Sie sind auf Seite 1von 3

Ivar Aasen Field Development Project pdQ

DEEPAK MITTAL

25.04.15

02I

27.02.2015

Issued for Construction

EStad

DD

SW

01E

30.09.2014

Issued for Review

EStad

HFO

SW

Rev.

Date

Prepared
by

Reviewed
by

Approved

by

Reason for Issue

690V ESSENTIAL SWBD - CIRCUIT AND TERMINATION DIAGRAM

230V UPS CONTROL VOLTAGE FOR ACBs SUPPLY

Package Title: EICT Package

Area
Code:

System

Code:

M120

83

Project No.:

C-00011

Purchase Order No:

S09011

Project Tag Numbers:

83EN0300

No. of
Pages :

Supplier Document Number:


51PO-04193.230-K-410-00

Rev.

02I

Project Document Number:

Proj Rev.

DN02-S09011-E-XK-3410-00

02I

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Index

Item

Description

Page

1 .

Table Of Content

2.

UPS Intake & Distribution

3.

4.

5.

6.

7.

8.

9.

10.

ALL DRAWING REFERENCES ARE

PREFIXED: DN02-S09011-E-XK-

FOR EXTERNAL TERMINATIONS, REF.:

690V ESSENTIAL SWBD - BLOCK AND TERMINATION DIAGRAM

DOC. NO.: DN02-S09011-E-XI-3401

AND TERMINATION DIAGRAMS FOR THE RESPECTIVE PACKAGES

Ivar Aasen_LV
SENTRON
3410-01

ELECTRICAL PROTECTION & METERING SINGEL LINE

DIAGRAM 690 V ESSENTIAL SWBD 83EN0300

DOC. NO.: DN02-SM-E-XJ-0056-01

ELECTRICAL KEY OVERALL SINGEL LINE INTERLOCK

DIAGRAM EMERGENCY & ESSENTIAL POWER DISTRIBUTION

DOC. NO.: DN02-SM-E-XJ-0062-01

FOR EQUIPMENT DETAILS, REF.:

690V ESSENTIAL SWBD - EQUIPMENT LIST

DOC. NO.: DN02-S09011-E-LA-3401

Acceptance Code:

1
.
.

.
.

DET NORSKE
27.02.201 5 EStad

DD

SW

01E
ISSUED FOR REVIEW

30.09.201 4 EStad

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Appr. by

Date:

P.O.Number

Tag no.

690V ESSENTIAL SWBD

CIRCUIT AND TERMINATION DIAGRAM

230V UPS CONTROL VOLTAGE FOR ACBs SUPPLY


Table Of Content

02I
ISSUED FOR CONSTRUCTION

Issue

Drawing Title:

Supplier

83EN0300

Signature:

S09011

=83EN0300

Area:

Scale

Siemens Dwg. No.:

M120

NTS

51PO-04193.230-K-410-01

+11A1R2

System:

DWG Size Drawing No.:

Rev:

83

A4

02I
1

DN02-S09011-E-XK-3410-01

Sheet:

Sheets:

2
<1>

=85EL0102A

EXT. CABLE

L2

<>

<4>

A1

No. / Text

A2

230VAC UPS AUX. SUPPLY

FOR SWBD MAIN CB'S CONTROL

/.4

SECONDARY 230VAC UPS AUX. SUPPLY

FOR SWBD MAIN CB'S CONTROL

RELAYS FOR DETECTING UPS FAILURE

SWITCH OVER RELAY

230VAC UPS AUX. SUPPLY TO

C.B. CUBICLE +11A1R2

230VAC UPS AUX. SUPPLY TO

C.B. CUBICLE +09A1R2

=85EL0102B

EXT. CABLE
L1

230V AC

-KB1

A1

L2

A2

/.5

A1

-K50

/.6

A2

R2

R1

R3

-K50

/.6

/.6

R3

/.5

R1

/.5

230V AC

<5>

R4

R2

<6>

+11

-X20

+09

-X20 1

Ivar Aasen_LV
SENTRON
3410-01

-KA1

-X10

L1

A
230V AC

<3>

<2>

R4

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

UPS/L1/83EN0300+11

=3401-01/7.1

UPS/L1/83EN0300+09

=3402-01/5.1

UPS/L2/83EN0300+11

=3401-01/7.1

UPS/L2/83EN0300+09

=3402-01/5.1

-KA1

-KB1

14
11

14
=3401-01/1 4.5 12 =3401-01/14.5 12

11

Acceptance Code:

1
.
.

.
.

.
.

DET NORSKE
ISSUED FOR CONSTRUCTION

27.02.201 5 EStad

DD

SW

01 E

ISSUED FOR REVIEW

30.09.201 4 EStad

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Appr. by

Date:

P.O.Number

Tag no.

690V ESSENTIAL SWBD

CIRCUIT AND TERMINATION DIAGRAM

230V UPS CONTROL VOLTAGE FOR ACBs SUPPLY


UPS Intake & Distribution

02I

Issue

Drawing Title:

Supplier

83EN0300

Signature:

S09011

=83EN0300

Area:

Scale

Siemens Dwg. No.:

M120

NTS

51PO-04193.230-K-410-01

System:

DWG Size Drawing No.:

Rev:

83

A4

02I
2

DN02-S09011-E-XK-3410-01

+11A1R2

Sheet:

Sheets:

Das könnte Ihnen auch gefallen