17.00

74.67

1,269.39

CODO PVC, UF, C-7.5,110mm x 45

und

14.00

71.51

1,001.14

CODO PVC, UF, C-7.5,110mm x 90

und

4.00

82.74

330.96

CODO PVC, UF, C-7.5,75mm x 1115'

und

40.00

44.11

1,764.40

UND

METRADO

PRECIO UNITARIO

PARCIAL

CODO PVC, UF, C-7.5,75mm x 2230'

und

18.00

50.68

912.24

CODO PVC, UF, C-7.5,75mm x 45

und

14.00

55.64

778.96

CODO PVC, UF, C-7.5,75mm x 90

und

13.00

53.87

700.31

CODO PVC, UF, C-7.5,63mm x 1115'

und

58.00

28.62

1,659.96

CODO PVC, UF, C-7.5,63mm x 2230'

und

15.00

33.90

508.50

CODO PVC, UF, C-7.5,63mm x 45

und

10.00

34.38

343.80

CODO PVC, UF, C-7.5,63mm x 90

und

6.00

33.50

201.00

REDUCCION PVC-UF, C-7.5, 110x75mm

und

8.00

57.45

459.60

REDUCCION PVC-UF, C-7.5, 75x63mm

und

7.00

35.75

250.25

VALVULA COMPUERTA 63mm ISO 7259 FFD

und

14.00

473.63

6,630.82

VALVULA COMPUERTA 75mm ISO 7259 FFD

und

20.00

741.19

14,823.80

VALVULA DE AIRE 75mm FFD

und

6.00

2,066.87

12,401.22

VALVULA DE PURGA 63mm FFD

und

6.00

1,572.44

9,434.64

und

813.00

240.58

195,591.54

und

326.00

64.39

20,991.14

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

vje

2.00

4,343.24

8,686.48

CERCO PROVISIONAL DE OBRA

100.00

83.84

8,384.00

CINTA PLASTICA SEALIZADORA DE PELIGRO LIMITE DE OBRA


INCLUYE POSTES

100.00

0.94

94.00

LIMPIEZA DE TERRENO MANUAL

m2

153.94

1.02

157.02

TRAZO, NIVELACION Y REPLANTEO.

m2

153.94

1.05

161.64

EXCAVACION MASIVA PARA CIMENTACION C/MAQ.

m3

692.73

4.22

2,923.32

EXCAVACION MANUAL P/CAJA REBOSE

m3

2.31

25.65

59.25

REFINE, NIVELACION Y COMPACTACION DE FONDO EXCAVADO

m2

153.94

1.99

306.34

RELLENO COMPACTADO C/MATERIAL DE PRESTAMO

m3

154.26

35.53

5,480.86

RELLENO COMPACTADO C/MATERIAL DE PROPIO

m3

158.51

15.51

2,458.49

ELIMINACION DE MATERIAL EXCEDENTE

m3

739.10

15.74

11,633.43

m3

61.58

146.20

9,003.00

ZAPATA CIRCULAR, CONCRETO F'C=280 KG/CM2

m3

168.54

307.91

51,895.15

ZAPATA CIRCULAR, ACERO F'y=4200 KG/CM2

kg

16,803.92

3.54

59,485.88

VALVULAS

CONEXIN DOMICILIARIA DE AGUA 1/2"


CONEXIN DE AGUA1/2", PVC, UF, C-7.5
DADOS DE CONCRETO 0.20x0.20x0.40
DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS
RESERVORIO ELEVADO TIPO FUSTE V=250m3
OBRAS PROVISIONALES

OBRAS PRELIMINARES

MOVIMIENTO DE TIERRAS

OBRAS DE CONCRETO CICLOPEO


CONCRETO CICLOPEO FC=100KG/CM2 + 30 % PM. PARA SUB
CIMIENTO
OBRAS DE CONCRETO ARMADO
ZAPATA CIRCULAR

LOSA DE PISO

UND

METRADO

PRECIO UNITARIO

PARCIAL

LOSA DE PISO, CONCRETO F'C=210 KG/CM2

m3

3.41

267.23

911.25

LOSA DE PISO,ACERO F'y=4200 KG/CM2

kg

134.58

3.54

476.41

FUSTE CIRCULAR, CONCRETO F'C=280 KG/CM2

m3

82.07

293.91

24,121.19

FUSTE CIRCULAR, ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

713.45

44.49

31,741.39

FUSTE CIRCULAR, ACERO F'y=4200 KG/CM2

kg

10,961.74

3.54

38,804.56

VIGA PUENTE, CONCRETO F'C=280 KG/CM2

m3

2.37

340.80

807.70

VIGA PUENTE, ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

17.77

47.38

841.94

VIGA PUENTE, ACERO F'y=4200 KG/CM2

kg

299.39

3.54

1,059.84

VIGA ANILLO DE FONDO, CONCRETO F'C=280 KG/CM2

m3

4.82

350.54

1,689.60

VIGA ANILLO DE FONDO, ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

15.68

48.89

766.60

VIGA ANILLO DE FONDO, ACERO F'y=4200 KG/CM2

kg

583.85

3.54

2,066.83

m3

4.67

350.54

1,637.02

m2

25.90

48.89

1,266.25

kg

525.98

3.54

1,861.97

m3

2.33

293.91

684.81

m2

22.25

52.70

1,172.58

kg

277.72

3.54

983.13

VIGA ANILLO CHIMENEA,CONCRETO F'C=280 KG/CM2

m3

0.69

350.54

241.87

VIGA ANILLO CHIMENEA,ENCOFRADO Y DESENCOFRADO


CARAVISTA

m2

4.10

48.89

200.45

VIGA ANILLO CHIMENEA, ACERO F'y=4200 KG/CM2

kg

76.72

3.54

271.59

TRONICO CONICO-CUBA,CONCRETO F'C=350 KG/CM2

m3

17.29

358.88

6,205.04

TRONICO CONICO-CUBA,ENCOFRADO Y DESENCOFRADO


CARAVISTA

m2

101.71

53.25

5,416.06

TRONICO CONICO-CUBA,ACERO F'y=4200 KG/CM2

kg

3,765.82

3.54

13,331.00

FONDO ESFERICO-CUBA,CONCRETO F'C=350 KG/CM2

m3

13.46

358.88

4,830.52

FONDO ESFERICO-CUBA,ENCOFRADO Y DESENCOFRADO


CARAVISTA

m2

79.18

53.25

4,216.34

FONDO ESFERICO-CUBA,ACERO F'y=4200 KG/CM2

kg

2,755.08

3.54

9,752.98

MUROS - CUBA,CONCRETO F'C=280 KG/CM2

m3

21.13

362.72

7,664.27

MUROS - CUBA,ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

211.22

59.70

12,609.83

MUROS - CUBA,ACERO F'y=4200 KG/CM2

kg

4,004.54

3.54

14,176.07

m3

3.95

362.72

1,432.74

FUSTE CIRCULAR

VIGA PUENTE

VIGA ANILLO DE FONDO

VIGA ANILLO INFERIOR


VIGA ANILLO INFERIOR, CONCRETO F'C=280 KG/CM2
VIGA ANILLO INFERIOR, ENCOFRADO Y DESENCOFRADO CARAVISTA

VIGA ANILLO INFERIOR, ACERO F'y=4200 KG/CM2


VIGA ANILLO SUPERIOR
VIGA ANILLO SUPERIOR,CONCRETO F'C=280 KG/CM2
VIGA ANILLO SUPERIOR,ENCOFRADO Y DESENCOFRADO CARAVISTA

VIGA ANILLO SUPERIOR,ACERO F'y=4200 KG/CM2


VIGA ANILLO CHIMENEA

TRONICO CONICO-CUBA

FONDO ESFERICO-CUBA

MUROS - CUBA

MUROS - CHIMENEA
MUROS - CHIMENEA,CONCRETO F'C=280 KG/CM2

UND

METRADO

PRECIO UNITARIO

PARCIAL

MUROS - CHIMENEA,ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

39.52

57.70

2,280.30

MUROS - CHIMENEA,ACERO F'y=4200 KG/CM2

kg

442.63

3.54

1,566.91

CUBIERTA - CUBA,CONCRETO F'C=280 KG/CM2

m3

6.74

356.28

2,401.33

CUBIERTA - CUBA,ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

84.30

57.39

4,837.98

CUBIERTA - CUBA,ACERO F'y=4200 KG/CM2

kg

1,253.63

3.54

4,437.85

CAJAS DE REBOSE,CONCRETO F'C=280 KG/CM2

m3

1.19

301.92

359.28

CAJAS DE REBOSE,ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

12.58

44.57

560.69

CAJAS DE REBOSE,ACERO F'y=4200 KG/CM2

kg

65.27

3.54

231.06

ARTESA DE REBOSE,CONCRETO F'C=280 KG/CM2

m3

0.40

362.72

145.09

ARTESA DE REBOSE,ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

4.63

53.58

248.08

ARTESA DE REBOSE,ACERO F'y=4200 KG/CM2

kg

25.84

3.54

91.47

m2

670.83

6.65

4,461.02

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm LOSA FONDO

m2

90.45

19.91

1,800.86

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm EN MUROS

m2

123.93

31.36

3,886.44

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm EN VIGAS

m2

16.31

26.22

427.65

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm CUPULA

m2

84.30

31.22

2,631.85

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm ARTES RED

m2

4.63

26.22

121.40

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm CAJAS DE REBOSE

m2

6.63

19.91

132.00

REVOQUE FINO PARA EXTERIOR DE LA ESTRUCTURA

m2

344.59

11.05

3,807.72

VEREDA DE CONCRETO F'C=175K/CM2

m2

31.14

37.76

1,175.85

VEREDA, ENCOFRADO Y DESENCOFRADO NORMAL

m2

8.88

38.56

342.41

VENTANA METALICA 0.35x0.35 C/PERFIL 1"X 1/8" + PLANCHA


PERF.CUAD. E=0.9mm

und

24.00

71.74

1,721.76

PUERTA METALICA 1.20x2.40 C/PLANCHA LAC 1/8" C/MARCO 1 1/2"x1


1/2"x3/16" Y REFUERZOS

und

1.00

650.36

650.36

BARANDA DE SEGURIDAD DE Fo. GALV. 2" Y 1"x1.00m ALT.

13.20

124.06

1,637.59

CANASTILLA METALICA DE SEGURIDAD C/PL 2"x1/4 +L1"x1/8"

16.95

95.49

1,618.56

ESCALERA TIPO MARINERO TUB Fo.GALV. PAR 2" PAS. 3/4"

21.65

54.14

1,172.13

VENTILACION C/TUBERIA DE Fo.GALV. 160mm.

und

4.00

598.44

2,393.76

SOPORTE METALICO VERTICAL P/TUB. DIAMETRO 160mm

und

12.00

186.73

2,240.76

TAPA METALICA EN CAJA DE REBOSE

und

1.00

578.84

578.84

PINTURA ANTICORROSIVA Y ESMALTE EN CARPINTERIA METALICA

m2

57.61

13.03

750.66

PINTURA EN TUBERIAS

78.32

14.71

1,152.09

CUBIERTA

CAJAS DE REBOSE

ARTESA DE REBOSE

CURADO Y PROTECCION DE LA ESTRUCTURA


CURADO ESPECIAL DE LA ESTRUCTURA
REVOQUES Y ENLUCIDOS

PISOS Y PAVIMENTOS

CARPINTERIA METALICA Y HERRERIA

PINTURA

CERRAJERIA

UND

METRADO

PRECIO UNITARIO

PARCIAL

SUMINIST.E INSTALACION DE CERRADURA DE 3 GOLPES(INC.


PROTECTOR EXTERNO Y TIRADOR)

und

1.00

85.90

85.90

BISAGRA DE FIERRO 4" PARA PUERTA

und

3.00

17.14

51.42

MANIJA DE FIERRO DE 1/2"

und

1.00

7.82

7.82

JUNTA DE CONSTRUCCION C/WATER STOP 9"

ML

371.90

33.45

12,440.06

REGLA GRADUADA-INDICADOR DE NIVELES PARA RESERVORIO

und

1.00

1,045.16

1,045.16

DESINFECCION C/EMPLEO DE CISTERNA+EQ.BOMBEO P/LLENADO

m3

250.00

23.07

5,767.50

CLORADOR CLORO-GAS DE INYECCION DIRECTA

und

3.00

7,928.84

23,786.52

31.65

4.75

150.34

m3

250.00

20.72

5,180.00

TUBERIA DE HIERRO DUCTIL BB K-9 DN 150MM (6")

53.49

116.09

6,209.65

TUBERIA DE HIERRO DUCTIL BB K-9 DN 110MM (4")

57.60

98.34

5,664.38

TUBERIA DE HIERRO DUCTIL BB K-9 DN 75MM (3")

und

22.42

82.59

1,851.67

CODO DE H.D. BB DN 150MM X 90

und

9.00

192.60

1,733.40

CODO DE H.D. BB DN 110MM X 90

und

4.00

108.57

434.28

CODO DE H.D. BB DN 75MM X 90

und

3.00

94.63

283.89

CODO DE H.D. BB DN 150MM X 45

und

4.00

192.60

770.40

CODO DE H.D. BB DN 110MM X 45

und

4.00

94.01

376.04

CODO DE H.D. BB DN 75MM X 45

und

2.00

90.29

180.58

UNION FLEXIBLE TIPO DRESSER DE 6" (150MM)

und

3.00

216.42

649.26

UNION FLEXIBLE TIPO DRESSER DE 4" (110MM)

und

8.00

141.03

1,128.24

UNION FLEXIBLE TIPO DRESSER DE 3" (75MM)

und

4.00

133.46

533.84

VALVULA COMPUERTA H.D. BB DN 150MM

und

2.00

983.42

1,966.84

VALVULA COMPUERTA H.D. BB DN 110MM

und

6.00

629.18

3,775.08

VALVULA COMPUERTA H.D. BB DN 75MM

und

3.00

617.90

1,853.70

TEEDE HD BB DN150MM X 150MM

und

2.00

261.18

522.36

TEEDE HD BB DN150MM X 110MM

und

4.00

176.82

707.28

TEEDE HD BB DN150MM X 75MM

und

1.00

143.23

143.23

BRIDA ROMPE AGUA DN 150 MM

und

2.00

80.31

160.62

BRIDA ROMPE AGUA DN 110 MM

und

2.00

60.40

120.80

BRIDA ROMPE AGUA DN 75 MM

und

1.00

41.81

41.81

REDUCCION DE H.D. BB DN 150MM x 110MM

und

1.00

241.30

241.30

REDUCCION DE H.D. BB DN 110MM x 75MM

und

1.00

163.86

163.86

TRANSICCION DE BRIDA - CAMPANA HD DN 150MM

und

1.00

138.64

138.64

TRANSICCION DE BRIDA - CAMPANA HD DN 110MM

und

2.00

106.58

213.16

TRANSICCION DE BRIDA - CAMPANA HD DN 75MM

und

1.00

78.74

78.74

MEDIDOR DE CAUDAL ELECTROMAGNETICO BB DN150MM

und

1.00

3,508.75

3,508.75

VARIOS

JUNTAS ASFALTICAS
ENSAYOS Y PRUEBAS
PRUEBA HIDRAULICA C/EMPLEO DE CISTERNA+EQ.BOMBEO
P/LLENADO
INSTALACIONES HIDRAULICAS
TUBERIAS Y ACCESORIOS

UND

METRADO

PRECIO UNITARIO

PARCIAL

MEDIDOR DE CAUDAL ELECTROMAGNETICO BB DN110MM

und

1.00

2,808.75

2,808.75

MEDIDOR DE CAUDAL ELECTROMAGNETICO BB DN75MM

und

1.00

2,248.75

2,248.75

CANASTILLA DE SUCCION ACERO INOX. DN110MM

und

2.00

355.46

710.92

CANASTILLA DE SUCCION ACERO INOX. DN75MM

und

1.00

305.51

305.51

BRIDA DE ACERO DN150MM P/SOLDAR

und

40.00

125.88

5,035.20

BRIDA DE ACERO DN110MM P/SOLDAR

und

40.00

94.38

3,775.20

BRIDA DE ACERO DN75MM P/SOLDAR

und

26.00

63.58

1,653.08

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DN 150MM

und

320.00

2.20

704.00

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DN 110MM

und

320.00

2.20

704.00

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DN 75MM

und

208.00

2.20

457.60

EMPAQUETADURA DE JEBE ENLONADO DE 6" (150MM)

und

38.00

7.57

287.66

EMPAQUETADURA DE JEBE ENLONADO DE 4" (110MM)

und

42.00

6.06

254.52

EMPAQUETADURA DE JEBE ENLONADO DE 3" (75MM)

und

21.00

5.63

118.23

INSTALACION DE ACCESORIOS HIERRO DUCTIL

und

70.00

89.75

6,282.50

DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS

und

27.00

230.36

6,219.72

EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL

26.00

20.82

541.32

REFINE Y NIVELACION DE FONDO PARA TUBERIA

26.00

1.19

30.94

CAMA DE APOYO PARA TUBERIAS, INCLUIDO ARENA 10CM

26.00

5.08

132.08

RELLENO Y COMPACTADO DE ZANJAS C/MAT. PROPIO

26.00

3.07

79.82

SUMINISTRO E INSTALACION TUBERIA PVC UF 160mm S-25 ISO4435

26.00

7.04

183.04

DOBLE PRUEBA HIDRAULICA A RED DESCARGA

26.00

2.96

76.96

CAJA DE CONCRETO DE 0.60x0.60M

und

1.00

165.27

165.27

CONEXIN DOMICILIARIA PVC 150mm (6") P/DESAGUE

und

1.00

348.23

348.23

EDUCACION AMBIENTAL POBLADORES

und

1.00

115.89

115.89

EDUCACION AMBIENTAL TRABAJADORES

und

2.00

115.89

231.78

CARTELES MENORES

und

17.00

209.99

3,569.83

SS.HH. PORTATIL (INC . MNMTO)

mes

6.00

2,574.14

15,444.84

glb

6.00

564.60

3,387.60

REFORESTACION

HA

0.08

12,032.44

962.60

REACONDICIONAMIENTO DEL AREA DE CAMPAMENTO DE OBRAS


PROVISIONALES

HA

0.08

4,235.48

338.84

PERFILADO Y NIVELACION DE MATERIAL EXCEDENTE

m2

1,382.24

0.76

1,050.50

ELABORACION DE PLAN DE SEGURIDAD Y SALUD

glb

1.00

422.59

422.59

CAPACITACION EN SEGURIDAD Y SALUD

glb

2.00

177.09

354.18

RED DE DESCARGA DE PURGA Y LIMPIEZA

MONITOREO ARQUEOLOGICO, AMBIENTAL,SEGURIDAD Y SALUD


PROGRAMA DE EDUCACION AMBIENTAL

PROGRAMA DE PREVENCION Y/O MITIGACION

PROGRAMA DE CONTINGENCIA AMBIENTAL


EQUIPO DE CONTINGENCIA AMBIENTAL
PROGRAMA DE ABANDONO DE OBRA

PLANDE SEGURIDAD Y SALUD

UND

METRADO

PRECIO UNITARIO

PARCIAL

IMPLEMENTACION DE PLAN DE SEGURIDAD Y SALUD


EQUIPO DE PROTECCION PERSONAL (EPPS)

mes

6.00

7,272.59

43,635.54

EQUIPO DE CONTINGENCIGENCIAS EN SEGURIDAD Y SALUD

glb

6.00

839.79

5,038.74

CARTELES PREVENTIVOS DE SEGURIDAD

und

10.00

159.13

1,591.30

ELABORACION DEL PLAN DE MONITOREO

glb

1.00

5,000.00

5,000.00

MONITOREO ARQUEOLOGICO

mes

6.00

2,627.20

15,763.20

m2

32,915.82

1.05

34,561.61

CORTE SOBRE RIBERA P/ESTRUCTURAS DE PROTECCION

m3

514.75

5.89

3,031.88

CORTE Y ACUMULACION DE MAT. P/ENCAUZAMIENTO DE RIO

m3

8,228.98

3.32

27,320.21

ACARREO DE PIEDRA DE 5"-10" APIE DE OBRA

m3

1,200.00

19.80

23,760.00

SUMINISTRO E INSTALACION DE GAVION CAJA FUERTE 5.0x1.0x1.0m,


(10x12 Q 2.7mm y 3.4mm. Galfan)

und

90.00

324.97

29,247.30

LLENADO Y CERRADO DE GAVION CAJA FUERTE 5.0x1.0x1.0m,(10x12


Q 2.7mm y 3.4 mm. Galfan)

und

90.00

148.76

13,388.40

SUMINISTRO E INSTALACION DE GAVION TIPO COLCHOFUERTE


5.0x2.0x0.3m, (10x12 Q 2.7mm y 3.4mm. Galfan)

und

160.00

474.47

75,915.20

LLENADO Y CERRADO DE GAVION TIPO COLCHOFUERTE


5.0x2.0x0.3m,(10x12 Q 2.7mm y 3.4 mm. Galfan)

und

160.00

148.76

23,801.60

SUMINISTRO DE INSTALACION DE GEOTEXTIL NO TEJIDO PP GT


190P

m2

1,932.20

8.54

ARQUEOLOGIA

OBRAS DE PROTECCION DE ESTRUCTURAS DE CAPTACION


TRABAJOS PROVISIONALES
TRAZO, NIVELACION Y REPLANTEO.
MOVIMIENTO DE TIERRAS

GAVIONES

COSTO DIRECTO

16,500.99
2,916,618.18

PORCENTAJE DE AVANCE
GASTOS GENERALES
UTILIDAD

7% CD

FACTOR DE RELACION

8 % CD

0.08

204,163.27

0.95

3,354,110.91

SUBTOTAL
IGV
PRESUPUESTO TOTAL

COSTO TOTAL

233,329.45

0.07
S/.

3,354,110.90

S/.

3,957,850.86

0.18

603,739.96

3,957,850.86

UND

METRADO

PRECIO UNITARIO

PARCIAL

INCIDENCIA PRESUPUESTAL
OBRA
UBICACIN
CONVOCATORIA
CONTRATISTA
SUPERVISOR
PROPIETARIO
PRESUPUESTO REFERENCIAL
PRESUPUESTO CONTRATADO
FECHA PTO. REFERENCIAL :

ITEM

FACTOR DE RELACIO

incluido el I.G.V.
incluido el I.G.V.

DESCRIPCION

PRESTACION ADICIONAL DE OBRA N1

DEDUCTIVO DE OBRA N1

TOTAL VARIACION

PRESUPUESTO CONTRACTUAL

PORCENTAJE DE INCIDENCIA

PRESUPUESTO

3,957,850.86
1,675,937.68
2,281,913.18
9,855,052.98
23.15%

1.000000000