(P-004-2004-MMD)
Edificio Multifamiliar Herrera
Cliente:
Sr. Carlos Herrera
Ubicacin: Urb. San Silvestre Primera etapaCalle Los Mastuerzos Mz. J - Lt. 21
Proyecto:
Hecho
Fecha
Atencion:
ITEM
DESCRIPCIN
UNID.
CANT.
P. UNIT.
S/.
Equipo TLM
11/15
PARCIAL
S/.
SUB-TOTAL
S/.
1.00
TRABAJOS PRELIMINARES
2.00
MOVIMIENTO DE TIERRAS
2.01
M3
21.16
30.86
652.86
2.02
M3
25.63
36.69
940.36
2.03
M3
8.32
16.81
139.86
2.04
M3
38.46
18.34
705.36
3.00
CONCRETO SIMPLE
3.01
M2
95.58
22.64
2,163.93
3.02
SOBRECIMIENTOS
3.02.1
M3
0.59
197.79
116.70
3.02.2
M2
8.18
32.32
264.38
4.00
CONCRETO ARMADO
4.01
CIMIENTOS REFORZADOS
4.01.1
CONCRETO EN CIMIENTOS
M3
16.45
243.16
3,999.98
4.01.2
ACERO EN CIMIENTOS
KG
169.14
4.07
688.40
4.01.3
ENCOFRADO DE CIMIENTOS
M2
2.64
29.70
78.41
4.02
ZAPATAS
4.02.1
CONCRETO EN ZAPATAS
M3
248.15
248.15
61,578.42
4.02.2
ACERO EN ZAPATAS
KG
136.76
4.02.3
ENCOFRADO DE ZAPATAS
M2
21.66
38.69
838.03
4.03
COLUMNAS
4.03.1
CONCRETO EN COLUMNAS
M3
7.88
298.77
2,354.31
4.03.2
ACERO EN COLUMNAS
KG
1204.35
2.19
2,637.53
4.03.3
ENCOFRADO DE COLUMNAS
M2
92.85
24.97
2,318.46
4.04
VIGAS
4.04.1
CONCRETO EN VIGAS
M3
10.07
234.68
2,363.23
4.04.2
ACERO EN VIGAS
KG
1187.53
2.19
2,600.69
4.04.3
ENCOFRADO DE VIGAS
M2
81.91
28.14
2,304.95
4.05
LOSA ALIGERADA
4.05.1
M3
12.58
224.44
2,823.46
4.05.2
KG
554.36
2.19
1,214.05
4.05.3
M2
123.91
17.99
2,229.14
4.05.4
UND
883.00
1.08
953.64
4.06
ESCALERA
4.06.1
CONCRETO EN ESCALERA
M3
0.00
234.68
4.06.2
ACERO EN ESCALERA
KG
0.00
2.19
4.06.2
ENCOFRADO DE ESCALERA
M2
0.00
30.00
5.00
ALBAILERIA
5.01
M2
133.10
43.03
5,727.29
5.02
M2
197.92
25.74
5,094.46
6.00
REVOQUES Y ENLUCIDOS
6.01
M2
215.39
15.71
3,383.78
6.02
TARRAJEO EN COLUMNAS
M2
59.08
19.74
1,166.24
6.03
TARRAJEO EN VIGAS
M2
22.77
23.02
524.17
6.04
TARRAJEO EN MUROS
M2
281.37
9.22
2,594.23
7.00
PISOS Y PAVIMENTOS
7.01
M2
113.04
15.13
1,710.30
7.02
M2
195.57
15.43
3,017.65
8.00
INSTALACIONES SANITARIAS
8.01
DESAGUE
8.01.1
PTO
4.00
93.51
374.04
8.01.2
PTO
7.00
53.48
374.36
8.01.3
ML
10.00
19.41
194.10
8.01.4
CAJAS DE REGISTRO
UND
2.00
89.86
179.72
8.02
AGUA
8.02.1
PTO
19.00
65.52
1,244.88
8.02.2
PTO
6.00
81.60
489.60
8.02.3
ML
15.00
7.80
117.00
8.02.4
ML
22.00
21.44
471.68
9.00
INSTALACIONES ELECTRICAS
9.01
PTO
21.00
45.32
951.72
9.02
PTO
5.00
45.32
226.60
9.03
PTO
25.00
58.29
1,457.25
9.03
GBL.
1.00
500.00
500.00
9.04
TABLERO GENERAL
UND.
1.00
500.00
500.00
3,635.57
S/.
S/.
S/.
S/.
124,265.18
12,426.52
18,639.78
155,331.48
SUB TOTAL
GASTOS GENERALES 10%
DIRECCION TECNICA Y UTILIDAD 15%
TOTAL
NO INCLUYE IGV
2,438.44
2,545.00
88,982.69
10,821.75
7,668.41
4,727.94
1,122.22
2,323.16