Sie sind auf Seite 1von 17

Ivar Aasen Field Development Project pdQ

DEEPAK MITTAL

17-APR-15

INCLUDE ANY CHANGES AGREED DURING FAT / FINAL INSPECTION AS AGREED.

02I

23.02.2015

Issued for Construction

EStad

DD

SW

01E

26.05.2014

Issued for Review

DD

HFO

SW

Rev.

Date

Prepared
by

Reviewed
by

Approved

by

Reason for Issue

690V PROCESS SWBD - CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB

Package Title: EICT Package

Area
Code:

System

Code:

M140

82

Project No.:

C-00011

Project Tag Numbers:

82EN0200

No. of
Pages :

17

Supplier Document Number:


51PO-04193.230-K-203-01

Rev.

02I

Purchase Order No:

Project Document Number:

Proj Rev.

S09011

-00
DN02-S09011-E-XK-3203-01

02I

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Index

Description

Page

1.

Table Of Content

2.

Main Air Circuit Breaker Overview

3.

690/110VAC Voltage Transformer - Busbar A

4.

690/110VAC Voltage Transformer - Busbar B

5.

Multi Instrument PAC 3200 - Measuring A side

6.

Multi Instrument PAC 3200 - Measuring B side

7.

230VAC UPS Intake & Outgoing Miniature Circuit Breakers

8.

Main Air Circuit Breaker Motor Drive & Spare Contacts

9.

Closing Coil & Signal Lamps

1 0.

Shunt Trip

10

11.

Under Voltage Trip

11

1 2.

2/3 Trip Selector Switch

12

13.

Siprotec Protection Relay

13

14.

Siprotec Binary Inputs

14

1 5.

Siprotec Binary Inputs

15

16.

Siprotec Spare Outputs, ESD/psd Trip Relay & Fault Contact


16

Item

ALL DRAWING REFERENCES ARE

PREFIXED: DN02-S09011-E-XKIvar Aasen_LV


SENTRON
3203-01

FOR EXTERNAL TERMINATIONS, REF.:

690V PROCESS SWBD - BLOCK AND TERMINATION DIAGRAM

DOC. NO.: DN02-S09011-E-XI-3201

AND TERMINATION DIAGRAMS FOR THE RESPECTIVE PACKAGES

ELECTRICAL PROTECTION & METERING SINGEL LINE

DIAGRAM 690 V PROCESS SWBD 82EN0200

DOC. NO.: DN02-SM-E-XJ-0054-01

ELECTRICAL KEY OVERALL SINGEL LINE INTERLOCK

DIAGRAM NORMAL POWER DISTRIBUTION

DOC. NO.: DN02-SM-E-XJ-0061 -01

FOR EQUIPMENT DETAILS, REF.:

690V PROCESS SWBD - EQUIPMENT LIST

DOC. NO.: DN02-S09011-E-LA-3201

Acceptance Code:

1
.
.

.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Table Of Content

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

16

<2>

<1>

<3>

<4>

<5>

<6>
L1

L2

L3

<>

<7>

MAIN BUSBAR B - 690V AC, 60Hz

L1

L2
L3

No. / Text

MOTOR DRIVE

CLOSING COIL

TRIP COILS

F1 : SHUNT, F4 UVT

FIRST SET MAIN C.B.

AUXILIARY CONTACTS

SECOND SET MAIN C.B.

AUXILIARY CONTACTS

READY TO CLOSE CONTACT

MAIN CIRCUIT

MAIN C.B. POSITIONS IN GUIDEFRAME.

THE SWITCHES OPERATES ONLY;

IN OUT POSITION : -S30

IN TEST POSITION : -S31,-S32

IN CONNECTED POSITION :

-S33, -S34 & -S35

A
L1_BUSB /4.1

=3202-01 /7.2

/1 5.2

L3_BUSB /4.1

X6:6

X5:6

X5:4

L2_BUSB /4.1

/8.2

/1 0.3
X5:10

/9.7
X5:8

X6:4

/9.6

=3201-01/7.2
X6:2

X6:12

/1 4.6

/1 4.5
X6:10

/1 1 .6

/1 1 .6
X5:12

X5:13

/1 0.2
X6:13

/9.1

X5:1

X6:7

/8.1

-Q01

4000A

-X40

<9>

-T01

4000/1 A, cl 1 , 5 VA

S1

P2
P1

S2

X6:5

/1 5.2

/8.2

Q1

S20

X5:5

X5:3

/1 0.3

/9.7

X5:9

X5:7

X6:3

/9.6

S4

=3202-01/7.2

=3201-01/7.2

X6:1

X6:11

/1 4.6

/1 4.5

/1 1 .6

S3

S2

S1

X6:9

X5:14

X6:14

X6:8

/9.1

X5:2

F4
U <

F1

X5:11

Y1

/1 1 .6

"MECH
SEALED
ON"
"MECH

SEALED
OFF" S11

/1 0.2

/8.1

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

-T03

-T02

S1

S1

P2
P1

S2

P2
P1

S2

01

02

03

I1 /5.3

I2 /5.3

I3 /5.3

04

I0 /5.3

-PE

<10>
-T04
S1
4000/1 A, cl 5P30, 5 VA

P2
P1

S2

-X41

-T05

-T06

S1

S1

P2
P1

S2

P2
P1

S2

01

02

03

F20_I1 /1 3.1

F20_I2 /1 3.1

F20_I3 /1 3.1

04

CT'S FOR SWBD MEASURING

10
CT'S FOR SWBD PROTECTION

(I>, I>>, Ip)

F20_I0 /1 3.1

-PE

L1_BUSA /3.1

2
4
1

L3_BUSA /3.1

/1 4.3

=3202-01/7.3

1
=3201-01/7.3

L2_BUSA /3.1

-S35

-S34

-S33

/1 4.4

2
4

CONNECTED

2
4

2
4
-S32

/9.1

/1 4.4

-S31
1

-S30

TEST
2
4

2
4

OUT

Ivar Aasen_LV
SENTRON
3203-01

<8> ACB POSITIONS

L1

L2

L3

MAIN BUSBAR A - 690V AC, 60Hz

L1

L2

L3

Acceptance Code:

1
.
.

.
.

.
.

Drawing Title:

Supplier

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01 E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Main Air Circuit Breaker Overview

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

16

<1>

<>

L1.1_BUSA

/5.1

L2_BUSA

/2.6

L2.1_BUSA

/5.1

L3_BUSA

/2.6

L3.1_BUSA

/5.1

No. / Text

690V BUSBAR A VOLTAGE

690/110VAC TRANSFORMER

I >

I >

I >

13
21
33
41

L1_BUSA

/2.6

SHORT CIRCUIT PROOF CABLES

0,11A-0,16A

Set 0,11A

B
A
B

/1 5.2
/8.3
=3201-01/12.3
/8.3

14
22
34
42

-Q03

-VT01

690

PE

110
3

-X42

01

02

03

04

110

dn

da

-X48

10

n
a
b

82EN200_2U_BUS A

=3201-01/10.5

Ivar Aasen_LV
SENTRON
3203-01

<2>

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

82EN200_2V_BUS A

=3201-01/10.5

2U_1 /1 3.3

2V_1 /1 3.3

Acceptance Code:

1
.
.

.
.

.
.

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
3

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
ISSUED FOR CONSTRUCTION

Date:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
690/110VAC Voltage Transformer - Busbar A

02I

Issue

Drawing Title:

Supplier

DN02-S09011-E-XK-3203-01

+03A1R2

Sheet:

Sheets:

16

<1>

L1.1_BUSB

/6.1

L2_BUSB

/2.6

L2.1_BUSB

/6.1

L3_BUSB

/2.6

L3.1_BUSB

/6.1

No. / Text

690V BUSBAR B VOLTAGE

690/110VAC TRANSFORMER

I >

I >

I >

13
21
33
41

L1_BUSB

/2.6

SHORT CIRCUIT PROOF CABLES

0,11A-0,16A

Set 0,11A

B
A

/1 5.2
/8.3
=3202-01/12.3
/8.4

14
22
34
42

-Q04

-VT02

690

PE

110
3

-X43

01

02

03

04

110

dn

da

9
6

-X49

10

n
a

82EN200_2U_BUS B

=3202-01/10.5

Ivar Aasen_LV
SENTRON
3203-01

<>

<2>

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

2U

/1 3.1

2V

/1 3.1

2W

/1 3.1

Acceptance Code:

1
.
.

.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

82EN200_2V_BUS B

=3202-01/10.5

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
690/110VAC Voltage Transformer - Busbar B

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

16

<>

<1>

14
22
34
42
6
W

I >

I >

I >

690 VAC VOLTAGE A SIDE

MULTI INSTRUMENT

/1 5.2
/8.4
/8.5
/8.2

0,11A-0,16A

Set 0,1 1 A

No. / Text

13
21
33
41

-Q05

SHORT CIRCUIT PROOF CABLES

690 V AC

L1.1_BUSA

/3.3

L2.1_BUSA

/3.3

L3.1_BUSA

/3.3

-VT03

690 V / 110 V

Copyright (C) Siemens AS All rights reserved

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

-X44

01

02

03

04

F20:C1

/1 3.6

F20:C2

/1 3.6

V1

V2

V3

VN

PE

DI-

11
12
13

<2>

Ivar Aasen_LV
SENTRON
3203-01

DI+

DI

-P01

SENTRON PAC 3200


7KM21 1 2-0BA00-3AA0
1L1 .1 1L1.2

DO-

DO+

DO

P01:L

L/+

AUX supply

P01:M

N/-

/6.5

/6.5

1L2.1 1L2.2 1L3.1 1L3.2

I1 .1

I2.1

I3.1

I1

/2.6

I2

/2.6

I3

/2.6

/6.3

/6.3

/6.3

E
I0.1

I0

/2.6

/6.3

Acceptance Code:

1
.
.

.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Multi Instrument PAC 3200 - Measuring A side

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

16

<>

<1>

14
22
34
42
6
W

I >

I >

I >

690 VAC VOLTAGE B SIDE

MULTI INSTRUMENT

/1 5.2
/8.2
/8.3
/8.3

0,11A-0,16A

Set 0,11A

No. / Text

13
21
33
41

-Q06

SHORT CIRCUIT PROOF CABLES

690 V AC

L1.1_BUSB

/4.3

L2.1_BUSB

/4.3

L3.1_BUSB

/4.3

-VT04

690 V / 110 V

Copyright (C) Siemens AS All rights reserved

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

-X45

01

02

03

04

P01:L

/5.6

P01:M

/5.6

V1

V2

V3

VN

PE
DI-

11
12
13

<2>

Ivar Aasen_LV
SENTRON
3203-01

DI+

DI

-P02

SENTRON PAC 3200


7KM21 1 2-0BA00-3AA0

1L1 .1 1L1.2

DO-

DO+

DO

L/+

AUX supply

N/-

1L2.1 1L2.2 1L3.1 1L3.2

I1 .1

/5.6

I2.1

/5.6

I3.1

/5.6

E
I0.1

/5.6

Acceptance Code:

1
.
.

.
.

.
.

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
6

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
ISSUED FOR CONSTRUCTION

Date:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Multi Instrument PAC 3200 - Measuring B side

02I

Issue

Drawing Title:

Supplier

DN02-S09011-E-XK-3203-01

+03A1R2

Sheet:

Sheets:

16

<>

<1>

<2>

<3>

<5>

<4>

<6>

<7>

/1 5.2
/8.6

I > I >

F02:2

/8.1

F03:2

/9.1

F04:2

/1 3.6

F05:2

/1 0.2

F06:2
/1 1 .1

F02:4

/8.1

F03:4

/9.1

F04:4

/1 3.6

F05:4

/1 0.2

F06:4

/1 1 .1

-U01
AC

230V AC/24V DC

24VDC SUPPLY TO C.B.

PROTECTION DEVICE BINARY INPUTS

230VAC AUX.SUPPLY TO C.B.

MOTOR DRIVE

230VAC AUX SUPPLY TO C.B.

CONTROL

14
22

13
21

1
2A

14
22

-F06

/1 5.2
/8.6

I > I >
2

2A

13
21

13
21
14
22

-F05

/1 5.2
/8.5

I > I >
4

2A

I >

13
21
14
22

-F04

/1 5.2
/8.5

I >

2A

I >

13
21
14
22

-F03

/1 5.2
/8.4

I >

/1 5.2
/8.4

2A

14
22

-F02

PE

L1

I > I >

13
21

1
-F01

3A

230VAC AUX SUPPLY TO C.B.

PROTECTION DEVICE/

MULTI INTRUMENT

230VAC AUX SUPPLY TO

C.B. SHUNT TRIP COIL

230VAC AUX SUPPLY TO

C.B. UVT TRIP COIL

DC

0V

-X60

230VAC DUAL UPS AUX.SUPPLY

UPS/L2/82EN200+03

=3210-01/2.3

No. / Text

230V AC

UPS/L1/82EN200+03

=3210-01/2.3

L+

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

0V_1

/1 4.2

Ivar Aasen_LV
SENTRON
3203-01

+24V DC

-X60

24V+_2

/1 5.1

24V+_1

/1 4.2

Acceptance Code:

1
.
.

.
.

DET NORSKE

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01 E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

230VAC UPS Intake & Outgoing Miniature Circuit Breakers


M140

Wood Group

Mustang

Appr. by

82EN0200A
Area:

Installation: Ivar Aasen Field

Development Project - PDQ Platform

P.O.Number

Tag no.

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB

02I

Issue

Drawing Title:

Supplier

Date:

Scale

Signature:

S09011

=82EN0200

Siemens Dwg. No.:

NTS
51PO-04193.230-K-203-01

+03A1R2

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
7

DN02-S09011-E-XK-3203-01

Sheet:

Sheets:

1 6

<>

<2>

<1>

230V AC

No. / Text

MAIN C.B. MOTOR DRIVE

14

13

12

11

10

-X100

F02:2

/7.3

SPARE AUXILIARY CONTACTS

34

-Q05

/5.2

22

22

33

21
-Q05
/5.2

42

-Q04
/4.2

X5:5

42

22

41

-Q04
/4.2

-Q03
/3.2

-Q03
/3.2

-Q01 -S4

/2.2

21

41

21

X5:6

34

33
22

-F06

/7.6

22

-F05
/7.5

21

21

32

31

30

21

29

28

27

-F04
/7.4
22

22

-F03
/7.3
22

-F02
/7.2
22

-F01
/7.1

21

26

21

25

24

23
21

41
-Q06
/6.2
42

22

22

21

20

19
-Q06
/6.2

X5:1

18

-Q06
/6.2

34

-Q05

/5.2

33

41

21

15

-X100

17

16

42

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

/2.2

S11

X5:2

Ivar Aasen_LV
SENTRON
3203-01

-Q01

F02:4

/7.3

Acceptance Code:

1
.
.

.
.

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Area:

Main Air Circuit Breaker Motor Drive & Spare Contacts


M140

DET NORSKE
ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01 E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

82EN0200A

02I

Issue

Drawing Title:

Supplier

Signature:

S09011

=82EN0200

Scale

Siemens Dwg. No.:

NTS

51PO-04193.230-K-203-01

+03A1R2

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3203-01

Sheets:

16

<1>

<5>

<7>

<6>

F03:2

/7.4 -X30

<>

<8>

No. / Text

MAIN C.B. CLOSING LOOP

C.B. CLOSE LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

INTERLOCK FROM OTHER C.B.

2
4

230V AC

-S31

/2.1

INCOMER A

INTERLOCK FROM OTHER C.B.

INCOMER B

REMOTE BYPASS INTERLOCK 2/3

C.B. CLOSE LOCAL

SIGNAL LAMP, ACTIVATED

ONLY FOR 2/3 CHANGE OVER SEQUENCE

C.B. CLOSED

SIGNAL LAMP

C.B. OPEN

SIGNAL LAMP

X5:7

C9

C11

C10

C13

C14

X6:3

E6

<2>

-X30

10

-F20

/1 3.2

4
-Q01

/2.2 -S3

-S2

BO1

BO2

-F20

/1 3.2

C12

-F20
/1 3.2

BO5

11

E5

12

INCOMER A

27 X6:1

33

14

-H03

X1

-H02

X1

-H01

-X30

CUBICLE NO.: +02A1R2

-X30

16

CUBICLE NO.:+01 A1 R2

-X30

13

-X30

X1

/2.2

2
4

2
4

-Q01

-S34

28 X6:1

-S33

-X30

-Q01

=3202-01/2.2
-S2

26

-X30

-Q01

=3201-01/2.2 -S2

=3201-01/2.2

X6:7

X6:2

-X30

X6:2

-X30

26

<4>

27

<3>

Y1

INCOMER B

=3202-01/2.2

X5:8

X6:4

-X30

-Q01

/2.2

-X30

X2

F03:4

/7.4

Acceptance Code:

1
.
.

.
.

Drawing Title:

Supplier

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01 E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Description

18

X2

X2

X6:8

15

17

Ivar Aasen_LV
SENTRON
3203-01

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB

Closing Coil & Signal Lamps

M140
NTS
51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
9

Area:

Scale

Siemens Dwg. No.:

DN02-S09011-E-XK-3203-01

+03A1R2

Sheet:

Sheets:

16

<1>

<4>

<6>

<5>

<>

<7>

F05:2

/7.6 -X30

19

230V AC

7
No. / Text

C.B. OPEN VIA SHUNT COIL

(50ms)

C.B. OPEN LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

C.B. OPEN

FROM ARC DETECTION UNIT

INSIDE C.B. A

C.B. OPEN

FROM ARC DETECTION UNIT

INSIDE C.B. B

-X30

6
A1

IN

33k

A2

-K4

<U>

/.6

-R1

-X30

10

-X80

3
34

-F30

12

-X47

02

-X30

11

E3

BO4

-F20

/1 3.2

35 X1 :7

-F30

INC. B

=3202-01/16.2

<2>

+02A1R2

X1 :8

34
X1:8

-X30

01

E4

INC. A

+01A1R2

35 X1:7

-X47

=3201-01/16.2

-X80

20

<3>

C.B. OPEN

SPARE TRIP

TRIP COIL SUPERVISION

TRIP COIL SUPERVISION

X5:10

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

-Q01

/2.2 S3

-R2

-R3.1

4,7k

1,5k

X5:9

21

22

-X30

47k

X6:13

-R3.2

-R3.3

1,5k

-Q01

-R4

/2.2

-R5

F1

1 k

E
23 X6:14

25

-K4

-X30

24

Ivar Aasen_LV
SENTRON
3203-01

4,7k

14
/1 5.6 11

12

F05:4

/7.6

Acceptance Code:

1
.
.

.
.

.
.

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

10

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
ISSUED FOR CONSTRUCTION

Date:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Shunt Trip

02I

Issue

Drawing Title:

Supplier

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

16

<3>

<1>

<4>

<6>

<5>

<7>

<8>

<>

<9>

230V AC

15

14

10

-X90

11

-X47

No. / Text

F06:2

/7.7

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

C.B. OPEN VIA UVT COIL

(73ms)

C.B. OPEN LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

C.B. OPEN BY ESD TRIP

C.B. OPEN BY PSD TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

10

C.B. UNDER VOLTAGE TRIP COIL

X5:13 & 14 : MOMENTARY TRIP

X5:11 &12 : DELAY 0,2-3,2 SEC

14

14
-K12

/16.5

13

13

E2

BO3

-K11

/16.4

E1

<2>

-X47

04

16

12

-X90

13

This drawing was produced electronically


and requires no signature.
It may not be amended manually

03

-F20

/1 3.2

X5:12

-Q01
-Q01

INCLUDE A JUMPER FOR ESD/PSD RELAY CONTACTS.


ALSO INCLUDE A NOTE TO SAY, REMOVE JUMPERS IF
ESD/PSD USED.

/2.2

F4

U<

E
X5:11

Ivar Aasen_LV
SENTRON
3203-01

X5:13

X5:14

<10>

F06:4

/7.7

Acceptance Code:

1
.
.

.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Under Voltage Trip

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

11

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

16

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually
Ivar Aasen_LV
SENTRON
3203-01

<>

No. / Text

<1>

2/3 TRIP SELECTOR SWITCH

LEGAND:

-S06

POS. 1: TRIP INC. A C.B. AFTER START SEQUENCE

=3201 -01/12.6

=3201-01/12.6

/1 5.6

/1 5.6

14

17

=3202-01/12.6

POS. 2: TRIP BUS TIE C.B. AFTER START SEQUENCE

POS. 3: TRIP INC. B C.B. AFTER START SEQUENCE

=3202-01/12.6

BUSTIE
INC B

INC A

Acceptance Code:

1
.
.

02I

Supplier

DET NORSKE
ISSUED FOR CONSTRUCTION

01E
ISSUED FOR REVIEW
Issue

Description

23.02.201 5 EStad

DD

SW

26.05.201 4 DD

HFO

SW

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Drawing Title:

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB

2/3 Trip Selector Switch

M140
NTS
51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

12

Area:

Scale

Siemens Dwg. No.:

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

16

2U_1

/3.5

82EN0100 BUS B VOLTAGE

2U

/4.5

2V

/4.5

-X46

01

F04:2

/7.5

02

F04:4

/7.5

03

04

DC L+
(AC)
LDC

COMMUNICATION PORT

System/service
interface
IEC 61850
IEC 61 870-5-103
Profibus DP
Modbus RTU
DNP 3.0

Ethernet Interface
DIGSI 4
RJ45

EL
OPT

Earthing at
rear of housing

Live Status Contact

Enter

Power Supply

BI11

BI10

BI9

BI8

BI7

BI6

BI5

Run

Error

BO5

BO4

BO3

BO2

BI4

OPERATION PANEL

Esc

BO1

BI3

BI1

VC, VN, Vsyn,VX

VA, VAB,Vph-n
VB, VBC

IN, INS

IC

SIPROTEC 7SJ8081

IA

BI2

-F20

C2

C1

D13
/1 5.6
D14
/1 5.6

C3
C4
C5
C6
C7
C8
D1
D2
D3
D4
D5
D6
D7
D8
D9

/1 5.6

F20_I0

D12

/1 4.3
/1 4.3
/1 4.4
/1 4.4
/1 4.4
/1 4.4
/1 4.5
/1 4.5
/1 4.6
/1 4.6
/1 5.2
/1 5.2
/1 5.3
/1 5.3
/1 5.4

F20_I1

F1
F2
F3
F4
F5
F6
F7
F8

/2.6

F20_I2

E13
E14

/2.6

F20_I3

E9
E11
E12

F20:C2

/5.6

2W

/4.5

/2.6

F20:C1

/5.6

2V_1

/3.5

EL

OPT

PE

B4

B3

B2

B1

E7
/1 6.6
E10
/1 6.6
E8
/1 6.6

E
C10
/9.5
C11
/9.5
C9
/9.5
C12
/9.4
C14
/9.4
C13
/9.4
E2
/1 1 .1
E1
/1 1 .1
E4
/1 0.3
E3
/1 0.3
E6
/9.1
E5
/9.1

Ivar Aasen_LV
SENTRON
3203-01

D10
/1 5.4
D11
/1 5.4

82EN0100 BUS A VOLTAGE

FOR SYNC. CHECK

82EN0200

/2.6

This drawing was produced electronically


and requires no signature.
It may not be amended manually

IB, IN2

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

COMMUNICATION TOPOLOGY

Acceptance Code:

REF.DWG.NO.: DN02-S09011-E-XI-3202-01

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Siprotec Protection Relay

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
13

DN02-S09011-E-XK-3203-01

+03A1R2

Sheet:

Sheets:

16

<>

<1>

<2>

<3>

<4>

No. / Text

<5>

24V+_1

/7.2

C.B IN CONNECTED POSITION

C.B. IN DISCONNECTED POSITION

-Q01

/2.2 -S1

-Q01

/2.2 -S1

C.B. IN TEST POSITION

C.B. OFF

1 = OFF

C.B. ON

1=ON

X6:11

X6:9

-S32

/2.1

-S30

/2.1

-S35

/2.2

2
4

2
4

2
4

X6:12

X6:10

-X35

C
D3

D1

D4

BI5

-F20

/1 3.2

D2

C8

C6

C4

-F20

/1 3.2

BI4

-F20

/1 3.2

BI3

-F20

/1 3.2

BI2

-F20

/1 3.2

C7

C3

C5

BI1

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Ivar Aasen_LV
SENTRON
3203-01

0V_1

/7.2

0V_2

/1 5.1

Acceptance Code:

1
.
.

.
.

.
.

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

14

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
ISSUED FOR CONSTRUCTION

Date:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Siprotec Binary Inputs

02I

Issue

Drawing Title:

Supplier

DN02-S09011-E-XK-3203-01

+03A1R2

Sheets:

1 6

<>

<2>

<1>

<3>

<5>

<4>

No. / Text

<7>

<6>

13

24V+_2

/7.3

C.B READY TO CLOSE

CONTROL VOLTAGE FAULT

-F01

/7.1

ARC DETECTED

SIGNAL FROM ARC DETECTION

UNIT FROM INC. C.B. A

ARC DETECTED

SIGNAL FROM ARC DETECTION

UNIT FROM INC. C.B. B

C.B. TRIP SIGNAL FROM 2/3

TRIP SELECTOR SWITCH

TRIP COIL SUPERVISION OK

12
14

4
-S06

/1 2.4

-K4

/10.6

11

-F30

C.B. TRIP BY ESD

STATUS SIGNAL

INC. B

=3202-01/16.2

14

-X35

-X35

14

-K12

/16.5

14

23

24

15 X1:1 5

13 13

23

-F30

-X35

-F05

/7.5

X1:16

24

14

-K11

/16.4

-F04

/7.4

-Q01

/2.2
S20

+02A1R2

X1 :1 6

14

-X35

14

X6:6

INC. A

+01A1R2

-F03

/7.3

15 X1:1 5

=3201 -01/16.2

13

13

11

-X35

-F02

/7.2

10

14

INHIBIT SYNC. CHECK

14

-X35

X6:5

-F06

/7.6

13

13

-X35

13

12

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

14 14

-Q03

/3.2

-Q04

/4.2

D13

D10

BI11

BI10

BI9

BI8

BI7

D11

D14

D8

13

D6

-Q06

/6.2

-F20

/1 3.2

-F20

/1 3.2

14 14

BI6

D9

D7

D5

-Q05

/5.2

-F20

/1 3.2

Ivar Aasen_LV
SENTRON
3203-01

-F20

/1 3.2

D12

13 13

E
0V_2

/1 4.6

Acceptance Code:

1
.
.

.
.

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-203-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
15

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
ISSUED FOR CONSTRUCTION

Date:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB
Siprotec Binary Inputs

02I

Issue

Drawing Title:

Supplier

DN02-S09011-E-XK-3203-01

+03A1R2

Sheet:

Sheets:

16

<1>

No. / Text

<3>

<2>

ESD TRIP

DE-ENERGIZED TO TRIP, +24VDC

SIL3

PSD TRIP

DE-ENERGIZED TO TRIP, +24VDC

SIL3

FAULT FROM SIPROTEC

HW COMMON SIGNAL FROM EACH SWBD

(SPARE SIGNAL)

E8

E7

3
E10

A2 (-)
Y2

7SJ8081

-F20

/1 3.2

-K12

/.5

A2 (-)
Y2

-K11

/.4

A1 (+)
Y1

A1 (+)
Y1

-X70

1
2
3

-X65

-X65

EXTERNAL

CABLE

EXTERNAL CABLE

Ivar Aasen_LV
SENTRON
3203-01

<>

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

ESD NODE

PSD NODE

ESD/PSD ARE NOT USED FOR BUS TIE.


INCLUDE A JUMPER.

E
-K1 1

14
/1 1 .2

24
/1 5.4

-K12

13

14
/1 1 .3

24
/1 5.4

23

13

23

Acceptance Code:

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Drawing Title:

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

BUSTIE ACB

Area:

Scale

Siemens Dwg. No.:

Siprotec Spare Outputs, ESD/psd Trip Relay & Fault Contact

M140

NTS

51PO-04193.230-K-203-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
1 6

DN02-S09011-E-XK-3203-01

+03A1R2

Sheet:

Sheets:

16