Beruflich Dokumente
Kultur Dokumente
Boom positioning
BUT 35 Boltec with drilling system DCS
Preparations
See Driving instruction
1250 0181 18
1250 0207 25
Positioning
Boom positioning
BUT 35 Boltec with drilling system DCS
1250 0187 13
Positioning
After positioning
Turn off the hydraulic pressure lever after boom positioning.
9852 2002 01
CAUTION!