Solution for Utilities:

66/11kV Substation Lambak Kanan, Brunei


Customer: DES Brunei
Country: Brunei
Project: 66/11 kV S/S Lambak Kanan
Date: 2003

Requirements
Building a 66/11kV substation as a greenfield project means even
the street to the new site and site levelling was included in the
contract
High attention by customer since project under the Ministry of
Development of Brunei Darussalam

Solution
Internal split into on and off-shore portion with local project
office set-up in Brunei

Scope of Supply

66 kV Outdoor Switchyard
66/11 kV Transformers
11kV AIS
AC-System / DC-System / UPS

SCMS & Protection System


Civil works / Fire Protection System
Installation & Commissioning

Page 1

2008

On-Shore: all civil activities by local subcontractor; installation


and commissioning under Siemens supervisors
Off-Shore: design engineering procurement and delivery of all
electrical components

Highlights
International contracting e.g.:
66kV breaker, Scada and Protection; Mimic Panel: Germany
66kV disconnectors, insulators, PTs and CTs; 11kV swgr: India
Transformers: Pakistan; Cables: Indonesia
Poles: Thailand;

Author

Siemens AG
Energy Power Distribution Solutions