Project Location : 56
Bazzar, near Chaibar,
Indore.
Building type :
Commercial.
Area of site : 15064
sq. Feet.
Construction
dimension : 105 feet
* 148 feet.
Duration : 15 days
(19 june 2015 3
july 2015)
SHOWROOMS :
Showroom 1 : 20 5 * 574 (1661 sq.
Ft)
Showroom 2 : 15 5 * 574 (1254 sq.
Ft)
Showroom 3 : 17 0* 574 (1384 sq.
Ft)
Showroom 4 : 16 4 * 574 (1329 sq.
Ft)
Showroom 5 : 17 0 * 574 (1384 sq.
Ft)
Showroom 6: 22 2 * 634 (1993 sq.
Ft)
SHOPS :
Shop 1 : 28 * 21 (835 sq. Ft)
Shop 2 : 34 2 * 15 (728 sq. Ft)
Shop 3 : 21 6 * 15 (458 sq. Ft)
EXACAVATION &
GROUND WORK
SUB
STRUCTURE
WORK
SUPER
STRUCTURE
WORK
FINISHING
WORK
SERVISE WORK
MASONRY
WORK
PROJECT DETAILS
FOOTING
Raft Footing of 1m
Grade M30
Upper mesh: dia = 10mm,
12mm
Lower mesh: dia = 10mm,
12mm
PCC Filling = 138.23 m3
Thickness at base= 100 to
150mm
Raft Filling: Theoretical
1382.37 m3, Practical- 1357
m3
COLUMN
Dimension :
400mm*800mm
Height: 2800mm
Concrete: M30
Reinforcement:
Grade: Fe500
Dia: 20mm
Distance between
two column: 4850mm
Overlapping of
reinforcement in
column: (40
to 46)*
diameter of bar.
STAIRCASE
Dimension:
Rise: 170mm
Tread : 300mm
Width : 600mm
CODE BEAM
POST
TENSIONIN
G SLAB
CROSS-BARS
COLUMN
REINFORCEMENT
32mm
Cap
reinforcement
26mm
CROSS-BARS
32mm
MESH
REINFORCEMENT
8mm
MATERIAL /
EQUIPMENT
JCB
ROLLER
CONCRETE (RMC)
MURRAM
CEMENT
LABOUR
STEEL (PER PIECE)
6mm
8mm
10mm
12mm
16mm
20mm
25mm
COST ( in Rs.)
900/hr
1200/hr
4000/m3
100/m
270/bag (50 Kg)
15/sq. Ft.
129
213
322
459
813
1272
1982