Beruflich Dokumente
Kultur Dokumente
1,500
200
2,300
100
500
1,800
200
GARBAGE
ROOM
4,200
350
150
SD
SP
cleaner's
sink
Smoke detector
Sprinkler
Ventilation Grill(300x300)
150
350
150
12
13
14
17
18
up
1,900
LIFT
LIFT
350
SP
SP
elect.
riser
duct
SP
SP
1,500
350
350
100
2,050
SP
SP
SD
100
900
CAFETERIA
4,650
200
SPACE
cemt screed ff
SP
200
150
100
200
2,600
LIFT
2,650
350
SD
100 1,300
S-14
Wall bracket
MV P&D
CAFE
Washrooms
SP
LIFT
BANK
Store
SP
SD
20
5,300
S-15
350
S-13a
LED lighting
2,000
2,750
19
SD
SP
SP
350
tea
room
MV
STORE
16
700
15
SP
11
CAFE
STORE
200 500
1,150
150 1,700
1,800
SP
10
LIFT
3,350
GOODS
LIFT
S-13SD
2,600
100
LIFT
6
3,400
granito ff
200
S-16
2,600
LIFT
LADIES
200
LOBBY
200
Access panel(400x400)
GENTS
1,900
BANK
Staff Entry
1,600
200
1,800
granito ff
350
1,300
350
P&D
1,000
200
LOBBY
150
350
350
350
2,600
200
2,600
2,600
1,800
100
750
DUCTS2,700
100 1,700
900
100
FEMALE
cer. floor
tiles
900
100
900
100
2,100
350
3,600
600
2,700
100 100
1,700 200
100 100
900 900
150
WHEEL
CHAIR
cer. floor
tiles
SP
SD
S-17
S-18
SP
SP
SD
C[31]03
Revision
LE ' MAC
APARTMENTS
C[31]04
SP
C[31]03
Date
Description of revision
UP
Affected drawings
Project title
Drawing type
PRODUCTION DRAWING
LOCATION DRAWING
GROUND FLOOR
LOBBY CEILING PLAN P-02
Job No.
314
Drawing No.
Scale
Drawn
1:200
J.A
Date
JULY 2013
L0(45)01
Revision
Checked
S.W.