COTO REAL DUQUESA RESIDENTS GROUP - NORMAL REPAIRS AND MAINTENANCE ISSUES

REF NO ISSUE WHEN RAISED AEA RESPONSE

Operations Director: Mark Wilkinson MIEE


"At the AGM AEA comitted themselves to provide a separate list
of works that were required as a result of poor commissioning
and handover, poor design, or poor quality installation"

001 Lifts

For example, for those at the AGM, this was when the discussion
centred around the lifts and the holes in the lift shafts allowing rain to
enter. The Lifts in general have frankly been a disaster

The most serious incident was the Lift at SAMOS 5 which snapped
with people in it at the time. This is to be reported to the Police by the

AEA said that THYSSEN had agreed to recommission the Lifts. That
should mean a credit to the Accounts for the Maintenance paid to
date. The same process was committed to other items also. We need

002 Garage Entrance and Access Doors

As detailed in individuals Edificio's

003 Painting and Decorating Raised at AGM 26/03/.2008

AEA have informed us that the Builder has accepted responsibility for
using "not suitable" material

004 External Lighting Raised at AGM 26/03/.2008

External Lights are regularly shorting out due to water seepage

005 Satellite TV Raised at AGM 26/03/.2008

Lots of problems reported with no signal for lengthy periods

006 Dark Wooden Beams CRDGRG 15/04/2008


It appears that these beams are prone to splitting, requiring 3 full time
Maintenance operatives working on these. Very expensive - we
should look to verify costings and investigate alternatives

007 Structural Engineers Report Reina 28/03/2008

Reina has asked us for an independent Structural Engineer to access


the building works as there are some issues with either building or

008 Community Snagging Raised at AGM 26/03/.2008

When do RYF expect to commence Community Snagging