DESIGN GUIDELINES
Adler, David. Metric Handbook Planning and Design Data. 2nd ed
1.SEATING
3. WHEELCHAIR LOCATION
4. CROSS GANGWAYS
With cross-gangways the line of the auditorium rake must continue
so that the audience can see the performance area above the
gangway as below. With stepped rows there requires a handrail to
the upper side of the gangway and, if a steep rake, a handrail to
the lower side.
Exit routes
The route must be a consistent width the same as the exit. There
must be no bottlenecks and all doors within the route must open
in the direction of escape. Routes within the building should
have fire-resistant enclosures. There are special requirements
for alldoors opening onto fire escape routes.
Stairs
Staircase flights should have at least two risers and not more
than 16. All treads should be 275 mm and risers 180 mm.
Ramps
Wheelchair users should be provided with flat or ramped escape
routes which may be separate from other routes. Ramps should not
be longer than 4.5 m or steeper than 8.5%.
5. CEILING ZONE
Acoustics: profiled reflector panels and possible adjustable
diffusers. For non-amplified music, reflectors also over concert
platform
Lighting: bridges for access and support for auditorium lighting,
working lights and emergency lighting as well as performance
lighting
Ventilation: air ducts and plenums, diffusers, noise attenuation
and monitoring equipment, supporting hangers and means of
access for servicing
Production requirements: for operas, dance musicals and drama,
a grid and pulley suspension for suspending scenery over
forestage,
including access by technicians
Fire control: detection system in voids and fire dampers in ducts
And
Structure: support for roof, ducts, lighting bridges, etc.
6. STAGE
Quick change
Separate rooms immediately off the stage, each with two make-up
positions and hanging rails.
Properties room
This is a store room, opening directly off a side stage for
properties for use during a performance. It requires a sink with
hot and cold running water.
Scene dock
At the same level as the stage for storage of scenery.
Loading bay
For the delivery of scenery and properties into the scene dock.
Allow for more than one pantechnicon to reverse.
Scenery
A repair and maintenance area at the side of the
maintain scenery and properties in use on the stage.
Piano store
stage
to
9. PLATFORM