Beruflich Dokumente
Kultur Dokumente
- INFORME 00
II.- INFORME MENSUAL DE AVANCE DE OBRA
III.- INFORME DE CIERRE
Version 2011
01/03/2016
Codigo FPA
Entidad Ejecutora:
I.- INFORME 00
Nota:
Version 2011
INFORME 00
DATOS GENERALES:
Codigo FPA:
Entidad Ejecutora:
Distrito:
Provincia:
Dpto.:
Residente Obra:
Auxiliar Contable:
Referencia
Costo Total
COSTO DIRECTO
Materiales de construccion
Maquinaria y Equipo
Mano de Obra
Servicios
B.-
C.-
D.-
S/.
Referencia
FPA
Municipalidad
Demandante
Colaboradora
Total
En Efectivo
Valorizado
Total
Porcentaje aporte
#DIV/0!
c.-
#DIV/0!
S/.
#DIV/0!
#DIV/0!
S/.
%
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
OK
PLAZO DE EJECUCION
Plazo de ejecucion
Meses
Version 2011
INFORME 00
DOCUMENTOS DE PRESENTACION OBLIGATORIA EN EL PRESENTE INFORME
1.- F-1: Presupuesto desagregado del proyecto segn Expediente Tcnico.
2.- F-2: Costos mensuales previstos de ejecucin.
3.- F-3: Servicios
4.- F-4: Programacin de compra de materiales
5.- F-5: Programacin mensual de equipo mecnico alquilado
6.- F-6: Programacin de equipo mecnico valorizado
7.- F7-1: Total H-H Mano de obra Remunerada y Valorizada
F7-2: Programacin Mano de obra Remunerada
F7-3: Programacin Mano de obra Valorizada
8.-
9.-
Version 2011
0
0
ENTIDAD:
Cdigo
A
Cdigo:
Unid Cantidad
P.U. S/.
0
Parcial
Version 2011
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado01/03/2016
Cdigo
Unid Cantidad
P.U. S/.
Parcial
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
OK
NOTAS:
Copiar el presupuesto del Expediente Tecnico
En proyectos de agua y saneamiento de varios poblados, el formato contiene la informacin CONSOLIDADA
__________________________________________
__________________________________________
__________________________________________
__________________________________________
SUPERVISOR
RESIDENTE
ALCALDE
Version 2011
Informe elaborado01/03/2016
Residente
Fecha de Inicio
Supervisor
Fecha de conclusion
tem
Partidas Genricas
Meses
Costos
Mes 1
Mes 2
Mes 3
Mes 4
Mes 5
Costo Total
Mes 6
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SUPERVISOR
RESIDENTE
ALCALDE
Version 2011
F3
SERVICIOS
CODIGO: 0
PROYECTO:0
ENTIDAD:
Item
Costo del
Servicio
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
SUMAS
Observacin
Version 2011
PROYECTO0
ENTIDAD:
Item
Referencia
Version 2011
Unid
Precio
unitario
SUMA PARCIAL
Cantidad
Precio total
Especificaciones Tecnicas
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
B
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
Version 2011
0.00
COMPRAS POSTERIORES DE
MATERIALES
SUMA PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
155
156
157
158
159
160
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUMA TOTAL
Si requiere ms filas, haga mostrar las filas entre 60 y 110 o entre 131 y 191
__________________________________________
SUPERVISOR
____________________
____________________________________
RESIDENTE
ALCALDE
Version 2011
0.00
ENTIDAD EJECUTORA:
0
Plazo:
Residente:
Supervisor:
tem
EQUIPO
Cantidad
H/M
Precio U.
H/M
1
2
3
4
5
6
7
8
9
10
11
12
TOTAL
Mes 1
Mes 2
Mes 3
Mes 4
Mes 5
Mes 6
0
0
0
0
0
0
H / M Total
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
Trabajos a realizar:
ACTIVIDAD
tem
1
2
3
4
5
6
7
8
9
10
11
12
SUPERVISOR
Version 2011
RESIDENTE
ALCALDE
0.00
ENTIDAD EJECUTORA:
0
Plazo:
Residente:
Fecha de Inicio:
12/30/1899
Supervisor:
Fecha de conclusion:
12/30/1899
tem
EQUIPO
Cantidad
H/M
Precio U.
H/M
1
2
3
4
5
6
7
8
9
10
11
12
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mes 1
Mes 2
Mes 3
Mes 4
Mes 5
Mes 6
H / M Total
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
Trabajos a realizar:
ACTIVIDAD
tem
1
2
3
4
5
6
7
8
9
10
11
12
SUPERVISOR
Version 2011
RESIDENTE
ALCALDE
Informe elaborado 01/03/2016
CDIGO: 0
NOMBRE DEL PROYECTO: 0.00
ENTIDAD EJECUTORA: 0
Plazo: 0
Tipo de Personal
Costo d-h
Costo h-h
1
2
3
Operario
Oficial
Pen Remunerado
0.00
0.00
0.00
Pen Valorizado
0.00
PRESUPUESTO MANO
OBRA
0.00
0.00
0.00
TOTAL REMUNERADO
0.00
0.00
0.00
Actividades (Especficas)
Mes 2
Mes 3
Mes 4
Mes 5
SUMA S/.
Mes 6
1
2
3
4
5
6
7
8
9
10
11
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 0.00
OK
Nota:
1) Si hay incongruencia entre el costo de la mano de obra remunerada segn cartula y las cifras aqu puestas, sale el aviso "CORREGIR",
en caso de congruencia sale OK
SUPERVISOR
Version 2011
RESIDENTE
ALCALDE
F7-3: PROGRAMACIN DE APORTE MANO DE OBRA VALORIZADA (ACUERDO CON LOS DEMANDANTES)
Item
ACTIVIDADES (Especficas)
Mes 2
Mes 3
Mes 4
Mes 5
N total
jornales
Mes 6
10
11
TOTAL
Costo Jornal
Notas:
0
S/. 0.00
__________________________________________
SUPERVISOR
Version 2011
RESIDENTE
ALCALDE
Item
A
Referencia
PERSONAL
1
2
3
4
5
6
7
8
9
10
GASTOS ADMINISTRATIVOS
10
1
2
3
4
5
6
7
8
9
10
Cantidad
Precio Unitario
Precio Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1
2
3
4
5
6
7
8
9
Unidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL:
0.00
OK
Cdigo
Proyecto 0.00
Ejecutora 0
Residente
Supervisor
Item
0
0
METAS
Plazo
Fecha de Inicio
12/30/1899
Fecha de conclusion
12/30/1899
UNIDAD
CANTIDAD
1
2
3
4
5
6
7
8
9
10
11
__________________________________________
SUPERVISOR
RESIDENTE
ALCALDE
Version 2011
Codigo FPA
Entidad Ejecutora:
Nota:
Version 2011
Version 2011
SUMARIO
1.-
2.-
3.-
4.-
5.-
6.-
7.-
8.-
9.-
10.-
11.-
12.-
13.-
Version 2011
INFORME MENSUAL
(llenar solo espacios en blanco)
DATOS GENERALES:
Codigo FPA:
Entidad Ejecutora:
Distrito:
Provincia:0
Dpto.:
Residente Obra:
Auxiliar Contable:
item
A.-
Referencia
Costo Total
COSTO DIRECTO
0.00
Materiales de construccion
0.00
Maquinaria y Equipo
0.00
Mano de Obra
0.00
Servicios
0.00
B.-
0.00
C.-
0.00
0.00
0.00
0.00
0.00
Referencia
FPA
En Efectivo
Municipalidad
-
Total
#DIV/0!
Version 2011
Total
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
0.00
#DIV/0!
S/. 0.00
#DIV/0!
0.00
Colaboradora
0.00
Plazo de ejecucion
Demandante
0.00
Valorizado
Porcentaje aporte
S/. 0.00
Meses
30-Dec-99
Inicio:
12/30/1899
Conclusin:
12/30/1899
INFORME MENSUAL
Version 2011
Cuadro N 1
Mes 1
Plazo (Meses):
Partida GENRICA/Especifica
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0.0%
Fecha de Inicio:
12/30/1899
0.0%
Fecha de Conclusion
12/30/1899
0.0%
0.0%
0.00
0.00
#DIV/0!
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.0%
-
0.00
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F
0
0
0
0
0
0
0
0
0
0
0
0
G
0
0
0
0
0
0
0
0
0
0
0
0
H
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
-
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0.0%
-
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 2
Plazo (Meses):
Version 2011
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F
0
0
0
0
0
0
0
0
0
0
0
0
G
0
0
0
0
0
0
0
0
0
0
0
0
H
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 3
Plazo (Meses):
Version 2011
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0.0%
0.0%
0.0%
0.0%
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
F
0
0
0
0
0
0
0
0
0
0
0
0
G
0
0
0
0
0
0
0
0
0
0
0
0
H
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
-
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0
0
0
0
0
0
0
0
0
0
0
0
0.0%
0.0%
-
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 4
Plazo (Meses):
A
00
00
00
00
00
00
00
00
00
00
00
00
B
00
00
00
00
00
00
00
00
00
00
00
00
C
00
00
00
00
00
00
00
00
00
00
00
00
D
00
00
00
00
00
00
00
00
00
00
00
00
E
00
00
00
00
00
00
00
00
Version 2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
00
00
00
00
F
00
00
00
00
00
00
00
00
00
00
00
00
G
00
00
00
00
00
00
00
00
00
00
00
00
H
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 5
Plazo (Meses):
A
00
00
00
00
00
00
00
00
00
00
00
00
B
00
00
00
00
00
00
00
00
00
00
00
00
C
00
00
00
00
00
00
00
00
00
00
00
00
D
00
00
00
00
00
00
00
00
00
00
00
00
E
00
00
00
00
00
00
00
00
Version 2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
00
00
00
00
F
00
00
00
00
00
00
00
00
00
00
00
00
G
00
00
00
00
00
00
00
00
00
00
00
00
H
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 6
Plazo (Meses):
Version 2011
00
00
00
00
00
00
00
00
00
00
00
00
00
B
00
00
00
00
00
00
00
00
00
00
00
00
C
00
00
00
00
00
00
00
00
00
00
00
00
D
00
00
00
00
00
00
00
00
00
00
00
00
E
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
00
00
00
00
F
00
00
00
00
00
00
00
00
00
00
00
00
G
00
00
00
00
00
00
00
00
00
00
00
00
H
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
00
0.0%
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 7
Plazo (Meses):
Version 2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
00
00
00
00
F
00
00
00
00
00
00
00
00
00
00
00
00
G
00
00
00
00
00
00
00
00
00
00
00
00
H
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
00
0.0%
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 8
Plazo (Meses):
Version 2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
00
00
00
00
F
00
00
00
00
00
00
00
00
00
00
00
00
G
00
00
00
00
00
00
00
00
00
00
00
00
H
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
00
0.0%
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1
Mes 9 (ltimo)
Plazo (Meses):
Version 2011
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0%
0.0%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.0
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Informe elaborado 01/03/2016
00
00
00
00
F
00
00
00
00
00
00
00
00
00
00
00
00
G
00
00
00
00
00
00
00
00
00
00
00
00
H
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
00
0.0%
Residente de Obra
Firma y sello
Version 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.0%
Supervisor de Obra
Firma y sello
Cuadro N 1-A
CODIGO:
PLAZO:
CRONOGRAMA GENERAL
Item
A
B
C
D
PARTIDA GENRICA
0
0
0
0
G
H
0
0
Avance
Acumulado
Costo
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Situacion
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0! PROGRAMADO
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0! PROGRAMADO
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0! PROGRAMADO
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0! PROGRAMADO
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0! PROGRAMADO
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0! PROGRAMADO
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0! PROGRAMADO
#DIV/0!
EJECUCIN VALORIZADA
#DIV/0!
#DIV/0!
AVANCE MENSUAL
Mes 2
Mes 3
1
2
3
4
5
6
7
8
9 (ltimo)
Mes 4
Mes 5
Mes 6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
12/30/1899
Mes 7
0.00
Mes 8
Mes
(ltimo)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0%
0.00%
0.00%
0.00%
0%
0.00%
0%
0.00%
0%
0 Meses
FECHA DE CONCLUSION:
Mes 1
#DIV/0! PROGRAMADO
AVANCE
PROGRAMADO:
AVANCE EJECUTADO
Version 2011
30-Dec
FECHA DE INICIO:
ENTIDAD EJECUTORA
Est
Est
Est
Est
Est
Est
Est
Est
Est
dentro
dentro
dentro
dentro
dentro
dentro
dentro
dentro
dentro
de
de
de
de
de
de
de
de
de
los
los
los
los
los
los
los
los
los
plazos
plazos
plazos
plazos
plazos
plazos
plazos
plazos
plazos
programadosMuy
programadosMuy
programadosMuy
programadosMuy
programadosMuy
programadosMuy
programadosMuy
programadosMuy
programadosMuy
buen
buen
buen
buen
buen
buen
buen
buen
buen
trabajo!.
trabajo!.
trabajo!.
trabajo!.
trabajo!.
trabajo!.
trabajo!.
trabajo!.
trabajo!.
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 1
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
S/.
0.00
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 2
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
S/.
0.00
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 3
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
S/.
0.00
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 4
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
S/.
0.00
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 5
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
S/.
0.00
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 6
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
0.00
S/.
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 7
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
0.00
S/.
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 8
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
0.00
S/.
0.00
-
Cuadro N 2
INFORME DE ADICIONALES Y DEDUCTIVOS DE OBRA DEL MES
PROYECTO:
0
ENTIDAD:
0
Mes 9 (ltimo)
ADICIONALES DEL MES
ADICIONALES
1).-
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
TIPO DE
ADICIONAL:
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
DEDUCTIVO
Materiales
M.O.R.
M.O.V.
Equipos Alquilado
Equipo Valorizado
Servicios
SUMA
COMENTARIOS:
0.00
2).-
3).-
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
Unidad:__________
Cantidad:_________
P.U.:_____________
P.T.:_____________
0.00
COSTO NETO
COSTO NETO ACUMULADO
Saldo :
0.00
S/.
0.00
0.00
1).-
Version 2011
0.00
Total
Total
0.00
S/.
0.00
-
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 1
Materiales adquiridos
en el presente ms
Materiales de Obra
Item
Tipo de material
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico:
Saldo de Materiales con respecto al Expediente:
Version 2011
Precio
unitario
-
Precio
unitario
Materiales en cancha
al final del mes
Costo
Material
Cantidad
Costo
Material
0.00
-
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 2
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Version 2011
Costo Material
Cantidad
0.00
-
0.00
(0.00)
Comentarios :
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 3
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Version 2011
Costo Material
Cantidad
0.00
-
0.00
(0.00)
Comentarios :
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 4
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Version 2011
Costo Material
Cantidad
0.00
-
0.00
(0.00)
Comentarios :
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 5
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Version 2011
Costo Material
Cantidad
0.00
-
0.00
(0.00)
Comentarios :
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 6
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Costo Material
Cantidad
0.00
0.00
(0.00)
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Comentarios :
Version 2011
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 7
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Costo Material
Cantidad
0.00
0.00
(0.00)
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Comentarios :
Version 2011
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 8
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Costo Material
Cantidad
0.00
0.00
(0.00)
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Comentarios :
Version 2011
Cuadro N 3
REPORTE DEL CONTROL DE MATERIALES
(llenar solo espacios en blanco)
PROYECTO:
ENTIDAD:
CODIGO:
0
0
Mes 9 (ltimo)
Materiales adquiridos
en el presente ms
Unidad Cantidad
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
180
- TOTALES S/.
Materiales segn Expediente Tcnico
Saldo de Materiales
Version 2011
Costo Material
Cantidad
0.00
0.00
(0.00)
Precio
unitario
-
Materiales en cancha
al final del mes
Costo
Material
-
Cantidad
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costo
Material
0.00
0.00
Materiales utilizados
durante el mes
Cantidad
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Costo
Material
SALDO / Materiales
ET versus adquiridos
Soles
0.00
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
ENTIDAD:
Mes 1
Mes 1
Precio
Unitario
Contrat.
ACUMULADO
Cantidad
Cantidad
Precio Total
H-m
H-m
SALDO
Costo por
Maquina
Costo por
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 1
Precio
Unitario
Valoriz.
ACUMULADO
Cantidad
Cantidad
Precio Total
H-m
H-m
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
Maquina
Costo por
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
TOTAL S.
Mes 1
Precio Total
-
TOTAL ACUMULADO
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 2
ENTIDAD:
Mes 2
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 2
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Mes 2
Precio Total
-
TOTAL ACUMULADO
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 3
ENTIDAD:
Mes 3
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 3
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
TOTAL S.
Mes 3
Precio Total
-
ACUMULADO
Costo por
Maquina
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 4
ENTIDAD:
Mes 4
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 4
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Mes 4
Precio Total
-
ACUMULADO
Costo por
Maquina
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 5
ENTIDAD:
Mes 5
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 5
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Mes 5
Precio Total
-
ACUMULADO
Costo por
Maquina
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 6
ENTIDAD:
Mes 6
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 6
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Mes 6
Precio Total
-
ACUMULADO
Costo por
Maquina
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 7
ENTIDAD:
Mes 7
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 7
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Mes 7
Precio Total
-
ACUMULADO
Costo por
Maquina
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 8
ENTIDAD:
Mes 8
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 8
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Mes 8
Precio Total
-
ACUMULADO
Costo por
Maquina
-
SALDO
Control
0.00
Version 2011
Cuadro N 4
REPORTE DEL CONTROL DE EQUIPO MECANICO
CODIGO
PROYECTO:
Mes 9 (ltimo)
ENTIDAD:
Mes 9 (ltimo)
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Contrat.
SALDO
Costo por
%
Maquina
Control
ALQUILADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
Mes 9 (ltimo)
ACUMULADO
Cantidad
Cantidad Costo por
Precio Total
H-m
H-m
Maquina
Precio
Unitario
Valoriz.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SALDO
Costo por
%
Maquina
Control
VALORIZADO
1
2
3
4
5
6
7
8
9
10
11
12
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL S.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Mes 9 (ltimo)
Precio Total
-
ACUMULADO
Costo por
Maquina
-
SALDO
Control
0.00
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 1
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 1
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 2
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 2
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 3
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 3
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 4
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 4
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 5
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 5
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 6
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 6
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 7
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 7
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 8
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 8
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 5
REPORTE DEL CONTROL DE MANO DE OBRA
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 9 (ltimo)
Fecha del / al
N Jornales
Valor Jornal(S/.)
Monto total
Operario
Oficial
Peon
SUMA
Fecha del / al
N Jornales
Planilla Nro:
Valor Jornal(S/.)
Monto total
SUMA
Mes 9 (ltimo)
ACUMULADO
PRESUPUESTO
SALDO
CONTROL
REMUNERADO
-
VALORIZADO
TOTAL
-
%
-
#DIV/0!
#DIV/0!
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 1
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
11
0.00
#DIV/0!
12
0.00
#DIV/0!
13
0.00
#DIV/0!
14
0.00
#DIV/0!
15
0.00
#DIV/0!
16
0.00
#DIV/0!
17
0.00
#DIV/0!
18
0.00
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 2
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 3
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 4
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 5
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 6
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 7
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 8
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 6
REPORTE DEL CONTROL DE SERVICIOS
CODIGO:
0
PROYECTO: 0
ENTIDAD:
0
DETALLE DEL MES
Item
Mes 9 (ltimo)
Costo del
Servicio segn
Expediente
Tecnico
GASTOS
EFECTUADOS
GASTOS
ACUMULADOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
11
#DIV/0!
12
#DIV/0!
13
#DIV/0!
14
#DIV/0!
15
#DIV/0!
16
#DIV/0!
17
#DIV/0!
18
#DIV/0!
#DIV/0!
SUMAS
Observacin
Version 2011
Cuadro N 7
CALCULO DEL INDICADOR DE EFICIENCIA DE EJECUCIN DE OBRA
Codigo:
Infor
me
N
Mes
Mes 1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
Mes 2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Mes 3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Mes 4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Mes 5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Mes 6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Mes 7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Mes 8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Mes 9 (ltimo)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(0.00)
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Valorizacio Adicionales
n de Obra ejecutados
CD+Imprevistos segn ET
TOTAL
MATERIALES
EQUIPO
MANO DE
OBRA
SERVICIOS
TOTAL
INDICE
EFICIENCI
A
Saldo
[(rojo) =
negativo]
0.00
Valorizado + adicionales
Indice Eficiencia = ----------------------------Gastado
---Nota: Si el ndice de eficiencia est debajo de 1, debe tomarse las medidas respectivas para lograr mayor eficiencia.
Si el ndice est debajo de 0.8, la situacin es crtica e urgen medidas al respecto
Version 2011
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
Cdigo:
Proyecto:
Entidad Ejecutora:
0
0
0
GASTOS DEL MES
Codig
o
Unid
Segn Informe 00
Cant. P.U.
Costo Total
Mes 1
Gastado
Acumulado
S/.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
#DIV/0!
PERSONAL
GASTOS ADMINISTRATIVOS
Saldo
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
#DIV/0!
#DIV/0!
Version 2011
Referencia
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
#DIV/0!
#DIV/0!
10
TOTALES
S/.
#DIV/0!
#DIV/0!
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 2
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 3
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 4
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 5
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 6
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 7
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 8
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cdigo:
Proyecto:
Entidad Ejecutora:
Cuadro N 8
CONTROL DEL PRESUPUESTO DE GASTOS GENERALES
0
0
0
Unid
Mes 9 (ltimo)
Gastado
PERSONAL
0.00
0.00
Acumulado
S/.
-
#DIV/0!
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
GASTOS ADMINISTRATIVOS
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
10
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
0.00
#DIV/0!
TOTALES
S/.
#DIV/0!
10
Saldo
Version 2011
Referencia
Segn Informe 00
Cant. P.U.
Costo Total
#DIV/0!
Cuadro N 9
PROYECTO:
ENTIDAD
Mes 1
A.- Gastos del mes infraestructura por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 1
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Version 2011
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
llenar solo espacios en blanco
CODIGO:
PROYECTO:
ENTIDAD
Mes 2
A.- Gastos del mes infraestructura por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 2
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Version 2011
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
llenar solo espacios en blanco
CODIGO:
PROYECTO:
ENTIDAD
Mes 3
A.- Gastos del mes infraestructura por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 3
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Version 2011
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
PROYECTO:
ENTIDAD
Mes 4
A.- Gastos del mes infraestructura por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 4
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Version 2011
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
PROYECTO:
ENTIDAD
Mes 5
A.- Gastos del mes infraestructura por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 5
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Version 2011
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
PROYECTO:
ENTIDAD
Mes 6
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 6
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Version 2011
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
PROYECTO:
ENTIDAD
Mes 7
A.- Gastos del mes infraestructura por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 7
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Version 2011
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
llenar solo espacios en blanco
CODIGO:
PROYECTO:
ENTIDAD
Mes 8
A.- Gastos del mes por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
%
Mes 8
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Version 2011
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
Cuadro N 9
RESUMEN DE COSTOS E INFORMACION FINANCIERA
PRESUPUESTO DE INFRAESTRUCTURA
llenar solo espacios en blanco
CODIGO:
PROYECTO:
ENTIDAD
Mes 9 (ltimo)
A.- Gastos del mes por rubros
Referencia
Costo S/.
Presupuesto
Expediente
Tcnico
Mes 9 (ltimo)
Materiales
0.00
0.00
#DIV/0!
Equipo y maquinaria
0.00
0.00
#DIV/0!
Mano de Obra
0.00
0.00
#DIV/0!
Servicios
0.00
0.00
#DIV/0!
Gastos Generales
0.00
0.00
#DIV/0!
Adicionales (imprev.)
0.00
Total
0.00
0.00
#DIV/0!
Notas:
B.- Flujo de Caja Infraestructura (S/. solo dinero en EFECTIVO / NO colocar APORTE VALORIZADO)
Entidad
Segn
Convenio
Aportes en el
mes
Gasto en el
mes
0.00
Municipalidad
0.00
Demandante
Colaboradora
Total
0.00
0.00
0.00
0.00
(0.00)
Segn
Convenio
Municipalidad
0.00
Demandante
0.00
Version 2011
Aporte en el
mes
Mano de Obra
Aporte en el
mes
Maquinaria
-
0.00
Aporte Total
en el mes
Pendiente de
aporte
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 1
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
#DIV/0!
Avance de Ejec. Acumulado:
0.00%
Saldo disponible
Monto
%
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Imprev.
#DIV/0!
Acumulado
#DIV/0! % Acum.Adicional
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 2
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 3
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 4
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 5
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 6
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 7
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 8
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
CUADRO N 10
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
Mes 9 (ltimo)
tem
1
2
3
4
5
6
7
Referencia
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
SUMA
Imprevistos/Adicionales
Costo total infraestructura
Justificacin Sobrecostos:
Version 2011
Gastos acumulados
Gastos
Monto
%
Programados
Ejec.en el mes
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
0.00
#DIV/0!
vs. Avance de Ejecucin:
0.00%
Saldo disponible
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(0.00) JUSTIFICAR
0.00 JUSTIFICAR
Adicional y Deductivo
Monto del Mes
Acumu.detalle
Suma S/.
% Acum.Adicional
% Imprev.
#DIV/0!
Acumulado
#DIV/0!
Cuadro N 11
REPORTE DE PRUEBAS DE LABORATORIO
(llenar slo espacios en blanco)
CODIGO:
PROYECTO:
ENTIDAD:
Informe
Prueba realizada
Fecha
Resultado
Partida
Referencia
OBSERVACIONES
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 1
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 2
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 3
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 4
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 5
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 6
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 7
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 8
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Cuadro N 12
PANEL FOTOGRFICO
Mes 9 (ltimo)
CODIGO:
PROYECTO:
ENTIDAD:
Version 2011
Codigo FPA
III.- INFORME DE
CIERRE
Nota:
Version 2011
INFORME DE CIERRE
CONTENIDO
CARATULA
L-1: Metas fsicas proyectadas y ejecutadas
L-2: Resumen de informes de avance mensual de obras (costos directos)
L-3: Valorizacin Final
L-4: Desempeo de Infraestructura segn Presupuesto y Financiamiento
L-5: Flujo Caja e Insumos
L-6: Ensayos de laboratorio
L-7: Materiales en cancha
L-8: Condiciones de ejecucin
L-9: Acta de entrega y conformidad de Obra
ANEXOS
1
Cuaderno de obras
Fotografias
Version 2011
INFORME DE CIERRE
DATOS GENERALES:
Codigo FPA:
Distrito:
Provincia:
Depto.:
Auxiliar Contable:
Referencia
Costo Total
COSTO DIRECTO
0.00
Materiales de construccion
0.00
Maquinaria y Equipo
0.00
Mano de Obra
0.00
Servicios
0.00
B.-
0.00
C.-
0.00
D.-
0.00
0.00
0.00
0.00
S/. 0.00
FPA
Municipalidad
-
En Efectivo
Valorizado
Total
Porcentaje aporte
#DIV/0!
Demandante
0.00
0.00
0.00
0.00
Colaboradora
-
#DIV/0!
Municipalidad
0.00
Demandante
S/. 0.00
0.00
#DIV/0!
Valorizado
FPA
0.00
0.00
0.00
#DIV/0!
Total
#DIV/0!
Total
0.00
0.00
Colaboradora
0.00
0.00
Total
0.00
0.0
0.00
0.0
0.00
Meses
30-Dec-99
Fecha de conclusin:
Version 2011
Cdigo
Proyecto 0.00
Ejecutora 0
Residente
0
0
Supervisor
Item
METAS
Plazo
Fecha de Inicio
30-Dec
Fecha de conclusion
30-Dec-99
UNIDAD
PROYECTADA
10
11
EJECUTADA
Justificacin de cambios
__________________________________________
SUPERVISOR
RESIDENTE
ALCALDE
Version 2011
L-2
Resumen de Informes Mensuales
CODIGO:
PROYECTO:
ENTIDAD:
2
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Valorizacion
Total
1
2
3
4
5
6
7
8
9 (ltimo)
Suma
M en Cancha
TOTAL
2.2
APORTES VALORIZADOS
Referencia
Mes 1
2.3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mes 2
-
Total valorizado
Materiales
Mes 3
-
Mes 4
-
Mes 5
-
I.E
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mes 6
-
Efectivo
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
Mes 7
-
Mes 8
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mes 9 (ltimo)
-
Total
Total
Mes 1
Mes 2
-
Mes 3
-
Mes 4
-
Mes 5
-
Mes 6
-
Mes 7
-
Mes 8
-
Mes 9 (ltimo)
-
Total
-
2.4
FINANCIAMIENTO DE INFRAESTRUCTURA EN EFECTIVO
Costo directo de la obra
0.00
Gastos generales
Total gasto en efectivo
0.00
Version 2011
L-3
INFORME DE CIERRE
Version 2011
Partida Especifica
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
Und.
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
-
0.0%
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION ACUMULADA/FINAL
Metrado
Parcial
%
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
00
0.0%
0
Costo Directo Total S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
0.00
0.00
0.00%
DESCRIPCIN
P. Total
0.00
Version 2011
0.00
0.00
TOTAL
0.00
Residente de obra
Firma y sello
Supervisor de obra
Firma y sello
Alcalde
Firma y sello
L-4
Informe de Cierre
CODIGO:
PROYECTO:
ENTIDAD:
Item
1
1.1.
Referencia
Proyectado
S/.
Infraestructura
Costo Directo
a) Materiales
b) Equipo mecanico
c) Mano de obra
d) Servicios
1.2.
1.3.
Diferencia
Ejecutado
Gastos generales
Imprevistos
SUMA TOTAL
0.00
0.00
-
(0.00)
(0.00)
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
(0.00)
#DIV/0!
Comentario:
4.1
4.1.1
FINANCIAMIENTO DE INFRAESTRUCTURA
Proyectado
Referencia
FPA
Efectivo
Valorizado
Total
4.1.2
Colaboradora
Total
Ejecutado
Referencia
FPA
MD
-
Demandante
-
Colaboradora
Total
Diferencia
Referencia
Efectivo
Valorizado
Total
Version 2011
Demandante
-
Efectivo
Valorizado
Total
4.1.3
MD
-
FPA
MD
-
Demandante
-
Colaboradora
-
Total
-
L-5
FLUJO DE CAJA DE INSUMOS
CODIGO:
PROYECTO:
ENTIDAD:
0
SUMAS FINALES
tem
Referencia
1
2
3
4
5
6
7
Materiales
Equipo Alquilado
Equipo Valorizado
Mano de obra pagada
Mano de obra valorizada
Servicios
Gastos generales
Imprevistos/ Adicionales
Costo/gasto total infraestructura
GASTOS
Ejecutado
Monto
0.00
-
Programado
Monto
%
0.00
-
0.00
%
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Diferencia
Monto
%
(0.00) JUSTIFICAR
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00 JUSTIFICAR
Justificacin sobrecosto:
Version 2011
L-6; L-7
Informe de Cierre
(llenar espacios en blanco)
CODIGO: 0
PROYECTO:
ENTIDAD: 0
ENSAYOS DE LABORATORIO
Informe
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Prueba realizada
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Fecha
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
Partida
Referencia
Resultado
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
MATERIALES EN CANCHA
Informe
Referencia
Unidad
Cantidad
PU
PT
-
TOTAL
Version 2011
L-8
Informe de Cierre
(llenar espacios en blanco)
CODIGO: 0
PROYECTO: 0
ENTIDAD: 0
8
8.1
Meses
CONDICIONES DE EJECUCION
Personal participante (Indicar presencia con V)
Gerente Municipal
Residente
Auxiliar
Contable
Supervisor
8.2
8.3
Plazo de ejecucin
Proyectado
Ejecutado
8.4
Meses
0.00
Indice de eficiencia
Valorizado =
Gastado
8.5
Version 2011
Meses
0.00
CONCLUSIONES
2)
Ubicacin
Localidad: 0
Provincia: 0
Distrito:
Regin:
3)
4)
PARTICIPANTES
a)
Entrega de la obra
Residente:
Supervisor:
b)
Recepcin de la obra
Autoridad local:
Alcalde distrital:
5)
Plazos
Fecha entrega del terreno:
Recepcin de la obra:
Plazo de ejecucin del Proyecto:
a)
Proyectado
b)
Ejecutado
6)
0
0
dia
mes
ao
dia
dia
mes
mes
ao
ao
0.00
Costos de la infraestructura
a)
Proyectado
b)
Ejecutado
c)
Materiales en Cancha
Costo de Obra:
nmero das
nmero das
- (C.D.proyectado+G.G.+Imprevistos)
0.00 (C.D.real+G.G.)
0.00
7)
Pruebas realizadas
Diseo de mezcla
Ensayo a la compresin
Pruebas hidralicas
Ensayos de compactacin
Resultados:
8)
0.00
Informe
Referencia
Unidad
-
Cantidad
PU
PT
-
TOTAL
9)
tem
Unidad
Proyectado
Ejectuado
Saldo
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
0.00
11
0.00
Entrega
Recibe
Entrega
Recibe