Sie sind auf Seite 1von 1

SHAPADU ENERGY & ENGINEERING SDN BHD

DOC. NO.
REV

HOOK UP AND COMMISSIONING OF TCOT FIREWATER MONITOR MODIFICATION PROJECT

DATE

22 December, 2015

MSET/M2-216/VDML-001

MSET ENGINEERING CORPORATION SDN BHD


PROJECT: HOOK UP AND COMMISSIONING OF TCOT SDV 146
AIR VOLUME TANK
CLIENT PROJECT.NO. : M2-216
FOR APPROVAL

VENDOR DOCUMENT/DWG
COD
E
A

RE
V

TRANSMITTAL NO.

RETURN STATU
DATE
S

REVISION: 2

ISSUE
DATE

RE
V

17.10.2012
17.10.2012
17.10.2012
17.10.2012

1
1
1
1

MSET/SEEN/M2-216/T-005
MSET/SEEN/M2-216/T-005
MSET/SEEN/M2-216/T-005
MSET/SEEN/M2-216/T-005

16.10.2012
16.10.2012
16.10.2012
16.10.2012
16.10.2012
16.10.2012

1
1
1
1
1
1

MSET/SEEN/M2-216/T-004
MSET/SEEN/M2-216/T-004
MSET/SEEN/M2-216/T-004
MSET/SEEN/M2-216/T-004
MSET/SEEN/M2-216/T-004
MSET/SEEN/M2-216/T-004

TRANSMITTAL NO.

RETURN STATU
DATE
S

MSETe/M2-216/VDML-001
MSETe/M2-216/SCH-001

21.09.201226.09.2012 0 MSET/SEEN/M2-216/T-001
21.09.201226.09.2012 0 MSET/SEEN/M2-216/T-001

CALCULATION AND DRAWINGS


MSET/M2-216/V-146/DC
MSET/M2-216/V-146/01
MSET/M2-216/V-146/02
MSET/M2-216/V-146/03
MSET/M2-216/V-146/04

21.09.201226.09.2012
21.09.201226.09.2012
21.09.201226.09.2012
21.09.201226.09.2012
21.09.201226.09.2012

0
0
0
0
0

MSET/SEEN/M2-216/T-001
MSET/SEEN/M2-216/T-00111.10.2012
MSET/SEEN/M2-216/T-00111.10.2012
MSET/SEEN/M2-216/T-00111.10.2012
MSET/SEEN/M2-216/T-00111.10.2012

MSETe/M2-216/ITP-001
MSET/M2-216/WP-319
MSET/M2-216/WP-310
MSET/M2-216/WP-344
MSET/M2-216/WP-313
MSET/M2-216/WP-314
MSETe/M2-216/WP-315
MSET/M2-216/WP-316
MSETe/M2-216/WP-324
MSET/M2-216/WP-333
MSET/M2-216/WP-337
MSET/M2-216/WP-343
MSET/M2-216/SWM-001
MSET/M2-216/WPS/PQR
MSET/M2-216/WPS/PQR
MSET/M2-216/WPS/PQR
MSET/M2-216/WPS/PQR
MSET/M2-216/WPS/PQR

21.09.201204.10.2012
21.09.201204.10.2012
21.09.201204.10.2012
21.09.201204.10.2012
21.09.201211.10.2012
21.09.201211.10.2012
21.09.201211.10.2012
21.09.201211.10.2012
21.09.201204.10.2012
21.09.201204.10.2012
21.09.2012
21.09.2012
21.09.201226.09.2012
21.09.201226.09.2012
21.09.201226.09.2012
21.09.201226.09.2012
21.09.201226.09.2012
21.09.201226.09.2012

0
0
0
0
0
0
0
0
0
0

MSET_SEEN_M2-216_T-002
13.10.2012
MSET_SEEN_M2-216_T-002
13.10.2012
MSET_SEEN_M2-216_T-002
13.10.2012
MSET_SEEN_M2-216_T-002
13.10.2012
MSET_SEEN_M2-216_T-003
MSET_SEEN_M2-216_T-003
MSET_SEEN_M2-216_T-003
MSET_SEEN_M2-216_T-003
MSET_SEEN_M2-216_T-002
13.10.2012
MSET_SEEN_M2-216_T-002
13.10.2012

B
B
B
B

0
0
0
0
0
0

MSET/SEEN/M2-216/T-00111.10.2012
MSET/SEEN/M2-216/T-00113.10.2012
MSET/SEEN/M2-216/T-00113.10.2012
MSET/SEEN/M2-216/T-00113.10.2012
MSET/SEEN/M2-216/T-00113.10.2012
MSET/SEEN/M2-216/T-00113.10.2012

C
B
B
B
B
B

MSET/M2-216/WQT-001
MSET/M2-216/NDT/001

WITHOUT ATTACHMENT
21.09.201216.10.2012 0 MSET/SEEN/M2-216/T-004
24.10.2012 1 MSET/SEEN/M2-216/T-006
21.09.2012

B
B
B
B

PROCEDURES AND PLANS


INSPECTION AND TEST PLAN
WELDING REPAIR PROCEDURE
WELDING CONSUMABLE CONTROL PROCEDURE
HYDROSTATIC TEST PROCEDURE
RADIOGRAPHIC TESTING PROCEDURE
MAGNETIC PARTICLE TESTING PROCEDURE
ULTRASONIC TESTING PROCEDURE
LIQUID PENETRANT TESTING PROCEDURE
BLASTING & PAINTING PROCEDURE
PACKING, MARKING, INLAND TRANS. & PRESERVATION
PROCEDURE
POSITIVE MATERIAL INDENTIFICATION EXMINATION PROCEDURE
(PMI)
HARDNESS TESTING PROCEDURE
SUMMARY OF WPS/PQR
WPS/PQR MSET 10/04A (GTAW/SMAW)
WPS/PQR MSET 10/06A (SMAW)
WPS/PQR MSET 10/06B (SMAW/SAW)
WPS/PQR MSET 10/44 (GTAW)
WPS/PQR MSET 11/45 (FCAW)

ISSUE
DATE

REVISION: 1

CONTROL DOCUMENTS

AIR VOLUME TANK V-146


DESIGN CALCULATION FOR V-146
GENERAL ARRANGEMENT & DETAIL DRAWING FOR V-146
NOZZLE DETAIL DRAWING FOR V-146
MANWAY DETAIL DRAWING FOR V-146
NAMEPLATE DETAIL DRAWING FOR V-146
C

PLANNE
D DATE

NO

VENDOR DOCUMENT MASTER LIST (VDML)


PROJECT MASTER SCHEDULE
B

REVISION: 0

DESCRIPTION

B
B

CERTIFICATIONS AND WARRANTIES


LIST OF QUALIFIED WELDER
NDT PERSONNEL QUALIFICATION LIST

STATUS CODES:
A

Approved , work may proceed

Revised and Resubmit. Work may proceed subject to incorporation of comments

Revised and Resubmit. Work may not proceed

For info only.Review not required

UPDATE ON

CLIENT
MSET PROJECT NO

:
:

Tuesday, 22 December, 2015


SHAPADU ENERGY & ENGINEERING SDN BHD
M2-216

PREPARED BY
REVIEWED BY

:
:

SH.FAREHAMIMIE ELYANA BT SYED MOHAMAD


SHEIKH MOHD. NAZRUL BIN SHEIKH ABD. JALIR

APPROVED BY

MOHD. KHAIRUL AMIN BIN KAMARUDIN

ISSUE
DATE

RE
V

TRANSMITTAL
NO.

REVISION: 3
RETURN STATU
DATE
S

ISSUE
DATE

RE
V

TRANSMITTAL
NO.

RETURN STATU
DATE
S

REMARKS

Das könnte Ihnen auch gefallen