SAR QC Department Visual Inspection Report
SAR FacteryforCahan alg Metal Fong
(Client: SIDEM Project No.
lOrder NO. = S189 Report No. = Ed Project Name: AZ-ZOUR NORTH PHASE -1WPP
Date 11-09-2014 Page Now 1 of 1
[Drawing Tile
rs xsre tthe weld accepted valy acoting oct speiTations an ppb cole
All wel shal be vival inset an sal eased
[rocetereNos [Wawope Bat Fie
ITEMINO, & DESCR ey wes Welder No Accepeeet, Rewarhs
BASE PLATE 900X900 16 003,006 | wos, wos Accept
en
Det Conan Near ae Deter Conon nr twat a
Ce ‘ay Tan eh Tse ae scene
WeDo ay Nat vee Tromtstm [2s] tn ot
Tale m1 Nowicie eet Tate Siam | Neti
oT m7 Non Webrings welesor | Ro eet arene
Tope tT oon 28 esas
: i oe Undo 2m th nt 20 ae
nearens ‘ave coer oa = 7
sme ina 3m 2. eam a
| Accepiance according to AWS DI.I table 6.1
[Tne aove menstioned ems are received, accepied and released for Punting phaso unless remarked for NDT ches
fF AITN.D.T earried out according to the Quality Control Plan.
Sas TAROCINGG: BAR PRODUCTION ENGI ‘CUENT REPRESENTATIVE
fame MOHAMMED ABDUL MANNAN KARAM RADY
iguature,
[Date 11-09-2014SAR QC Department Visual Inspection Report
SA Facog et ong
[Chient SiDEM Project No.
lOrder NO sw Report No: | a Project Name: AZ-ZOUR NORTH PHASE 1-IWPP
[Dates 10.09.2014 Page No. i of, 1
[Drawing Tite
To esr he el sepa vly colin to Sent pecans dppb ale
Al el shale ily np a sl be accepted
frocedure Ns POCT few spe ia Tie
{TEM O. & DESCRIPTION ow wrs Weider Ne. Aeceplst
BASE PLATE 900X900 4 03,006 | wos, wos Accept
TERT
ve Te Tonio Tater ena Te a
Tae = Tor Siem pee faSaneae
Waa i ee Tamctctan [asm] ti oat
deh ny Now rib bearaaeaee Letom Sion] telat
Ores 7 Ne act Teter | Now a
Taian a oer it T2250 irr
Pin posiy foul aay See oom 7 oe 7
Tic above menstoned ems are received, eeepled and eased for Painting phase unless remarked for NDT check
FF AIIN.D.T carried out according to the Quality Control Plan.
[* Acceptance according to AWS DILL table 6.1
AR QCENG
‘SAR PRODUCTION ENGG:
‘CLIENT REPRESENTATIVE
‘ame MOHAMMED ABDUL MANNAN
KARAM RADY
iguature
ate 10-09-2014SAR QC Department Visual Inspection Report
SAR Factor aanaing Metal Forming
‘SIDEM Project No.
S19, [-ReportNo.: | Bs Project Name: __AZ-ZOUR NORTH PHASE -IWPP.
09-09-2014 Page Nox: i of 1
5 Saped wisp aeoring to cents specications and wpb code
[si welds shale isl inspected and shal be ace
[Procedure Nox rocwsT [earner Ba Tile
ITENLNO. & DESCRIPTION oy ws Weller No Aceepueeet emacs
BASE PLATE 900X900 16 003, 006 wo, Wos Accept
Deke Tye Conan asin ato Dene Te ‘Conon asim allows
Crt 7 Now eit) Tesi Za
Watise Nea a on pct Tamcbenem | smn
— | nin lt)
Tait ‘ay Nos cited) ar Sm
Dewe ay Now aiid) Waka Tnge welnan | Ron ted a Be
Wal etn 7 eT Tr
Cat ear napa 25mm Tosa 3 a ih
c zi Uae 2 dia 30
Ping oy Taya ina a Tom
eatin ey 30h om eee iia
The above menstioned Kms ae received, acopied and eTeoed for Painting phase unless remarked for NDT check,
FAILN.D.T eartied out according to the Quality Control Pian
Dit table 6.1
SAR QOINGG. ‘SAR PRODUCTION ENGG: ‘CLIENT REPRESENTATIVE
lame MOWAMMED ABDUL MANNAN KARAM RADY
09-09-2014SAR QC Department Visual Inspection Report
A Fact fo Gahan al Freig
Tien SIDEM Project Not
rier NO. Sa Report Ne: a Project Name OUR NORTH PHASE IWF
Dae: 15-05-2010 Page Ni fof 1
Drawing Ti
fisemne ta ie wil pel roy rong ces ipower
A vel sl be vying an sale ced
PrecureNe FOC a 7
TEN NO. & pEsciIPrioN ay wes Wer Ne ccptet | Remmets
BASE PLATE 900X900 20 003, 006 Wod, WO8 ‘Accept
Tair iw Teri ae aa feeriar
Tama a Tere seietyaany [EERSCeaR [sem] hee
“Undeil any ‘Now (probbited) ee = 8am San nomial
= i a Taare | Tow ied
Wace 7 =
a rey ae 2am
The above mensone Kes are eset, accion lease or Paitng phase es Rotel Tr NDT she
PAIN. Tearred out according tote Quality Control Plan,
+ Acceptance acording AWS DILl able 6.1
|
TaROC TNO ee CLUENT RAPRESENTTIVE
Name MOWANIMED ABDUL MANNAN KARAM RADY
coatins ee Pe eal
Date 4-09-2014 JSAR QC Department Visual Inspection Report
Sa Fact lr Calenang eon
STent = SIDEM Project No.
der NO. = S189 Report No.: | a Project Name: AZ-ZOUR NORTH PHASE [-IWPP.
Date: 07-09-2014 Page No, i _of 1
Drawn
[ro easire ha th wat accepted vinalyaccring wo elenfs gpesictons and ape oe
ral welds shal vil inspec an shal be ace
| ITEM NO. & DESCRIPTION Qty WPS ‘Welder No, Accept/Reject Remarks:
BASE PLATE 900X900 20 003, 006 Wod, WO8 Accept
‘Undertlt Any ‘Now (peohbited) ee ™ a weld bengSAR QC Department Visual Inspection Report
Sa Factor Caanng eam
= _ =
[Ciient ‘SIEM Project No.
S219 |___Report No. 2. Project Name+ _AZ-ZOUR NORTH PHASE 1-1WPP
‘31-08-2017 Page No.s 1 of 1
To ene al he wa We meed val Sewing oC spicata aR cle
All wel il be vs ingcied a sl be ace
rose Now POC ven ope a Tie
{TEMLNO, & DESCRIPTION ow wes WellerNe, cepttejct— | Remarts
BASE PLATE 900X900 7 003, 006 Wor, Wos Accept
ree
Dee Te Contos Diaconate ba ra
Tate a Na oi Tse tat] eomton
ener my Ni oi Tomcuctae [Psi] tance
Underit Ay ‘Now (naib) ea TG Sm a
os 7 Re pia oo
Taisen aay s Tr
Fa a ie ae FO
ining posity ‘aay ober ro — aa fee
Joiot ype Kina 300 20 co a
i above menstoned Toms ave eed, asap apd Teed fr Painting phase les nario oe NDT cho
ng to the Quality Control Plan,
[Acceptance according 19 AWS ILI table 6.1
TARQCINGG: SAR PRODUCTION ERGG CUNT REPRESENTATIVE
fame MOHAMMED ABDUL MANNAN KARAM RADY
signature = eae
[Date TateSAR QC Department
(Clears SEM
Tw Teport No. wa RETOUR NORTH PASE TWP
26-08-2014 Tre ET
BASE PLATE 900X900 15 003, 006 WoL, Wod Accept
a a ia a —
“Usd ay “New (probed ween > Siam Se hasan
a See Soaeas | Seas
ode dca
Tied ss i, noun Teal Fig pi wes aa or NOTE
FAINT cared out according ote Quality Control Plan,
I} Accepunce necrdingto AWS DI. | ule
TRTCINGT TROON ECE SENTERO
ae MOHAMMED ABDUL MANNAN KARAM RADY
[Signature a
[Date ZIRTSAR
QC Department
S ‘AR Factor avanng Mtl Fnming
Visual Inspection Report
[Cliene DEM Project No-
der NO, S19 Report No. i Project Name? AZ-ZOUR NORTH PHASE LAWPP
27-08-2014 Page No i of i
[rc ensre tht the wok accepted vsalyecording to dane pouications and pleas code
Al wld hal be visually npc and sal be acepted
Procedure Noe
POCHST Bat il
ITEMLNO. & DESCRIPTION ey wes Weller No. Accept Remar
BASE PLATE 900X900 3 003 wor Accept
Deter Te ‘ceo Niimum aac tnt [| tee Conon Tain wah
Cie a Kon oil) Tes col ares
co a eet any ed
= 7 ‘on wait) Webohegs won
To Ten Fes agua 23 Tesmaine St wi
ras Unde 2 x
1 above menstioned lems are recived, acoepied and released lor Painting phase unless remade for NDT eheck
FAIIN.D.T carried out according to the Quality Control Plan.
|: Acceptance according to AWS DI. table 6.1
SAROCINGG, “SARFRODUCTION ENGG. ‘CLIENT REPRESENTATIVE
jamie MOHAMMED ABDUL MANNAN v.
signature
[Date