PV Components
UTILITY
METER
M
There are some alternatives for distributing generated power, these are clean
WIND
TURBINE
1 kW
and efcient. For a better generation and distribution, a design controller of loads and
ENPHASE
M 250
energy generated that is completely intelligent and independent. This means, that
PROJECT:
INVERTER
DC - AC
WIND-DC
DISCONNECT
system is able to make smart and autonomous decisions. The system created is
A
ARRAY 2
ADDRESS:
C1 H9 HILLSIDE SAN
JUAN, P.R.
RENEWABLE
AC PREPA
DISCONNETC
NOT SCALE
DRAWING BY:
AUTOMATIC
SWITCH
SECONDARY PANEL
Further, the Model M250 micro inverter is more powerful and safer
PROJECT NO.
SHEET NO.
3-9
DRAWING NO.
DESIGNER'S CERTIFICATION
BATTERY
BANK
TRINA SOLAR
TSM-PA05
PANELS 29 OF 250W
TOTAL 7.25kW
totalmente inteligente y autnomo. Esto signica que este sistema es capaz de tomar
SECONDARY
PANEL
CRITICAL LOAD
120V/240V
INVERTER/CHARGE
CONTROLLER
(2)
JUNCTION
BOX-3
ARRAY 3
1. I certify that I am a licensed engineer or archited member of the collage of my profession and
authorized by this project's owner to present these construction plans to PREPA.
2. In compliance with Law No. 7 of July 19, 1985, as amended, known as Contruction
Plans Certication Law, I certify that I prepared the electric design of this project following all codes,
standards, norms and regulation approved by PREPA. Puerto Rico Planning Board and Permits and
Regulation.
DATE: _____________
__________ ___________________________
LIC. NO: ______________
DESIGNER'S SIGNATURE
__________________________________________________________________________________
Introduction
Renewable technology is moving very fast, no we have different alternatives to
generate clean an efcient energy. There is solar, wind, hydro, ocean, hydrogen
LEGEND:
TRINA SOLAR TSM-250-PA05
UTILITY METRE
ENPHASE M 250
DESIGN KW:
DATE: ______________________
2. PREPA does not assume responsibility over the certied design. PREPA's endorsement does not
relieve the designer from the professional responsibility assumed with the certication on these
project's plans. This endorsement receives neither the builder nor private inspector from compliance
with standing dispositions from National Electric Code; National Electric Safety Code, construction
standards, norms and regulation from PREPA and other government agencies as well as federal and
state laws ruling by the time construction
WIND TURBINE
3. This endorsement is valid for one year. If electrical works have begun during this year, with prior
notication to PREPA, the endorsement will still be valid until work's completion. In case there is not
certied electrical work during a twelve month period, this endorsement will lose its validity.
__________________________________________________________________________________
OBSERVATIONS
WIND-DC DISCONNECT
ENPHASE BRANCHH
E-2
Important note:
1. The contractor must verify all
dimensions and site conditions
before proceeding with work. If you
nd any error, omission or failure,
the contractor shall notify the
Engineer before and or continue
the work until corrections are made.
The engineer must be notied about
the error, omission or failure and
continuous work the contractor shall
be responsible for any errors,
omissions and / or omissions.
2. All designs and drawings and
prints content issued by "power
system evolution" are the exclusive
property
of
"power
system
evolution" and should not be reused
elsewhere. Except for which they
were specically designed.
3. Information\ and\ documents
presented here are the property of
"power
system
evolution",
reproduction or use part or all of
this document and the information
may be performed by authorized
persons must submit a written
consent of "power system evolution
"might otherwise be in violation of
copyright which is completely
forbidden.
energy. Equally important is the knowledge to store this energy and use it, has
Eolic Components
APPROVED
DATE
1.
Economical Analysis
2.
INVERTER/CHARGE CONTROLLER
than previous models, and can be paired with higher powered 60 cell
REV.
8.25 KW______
1. PREPA endorses the electric design shown in these construction plans based on the certication
presented by the designer in compliance with Law No. 7 of July 19, 1985 as emended.
JUNCTION BOX
BATTERY BANK
tolerance.
SCALE:
PRIMARY PANEL
MAIN BREAKER
120V / 240V
elctrica y que a su vez sea energa limpia. Para optimizar la generacin y lograr una
JUNCTION
BOX-2
POWER SYSTEM
EVOLUTION
ATS
ALTERNATIVE
ENERGY
SHEET TITLE:
ATS
RENEWABLE
ENERGY
PROPERTY OF:
B
ENPHASE
M 250
PORTABLE
GEN.-AC
DISCONNECT
E
JUNCTION
BOX-1
SMART RESIDENTIAL
BIMODAL SYSYEM
PORTABLE
GENERATOR\ 10\
ARRAY 1
- Trina Solar
3.
4.
improve signicantly.
modern
- Economical Overview
savonious rotor. S-rotors achieve optimal performance, the two blades must be
First off, the economic analysis that will be established will be made involving all
offset to permit some circulation of air ow. Because of its simplicity, a Savonious
components chosen in the previous chapters. Table 18-7 presents a list with all equipment
photovoltaic effect in 1839. The First practical photovoltaic cell was invented at Bell
selected from the design with its accurate price. Note that these prices don't include tax.
Once prices of equipment are added, a total of $46,026.42 is obtained from the design.
1888 in Cleveland, Ohio by Charles F. Brush. As a group we opted to use both solar and
wind energy as our renewable energy generators. Living in Puerto Rico close to the
system. In recent years thanks to the study of power electronics theres been an
ENPHASE
M 250
SMART RESIDENTIAL
BIMODAL SYSTEM
PROPERTY OF:
POWER SYSTEM
EVOLUTION
ADDRESS:
SOLAR-AC
DISCONNECT
PREPA
C1 H9 HILLSIDE SAN
JUAN, P.R.
SHEET TITLE:
PV SYSTEM MONOLINEAR
SCALE:
several new technologies and new type of batteries, for instance the Lithium-Ion
JUNCTION
BOX-2
ARRAY 2
store more energy and have a slow loss of charge. Furthermore we must take a look at
5
point where its no longer useful. Home automation is also a growing eld, recently
ENPHASE
M 250
ARRAY 3
ELECTRICAL
PANEL A
AUTOMATIC
SWITCH
SECONDARY PANEL B
4-9
SOLAR-AC
PROTECTION BOX
3 BREAKER-20 AMP/2P
DESIGNER'S CERTIFICATION
1. I certify that I am a licensed engineer or archited member of the collage of my profession and
authorized by this project's owner to present these construction plans to PREPA.
2. In compliance with Law No. 7 of July 19, 1985, as amended, known as Contruction
Plans Certication Law, I certify that I prepared the electric design of this project following all codes,
standards, norms and regulation approved by PREPA. Puerto Rico Planning Board and Permits and
Regulation.
DATE: _____________
__________ ___________________________
LIC. NO: ______________
DESIGNER'S SIGNATURE
__________________________________________________________________________________
1,2,3
1
2
#8 THWN-2
3
4"
JUNCTION BOX
DESIGN KW:
DATE: ______________________
2. PREPA does not assume responsibility over the certied design. PREPA's endorsement does not
relieve the designer from the professional responsibility assumed with the certication on these
project's plans. This endorsement receives neither the builder nor private inspector from compliance
with standing dispositions from National Electric Code; National Electric Safety Code, construction
standards, norms and regulation from PREPA and other government agencies as well as federal and
state laws ruling by the time construction
3. This endorsement is valid for one year. If electrical works have begun during this year, with prior
notication to PREPA, the endorsement will still be valid until work's completion. In case there is not
certied electrical work during a twelve month period, this endorsement will lose its validity.
__________________________________________________________________________________
OBSERVATIONS
PVC SCH-40
ENPHASE BRANCH
ELECTRICAL PANEL A
ELECTRICAL PANEL B
REV.
APPROVED
DATE
- Payback
4.75% interest rate to be paid in 7 years, or84 months. Coop Isabela offers a loan at a 5.95%
connection operation in a single model. Besides, VFXR provide system designers with
Banco Santander
Coop Isabela
Loan Amount:
$46,026.42
$46,026.42
Interest Rate:
4.75%
5.95%
Payback Period:
7 years = 84 month
Monthly Payment:
$645.13
$387.14
$8,164.50
$23,658.78
chemistry known for light weight and very high discharge rates. Iron Edison battery
$54,190.92
$69,685.20
unprecedented exibility and compatibility for nearly any power conversion scenario,
the VFXR have new features and technologies.
8.25 KW______
1. PREPA endorses the electric design shown in these construction plans based on the certication
presented by the designer in compliance with Law No. 7 of July 19, 1985 as emended.
Payback Period
Energy Storage
E-3
Important note:
ELECTRICAL
PANEL B
LEGEND
SHEET NO.
DRAWING NO.
1.
2.
3.
DRAWING BY:
TRINA SOLAR
TSM-PA05
PANELS 29 OF 250W
TOTAL 7.25kW
system, where we can bring the customer a way to fully live off-grid but at the same
SOLAR-AC
COMBINER BOX
50 AMP/2P
JUNCTION
BOX-3
becoming more feasible, with a more commercial approach, and a very important
been engaged in the design, installation and sale or lease of solar photovoltaic system
NOT SCALE
4.
systems can be used for 12, 24 and 48 volt applications. We can also help you optimize
Coop Isabela
:
battery capacity to take better advantage of the solar, wind and other hardware you
Our charge controller will charge the batteries and monitor them. Equally important,
Banco Santander:
the inverters transform the DC into AC, so the energy can be used in the house. At the
same time a controller will monitor the house energy consumption, operating the
PROJECT:
PROPERTY OF:
WIND-DC
DISCONNECT
BOX
INVERTER
DC - AC
POWER SYSTEM
EVOLUTION
WIND-AC
DISCONNECT
"PREPA"
60 AMP/2P
WIND-AC
DISCONNECT
ELECTRICAL PANEL A
- Design taking into consideration the functions of the systems working together.
ELECTRICAL PANEL B
PREPA METER & MAIN BREAKER
E-5
DATE: _____________
DESIGN KW:
DATE: ______________________
2. PREPA does not assume responsibility over the certied design. PREPA's endorsement does not
relieve the designer from the professional responsibility assumed with the certication on these
project's plans. This endorsement receives neither the builder nor private inspector from compliance
with standing dispositions from National Electric Code; National Electric Safety Code, construction
standards, norms and regulation from PREPA and other government agencies as well as federal and
state laws ruling by the time construction
__________________________________________________________________________________
OBSERVATIONS
1) RELOCATION OF EXISTING LINES AND WORK IN CONNECTION WITH ENERGIZED LINES
WILL BE DONE BY PREPA WITH THE SOLICITOR PAYING THE COST AS INCURRED WITH
PREVIOUS NOTIFICATION BY THE BUILDER, THE ABOVE MENTIONED WORK SHOULD BE
COMPLETED BEFORE COMMENCING THE\ WORK OF CONSTRUCTION THE PROJECT.
2) THE APPROVAL OF THESE PLANS BY THE AUTHORITY DOES NOT RELIVE THE BUILDER
OF COMPLYING WITH EACH AND ALL OF THE REQUISITES ESTABLISHED BY THE NATIONAL
ELECTRIC CODE AND THE REGULATION OF THE PUERTO RICO ELECTRIC AUTHORITY.
3) THE APPROBAL OF THESE PLANS IS ON THE CONDITION THAT THE AUTHORITY BE
CONSULTED ON THE CONDITION OF THE ELECTRICAL SERVICE AT THE TIME OF
BEGINNING CONSTRUCTION.
1.
APPROVED
- PLC Software
The procedure of control system will be developed and validated by a PLC
software that can sustain an trial and error process. The software selected for
MicroLogix 1100 PLC hardware will be tested with RSLogix 500. This software will
help maximize performance, save project development time, and improve
productivity.
- Interface
The MicroLogix 1100 will be performing with a 1761-NET-ENIW that provides
EtherNet/IP connectivity for control system devices. Ethernet Network Interface,
ENIW, allows for easy connection to non-Ethernet controllers onto new or existing
Ethernet networks as well upload or download programs, communicate between
3.
4.
8.25 KW______
1. PREPA endorses the electric design shown in these construction plans based on the certication
presented by the designer in compliance with Law No. 7 of July 19, 1985 as emended.
DATE
The MicroLogix 1100 controller is aviable in 10, 16 or 32 point digital I/O versions.
Important note:
1. I certify that I am a licensed engineer or archited member of the collage of my profession and
authorized by this project's owner to present these construction plans to PREPA.
2. In compliance with Law No. 7 of July 19, 1985, as amended, known as Contruction
Plans Certication Law, I certify that I prepared the electric design of this project following all codes,
standards, norms and regulation approved by PREPA. Puerto Rico Planning Board and Permits and
Regulation.
2.
family, the MicroLogix 1100 controller brings high-speed, powerful instructions and
exible communication to applications that demand compact, cost-effective solutions.
DRAWING NO.
DESIGNER'S CERTIFICATION
REV.
M
DATE:
6-9
ELECTRICAL
PANEL B
3. This endorsement is valid for one year. If electrical works have begun during this year, with prior
notication to PREPA, the endorsement will still be valid until work's completion. In case there is not
certied electrical work during a twelve month period, this endorsement will lose its validity.
3,4
Group Members
SHEET NO.
NOT SCALE
DRAWING BY:
ELECTRICAL
PANEL A
__________ ___________________________
LIC. NO: ______________
DESIGNER'S SIGNATURE
__________________________________________________________________________________
- Develop a feasibility study between renewable energy and electric energy with the
The Micro Logix family of controllers provides ve levels of control, small on size,
SHEET TITLE:
for payment will be Banco Santander because of its low interest paid at years.
ADDRESS:
C1 H9 HILLSIDE SAN
JUAN, P.R.
LEGEND
perform.
but since its payback period is 7 years the monthly payments is $645.13. The best option
- PLC Hardware
SMART RESIDENTIAL
BIMODAL SYSYTEM
- Design a module which will implement a design of the PV and Eolic system that
$15,494.86
$387.14 but a high paid rate, on the contrary Banco Santander offers a low interest rate,
Control Components
EOLIC SYSTEM
MONOLINEAR
Objectives
- Dene a critical and no critical load on the residence for energy optimization.
- $54,190.92
Comparing both bank loan offers, Coop Isabela offers a lower monthly payment of
conserve the energy in the batteries and make sure the house is running properly.
Dierence:
$69,685.20
house in different modes. While each of these modes will hace a specic purpose, to
QUANTITY
1
1
1
1
1
2
1
1
DATE:
the best way to charge possible and make sure the batteries doesnt discharge to the
Collaborating with New Energy Consultants, a native Puerto Rican company, has
ENPHASE
M 250
batteries. The rst commercial lithium batteries appear in 1991. This new battery can
UNIT PRICE
TOTAL
$4,108.50
$4,108.50
$2,129.44
$2,129.44
$10,907
$10,907
$7,636.36
$7,636.36
$7,300
$7,300
$1,770
$3,540
$805.12
$805.12
$9,600
$9,600
Total
$46,026.42
Table 18-7: List of total amount system equipment components with prices.
Windy Boy This inverter is capable of handling an input of 3,800 watts and 3,600
PROJECT:
PREPA METER
MAIN BREAKER
JUNCTION
BOX-1
efciency. Also batter storage system have seen its share of improvements with
ITEM
CONTROL EQUIPMENT
PV RACK SYSTEM
PV SYSTEM
EOLIC SYSTEM
BATTERY BANK
OUTBACK VFXR 3648
ELECTRICAL INSTALLATIONS
ENGINEERING LABOR
input/output specications. For this reason, the inverter chose in this design is a
ARRAY 1
the market, it was found that inverters come in different intakes regarding the
PV SYSTEM
MONOLINEAR
Equator we have a high amount of light time that can be used for our photovoltaic
GROUP #105
controllers, and generate email messages via simple mail transport protocol (SMTP).
compatibility.