Sie sind auf Seite 1von 53
(For Internal Circulation Only) COS-ISO-00-OGN/OPS/SYST/018 Rev. No. : 0 February, 2002 OPERATION GUIDANCE NOTE QUALITY MANAGEMENT IN MAINTENANCE / OVERHAULING CORPORATE OPERATION SERVICES National Thermal Power Corporation Ltd. NATIONAL THERMAL POWER CORPORATION OPERATION AND MAINTENANCE FORMAL DOCUMENTATION SYSTEM OPERATION GUIDANCE NOTE: COS-ISO-00-OGN/OPS/SYST/018 Rev. No.: 0 Date ; February 2002 QUALITY MANAGEMENT IN MAINTENANCE / OVERHAULING Approved for we Implementation by a cats Director (Operation) Date: Enquiries to: Head of Corporate Operation Services QUALITY MANAGEMENT IN MAINTENANCE / OVERHAULING INDEX SI. No. Title © Page 1.0 INTRODUCTION a 2.0 SUPERSEDED DOCUMENTS 2 3.0 QUALITY ASSURANCE PLAN FOR OVERHAULS 3 3.1 Steam Generator 3 3.2 Burner Assembly 5 33 Air Preheate: 6 3.4 Coal Feede 7 35 Power Cycle Piping 7 36 ESP 8 a7; 5 Flushing Apparatus / Hydro Ejector 8 38 Bow! Mill 9 3.9 Ball & Race Bill 10 3.10 PA. Fan 15 3.14 FD Fan 15 3.12 LD. Fan 16 3.13 Turbine 17 3.44 Turbine Auxiliaries 20 3.15 Boiler Feed Pump 20 3.16 Generator 21 3.17 Power Transtormers 24 3.18 HT Motors 28 3.19 LT Motors 32 3.20 HT/LT Switchgear 32 3.21 Ash Slurry Pump 34 3.22 Ash Slurry Pipe Line 35 3.23 Bottom Ash Hopper / Scrapper Conveyor 35 3.24 CW Pump and Sump 36 3.25 Control and Instrumentation 36 3.26 Chemical Plant 42 4.0 REVIEW 46 Annexure Unit Overhauling Norms for NTPC Thermal Units 47

Das könnte Ihnen auch gefallen