Earthquake Analysis | Eng. Abdelghani Asalai


Lecturer: Dr. Ramadan Murad

A tall building of 10 stories with plan as shown in the Figure, its required to determine deflections. Max
story drift and force in the core and frames for earthquake load. Using the Given data.

5.0m

3.0m

3.0m

3.0m

3.0m

3.0m

3.0m

3.0m

3.0m

3.0m

Core

3@7.5m

Force direction

6@7.5m

1|Page

Earthquake parameters:
E =2.18*106 kN/m2
Z= 2
W = 37500kN
Wi= 3750
K=0.0461
Tn = 1
Section properties
Core Dimensions : 3*2.5*0.2 m
Frame 1: Ic =146765 cm4 , Ig = 169000 cm4
Frame 2: Ic =275140 cm4 , Ig = 169000 cm4
h1 = 5m

hi = 3m

Solution:
=

1
15

1
151

= 0.0667

Earthquake shear force acting on building is


=
= 2 0.0461 0.0667 1 37500 = 230.5
Force acting on building roof:
= 0.07 0.25
= 0.07 1 230.5 = 16.14 < 57.63
Force acting on each individual story
=

( )

2|Page

1 =

(230.5 16.14) 3750 5


= 5.79
693750

2 =

(230.5 16.14) 3750 8


= 9.27
693750

3 =

(230.5 16.14) 3750 11


= 12.75
693750

4 =

(230.5 16.14) 3750 14


= 16.22
693750

5 =

(230.5 16.14) 3750 17


= 19.70
693750

6 =

(230.5 16.14) 3750 20


= 23.17
693750

7 =

(230.5 16.14) 3750 23


= 26.65
693750

8 =

(230.5 16.14) 3750 26


= 30.13
693750

9 =

(230.5 16.14) 3750 29


= 33.60
693750

10 =

(230.5 16.14) 3750 32


= 37.08
693750
= + = 230.5

Section Properties
=

12
1 1
( + )

For Frame 1
12 2.18 106

1 =
3

= 4381.22 4

1
1
169000 +
146765
3
4
1004
1004
(
)
7.5
3

For Frame 2
3|Page

12 2.18 106

2 =
3

= 4977.51 4

1
1
169000 +
275140
3
4
1004
1004
(
)
7.5
3

= 4 4381.22 + 2 4977.51 = 28672.5 4


Height of building =5+9*3 = 32 m

3 2.53 2.6 2.13


=

= 1.9 4
12
12

28672.5
=
= 32
= 2.66

2.18 106 1.9


From Variation Chart for Horizontal Displacement

= 1 1 0.3

4
7.2 324
1 =
0.3 = 0.0684
8( )
8(2.18 106 1.9)

Where: V = 230.5/32 = 7.2 kN/m


Max Story Drift

3
max =
2

6
= 2.66 ,

0.53 2 0.29

7.2 323
=
0.29 = 2.75 103
6(2.18 106 1.9)
Determination of Bending Moment In Wall and Frame
()

2
=
3
2

Consider determining bending moment at Z = 12.5 m in the middle of height between the 3rd and
4th story.
4|Page

Using the Variation Chart for bending moment we get:


12.5
=
= 0.39 , = 2.66 3 0.05

32
Moment in wall at Z=12.5 is
12.5 =

7.2(322 )
0.05 = 184.32 .
2

The total moment in the set of frames at level 12.5 meter from the base is given by:
() =
(12.5) =

( )2

2

7.2 (32 12.5)2


184.32 = 1184.58 .
2

The moment in the individual frames is obtained from the total moment in proportion to their
shear rigidities.
Moments in Frame 1:
1
4381.22
=
1184.58 = 181.00 .

28672.5
Moments in Frame 2:
1
4977.51
=
1184.58 = 205.64 .

28672.5
Shear Force in Wall and Frame:
() = 4

, ( , )

Consider determining the shear force at Z= 12.5 m

= 0.39

From the variation shear chart for wall and frames we find that K4 = 0.25
:- Shear in the Core at Z= 12.5m is
(12.5) = 7.2 32 0.25 = 57.6
Total shear in set of frames is as follows:
5|Page

= ( ) ()
= 7.2 (32 12.5) 57.6 = 82.8
The shear in individual frames is obtained from total shear in set of frames in proportion to their
rigidities:
1 =

1
4381.22
=
82.8 = 12.65

28672.5

2 =

2
4977.51
=
82.8 = 14.37

28672.5