Sie sind auf Seite 1von 294
amec foster PROJECT SITE REPORT S25 wheeler PROJECT: West End High School - CP2 PROJECT NO.:___167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:__July 10", 2015 CONTRACTOR:__ MARCO VISIT DATE:__June 11", 2015 REPORT BY:__Rebecca Manuel CATEGORY: Civil: Arch: O Mech: Ele Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: Substantial Performance: Final Performance: PROGRESS: Monthly Progress Review Site visit to review structural works completed to date. The following items were noted during the site tour on Thursday June 11”, 2015: ‘Structural 1. Despite previously raised concems, bond beams and reinforcing around openings are apparently still not installed in elevator masonry walls. See Photo 1. 2. As previously noted, masonry walls should be restrained as shown on the construction drawings. 3. _Itwas previously documented that Amec Foster Wheeler has become aware of the contractor "remediating" the shear wall reinforcing in ways which do not match the construction drawings. Documentation of contractor's remediations has not been received for review. See Photo's 2 to 6. 4. Some areas still require honeycombing remediation. See Photo 7. 5. Openings were cut into one of the masonry shear wall’s in the Penthouse. Ver Reinforcing was cut during this process. See Photo's 8 to 12. 6. Opening cut into shear wall allowed opportunity to view lack of vertical reinforcing within the shear wall. This wall is along gridline G between gridlines 7 and 11 on the ground floor. See Photo's 13 to 15. 7. All openings should be reinforced as shown on the drawings. See Photo's 13 to 17. PMF.06 Rev. 1 Project Site Report Report Date: July 9", 2015 Page 2 8. Provide any inspection and testing results required in the contract documents. 9. Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. ‘Subsection 40(1) DISTRIBUTION ‘Steve Matthews, P.Eng, TW Amec Foster Wheeler Americas Limited Tonya Knopp, Amec Foster Wheeler Power & Proce 438 Crosbie Road ‘mec Foster Weer Americas United PO Box 9600, Power & Process St Jon's NL Canada “AYA 301 Tet (709) re 1900 167733-0P2-94-5025 -Projec Site Repent $25 June 11,2015 Fax #709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: July 9", 2015, Page 3 183 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL Canada “ATA 301 Tel +(708) 724-1900 167733-CP2-9.4-S025 - Project Ste Report $25 June 11,2015 Fax +709) 739-5458 PME 06 Rev. 0 Project Site Report Report Date: July 9", 2015. Page 4 Photo 3 138 orosbie Road ‘Amee Foster Wheeler Americas Limited PO Box 9600 Power & Process St dohn’s NL Canada “AA 301 Tel (709) 724-1000 167733-P2.84-5026 - Project Sto Report S25 June 11.2015 Fax +(709) 7335458, PMF.06 Rev. 0 Project Site Report Report Date: July 9”, 2015 Page 5 Photo $ 138 Crosbie Road ‘Amoc Foster Wheeler Amasicas United PO Box 9600 Power & Process St John's NL Ganeda AIAIC1 Tat +09) 724-1900 167733-0P2.0,4-8025 - Project Ste Report $25 June 11,2015 Fax +709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: July 9", 2015 Page 6 4133 Crosbie Road ‘Amos Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL Canada ATA 3C1 Tel +708) 724-1900 167733-CP2-9.4-5025 - Project Site Report S25 June 11,2015, Fax +708) 730-5458 PMF 06 Rev. 0 Project Site Report Report Date: July 9”, 2015 Page 7 133 Crosbie Road ‘Amoc Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St, John's NL Canada ATA3C1 Tel +(709) 724-1900 167733-CP2-8.4-8025 - Project Site Report $25 June 11,2015 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: July 9°, 2015. Page 8 133 Crosbie Rood ‘Ameo Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John's NL Canada “A1A 301 Tel +(708) 724-1900 167733-CP2-8.4-S025 - Project Ste Report $25 June 11,2015 Fax #(708) 730-5458 PME 06 Rev.0 Project Site Report Report Date: July 9", 2015 Page 9 138 Crosbie Road Amec Foster Wheeler Americas Limited PO Box 9800 Power & Process. St. John's NL Canada ATA 3ct ‘Tel +(709) 724-1900 167733-CP20,4-5025 - Project Site Report S25 June 11.2015. Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: July 9", 2015. Page 10 133 Crosbie Rood ‘Amec Foster Wheeler Americas Limits PO Box 9600 Power & Process St. Jo's NL Ganada AIA C+ 4167733-CP2-9.48025 - Project Site Report $25 June 11,2015, Tel +(708) 724-1900 Fax +4709) 738-5458, PMF.08 Rev. 0 Project Site Report Report Date: July 9", 2015. Page 11 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John’s NL Canada “AIA 301 Tel +(708) 724-1900 167733-CP2-9,4-5025 - Project Site Report S25 June 11,2015 Fax +708) 738-5458, PMF.06 Rev. 0 amec foster PROJECT SITE REPORT S24 wheeler PROJECT: West End High School — CP2 PROJECTNO.:___ 167733 CLIENT: __Dept. of Transportation & Works REPORT DATE:__June 12", 2015 CONTRACTOR:__ MARCO. VISIT DATE:__May 19", 2015, REPORT BY:_Rebecca Manuel CATEGORY: Civil: 0 Arch: U = Mech: = Elect: Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: ‘Substantial Performance: Final Performance: O PROGRESS: Mid Month Review Site visit to review structural works completed to date. The following items were noted during the site tour on Tuesday May 19”, 2015: Structural 1. Bond beam and reinforcing around openings apparently not installed in elevator masonry walls. See Photo 1 2. Aconcem has previously been raised that bond beams have not been installed in some locations during the installation of masonry walls. it is not possible for Amec Foster Wheeler to visually verify this during the site visit since only the face of the masonry block is visible. 3. _Inaddition to ensuring the bond beams are installed as per the construction drawings, the top courses of masonry must be grouted where specified on the construction drawings. It is not possible for Amec Foster Wheeler to visually verify this during the site \isit since only the face of the masonry block is visible. 4. As previously noted, masonry walls should be restrained as show on the construction drawings. Contractor should submit stamped sketch showing existing detail works or a ‘stamped sketch showing proposed remediation. This is a major concer as finishes are being installed and this will be difficult and potentially costly to remediate afterwards. See Photo's 2 and 3. 5. Column to shear walll interface appears to have insulation in it. See Photo 4. PMF.06 Rev. 1 Project Site Report Report Date: June 12", 2015 Page 2 6. 10. "1. 12, 13, 14, 15. In Photo 5 it appears there are multiple broken (and at least one intact) masonry strap anchors which are visible. Contractor to state if masonry strap anchors which were broken were replaced with additional masonry strap anchors. Comments or remediation detail has not been received from contractor for previously noted deficiency where contractor appears to have failed to install masonry strap anchors in shear wall at column F7. Could not access music room D-104. See Photo 6, Itwas previously documented that Amec Foster Wheeler has become aware of the contractor "remediating" the shear wall reinforcing in ways which do not match the construction drawings and have not been submitted for approval. See Photo 7. As previously noted, installation of additional reinforcement at openings in concrete block walls does not match construction drawings. Contractor has begun “remediating” this issue without providing stamped drawings for review. See Photo 8. Contractor must. provide stamped remediation for review before proceeding to implement in other areas. See Photo 9. ‘Some areas still require honeycombing remediation. See Photo 10. ‘As previously noted, it has come to the attention of Amec Foster Wheeler that the library curtain wall which was modified as part of CCN No. 98 is being installed but does not match the issued drawings. Contractor still has not submitted stamped procedure/drawings for this remediation. As previously notes, shear wall along gridline A being covered with finishes despite incomplete Shear Wall construction and incomplete required remediations. For example, the column to shear wall connection. See Photo 11 As previously noted, bond beam installation along gridline G between gridlines 7 and 11 does not match construction drawings. Contractor has notified Amec Foster Wheeler that remediation of the bond beams along gridiine G has been completed and the wall has been constructed as per the drawings. Contractor did not submit a stamped procedure or drawing(s) for review prior to commencing work. It appears that the contractor has removed between one to three courses of masonry in order to install the bond beam. The contractor may have had to cut the vertical reinforcing in order to complete this. This would not match the contract drawings and requires remediation. As previously noted, it appears that insufficient clip angle contact is visible in various areas throughout the building. It appears that finishes are being applied in some areas 4133 Grosble Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL. Canada AIA 3C1 Tet (709) 724-1000, 167733-0P2:8.4-5024 - Project Site Report $24 May 19,2015 Fox +709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: June 12", 2015 Page 3 which will make this issue difficult and more costly to remediate in the future and may negatively impact the project schedule. See Photo 12. 16. As previously noted, stairwell masonry remains unrestrained in many locations. See Photo 13. 17. Contractor to ensure debris is removed before commencing concrete pour around columns. See Photo 14, 18. Contractor appears to have initiated a structural remediation in some areas that was not submitted for review and approval beforehand. Contractor is reminded that they must submit a stamped procedure or drawing(s) for review prior to commencing work. See Photo's 15 to 18. 19. Shear walls with previously noted deficiencies remain unresolved. in some cases finishes are being installed over these deficiencies without remediation. 20. Many other important deficiencies noted in previous site reports remain unresolved. in ‘some cases finishes are being installed over these deficiencies without remediation. 21. Provide any inspection and testing results required in the contract documents. 22. __Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. ‘Subsection 40(1)) DISTRIBUTION ‘Steve Matthews, P.Eng, TW Americas Limited Tonya Knopp, Amec Foster Wheeler a Manuel 4139 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Bax 9600 Power & Process St John's NL Canada A1A 301 Tel +(709) 724-1900, 167739-0P2-0.4-8024 - Project Site Report S24 May 19.2015 Fax #{708) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: June 12", 2015 Page 4 Photo 2 138 crosble Road ‘Amec Foster Wheeler Americas ited PO Box 9600 Power a Process St Johns NL Canada “AIA 3C1 ‘Fat (708) 724-100 167733-c?2.04-8024 - Project Site Report $24 May 19.2015 Fax +(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: June 12", 2015. Page 5 0103 Photo + 133 Crosbie Road ‘Amc Foster Wheeler Americas Liited PO Bax 9000 Power & Process St Jon's NL Cenada -ATACI ‘Ta »(709) 724-1000 107733-CP2-94.5024 Project Site Report $24 May 102015 Fax +(709) 739-6458 PMF.06 Rev. 0 Project Site Report Report Date: June 12", 2015 Page 6 Photo 6 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process. St. Joha's NL Canada ATA SCt 167733-CP2-0.4-8024 - Project Ste Report $24 May 19,2015 Tel +(709) 724-1900 Fax +709) 730-5458 PMF.06 Rev. 0 Project Site Report : June 12", 2015 4133 Crosble Road PO Box 9600 ‘St John's NL Canada AIA 3C1 Tel +708) 724-1900 Fax +(709) 739-6458 Photo 8 ‘Amec Foster Wheeler Americas Limited Power & Process 167733-CP2-94-5024 - Project Site Report $24 May 19,2015 PMF.06 Rev. 0 Project Site Report Report Date: June 12", 2015 Page 8 Photo 9 133 Crosbie Road ‘Amc Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John’s NL Canada “AIA 301 Tel (708) 724-1900 167733-CP2-84-8024 - Project Site Report $24 May 19,2015 Fax +(708) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: June 12", 2015 Page 9 123 Crosbie Road ‘Amoc Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL Canada ATA 3Ct Tel +(709) 724-1900 167733-CP2-94-8024 - Project Ste Report $24 May 192015, Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: June 12%, 2015 Page 10 4133 Crosbie Road ‘Amos Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘st dots NL (Canada ATA 3C1 Tet #708) 724-1000 167733-CP2-9.4.8024 - Project Site Report $24 May 19,2015, Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: June 12", 2015, Page 11 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St John's NE Canada ATA 3Ct 167733.0P2-9.48024 - Project Ste Report $24 May 19.2015 Tel +(709) 724-1900 Fax +708) 730-5458 PME.06 Rev. 0 Project Site Report Report Date: June 12", 2015 Page 12 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 8600 Power & Process St. John’s NL Ganada “AIA 361 167733.P2-0.4-8024 - Project Ste Report S24 May 19.2015, Tot (709) 724-1900 Fax #(709) 739-5458 PMF.06 Rev. 0 amec foster PROJECT SITE REPORT S22 wheeler PROJECT: West End High Schoo! - CP2 PROJECT NO.: 167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:__April 22", 2015 CONTRACTOR:. MARCO. VISIT DATE:___April 17", 2015 REPORT BY: Rebecca Manuel CATEGORY: Civil: U Arch: U Mech: | Elect: Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: — ‘Substantial Performance: Final Performance: © PROGRESS: Mid Month Review visit to review structural works completed to date. The following items were noted during the site tour on Friday April 17", 2015: Structural 1. Elevator openings are not property reinforced as per construction drawings. See Photo 1 2. ‘Some areas still require honeycombing remediation. See Photo's 2 to 4. 3. Stairwell masonry restraint angle not restraining any masonry. See Photo's 5 and 6. 4. Installation of additional reinforcement at openings in concrete block walls does not match construction drawings. Contractor to provide stamped drawings of the implemented remediation for review. See Photo's 7 to 9. 5. Additional reinforcement yet to be installed at openings in concrete block walls. See Photo 10, 6. ‘Shear walls with previously noted deficiencies remain unresolved. In some cases the contractor is installing finished that cover up these deficiencies without remediating them. See Photo's 11 and 12 for an example. 7. While discussing with the contractor deficiencies with the shear wall along gridline A between gridiines 6 and 7 it was apparent the contractor representative was unaware of the deficiencies despite them being reported and discussed numerous times with Marco. Contractor should review previously noted deficiencies and submit remediation plan for review. PMF.06 Rev. 1 Project Site Report Report Date: April 22°, 2015 Page 2 8. 10. Itwas previously noted that some shear walls were not properly reinforced as per the construction drawings. It has come to the attention of Amec Foster Wheeler that in an. effort to correct this deficiency the contractor has improperly installed reinforcement in the shear walls along gridline F. The procedure described involves dropping reinforcement from the top of the wall into the appropriate wythe without providing connection to the slab or the required overlap. Contractor to submit stamped drawing for review or remediate as per construction drawing. Provide any inspection and testing results required in the contract documents. Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. Subsection 40(1) DISTRIBUTION Steve Matthews, P.Eng, TW ‘Amec Foster Wheeler Am: ited Kirk Kendall, Amec Foster Wheeler febecca Manuel 133 Crosbie Ross ‘Amec Foster Wheeler Americas Limited PO Blox 9600 Power & Process St. John's NL Genada ATA 301 Tel +(709) 724-1900 167738-CP2-9,4-8022 - Project Site Report $22 Apri 22,2015, Fax +709) 739-5458 PMF.06 Rev. 0 Project Site Report April 22™, 2015, 433 Crosbie Road PO Bax 9600 ‘St John's NL. Canada AIA C1 Tel +4709) 724-1900 Fax 4{708) 739-5458 Photo 2 ‘Ameo Foster Wheeler Americas Limited Power & Process 167733-CP2-9.4-S022 - Project Site Report $22 April 22.2015 PMF.06 Rev. 0 Project Site Report Report Date: April 22%, 2015 Page 4 Photo 4 ‘Amec Foster Wheeler Americas Limited 123 Crosbie Road Power & Process PO Box 9600 ‘St John's NL Canada ATA 301 Tel (708) 724-1900 167733-CP2-9,4-5022 - Project Site Report $22 Api 22.2015 Fax #(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 22°, 2015 Page 5 209.417 Photo 6 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St, John’s NL Canada “AIA 31 Tet (708) 724-1900 167733-0P29,4-8022 - Project Site Report $22 Apil22.2015 Fax +(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 22", 2015 Page 6 133 Crosbie Road ‘Amoc Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL (Conada ATA 301 Tel +(708) 724-1900, 167739-CP2-9,4-5022 - Project Site Report $22 April22.2015 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 22, 2015 Page 7 Photo 9 183 Crosbie Road ‘Amec Foster Wheoler Americas Lined PO Box 9600| Power & Process St John's NL Genaca ATA Ct 167733-CP2.0.4-502 - Project Ste Report $22 Apri 22.2015 Tel (708) 724-1900 Fax +709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 22°, 2015. Page 8 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St, John’s NL Canada “ATA301 Tel #(708) 724-1900 167733-CP2.9,4-8022 - Project Site Report $22 Apri 22.2015, Fex +709) 739-5458 PMF.06 Rev. 0 amec foster PROJECT SITE REPORT $21 wheeler PROJECT: West End High Si Pi PROJECT NO.: 167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:__Aoril 40", 2015 CONTRACTOR:. MARCO. VISIT DATE:___April 2", 2015 REPORT BY: Rebecca Manuel CATEGORY: Civil: 0 Arch: 9 Mech: 1) Elect: 0 ‘Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: 0 ‘Substantial Performance: 2 Final Performance: (1 PROGRESS: Progress Review Site visit to review structural works completed to date. The following items were noted during the site tour on Thursday April 2™, 2015: Structural 1 ‘Shear Wall along gridline 7 between gridlines A and B being covered up with finishes, although all deficiencies have not yet been addressed. See Photos 1 and 2. 2. Shear Wall along gridline 7 between gridlines A and B: Bar anchor(s) missing. See Photo 3. 3. Many shear walls have previously noted deficiencies that remain unresolved. For example: Wall along gridline G between gridlines 6 and 7 - See Photo's 4 and 5. Wall along gridline G between gridlines 6 and 11 - See Photo 6. Wall along gridline 1 between gridlines E and F - See Photo 7. Wall along gridline 7 between gridlines E and F - See Photo's 8 to 11 Wall along gridline A between gridiines 6 and 7 - See Photo 12. Wall along gridline F between gridlines 6 and 7 - See Photo 13. Wall along gridline F between gridlines 6 and 11 - See Photo's 14 to 16. eoce00e 4, Some areas still require honeycombing remediation. See Photo's 17 to 19. 5. Provide additional reinforcement at openings in all concrete block walls as specified in contract drawings. See Photo's 20 to 25. PMF.06 Rev. 4 Project Site Report Report Date: April 7", 2015 Page 2 6. 10. "1. 12. Provide masonry partition wall support as specified in contract drawings. See Photo's 26 to 28. Poor Grouting. See Photo 29. Poor installation of masonry in shear wall along top course. See Photo 30. As noted on previous reports many shear wall columns require remediation where the shear wails do not extend into the web or flange of the column. See Photo's 31 to 41 Stairwell masonry restraint angle not restraining any masonry. See Photo 42. Provide any inspection and testing results required in the contract documents. Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. Subsection 40(1) DISTRIBUTION Steve Matthews, P.Eng, TW ‘Amec Foster Wheeler Americas Limited Kirk Kendall, Amec Foster Wheeler Power & Process Rebecca Manuel 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process. ‘St. John's NL Canada AIA3Ct Tel +(709) 724-1900 167733-CP2.4-5021 - Project Site Report $21 April 2.2015 Fax +{708) 739-5458, PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 3 Photo 2 433 Crosbie Read ‘Amos Foster Wheeler Americas Limited PO Box 9800 Power & Process St Joha's NL. Garada ATA 301 Tal +(709) 724-1900 167733-CP2-64-8021 - Project Site Report $21 April 22015 Fax +1709) 738.5458, PMF.06 Rev. 0 Project Site Report Report Date: April 7°, 2015 Page 4 Photo 3 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process. ‘St John's NL Canada ATA SCI 167733-CP2-94-5021 - Project Site Report $21 Apri 22015 Tat (708) 724-1900 Fax +709) 739-5458 PM.08 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 5 Photo 6 438 Crosbie Road ‘Amec Foster Wheoler Americas Limited PO Bax 9600 Power & Process St. John's NL Canada “AIA3C1 Tel +(708) 724-1900 167733-CP2-94-S021 - Project Ste Report $21 Apel 22015 Fax +709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 6 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600, Power & Process ‘St John's NL Canada ATA 301 Tel +(708) 724-1900 167733-CP2-8.4.8021 - Project Site Report $21 Apr 22015. Fax +(708) 738-5458 PMF.068 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 7 4133 Crosble Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process: ‘St John's NL Canada ATA C1 Tol +(708) 724-1900, 167733-CP2.9.4-8021 - Project Site Report $21 April 2.2015 Fax +(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 7°, 2015 Page 8 439 Crosbie Road ‘Amec Foster Wheeler Amareas Lied PO Box 600 Power Process ‘St doh’ NL Canada ATA 3c 107733-0P2.9.4-8021 - Projet Ste Report $21 Apt 22015 Tel +(709) 724-1900 Fax #(709) 730-6458 PME.08 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 9 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John’s NL, Ganada AIA SC 167733.CP2-9.4-S021 - Project Ste Report $21 Apt 2.2015 Tel +1708) 724-1900 Fax +(708) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 10 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process: St. John’s NL Canada “ATA3C1 Tel (708) 724-1900 167733-CP2-8 4.8021 - Project Site Report $24 Apr 2.2015 Fax +(709) 739-6458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 11 4133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process. St, John's NL Canada “ATA 301 Tot +(708) 724-1900 167733-CP2-9.4-5021 - Project Se Report S21 April22015 Fax +(709) 738-5458 PMEF.06 Rev. 0 Project Site Report Report Date: April 7", 2015. Page 12 Photo 20 4133 Crosbie Road ‘Amec Foster Wheeler Amercas Lined PO Box 9000 Power & Process St Joist, Cored AIA 301 Tat (09) 724-1000 167733.0P2.8.4-8021 - Project Site Report S21 Ap 22015 Fax +(709) 739-5458 PMF.08 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 13 133 Crosbie Rood ‘Amec Foster Wheeler Americas Limited PO Box 9600 ce ‘St Job's NL Canada ATA C1 coecasinorE 167783-CP2-9.4.5021 - Project Ste Report $24 Api 2.2015 Fax #(703) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 14 Photo 23 183 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John’s NL Canada “AIA 301 Tol +(708) 724-1900 167738-CP2-9.4.8021 - Project Site Report $21 April22015 ax +4708) 730-5458 PMF.08 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 15 133 Crosbie Road PO Bx 9600 St. John's NL Canada ATA 361 Tel +708) 724-1900 Fax #(709) 739-5458 Photo 26 ‘Amec Foster Wheeler Americas Limited Power & Process 167733-0P2-9.4-S021 - Project Site Report $21 April 22015 PMF.08 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 16 Photo 28 133 Crosbie Rood ‘Amec Foster Wheeler Americas Liited PO Box 9600| Power & Procass Stsonn's NL Ganede ATA SC 167739-CP2.8.4-802' - Project Ste Report $21 Apel 2.2015 Tol +(708) 724-1900, Fax +(709) 730-6458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015. Page 17 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St Joba's NL Canada “ATA ct Tel +(709) 724-1900 167798-CP2-9.4-8021 - Project Ste Report $21 Apri 2.2015 Fax +709) 730-5458 PME.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 18 ‘Photo 31 Photo 32 133 Crosbie Road ‘Amec Foster Wheeler Amercas Lined PO Box 9600 Power Process St John's NL Gansta ATA 3c el (709 72-1000 167733-02.0 4-802! - Project Ste Report S21 Apa 2.2015 Fax $700) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 19 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 2600 Power & Process St Jobs NL Canada “AIA 3C1 167733-6P2-9.4.5021 - Project Ste Report $21 Apt 22015 Tel +(708) 724-1800 Fax +(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 20 433 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Bax 9600 Power & Process ‘St John's NL Canada AIA 3C1 167733-CP2-0.4-S021 - Project Sto Report $21 Apr 22015 Tel (708) 724-1900 Fax +709) 739-5458, PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 21 Photo 37 Photo 38 139 Crosbie Road ‘Amec Foster Wheeler Americas Lined PO Box 9600 Power & Process St Johns NL Ganada ATA Ct Tel +709) 724-1900, 167733.0P2.8.4-8021 - Project Ste Report S21 Api 2.2015 Fax +(709) 739-5458 PMF.08 Rev. 0 Project Site Report ipril 7°, 2015 Photo 39 Photo 40 133 Crosbie Road ‘Ames Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL Canada ATA C1 Tol +(708) 724-1900 167733-CP2-9.4-8021 - Project Ste Report $21 April 2.2015 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: April 7", 2015 Page 23, 433 Crosbie Road ‘Ames Foster Wheeler Americas Limited PO Box 9600 Power & Process St. Jon's NL Canada “AIA 301 Tet #709) 724-1900 167733-0P29.4-S021 - Project Site Report S21 Aptil2,2015 Fax +(708) 730-5458 PMF.08 Rev. 0 amec PROJECT SITE REPORT S20 foster wheeler PROJECT: West End High School — CP2 PROJECT NO.: 167733 CLIENT: __Dept. of Transportation & Works REPORT DATE:__March 31", 2015 CONTRACTOR:_ MARCO. VISIT DATE: March 27", 2015, REPORT BY: Rebecca Manuel CATEGORY: Civil: U Arch: Elect: 0 ‘Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: © Substantial Performance: 0 Final Performance: PROGRESS: Additional Re Site visit to review shear wall vertical reinforcing placement through openings cut into shear walls. The following items were noted during the site tour on Friday March 27", 2015: ‘Structural 1 New bar anchors in shear wall along gridline 7 between gridlines A & B observed. Appear to be installed at 400mm spacing as required. See Photos 1 and 2. 2 ‘Shear Transfer element installed as observed from a distance in wall along gridline 7 between gridlines A & B. See Photo 3, 3. Vertical reinforcing observed in Level 1 of shear wall along gridline 7 between gridiines A&B. Spacing observed at 400mm as shown on drawings. See Photo 4. 4. ‘Shear wall deficiencies as described in report $14 remain unresolved for Level 2 of ‘shear wall along gridline 7 between gridlines A & B. See Photo 5. 5. Shear wall deficiencies as described in report $14 remain unresolved for Level 1 of shear wall along gridline 7 between gridlines E & F. See Photo 6. 6. Masonry strap anchors incorrectly installed (not attached to masonry wall) for Level 2 of shear wall along gridiine 7 between gridiines E & F. See Photo 7. 7. Shear wall deficiencies as described in report S14 remain unresolved for Level 2 of shear wall along gridline 7 between gridlines E & F. See Photo 8, 8. Shear Transfer element observed in wall along gridline 7 between gridlines E & F. See Photos 9 and 10. PMF.06 Rev. 1 Project Site Report Report Date: March 31", 2015, Page 2 9. Incorrect vertical reinforcing observed in Level 2 of shear wall along gri gridlines 6 & 7. See Photo 11 and Photos 13 to 17. Deficiencies identifi for neighbouring shear walls likely also apply to this shear wall. F between in report S14 10. Shear wall deficiencies as described in report $14 remain unresolved for Level 1 of shear wall along gridline F between gridiines 6 & 7. See Photo 12. 14. Shear wall deficiencies as described in report S14 remain unresolved for both Levels of shear wall along gridline F between gridlines 6 & 11. See Photos 18 to 20. 12. Shear wall deficiencies as described in report $14 remain unresolved for all Levels of shear wall along gridline G between gridlines 6 & 7. See Photos 21 and 22. 13. Shear wall deficiencies as described in report $14 remain unresolved for all Levels of ‘shear wall along gridline G between gridlines 6 & 11. See Photos 23 to 25. 14, Provide any inspection and testing results required in the contract documents. 15. _Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. DISTRIBUTION Subsection 40(1) Steve Matthews, P.Eng, TW ‘Amec Foster Wheeler Americas Limited Kirk Kendall, Amec Foster Wheeler Power & Process 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John’s NL Canada AIA 3C1 Tet (70) 724-1900 167799-CP2-9.4-8020 - Project Ste Report $20 March 27,2015 Fax +709) 739-5458 PMF-06 Rev. 0 Project Site Report Report Date: March 31%, 2015, Page 3 188 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John's NL Canada “AIA 3¢1 ‘Tel +(708) 724-1900 167738-CP2-9,4-5020 - Project Site Report $20 March 27,2015 Fax +(708) 738-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31%, 2015 Page 4 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John's NL Canada “ATA 3C1 Tol” *(709) 724-1900 167733-CP29,4-5020 - Project Site Report S20 March 27,2015 Fax +{709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31%, 2015. Page 5 133 Crosbie Rood ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St Johr's NL Canada “AIA 3C1 167733-CP2-9,4-8020 - Project Ste Report S20 March 27,2015, Tel +(703) 724-1900 Fax +(709) 739-5458, PMF.06 Rev. 0 Project Site Report Report Date: March 31%, 2015 Page 6 433 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL Canada ATA 301 4167733-CP2:94-S020 - Projet Ste Report $20 March 27,2015 Tet +(708) 724-1900 Fax +(708) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31%, 2015. Page7 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St, John's NL Canada “AIA 301 Tol +(709) 724-1900 167733-CP2-04-8020 - Project Site Report $20 March 27,2015 Fax *(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31", 2015, Page 8 139 Crosbie Road Amec Foster Wheeler Americas Lites PO ox 9000 Power &Procass ‘SL Job's NL Ganacs “ATA 3c 107733-CP2.94.5020 Projet Sie Report $20 March 272015 Tet +(709) 724-1900 Fax +{708) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31", 2015, Page 9 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John's NL Canada AIA 3C1 167733-0P2-94-8020 - Project Ste Report S20 March 27.2015 Tel +709) 724-1900 Fax #(708) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31°, 2015 Page 10 138 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John’s NL Ganada “ATA 301 Tel +(708) 724-1900, 167733-CP2-9.4-S020 - Project Site Report $20 March 27,2015 Fax #(709) 739-5458 PMF.08 Rev. 0 Project Site Report Report Date: March 31", 2015 Page 11 Photo 17 Photo 18 4188 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 2600 Power & Process St John's NL Canada AIA C1 Tel +709) 724-1900, Fax #708) 730-5458 167733-CP2-9,4-8020 - Project Site Report S20 March 27,2015 PMF.06 Rev. 0 Project Site Report Report Date: March 31%, 2015 Page 12 Photo 19 Photo 20 133 Crosble Road ‘Amec Foster Wheeler Amica Limited PO Bex 9600 Power & Process St John’s NL Canada “AIA 361 Tel »(709) 724-1000 167732-0°2.9 4.8020 - Project Ste Report $20 March 27,2015 Fax +(709) 739-5458. PMF.06 Rev. 0 Project Site Report Report Date: March 31%, 2015 Page 13, Photo 22 438 Crosbie Road ‘Amec Foster Wheeler Americas Liited PO Bax 9600 Power & Process St. John’s NL Canada “ATA301 Tel ¥(708) 724-1900 167733-CP2-04-5020 - Project Ste Report $20 March 27,2015 Fax #(708) 738-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31", 2015, Page 14 Photo 24 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. Jo's NL Ganada “AIA 3c 167733-CP2-9,4-8020 - Project Site Report S20 March 27,2018, Tel +(709) 724-1900 Fax +4708) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 31%, 2015, Page 15 133 Crosbie Rood ‘Amec Foster Wheeler Americas Limited PO Box 8600 Power & Process St. John's NL Ganada “AIA 361 167733-CP2-9.4-5020 - Project Ske Report $20 March 27.2015 Tol +(708) 724-1900 Fax #(708) 730-5458 PM.06 Rev. 0 amec foster PROJECT SITE REPORT S19 wheeler PROJECT: West End High Schoo! - CP2 PROJECT NO.:___167733 CLIENT:__Dept. of Transportation & Works REPORT DATE: _March 24", 2015 CONTRACTOR:__MARCO VISIT DATE:___March 18", 2015 REPORT BY: Rebecca Manuel CATEGORY: Civil: Arch: | Mech: Elect: 0 Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: Substantial Performance: Final Performance: © PROGRESS: Mid Month Review Site visit to review structural works completed to date. The following items were noted during the site tour on Wednesday March 18", 2015: Structural 1. Restrain masonry wall at bottom chord of joists when required as per contract documents. Allow for deflection of the joists. See Photos 1 and 2. See Photos 22 to 27. 2. Clip angles providing insufficient contact with masonry. See Photos 3 to 9. 3 Ensure fall arrest anchors are installed as shown in the drawings. See Photo 10. 4. Progress noted with respect to honeycombing repair procedure. Some areas still require remediation. See Photos 11 to 15 and 28 to 30. Photo 28 shows an instance where the contractor has not yet finished removing all of the affected concrete. Photos 29 and 30 show the same wall at earlier stages of construction. These photos demonstrate the extent of damage that remains when compared to photo 28 showing what has been completed. 5. Ensure additional reinforcement has been installed in openings in all concrete block walls as shown in the drawings. See Photos 16 and 17. 6. Ensure Shear Transfer element has been installed in shear walls along gridline 7 as. shown in issued detail ip Bond beam installation along gridline G does not match contract drawings. See photos 18 to 20. PMF.06 Rev. 4 Project Site Report Report Date: March 24”, 2015 Page 2 8. Remove rust and ensure steel surfaces are primed as specified. See Photo 21. 9. Provide any inspection and testing results required in the contract documents, 10. tems noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. Subsection 40(1) DISTRIBUTION Steve Matthews, P.Eng, TW ‘Amec Foster Wheeler Americas Limited Kirk Kendall, Amec Foster Wheeler cca Manuel 433 Crosbie Road ‘Ameo Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL Canada “ATA 3C1 Tal +(709) 724-1900 167733-CP20.4-8010 - Project Ste Report $19 March 18,2018 2 Fax 4708) 736-5458, PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015 Page 3 433 Crosbie Road ‘Ameo Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John’s NL Canada “ATA3¢1 Tel +(709) 724-1900 167733-CP294-8019 - Project Site Report $19 March 18,2015 2 Fax +(709) 739-6458 PMF.06 Rev. 0 Project Site Report Report Date: March 24”, 2015 Page 4 133 Crosbie Road PO Box 9600 ‘St Joha's NL. Canada ATA 3C1 Tel +(709) 724-1900 Fax +(709) 739-5458, Photo 4 ‘Amec Foster Wheeler Americas Limited Power & Process 167739-CP2-94-8019 - Project Site Report $19 March 18,2015 2 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015 Page 5 133 Crosbie Road ‘Amoc Foster Wheeler Americas Limited PO Box 9600 Power & Process St. Joba's NL Canada AtA3C1 Tel +(708) 724-1900 167733-0P2.9.4-8019 - Project Ste Report $19 March 18,2015 2 Fax +(708) 738-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24”, 2015 Page 6 Photo & 4133 Crosble Road ‘Amec Foster Wheeler Americas Liited PO Box 9600 Power & Process St, John’s NL Canada “AIA 301 Tet (709) 724-1000 167733.CP2.9.4-8019 - Project Ste Report $19 March 18,2018 2 Fax +709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24”, 2015 Page 7 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St Joha's NL Canada “ATA 301 167739-CP2-9.4.5019- Project Ste Report $19 March 18,2015 2 Tol +(709) 724-1900 Fax +708) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015. Page 8 Photo 11 Photo 12 4138 Crosble Road ‘Ames Foster Wheeler Ameras Lined PO Box 9600, Power & Process St Jo's NL Canada AYA 3C1 Tal »(708) 724-1000 167793-CP2.94-8019 - Project Se Report $19 March 18,2015 2 Fax #(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015 Page 9 Photo 14 4133 Crosbie Rood ‘mac Fostes Wheeler Americas Linited PO Box 2600 Power 8 Process Stsohns NL Ganada ATA Ct 167739-0P2-0.4.5019 -Projec Site Report $19 Mach 182015 2 Tel ¥(709) 724-1900 Fax #(708) 736-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015 Page 10 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St John's NL Ganada “AA 361 167733-CP?2-9.45019 - Project Ste Report $19 March 16,2015 2 Tel +1709) 724-1900 Fax (708) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015 Page 11 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. Johe's NL Canada “ATA 301 Tol +(709) 724-1900 167733-CP2-8.4-S019 - Project Site Report $19 March 18,2015 2 Fax +709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015, Page 12 4133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John's NL Canada “ATA 301 Tet +(709) 724-1900 167733-CP2.9.4-S019 - Project Ste Report S19 March 18,2016 2 Fax +708) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015, Page 13, Photo 22 4133 Crosbie Road ‘Amos Foster Wnedlr Americas Limited PO Box 2600, Power & Process St ohne NL Canada “AIA 301 167733-CP2.9.4-S018- Project Ste Report S19 March 1820152 Tel +(709) 724-1000 Fax 4708) 738-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015, Page 14 Photo 23 Photo 24 133 Crosbie Rood ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St. Job's NL Ganada AIA 301 167733-CP2-8.4-S018 - Project Site Report S19 March 182015 2 Tel +(708) 724-1900 Fax #(708) 738-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24”, 2015 Page 15 Photo 25 188 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John's NL Canada “AIA 301 Tel +(709) 724-1900 167733-CP2-9.4-S019 - Project Site Report S18 March 18,2018 2 Fax +709) 730.5458 PMF.06 Rev. 0 Project Site Report Report Date: March 24", 2015 Page 16 4133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9800 Power & Process ‘St. John's NL Canada “ATA 361 Tol +(709) 724-1900 167733-CP 2-04-5019 - Project Site Report $19 March 18,2015 2 Fax +(709) 739-5458 PMF.08 Rev. 0 Project Site Report Report Date: March 24”, 2015 Page 17 Photo 29 133 Crosbie Road ‘Amee Foster Wheeler Americas Limited PO Box 3600 Power & Process St John's NL Canada AIA 361 167733-CP2-8.4S018- Project St Report $19 March 18:20152 Tel +(709) 724-1900 Fax +708) 739-5458 PMF.06 Rev. 0 amec foster PROJECT SITE REPORT S18 wheeler PROJECT: West End High School - CP2 PROJECT NO.: __167733 CLIENT:_Dept. of Transportation & Works REPORT DATE:__March 11°, 2015 CONTRACTOR:__ MARCO VISIT DATE:___March 6", 2015 REPORT BY: Rebecca Manuel CATEGORY: Civil: 0 Arch: 0 = Mech: Elect: Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: 0 Substantial Performance: © Final Performance: 0 PROGRESS: Progress Review ‘Site visit to review structural works completed to date. The following items were noted during the site tour on Thursday March 6", 2015: ‘Structural 1 Honeycombing repairs observed at various stages of compl building. See Photo's 1 through 4. Please note the following: © Photo 2 shows an instance where the contractor has not yet finished removing all of the effected concrete. © Photo 3 shows a section of honeycombing which requires remediation but has not yet been initiated. Contractor to repair all instances of honeycombing throughout the building. jon throughout the 2 Masonry restraints required atop concrete block partitions as per contract documents. ‘See Photos 5 to 10. 3 Restrain masonry wall at bottom chord of joists when required as per contract documents. Allow for deflection of the joists as specified in contract documents. See Photo 7. 4, Ensure bond beams will be installed in shear walls where specified in contract documents. See Photo 11. 5. Provide a protective covering to ensure the flooring is not damaged during the honeycombing repair procedure. See Photo 12. 6. Poorly grouted masonry. See Photo 13. PMEF.06 Rev. 1 Project Site Report Report Date: March 11”, 2015 Page 2 7 Provide any inspection and testing results required in the contract documents. 8 _Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. Subsection 40(1) DISTRIBUTION ‘Steve Matthews, P.Eng, TW Amec Foster Wheeler Am Kirk Kendall, Amec Foster Wheeler s Limited 133 Crosbie Road ‘Amec Foster Whooler Americas Limited PO Box 9600 Power & Process: ‘St John's NL Canada ATA 3C1 Tel (708) 724-1900, 167733-CP2-9 4.8018 - Project Site Report $18 March 6.2018 2 Fax +(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 11", 2015 Page 3 Photo 1 Photo 2 439 Crosbie Road ‘Amec Fostes Wheeler Amascas Limited PO Box 9000 Power Process St Jone NL Canada “AIA 301 ‘Tal ¥(700) 724-1900 167733.0P2.8.4-8018 - Project Site Report S18 March 62015 2 Fax +(709) 730-5458, PMF.06 Rev. 0 Project Site Report Report Date: March 11", 2015 Page 4 Photo 4 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John's NL Canada “ATA 9C1 167733-0P2:9.4-5018 - Project Site Report $18 March 6,2015 2 ‘Tel +708) 724-1900, Fax +(709) 730-5458, PMF.06 Rev. 0 Project Site Report Report Date: March 11", 2015 Page 5 Photo S Photo 6 193 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process: ‘St John's NL. Canada AIA 301 Tol +(708) 724-1900 167733-CP2-0.4-8018 - Project Ste Report S18 March 6.2015 2 Fax #709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 11”, 2015, Page 6 Photo 7 Photo 8 138 Crosbie Road ‘Amos Foster Whedler Americas Linited PO Box 9e00 Power & Process St JomsNL Canada AIA 361 167733.0°2.8.4-5018 - Project Site Report 18 March 62015 2 Tel (708) 724-1900, Fax +(709) 730-5458 PMF.06 Rev. 0 Project Site Report Report Date: March 11", 2015 Page 7 Photo 9 133 Crosbie Rood ‘Ames Foster Whecler Americas Limited PO Box 9600 Power & Process St John's NL Canada AIA 3Ct 167733-CP2.9.4-8018- Project Site Report S18 March 6.2015 2 Tel +(709) 724-1900 Fax +(708) 7395488, PMF.08 Rev. 0 Project Site Report Report Date: March 11°, 2015 Page 8 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 ene ‘St. John's NU Ganada “ATA 361 es 167733-CP2-8.4-S018- Project Site Report $18 March 62015 2 Fax "(708 730-5458 PMF.06 Rev. 0 Project Site Report 3: March 11, 2015. 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process St. John’s NL Canada “AIA 301 Tel +708) 724-1900 167733-CP2-9.4-5018 - Project Site Report $18 March 6,2015 2 Fax +709) 730-5458 PMF.08 Rev. 0 amec PROJECT SITE REPORT S17 foster wheeler PROJECT: West End High School - CP2, PROJECT NO.: 167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:__February 24", 2015 CONTRACTOR:. MARCO VISIT DATE:. February 19", 2015 REPORT BY: Rebecca Manuel___ ‘CATEGORY: Civil: 0 Arch: 0 Mech: 0 Elect: 0 Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: 0 ‘Substantial Performance: © Final Performance: 1 PROGRESS: Mid Month Review Site visit to review structural works completed to date. The following items were noted during the site tour on Thursday February 19", 2015: ‘Structural aS Provide documentation that bond beam has been installed in shear wall as specified in contract documents. See Photo 1 - Left Hand Side. 2 Ensure bond beam is going to be installed is shear wall shown in Photo 1 ~ Right Hand Side. 3. Honeycombing has been painted over, but not repaired. See Photo 2. 4 Observed cracking within concrete slabs. See Photos 3 & 4. 5. Observed curling of slabs at control joints. See Photo 5. 6. Provide any inspection and testing results required in the contract documents. 7. Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. DISTRIBUTION Subsection 40(1) Steve Matthews, P.Eng, TW ‘Amoc Foster Wheeler Americas Limited Kirk Kendall, Amec Foster Wheeler Power & Process PME.06 Rev. 1 Project Site Report Report Date: February 24", 2015 Page 2 433 Crosbie Road ‘Ames Foster Wheeler Americas Limited PO Box 9600 Power & Process ‘St. John's NL Canada ATA 301 Tol +(708) 724-1800 167733-CP2-9 4.8017 - Project Ste Report $17 February 182015 Fax +709) 730.5458, PMF.08 Rev. 0 Project Site Report Report Date: February 24", 2015 Page 3 Photo 3 Photo 4 133 Crosbie Road ‘Amec Foster Wheeler Americas Limited PO Box 9600 Power & Process. ‘St. John's NL Canada “ATA3C1 Tel #709) 724-1000, 167733-CP2-9 4-8017 - Project Site Report $17 February 192015 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: February 24", 2015 Page 4 4133 Crosbie Road ‘Ames Foster Wheeler Americas Limited PO Box 9600 Power & Procass. ‘St John's NL Canada ATA 301 Tel (708) 724-1900 167733-CP2.9 4-S017 - Project Ste Report $17 February 192015 Fax +(709) 739-6458 PMF.06 Rev. 0 amec foster PROJECT SITE REPORT S16 wheeler PROJECT: West End High School - CP2 PROJECT NO.:__167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:_February 5%, 2015 CONTRACTOR:___MARCO. VISIT DATE:__February 3%, 2015 REPORT BY: Rebecca Manuel CATEGORY: Civil: 0 Arch: Mech: | Elect: | Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: Substantial Performance: Final Performance: PROGRESS: Mid Month Review Site visit to review structural works completed to date. The following items were noted during the site tour on Wednesday February 3”, 2015: Structu 1 Honeycombing repairs have begun. Have not witnessed repair process. 2. Missing or insufficient clip angles have been installed or replaced in some areas. However, other areas still require remediation. In photos 1 to 4 it can be seen that some of the clip angles do not show sufficient overlap with the masonry. 3 Provide any inspection and testing results required in the contract documents. 4, Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. Subsection 40(1) DISTRIBUTION Steve Matthews, P.Eng, TW Amec Foster Wheeler Americas Limited Kirk Kendall, Amec Foster Wheeler Power & Process PMEF.06 Rev. 4 Project Site Report Report Date: February 5", 2015 Page 2 Photo Photo 2 133 Crosble Road ‘Amec Foster Wheeler Americas Liited PO Bex 9600 Power & Process ‘St. John's NL Canada AIA 361 Tel (709) 724-1000 167738-CP2-8.4-8016 - Project Site Report S16 January 19,2015 Fax +(709) 730-5468 PMF.06 Rev. 0 Project Site Report Report Date: February 5", 2015 Page 3 Photo 4 133 Crosbie Road ‘Amos Foster Wheeler Americas Limited PO Box 8600 Power & Process St John's NL Canada ATA3C1 “at ¥(700) 724-1000 167733-0P2-94-8016 - Project Ste Report S15 January 19,2015 Fax #{708) 730-5458 PMF.06 Rev. 0 amec foster PROJECT SITE REPORT S15 wheeler PROJECT: West End High School — CP2 PROJECT NO.:__167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:_January 23°, 2015 CONTRACTOR: _MARCO VISIT DATE:__January 19", 2015 REPORT BY: Rebecca Manuel CATEGORY: Civil: | Arch: Mech: ) Elect: 0 ‘Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: Substantial Performance: Final Performance: © PROGRESS: Mid Month Review Site visit to review structural works completed to date. The following items were noted during the site tour on Monday January 19", 2015: Structural 1 Ensure masonry walls are plumb and properly restrained. See photos 1 and 2 showing masonry wall between gridlines 15 and 16 along gridiine Q. Masonry near Q15 appears to be tilting forward when compared to the masonry near Q16. Photo 1 was taken facing Q16. Photo 2 was taken facing Q15. 2. Provide previously requested structural steel inspection and testing results. 3. Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. ‘Subsection 40(1) DISTRIBUTION Steve Matthews, P.Eng, TW ‘Amec Foster Wheeler Americas Limited Kirk Kendall, Amec Foster Wheeler Power & Process PMF.06 Rev. 4 Project Site Report Report Date: January 23°, 2015 Page 2 183 Crosbie Road ‘Amec Foster Wheeler Americas Limit PO Box 9600 Power & Process ‘John’s NL Ganada “AIA SC 167733-0P2-0.4-815- Project Site Report S15 January 19,20155 Tol +(709) 724-1900 Fax +(709) 799-5458 PMF.06 Rov. 0 Project Site Report Report Date: January 23°, 2015 Page 3 4193 Crosbie Road PO Box 2600 St. John's NL Canada ATA C1 Tel +(709) 724-1900 Fax +(709) 739-5458 Photo 2 ‘Amec Foster Wheeler Americas Limited Power & Process 167739-CP 20.4815 - Project Ste Report S15 January 19,20155. PMEF.06 Rev. 0 amec PROJECT SITE REPORT S14 foster wheeler PROJECT: West End High Schoo! — CP2 PROJECT NO.: 167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:__December 49", 2014 CONTRACTOR:, MARCO VISIT DATE:___December 15", 2014 REPORT BY: Rebecca Manuel areal Civil: Arch: Mech: () Elect: ‘Struct: PURPOSE: Quality/Progress Review: X Site Coordination: Substantial Performance: Final Performance: PROGRESS: Site visit to review structural works completed to date. The following items were noted during the site tour on Monday December 15”, 2014: ‘Structural 1 See Figure 1: Area C/D Concrete Block Shear Wall Location Map, Table 1: Area C/D Concrete Block Shear Wall Observations and reference photos. 2 Column Masonry Straps sticking out through face of wall. See Photo 55. 3 ‘Some areas require concrete honeycombing remediation but the process has not yet begun. See Photos 56-57. 4 ‘Some areas where removal of honeycombing was ready for inspection are unsatisfactory. See Photos 58-60 showing loose material requiring removal. 5. Concrete Block was removed from some shear walls to determine if proper reinforcing was installed. In both instances it was. See Table 1, Figure 1 and Photos 44 and 53. 6. _ Provide previously requested structural steel inspection and testing results. 7. Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. PMF.06 Rev. 4 Project Site Report Report Date: December 19, 2014 Page 2 Figure 1: Area C/D Concrete Block Shear Wall Location Map ‘Amec Foster Wheeler 133 Grosble Rod PO Bax 9600 ‘St John's NL (Canada AIA 3C1 Tel +(709) 724-1900 Fax #{709) 730-5458, Project Ste Report $14 December 15,2014 PMF.08 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 3 Deficiency | Bar] Colum ] Column | Centered | Clip] Masonry | Reinforda | Bond Shear Wall | Anchors | Masonry | Masonry | onGrid | Angles | IntoWeb| g — | Beam Location | InPlace | Strapsin | Straps Present | orFlange | Correctly | — in (Photo Ret.) Place | Centered of | instated | Prace ‘Column B Unknown | Yes | Unknown | No [Yes | No. | Unknown | NIA (Ph.1-3) 5 Unknown | Yes | Unknown | No [Yes] No | Unknown | NIA (Pha) ‘C- GF No Yes | Unknown | ves | ves | No] Unknown | No (Ph2-10) | (Dificut tobe Certain) T=LVLZ | Unknown | Unknown | Unknown | Ne | Yas Unknown | NR (Ph.11-13) 0-GF No Yes | Unknown | Yes | Yes_| No | Unknown | No (Pn.14-16) | (Cificun tobe Certain) D=LWVEz | Unknown | Uaknaws | Unknown | Na Yer Tnkwoan | Wk (Pni7), E-GF__| Unknown | Unknown | Unknown | Yas | No No _| Unknow | Nim (Ph.18-21) E-M2 No Yes Yes a No | NA Wc) (Ph 22-26), F-GF | Unknown | Unknown | Unknown | Yes | No Wo | Unknown | NIA (Ph27-28) F-UML2 ‘Consirocion has not BEGUN (P29) G-GF | Unknown | Vas] Unknown | Yes [Yes] No] Unknown | Ni (Ph.30-35) G-lm2 | No Yes No No No No No | WA (uc) (Damage (Ph.36-42) a) H-GF Wo | Unknown | Unknown Yes | No Yes | WA (Ph.43-44) = H-LVL2_| Unknown | Yes | Unknown Unknow | No | Unknown | NA (Phas) n 1-GF Taknown | Yes | Unknown | Unknown | No No | Unknown | NA (Ph.a6-47) T=LvL2 | Unknown | Yes | Unknown | Unknown | Yes | Yes | Unknown | NA (Ph.48-50) - J Yes Yes | Unknown | —No—| Yes |e | Unknown | TW ry Yes Yes | Unknown | No] Yes] No Yes | NA (Ph 51-54) Table 1: Area C/D Concrete Block Shear Wall Observations . U.C. = Under Construction "' Appears to be centered, but must be verified ‘Amec Foster Wheeler 133 Crosbie Road PO Bax 9600 St John's NL Canada ‘AIA 301 Tel +(708) 724-1900, Fax +(708) 730-5458 Project Site Report $14 December 18,2014 PMF.06 Rev. 0 Project Site Repor Jecember 19, 2014 Could not verify due to limited access to this walll on this day This was confirmed previously through correspondence with Dept. TRW_ DISTRIBUTION Kirk Kendall, PMP Amec Foster Wheeler AMEC Americas Limited Power & Process bsection 40(1 Steve Matthews, P.Eng otw ‘Subsection 40(1) cca Manuel ‘Amee Foster Wheeler 133 Crosbie Road PO Box 9600 ‘St John's NL Canada “ATA 301 ‘Tel +(708) 724-1900 Fax $(708) 738-5458 Project Site Report S14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 5 Photo 2 ‘Amec Foster Wheeler 133 Crosbie Road PO Box 9800 Sit, John's NL Canada A1A9¢1 Tel +(708) 724-1900 Fax +(709) 739-5458 Project Ste Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 6 ‘Ames Foster Whedler 133 Crosbie Roas PO Box 9600 ‘St. Joha's NL Canada “ATA3C3 Tol +(709) 724-1000, Fax +4709) 738-5458, Project Ste Report $14 December 15,2014 PMF.08 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 7 Photo S Photo 6 ‘Amec Foster Wheeler 133 Crosbie Rosd PO Box 9600 SS. John's NL Canada ATA 3Ct Tel +(703) 726-1900 Fax +4709) 739-5458 Project Ste Report S14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 8 ‘Ames Foster Wheeler 133 Crosbie Road PO Box 9600 St. John’s NL ‘Caneda AIA 301 Tel +708) 724-1900 Fax +709) 735-5458 Project Site Report $14 December 15,2014 PMF.08 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 9 Photo 9 ‘Amec Foster Wheeler 133 Crosbie Road PO Box 9600 ‘St Joba's NL Canada “AtA3C1 Tel +708) 724-1800 Fax +(709) 739-5458 Project Ste Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 10 Photo 11 Photo 12 Amec Foster Wheeler 133 Crosbie Roas PO Box 9600 St Joha's NE Canada “ATAIC Tel 1709) 724-1000 Fax #{709) 739-5458 Project Site Report $14 December 15,2014 PME.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 11 Photo 14 ‘Amec Foster Wheeler 4133 Crosbie Road PO Box 9600 ‘St John's NL Canada ATA 3Ct Tel +(709) 724-1900 Fax +709) 730-5458 Project Sie Report $14 December 15.2014 PMF.05 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 12 Photo 16 ‘Amee Foster Wheeler 133 Crosbie Rose PO Box 9600 ‘St. John's NL Canada “ATA3C1 Tel +(709) 724-1900 Fax +{709) 739-5458 Project Site Report $14 December 15,2014 PMF.08 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 13, Photo 17 ‘Amec Foster Wester 133 Crosbie Road PO Box 9800 ‘St Johe's NL Canada AtA2¢1 Tel +(709) 724-1900 Fax +(709) 730-5458 Project Site Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 14 Photo 20 ‘Ames Foster Wheeler 433 Grosble Roas PO Box 3600 St. John's NL Canada “ATA3¢1 Tel +709) 724-1900 Fax (708) 739-5458 Project Site Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 15 PO Box 9600 St. John's NL Canada “ATA 361 Tel +(709) 724-1900 Fax +708) 736-5458, Project Site Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 16 ‘Amee Foster Whesler 133 Crosbie Road PO Box 9600 ‘St. Joba's NL Canada “ATA 30% Tel +(708) 724-1900 Fax +{708) 739-5458 Project Site Roport $14 December 16,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 17 Photo 25 ‘Amec Foster Wheeler 133 Crosbie Road PO Box 9800 St, John's NU Canada “A1A3¢1 Tel +709) 724-1900 Fax +4708) 736-5468, Project Site Report $14 December 18,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 18 Photo 28 ‘Amer Foster Wheeler 133 Crosbie Road PO Box 9600 ‘St, Joba's NL Canada “ATA 3C1 Tel +(709) 724-1900 Fax +4709) 730-5458, Project Site Report $14 December 15,2014 PME.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 19 Photo 29, ‘Ameo Foster Wheeler 433 Crosbie Road PO Box 9600 ‘St Johe's NL Canada “ATA 361 Tel +709) 724-1900 Fax (709) 738-5458 Project Site Report S14 December 15.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 20 Photo 32 ‘Ames Foster Wheeler 433 Crosbie Rose PO Box 9600 St. John’s NL Canada ATA3C1 Tel (708) 724-1900 Project Ste Report $14 December 15,2014 PME.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 21 ‘Amec Foster Wheeler 133 Crosbie Road PO Box 9600 ‘St John's NL. Canada ATA 301 Tet +(709) 724-1900 Fax #{708) 730-5458 Project Ste Report $14 December 15.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 22 Photo 35, ‘Ames Foster Wheeler 133 Crosbie Road PO Box 9600 St, John's NL Ganada “ATA 301 Tel +(708) 724-1900 Fax +{708) 739-5458 Project Ste Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 23 ‘Amec Foster Wheeler 133 Crosbie Road PO Bax 9600 St. John’s NL Canada “AIA3C1 Tel +(708) 724-1900 Fax +709) 730-5458 Project Ste Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 24 Photo 39 ‘Photo 40 ‘Amac Foster Whesler 133 Crosbie Rose PO Box 9600 ‘St. John's NL Canada “ATA3C1 Tel +4709) 724-1800, Fax +{700) 730-5488 Project Site Report $14 December 16,2014 PME.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 25 ‘Amec Foster Wheeler 133 Crosbie Road PO Box 9500 ‘St Joba's NL Canada “A1A3C1 Tet +(709) 724-1900 Fax +(709) 739-5458 Project Site Report $14 December 15,2014 PMF.08 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 26 ‘Amec Foster Wheeler 4133 Crosbie Rose O Box 9600 ‘St John's NL Canada “A1A3¢4 Tel +709) 724-1900 Fax (708) 739-5458 Project Site Report $14 December 16,2014 PME.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 27 Photo 46 ‘Ame Foster Wheeler 133 Crosbie Rosa PO Box 9600 ‘St Joha's NL Canada “ATA3C1 Tol +(708) 724-1900, Fax +{709) 799-5458, Project Site Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 28 Photo 47 3.21 we ‘Amec Foster Wheeler 4153 Crosbie Roe PO Box 9600 ‘SI. John's NL Canada “ATA3¢1 Tel +(709) 724-1800 Fax $(709) 739-5458 Project Site Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 29 OT Tey Photo 50 ‘Amec Foster Wheeler 133 Crosbie Road, PO Bax 9600 St, John's NL Canada “AIA 301 Tel +(708) 724-1900 Fax +709) 730-5458 Project Ste Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 30 Photo St Photo $2 ‘Amec Foster Wheeler 4133 Grosble Road 0 Box 9600 ‘St Johe's NL Canada AIA 301 Tet +(709) 724-1900, Fax +{708) 739-5458 Project Site Report $14 Docembar 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 31 — 2018 12 16. Photo 4 ‘Amec Foster Wheeler 133 Grosbie Road PO Box 9600 St. John’s NL Canada ATA 3Ct Tel +709) 724-1900 Fax #700) 739-5458 Project Site Report $14 December 15,2014 PMF.08 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 32 ‘Amec Foster Whesler 4133 Crosbie Road PO Bax 9600 ‘St Joba's NL Canada “ATA3C1 Tel +(709) 724-1900 Fax +{700) 739-5458 Project Site Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 33 ‘Amec Foster Whedler 423 Grosbie Road Canada A1A3c1 Tel +709) 724-1900 Fax +709) 730-5458 Project Ste Report $14 December 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 19, 2014 Page 34 Photo 59 Photo 60 ‘Amec Foster Wheeler 4133 Crosbie Road PO Box 9600 ‘St. Johe's NL Canada “ATA3C1 Tol +(709) 724-1900 Fax +(709) 730-5458 Project Site Report S14 December 15,2014 PMF.06 Rev. 0 amec foster PROJECT SITE REPORT S13 wheeler PROJECT: West End High School - CP2 PROJECT NO. 167733 CLIENT: __Dept. of Transportation & Works REPORT DATE:__December 5", 2014 CONTRACTOR: MARCO VISIT DATE:__December 1", 2014 REPORT B’ Rebecca Manuel CATEGORY: Civil: Ll Arch: [] = Mech: [- Elect: [) Struct: X. PURPOS! x Site Coordination: =) ‘Substantial Performance: C Final Performance: () PROGRESS: Site visit to review structural works completed to date. The following items were noted during the site tour on Monday December 1#, 2014: ‘Structural 4 ‘Shear transfer elements are required in masonry shear walls to be installed in gap between in top of beams and bottom of steel deck below. Shear wall must be continuous throughout its height. Detail will be provided. See Photos 1 and 2. 2. Clip angles are not required atop masonry shear walls. Ensure bar anchors have been installed as specified on contract drawings. See Photo 2. 3. Ensure connection detail between masonry and columns is as shown in contract drawings. See Photos 1 and 2. 4, Ensure the items noted above have not been repeated elsewhere. For example, there is another masonry shear wall located along gridline 7. 5. ‘Shear Wall along gridline G between gridlines 11 and 7 appears to be partially constructed. See Photo 3. Note the following points: © Shear Walls appear not to be grouted between masonry and W460 beams. © Ensure bar anchors have been installed. Clip Angles can be observed looking at these walls from Area C. Shear walls should have bar anchors, not clip angles. PMF.06 Rev. 4 Project Site Report Report Date: December 5, 2014 Page 2 ‘© Ensure masonry extends to web of columns and that masonry anchors are present. © Ensure full length bond beams will be installed. There are a number of problems surrounding masonry shear walls throughout the building. Contractor should perform inspection of masonry shear walls to ensure compliance to contract drawings. AMEC will also review during next site visit. 7. Clip angles have been reinstalled in some of the required areas. See Photos 4 to 6. Clip angles yet to be reinstalled in other areas. See Photos 7 to 9. 8 Ensure bar anchors have been installed in penthouse masonry shear walls. See Photo 10. 9. ‘Areas where concrete remains to be poured. See Photos 11 and 12. 10. Weld appears to have only been provided along one side of square comer tab. See Photos 13 and 14. 11. Weld appears to be corroding, ensure welds are protected from the elements. See Photos 13 and 14. 12. Concrete honeycombing remediation has begun in some areas. See Photos 15 to 18. A finished sample was not observed at time of site visit. 13. Some areas require concrete honeycombing remediation but the process has not yet begun. See Photos 19 to 21 14. Ensure concrete honeycombing remediation occurs in areas where masonry has been erected that will cover up the honeycombing issues. For example, see photo 21 ‘showing a concrete shear wall on Level 3 of Area A. See photos 22 to 24 showing the same wall before construction of the perpendicular interior concrete block wall. Note that the masonry that has been installed along the wall partially covers up the honeycombing issues that have not yet been remediated. 15. OWS\'s near concrete wall may not be sufficiently laterally restrained as shown in photo 25 (library area). Should provide additional lateral restraint by installing horizontal bridging in addition to the existing cross bridging near to the wall. 16. Provide masonry restraints where masonry walls approach the underside of exposed stairwell beams. See Photo 26 for an example. Photo was taken in in Area A along gridline 28. ‘Amec Fostor Whose 4133 Crosbie Road PO Box 9600 ‘St Joh NL Ganada “AIA 361 Tel +(709) 724-1800 Fax $708) 730-5458 Project Site Report $13 December 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 3 17. Provide previously requested structural steel inspection and testing results. 18. __Items noted on previous site visits and not duplicated in this report must be addressed if they have not yet been resolved. DISTRIBUTION Kirk Kendall, PMP Amec Foster Wheeler AMEC Americas Limited Power & Process ‘Subsection 40(1) Stove Matthews, P.Eng pw Rebecca Manuel ‘Ames Foster Wheder 433 Grosble Road PO Box oe00| Staonne NL Canada AIA SCI Tot +(708) 724-1900 Fax +(709) 730-6468 Project Site Report $13 December 1,204 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 4 ‘Photo L ‘Amec Foster Wheeler 4133 Crosbie Road PO Box 9¢00 ‘St John's NE Canada ATA 3C1 Tel (709) 724-1900 Fax +(709) 730-5458, Project Site Report $13 Decamber 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 5 Photo 4 ‘Amec Foster Wheeler 433 Crosbie Road PO Box 9600 ‘St John's NL Canada ATA 301 Tel +(709) 724-1900, Fax +4708) 730-5458 Project Ste Report $13 December 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 6 Photo 6 ‘Ame Foster Wheeler 433 Crosbie Road PO Box 9600 ‘St John'e NL Canada ATA 301 Tel +(709) 724-1900 Fax +(709) 739-5458 Project Ste Report $13 December 1,2014 PME.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 7 ‘Amec Foster Whesler 133 Grosbie Road PO Box 3600 ‘St Joh’ NL Canada ATA 3Ct Tel +(708) 724-1900 Fax +{708) 736-5458, Project Site Report $13 December 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 8 Photo? ‘Amec Foster Wheeler 433 Crosbie Road PO Box 9600 ‘St John's NL Canada ATA 3C1 Tel ¥(708) 724-1900 Fax +(709) 730-5458 Project Site Report $13 December 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 9 ao ie 1 Photo 11 ‘Photo 12 ‘Amec Foster Wheeler 4133 Crosbie Rood PO Box 9600 St. John'e NL Canada “ATA 3C1 Tel +(709) 724-1900 Fax +(708) 730-6458 Project Site Report $13 December 1,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 10 Photo 14 ‘Amec Foster Wheeler 4133 Crosbie Rood PO Box 9600 ‘St John’s NL Canada ATA 3C1 Tel +(709) 724-1900 Fax (709) 730-5458, Project Ste Report $13 December 1.2014 PMF.08 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 11 Photo 15 Photo 16 ‘Amec Foster Wheeler 433 Crosbie Road PO Box 9600 ‘St John's NL Canada ATA 301 Tel +(708) 724-1900 Fax (708) 730-5458 Project Site Report $13 December 1,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 12 ‘Photo 17 ‘Amec Foster Wheoler 4133 Crosbie Road PO Box 9600 ‘St John's NE Canada “AtA 301 Tel +(709) 724-1900 Fax (709) 730-5468 Project Site Report $13 December 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 13, ‘Ames Foster Wheeler 4133 Crosbie Road PO Box 9600 ‘St John’s NL Canada ATA 3Ct Tol +(709) 724-1900 Fax +709) 739.5458 Project Site Report $13 December 1.2014 PMF.06 Rev. 0 Project Site rene jecember 5, 2014 Photo 22 ‘Amec Foster Wheeler 4133 Crosbie Road PO Bax 9600 ‘St John's NL Genada ATA 301 Tel +(703) 724-1900 Fax +709) 739-5458, Project Site Report $13 December 1,2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 15 ‘Amec Foster Wheeler 133 Crosbie Road PO Box 9600 St. John’s NL Canada “ATA 3C1 Tel +(708) 724-1800 Fax +(709) 730-5458 Project Site Report $13 December 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: December 5, 2014 Page 16 Photo 26, ‘Amec Foster Wheeler 1183 Crosbie Road PO Box 9600 ‘St John's NL Canada ATA 3Ct Tel +(709) 724-1900 Fax +709) 730-5458, Project Site Report $13 December 1.2014 PMF.06 Rev. 0 November 25", 2014 amec [ 167733-9.4 foster wheeler ‘Steve Matthews, P. Eng. Project Manager, Special Projects Directorate Department of Transportation and Works Ground Floor, East Block P.O. Box 8700 St. John’s, NL A1B 4J6 Dear Mr. Matthews, West End High School - CP2 Mid-November Site Inspection Please find enclosed each discipline’s Site Visit Report for the November 17", 2014, site visit. Please do not hesitate to be in touch should you have questions. Sincerely, ‘Subsection 40(1) Kirk Kendall, P. Eng., PMP Project Manager ‘Amec Foster Wheeler Tel: (709) 724-2111 ‘Subsection 40(1) Fax: (709 739-5458 Emai Enel. ce Jean Gibbons — DTW David McCall - DTW 133 Crosbie Road AMEG Amesias Linited P.O. Box 9600 Power and Process St.Joha, NL_ATASCH (708) 724-1800 ‘amectw.com amec foster PROJECT SITE REPORT S12 wheeler PROJECT: West End High School — CP2 PROJECT NO.: 167733 CLIENT: __Dept. of Transportation & Works REPORT DATE:__November 25", 2014 CONTRACTOR:__MARCO VISIT DATE:__ November 20", 2014 REPORT BY: Rebecca Manuel CATEGORY: Cin u Arch: Mech: |) Elect: | ‘Struct: X PURPOSE: Quality/Progress Review: =X Site Coordination: = 1) ‘Substantial Performance: C Final Performance: =) PROGRESS: Site visit to review structural works completed to date. The following items were noted during the site tour on Thursday November 20", 2014: ‘Structural 1 Bond beams appear not to have been installed in masonry wall along line 13 between gridiines Hx and G and in nearby masonry wall along line Hx between 12 and 13. See Photos 1 to 2. Concrete installation incomplete in Area D. See Photo 3. It appears that the masonry was chipped away behind some of the upper masonry restraint angles in Area D. This issue has been noted on previous reports in other areas as well. See Photo 4. Concrete honeycombing issues do not appear to have been remediated yet. See Photos 5 and 6. Penthouse was not accessible at time of visit. Provide previously requested structural steel inspection and testing results. Items noted on previous site visits and not duplicated in this report must be addressed if, they have not yet been resolved. PMF.06 Rev. 4 Project Site Report Report Date: November 25, 2014 Page 2 DISTRIBUTION Kirk Kendall, PMP. Steve Matthews, P.Eng ‘Amec Foster Wheeler 133 Crosbie Road PO Box 9600 ‘St John's NL Canada ATA 3C1 TTol_+(708) 724-1900 Fax #(708) 730-5458 Amec Foster Wheeler ‘AMEC Americas Limited Power & Process Subsection 40(1) Project Site Report $12 November 20,2014 PME.06 Rev. 0 Project Site Report Report Date: November 25, 2014 Page 3 “f/ 20m 11a) { ‘Amc Foster Wheeler 4133 Crosbie Road. PO Box 9600 ‘St Joha's NL Canada ATA 3C1 Tal +(709) 724-1900 Fax +(709) 739-5458 Project Site Report $12 November 20,2014 PMF.06 Rev. 0 Project Site Report : November 25, 2014 20 1 20 Photo Photo ¢ ‘Amec Foster Wheeler 133 Crosbie Rosa PO Box 9600 ‘St Joba's NL Canada A1A 301 Tel +(709) 724-1900 Fax +(708) 739-5458 Project Site Report $12 November 20,2014 PMF.06 Rev. 0 Project Site Report Report Date: November 25, 2014 Page 5 ‘Amos Foster Wheeler 4133 Crosbie Roas PO Box 9600 St. Jones NL Canada ATA Ct Tel +(708) 724-1900 Fax +(709) 739-5458 Project Site Report $12 November 20.2014 PMF 06 Rev. 0 amec foster PROJECT SITE REPORT - A016 wheeler PROJECT: West End High School — CP2 PROJECT NO.: __167733-9.4 CLIENT: __Dept. of Transportation & Works REPORT DATE:__November 21, 2014 CONTRACTOR:__MARCO VISIT DATE:__November 17%, 2014 REPORT BY:. Greg French CATEGORY: Givi: Lo Arch: X Mech: Elect: (J Struct: 0 PURPOSE: Quality/Progress Revi x Site Coordination: PROGRES: ‘Substantial Performan« C Final Performance: (1 as per attached spreadsheet and certificate of payment Site inspection was performed to review the quality of the architectural portion of work. 4.0 Report The following are my concerns and observations noted during the review: 1 It appears that there is no rigid backing material behind the Sopraseal membrane covering the columns not requiring a fire rating (see photos 189 and 195). The Sopraseal membrane must have rigid backing material to which it can be adhered. This item was noted in previous reports. There is insufficient rigid insulation at the base course of concrete block on the exterior wall along grid line 1 between grid lines A and H (see photos 186 and 190). Contractor should ensure that there are no areas where insulation is missing. ‘There are several locations where the mortar joints have not been struck flush (see photos 187 and 188 showing joints on the West side of area D along grid line H between grid lines 1 and 2). This appears to have prevented the rigid insulation from being installed tight to the concrete block and membrane reduced the depth of the air cavity between the masonry veneer and the rigid insulation and caused the insulation to be damaged when the retaining wedges were installed (see photos 184, 185, 188 and 190). These conditions are not acceptable. This item has also been noted in previous reports. There are several locations where the Sopraseal membrane is wrapped around steel! columns on the exterior wall and spanning the web from flange to flange with no backing material (see photo 209). This is unacceptable and the membrane must hate rigid backing material. This item was also noted in previous reports. PMF.06 Rev. 4 Project Site Report Report Date: November 21#, 2014 Page 2 5, There is reinforcing steel projecting up from the concrete slab in the shear wall opening at the entrance to A143 Home Economics, on grid line Q between grid lines 27 and 28 (see photo 037). There should not be any steel reinforcing projecting from the slab in this location. Contractor should verify that the opening in the shear wall is the correct size and is correctly located. There are missing masonry ties and insulation retaining wedges along grid line H between grid lines 1 and 2 (see photos 191, 192 and 198). This item has also been noted in previous reports. There are alternating bullnose and square edge concrete blocks around the jambs of windows WO3 and WS in rooms C101 and C109 (see photos 102 and 103). The vertical face of the brick veneer at the roof line below the top of the parapet is not parallel with the vertical face of the parapet (see photos 1443 and 1493-courtesy Leon Murphy, Transportation and Works). In some locations the parapet overhangs the brick veneer by approximately 50mm and in other locations, in some cases along the same wall, the vertical face of the brick veneer is outside of the vertical face of the parapet. This is unacceptable. The contractor should provide a solution for review by the architect. ‘AMEC Americas Limited 4133 Crosbie Road PO Box 9600 St. Job's NL la AIA3C1 Tol +(709) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: November 21#, 2014 Page 3 2.0 Photos Photo 037 Photo 102 AMEC Americas Limited 4133 Crosbie Road PO Box 9600 ‘St John's NL. Canada ATA 301 Tel ¥(709) 724-1900 Fax +(708) 73.5458 PMF.0¢Rev. 0 Project Site Report Report Date: November 21%, 2014 Page 4 ‘AMEC Americas Limited 4133 Crosbie Road PO Box 9600 St John's NL Canada ATA 3C1 Tol +(708) 724-1900 Fax +(708) 7395458 PMF.06 Rev. 0 Project Site Report Report Date: November 21%, 2014 Page 5 AMEC Americas Limited 133 Crosbie Road PO Box 9600 St. John's NL Canada ATA 3c Tel +708) 724-1900 Fax +(709) 739-5458 PME.06 Rev. 0 Project Site Report Report Date: November 21%, 2014 Page 6 Photo 187, AMEC Americas Limited 4133 Crosbie Road PO Box 9600 St. Joha's NL (Cenada “AIA 301 Tel_¥(708) 724-1900 Fax +(709) 739-6458 PMF.06 Rev. 0 Project Site Report Report Date: November 21%, 2014 Page 7 AMEC Americas Liited 133 Crosbie Road PO Box 9600 St, John's NL Canada ATA 3C1 Tel +{709) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: November 21", 2014 Page 8 AMEC Americas Limited 133 Crosbie Road PO Box 9600 ‘St Jon's NL. Canada ATA C1 Tel +(709) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report Report Date: November 21%, 2014 Page 9 AMEC Americas Limited 133 Crosbie Road PO Box 9600 St. Jonn’e NL Canada ATA 301 Tel +(709) 724-1900 Fax (709) 738-5458 PME.06 Rev. 0 Project Site Report Report Date: November 21%, 2014 Page 10 AMEC Americas Limited 433 Crosbie Road PO Box 9600 St, Joha's NL Canada “ATA3C1 Tel (708) 724-1900 Fax +(709) 730-5458 PMF.08 Rev. 0 Project Site Report Report Date: November 21%, 2014 Page 11 Photo 1493 DISTRIBUTION AMEC Americas Limited Power & Process Subsection 40(1 ‘Steve Matthew, TW a Kirk Kendall, Amec Foster Wheeler Nat Satfas, Amec Foster Wheeler French ‘AMEC Americas Limited 4133 Crosble Road PO Box 9600 St, John's NL Cenada AIA 3C1 Tel +(709) 724-1900 Fax +709) 739-5458, PMF.08 Rev. 0 emec November 3%, 2014 167733-9.4 Steve Matthews, P. Eng. Project Manager, Special Projects Directorate Department of Transportation and Works Ground Floor, East Block P.O. Box 8700 St. John's, NL A1B 4J6 Dear Mr. Matthews, Re: West End High School - CP2 Mid-October Site Inspection Please find enclosed each discipline's Site Visit Report for the October 15", 2014, site visit. Please do not hesitate to be in touch should you have questions. Sincerely, Subsection 40(1) Kirk Kendall, P. Eng., PMP Project Manager ‘AMEC Americas Limited Tel: (709) 724-2111 Subsection 40(1) Fax: (709 739-5458 Email; Encl. e Jean Gibbons - DTW David McCall ~ DTW |AMEC Americas Lirtod 133 Crosbie Road PO Box 9600 St, John’s NL Canada ATA 31 Tel +(709) 724-1900 Fax +{708) 738-5458 ww. ames.com ame PROJECT SITE REPORT S10 PROJECT: West End High School - CP2 PROJECT NO.:__ 167733 CLIENT:_Dept. of Transportation & Works REPORT DATE:_October 24%, 2014 CONTRACTOR:__MARCO VISIT DATE:__October 15%, 2014 REPORT BY: Rebecca Manuel CATEGORY: civil: [ Arch: Mech: [ Elect: [ Struct: X PURPOSE: QualityiProgress Review: X Site Coordination: [1 ‘Substantial Performance: = [) Final Performans Q PROGRESS: Site inspection to review Structural works completed to date. The following items were noted during the site tour on Wednesday October 15", 2014: 1. Various structural steel items to be installed as previously noted. See Photo 1. 2. As previously noted, concrete honeycombing observed. AMEC awaiting resubmission of proposed remediation plan. See Photo's 2 and 3 showing one occurrence of this issue. 3. Missing and damaged bridging has not been fixed. See Photo 4, 4, Atthe time of this inspection no portions of lower masonry remediation were visible for inspection. 5. Ponding observed on conerete floor in Area B. See Photo 5. 6. Concrete installation incomplete in Area D. See Photo 6. 7. Rusting steel joists, bridging and decking. See Photo 7. 8. Poor Grouting. See Photo 8. 9. Damaged bar anchors. See Photo 9. 10. Damaged slab in Area A level 2. See Photo 10. PMF.06 Rev. 1 Project Site Report Report Date: October 24%, 2014 Page 2 11. Wall does not match construction drawings (missing door, missing or insufficient upper masonry restraint angles). See Photos 11 to 13. 12, Ensure at least 2° overlap between masonry and restraint. See Photo 14. 13, Weld between beam and column appears poor. Review in field. See Photo 15. 14. Items noted on previous inspections and not duplicated in this report must be completed if they have not yet been resolved. 15. Penthouse roof was not observed. DISTRIBUTION Subsection 40(1) Kirk Kendall, PMP ‘AMEC Americas Limited Steve Matthews, P.Eng Power & Process AMEC Americas Limited 129.31 Pippy Place, Suite 2002 PO Box 9600 St. John's NL Canada ATA 3C1 Tel +(708) 724-1900 Fax +(709) 730-5468 Project Site Report $10 October 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 24%, 2014 Page 3 Photo 2 ‘AMEC Americas Limited 29:31 Pippy Place, Suite 2002 PO Box 9800 ‘St. John's NL Canada ATA 3C1 Tel +(709) 724-1900 Fax +(709) 739-5458 Project Site Report $10 October 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 24”, 2014 Page 4 AMEC Americas Limited 129-31 Pippy Place, Suite 2002 PO Box 9500 ‘St John's NL. Canada AIA 301 Tel +(708) 724-1000, Fax +(708) 738-5458 Project Site Report $10 October 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 24", 2014 Page 5 Photo 5 Photo 6 ‘AMEC Americas Liited 28:3 Pippy Place, Sule 2002 PO Box 9600 ‘St. John's NL Canada AIA 3C1 Tel 709) 724-1900 Fax +709) 730-5458 Project Site Report $10 October 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 24", 2014 Page 6 ‘AMEC Americas Limited 28-31 Pippy Place, Suite 2002 PO Box 9600 St. Joha's NL Canada ATA 301 Tel +(708) 724-1900 Fax +(709) 739-5458 Project Ste Report $10 October 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 24", 2014 Page 7 Photo 10 ‘AMEC Americas Limited 2-31 Pippy Place, Suite 2002 PO Box 8600 ‘St John's NL. Canada ATA 3C1 Tel +(708) 724-1900, Fax +709) 739-5458 Project Site Report $10 October 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 24”, 2014 Page 8 AMEC Americas Limited 129-31 Pippy Place, Suite 2002 PO Box 9500 ‘St John's NL. Canada AIA 3C1 Tel +(709) 724-1900 Fax #(709) 739-5458 Project Site Report $10 October 15,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 24”, 2014 Page 9 Photo 14 AMEC Americas Limited 28:31 Pippy Place, Sulte 2002 PO Box 9600 St. Joha's NL Canada “ATA 3C1 Tel (709) 724-1900 Fax +(709) 799-5458 Project Site Report $10 October 15.2014 PME.06 Rev. 0 Project Site Report Report Date: October 24”, 2014 Page 10 AMEC Americas Limited 29.31 Pippy Place, Suite 2002 PO Box 9600 ‘St John's NL. Canada AIA 3C1 Tet (709) 724-1900 Fax +{708) 739-5458 Project Site Report $10 October 15,2014 PMF.06 Rev. 0 amec9 PROJECT SITE REPORT PROJECT: West End High School — CP2 PROJECT Nt 167733-9.4 CLIENT: __Dept, of Transportation & Works REPORT DATE:___Oct 20", 2014 CONTRACTOR:__ MARCO. VISIT DATE:___Oct 15", 2014 REPORT BY:. Steve Corbett CATEGORY: civ: Arch: (Mech: (lect: X Struct: PURPOSE: Quality/Progress Review: =X Site Coordination: = ‘Substantial Performance: Final Performance: PROGRESS: as per attached spreadsheet and certificate of payment Site inspection was performed to review the electrical portion of the work for the first half of October. Below are the observations of the west end high school from our site visit, Wednesday Oct 15": 1. First floor: a. No progress of conduit in gym area b. New back boxes installed. ¢. Conduits removed from hallway. 2. Second floor: a. No progress to review 3. Third floor: a. No progress to review 4. Mezzanine: a, No progress to review DISTRIBUTION AMEC Americas Limited Subsection 40(1) TW - Steve Matthews Power & Process. ‘AMEC - Kirk Kendall ‘Steve Corbett PMF.06 Rev. 1 ame PROJECT SITE REPORT — A014 PROJECT: West End High School - CP2 PROJECT NO.: __ 16773: CLIENT: __Dept. of Transportation & Works REPORT DATE:___October 20", 2014 CONTRACTOR:___MARCO VISIT DATE:___October 15%, 2014 REPORT BY: Greg French CATEGORY: Civil: Arch: X Mech: Elect: [ Struct: [) PURPOSE: Quality/Progress Review: =X Site Coordination: [1] Substantial Performance: (1) Final Performance: [J PROGRESS: as per attached spreadsheet and certificate of payment Site inspection was performed to review the quality of the architectural portion of work. Report The following are my concerns and observations noted during the review: 1, Itappears that there is no rigid backing material behind the Sopraseal membrane covering the columns not requiring a fire rating (see photo 046). The Sopraseal membrane must have rigid backing material to which it can be adhered. 2. The inner layer of insulation is missing between windows at intersection of grid lines T and 19 (see photo 039). Contractor should ensure that there are no areas where insulation is missing. 3. There are several locations, particularly on the South side of the building, where the mortar joints have not been struck flush (see photos 045 and 048). On the exterior wall of stairway S-4, adjacent to the library curtain wall, the Sopraseal membrane has been installed over mortar joints that have not been struck flush (see photo 054). These conditions are not acceptable. 4. There are several locations where the Sopraseal membrane is wrapped around steel columns on the exterior wall and spanning the web from flange to flange with no backing material (see photos 032, 058, 061, 064, 066, 067, 082and 313). This is unacceptable and the membrane must have rigid backing material. PMF.06 Rev. 1 Project Site Report October 20", 2014 Page 2 5. ‘The Sopraseal membrane and metal flashing installation on the comer at the intersection of grid lines G and 14 is unacceptable (see photos 57, 58 and 59). 6. The damaged flashing adjacent to door X17 in room D101 is unacceptable and must be replaced (see photo 4874), 7. There are several locations on the exterior wall where it appears that the rigid insulation, retaining wedges have not been installed (see photos 4878 and 4884). 8 The rigid insulation on the exterior wall does not extend all the way to the masonry check on the North side of the building on either side of door X15 (see photos 084 and 085). This condition is unacceptable. 9, There is 3” of rigid insulation on the exterior walls on grid line 9 and grid line H (see photos 095 and 096). The contract documents indicate 4” ofrigid insulation. 10. The concrete sill return on doors X19 and X20 jambs are filled with brick remnants and rigid insulation (see photos 110, 115 and 116). This gap should be filed with concrete sill material matching the concrete sil. 11. The infil of the column base plate check in the foundation with various masonry materials of different colours and shapes is unacceptable (see photos 113, 114, 119, 120 and 122). 12. There are gaps in the sealant on the gypsum board covering the steel beam supporting the roof along grid line H (see photos 198 and 199) 13, There are two rooms (A224 and A226) on level 2 in which the spray applied fire stopping material on the steel beams supporting the foor of level 3 appears to be wet (see photos 259 and 261). 14, The Sopraseal membrane on the exterior wall adjacent to and around the windows in rooms A301 and A303 is melted, and in at least one location, burned through (see photos 313, 317, 318, 319 and 321). 15, There was no barrier restricting access to the roofof level 3 and no indicator or barrier restricting access to the area within 2 metres of the edge of the roof (see photos 350 and 351). In addition to this, there were 4 workers working on the roof adjacent to the penthouse, within 2 metres of the edge of the roof, who were not wearing fall arrest harnesses. /AMEC Americas Limited 29.31 Pippy Place, Sulle 2002 70 Box 9600 St John's N. Canada ATA 3Ct Tel +(709) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 3 Photos. ‘AMEC Americas Limited 128-31 Pippy Place, Suite 2002 Canada AIA 3C1 Tel +1709) 724-1900 Fax +(709) 739-6458 PMF.06 Rev. 0 Project Site Report ‘October 20", 2014 Page 4 Photo 045 AMEC Americas Limited 28:31 Pippy Place, Suite 2002 0 Box 9800 St John's NL. Canada ATA 301 Tel +(709) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 5 AMEC Americas Limited 29-31 Pippy Place, Suite 2002 PO Box 9600 St Job's NL (Canada ATA 301 Tet +(703) 724-1900 Fax +(708) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 6 ‘AMEC Americas Limited 2.31 Pippy Pace, Suite 2002 PO Box 9800 St Jo's NL, Canada AtA 3c Tel +(708) 724-1900 Fax +708) 799-5458 PMF.06 Rev. 0 Project Site Report ‘October 20", 2014 Page 7 Photo 061 ‘AMEC Americas Limited 28:31 Pippy Place, Suite 2002 PO Box 9600 St. Joba's NL Canada ATA 301 Tel (708) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report ‘October 20", 2014 Page 8 AMEC Americas Limited 29-31 Pippy Pace, Sulte 2002 PO Box 9600 St. Joha's NL (Conada AIA 301 ‘Tat +(708) 724-1800 Fax +(709) 739-6458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 9 Photo 084 ‘AMEC Americas Limites 29:3 Pippy Place, Suite 2002 PO Box 9600 St, Joha's NL Canada “ATA 301 Tel (708) 724-1900 Fax +709) 739-5458 PMF.06 Rev. 0 Project Site Report October 20%, 2014 Page 10 Photo 085 ‘AMEC Americas Linited 20-31 Pippy Place, Suite 2002 PO Box 9800 St. John's NL Canada ATA 3C1 Tel +(703) 724-1900 Fax +(708) 739.5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 11 AME Americas Limited 29:31 Pippy Place, Suite 2002 PO Box 9500 ‘St John's NL. Canada AIA 3c Tol +(709) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 12 AMEC Americas Limited 28:31 Pippy Place, Suite 2002 PO Box 9800 St John's NL. Canada ATASC1 Tel +(709) 724-1900 Fox +(709) 739-5458 PMF.06 Rev. 0 Project Site Report October 20%, 2014 Page 13 _ Photo 116 [AME Americas Limited 28:31 Pippy Place, Suite 2002 PO Box 9800 ‘St John's NL Canada AIA 3Ct Tol +(708) 724-1900 Fax +(709) 7385458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 14 ‘AMEC Americas Limited 28-31 Pippy Place, Suite 2002 0 Box 9600 St John's NL (Canada ATA 301 Tol +(708) 724-1900 Fax +(709) 739-9458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 15, Photo 122 ‘AMEC Americas Limite 29.31 Pippy Pace, Sute 2002 0 Box 8600 St John's NL Canada “AIA 361 Tel ¥(700) 724-1900 Fax (709) 739.5458 PMF.06 Rev. 0 Project Site Report October 20%, 2014 Page 16 Photo 199 Photo 259 AAMEC Americas Limited 29:31 Pippy Place, Suite 2002 PO Box 9600 St. Joba's NL. Canada A1A 301 Tel (708) 724-1900 Fax +(708) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 17 Photo 261 ‘AMEC Americas Limites 29:31 Pippy Place, Sute 2002 PO Box 9600 St. John's NL Canada “ATA 361 Tel (708) 724-1900, Fax #708) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 18 Photo 317 Photo 318 AMEC Americas Limited 20.31 Pippy Place, Sule 2002 Po Box eco St Jobs NL Canada ATA 361 Tol +(709) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 19 Photo 319 AMEC Americas Limited 29.31 Pippy Place, Sulte 2002 PO Box 9600 St. Joha's NL. Canada AIA 3C1 Tel +(708) 724-1900 Fax +(709) 739-5458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 20 AMEC Americas Limited 129-31 Pippy Pace, Sulte 2002 PO Box 9600 ‘St Job's NL Canada AIA 9C1 Tel +(708) 724-1900 Fax +708) 730-5458 Photo 350 Photo 351 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 21 __Photo 4874 |AMEC Americas Limited 28-31 Prppy Place, Suite 2002 PO Box 9600 St. Johe's NL. Canada ATA 301 Tel +(708) 724-1900 Fax +(709) 7395458 PMF.06 Rev. 0 Project Site Report October 20", 2014 Page 22 DISTRIBUTION AMEC - Nat Salfas AMEC - Kirk Kendall ‘AMEC Americas Limited 129-31 Pippy Place, Sulte 2002 PO Box 9600 ‘St John's NL Canada AIA 3C1 +(709) 724-1900 "ax +708) 736-5458 Photo 4883 « AMEC Americas Limited Power & Process Gre 16/10/2014 French ‘Subsection 40(1) PMF.06 Rev. 0 ame® PROJECT SITE REPORT - C14 PROJECT: West End High School - CP2 REFERENCE NO.: 167733-CP2-9.4 CLIENT:____Dept. of Transportation & Works © REPORT DATE: October 20, 2014. CONTRACTOR:__MARCO MISIT DATE:_October 16, 2014 REPORT BY: Dave Osbome CATEGORY: civil: X Arch: Mech: [) Elect: ‘Struct: [7 PURPOSE: Quality/Progress Review: X Site Coordination: Substantial Performance: | Final Performance: [1] PROGRESS: Scheduled: _% Actual % Site inspection to review 01100 Site Works work completed to date. The following items were noted during the site tour on Thursday, October 16, 2014: 01106 Leed + The Catch Basins at the entrance to the site off Topsail Road and on site have sheets of Filter Fabric installed under the grate not Silt Sacks as noted on Drawing C13, Note: 22. * Stabilized Construction Mat is no longer required as the majority of the roads are paved. 01110 Site Development * The Soccer Fiek approximately 75% complete including the sod. The area remaining is the SW corner where the topsoll etc. is stockpiled. The area between the curb and the school (South elevation of the Teacher's Parking Lot) has to be regraded as required to install the sidewalk/landscaping etc. The area between the School and curb on the South elevation also has to be graded to install the sidewalks etc. 01125 Excavate & Backfill — Building ‘+ The piping for the water entrance is complete and the area is backfilled as required. There are Locator Balls to be installed however Robert Rideout advised that there is work to do in the area and will get back to me as to when they can be placed (see pic 4849 attached), PMF.06 Rev. 1 Project Site Report Report Date October 20, 2014 Page 2 01135 Concrete Curbs/Sidewalks/Pads + The curbs are 99% complete, the only curb left to be poured are two locations on the South Elevation of the Teacher's Parking Lot. ‘= Sidewalk construction is ongoing along the Gym and Cafeteria. 01145 Site Furnishing ‘© The Concrete Sitting Wallis in place on the NW comer of the school. As per my conversations with Robert Rideout, the washroom trailer has to be moved to install the Concrete Sitting Walls on the SW corner of the school. Observations Noted During the Site Visit ‘+ Weirs are installing the forms for the sidewalks on the North side of the Gym and Cafeteria. Manhole 3703R is installed +/- 1.5 meters to far to the North therefore the Manhole is partially in the asphalt (see pic 4855 attached). | contacted Weirs on same and the Manhole will be adjusted as required and the asphalt extended to surround the cover to eliminate erosion. © As per Section 01 52 00 Item 1.13.1 of the Specifications, construction debris, waste materials and packaging materials are to be removed from the work site on a daily basis. There is a lot of construction related debris scattered over the site especially on the East Elevation (see pics 4870, 4871 & 4873 attached). «The entrance to the site is basically completed except for the new traffic lights and some landscaping ete .(see pic 4861 attached). AMEC Americas Limited 29:31 Pippy Place ‘Suite 2002 PO Box 9600 ‘St. Joha's NL Canada AtA 301 FP167733\Fles\09 Construction OP?2 - BUILDING ENVELOPE AND Tel +(709) 724-1900 (COMPLETIONSI04 Inspection ReportsProject Site Report 14 ~CIVIL- October 16 Fax +708) 739-5458 2014. docx PMF.06 Rev. 0 Project Site Report Report Date October 20, 2014 Page 3 Pic 4855 |AMEC Americas Limited 29:31 Pippy Place ‘Suite 2002 PO Box 9600 ‘St. Joha's NL Canada AtA3c1 FAP 167733\Fies\09 Construction\CP2 - BUILDING ENVELOPE AND ‘Tal (709) 724-1900, ‘COMPLETIONSI04 inspecton Repors\Project Site Report 14 CIVIL- October 16 Fax +709) 739-5458 2014 docx PMF.06 Rev. 0 Project Site Report Report Date October 20, 2014 Page 4 Pic 4871 ‘AMEC Americas Limited 20.31 Pippy Place ‘Suite 2008 PO Bex 9600 St John's NL Canada “AIA 301 :\P167733\Fies\09 Construction\CP2 - BUILDING ENVELOPE AND Tal. (708) 724-1900, (COMPLETIONSI04Inspecton Reperts\Projct Site Report 14 = CIVL- October 16 Fax +709) 730-5458 2014.docx PMF.06 Rev. 0 Project Site Report Report Date October 20, 2014 Page 5 Pic 4873 Pic 4861 AMEC Americas Limited 2:31 Pippy Place Suite 2002 PO Box 9600 St, Johe's NL Canada ATA3C1 FP 167733\Fls\09 Constructon\CP2 - BUILDING ENVELOPE AND Tel +09) 724-1900 ‘COMPLETIONSIO# Inspection Repors\Projct Site Report 14 -CIVIL- October 18 Fax +(709) 739-5458 2014 doce PMF.06 Rev. 0 Project Site Report Report Date October 20, 2014 Page 6 DISTRIBUTION Kirk Kendall, AMEC Steve Matthews, DTW |AMEC Americas Liited 29:3 Pippy Place Suite 2002 PO Box 9600 St, Johe's NL Canada “ATA 301 Tel +(709) 724-1900 Fax +{708) 730-5458 ‘Subsection 40(1) AMEC Americas Limited Power & Process ‘David Osborne FP167733\Ftes\09 Construction CP?2 - BUILDING ENVELOPE AND ‘COMPLETIONSIO4 Inspection ReportsProject Ske Report 14 -CIVIL- October 16 2014 doc. PMF.06 Rev. 0 ame PROJECT SITE REPORT - M13 PROJECT: West End High School - CP2 PROJECT NO.: __167733-9.4 CLIENT:__Dept. of Transportation & Works REPORT DATE: ___October 31%, 2014 CONTRACTOR:__MARCO. VISIT DATE:___October 15", 2014 REPORT BY:. Doug Kennedy. CATEGORY: O Arch: 1 Mech: X Elect: [ Struct: [ PURPOSE: Quality/Progress Review: =X Site Coordination: = (1 ‘Substantial Performance: Final Performance: L] PROGRESS: _ As per attached spreadsheet and certificate of payment Site inspection was performed to review mechanical interim portion of work for the month to review materials incorporated on site and visually review the installation of sprinkler piping, plumbing, ventilation and materials stored on site. The following items are noted: 1. Plumbing ‘* Contractor was working on the installation of installing water lines for.the first level Area C male and female washrooms, Areas C & D and drainage for the 2™ floor mechanical room area C & D were ongoing. * Contractor advised that the cleanouts and floor drains were being protected and brought up to the required height to accommodate finished floor materials. However, there was no evidence of this being done at time of site visit. ‘* Contractor was instructed to install supports on vertical piping. However, we received correspondence that this was not required. We therefore request that the contractor engage the manufacturer's representative to visit the site and provide a written report on the installation of drainage, venting and rain water piping. Also, include report on AquaRise CPVC piping for domestic water piping. ‘+ Domestic hot water tanks have arrived on site, 2. Ventilation ‘¢ Itwas note that round spiral ductwork sitting on the floor on the third level contained excessive amount of construction dust. Ductwork should be covered at alltimes. ‘Ductwork for Areas C and D has arrived on site and contractor was in the process of sorting and fabricating ductwork on site. * Contractor has not provided documentation on the cutting of flanges for the roof curbs to accommodate the 38 x 93 mm wooden pressure treated roof curbs as previously requested. Contractor to confirm that this is in agreement with the roof PMF.06 Rev. 1 Project Site Report Report Date: October 15, 2014 Page 2 curb manufacture. It was also, noted that there is no plastic or wire mesh protecting the fibreglass insulation. This as well requires clarification from the roof curb manufacturer. On-going no report. + The installation of the of ductwork is ongoing on the 2™ Level corridor ceiling and the connecting onto the VAV Boxes and Crosstalk silencers is ongoing Area A and B. ‘+ Itwas noted that Insulator was not installing welded pins on the ductwork as per Specifications Section 23 07 13. Previous duct insulation installed is to be removed and pined and reinstated. + AMEC advised that Vanne Technical Services Inc, had performed the Duct Leakage Testing. AMEC advises that the Balancing Company does not meet Specifications Section 23 05 93 and the Duct Leakage test will have to be reapplied meeting the requirements of Specifications. On-going no reply to date. 3. Fire Protection ‘* _Itwas noted that the sprinkler piping for the gymnasium rises up and goes down again where it passes through the stage area. Contractor to advise on how future modifications or repairs are going to know that when removing a sprinkler there be more than 5 gallons of water trapped when removing or repairing a sprinkler head. * Contractor has installed sprinkler piping in the Gymnasium at time of site visit. + Water entries for the domestic water and fire protection have been installed outside the building and contractor is in the process of installing pipe support rods on the inside of the building in Mechanical Room D116. However, this piping is incomplete and additional information is to be provided. Still outstanding. Ongoing. ; + The installation of roof drains is ongoing. * Itwas pointed out to Marco's Superintendent that debris was to be removed from pipe chases. On-going Subsection 40(1) DISTRIBUTION AMEC Americas Limited Marco — Garry Smith Power & Process AMEC ~ Kirk Kendall Doug Kennedy 438 Crosbie Ri PO Box 9600 St. John’s NF Canada “AIA 9C1 Tol +(708) 724-1900 Fax 4(709) 739-6458 Mechanical Project Site Report M13 October 18, 2014.d0c4 PMF.06 Fev. 0 ame® PROJECT SITE REPORT S09 PROJECT: West End High School - CP2 PROJECT NO.: __ 167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:_October 6", 2014 CONTRACTOR:__MARCO. VISIT DATE:__October 1", 2014 REPORT BY:____Rebecca Manuel __ CATEGORY: Givi: Arch: (Mech: |) Elect: |. Struct: X PURPOSE: QualityiProgress Review: =X Site Coordination: Substantial Performance: Final Performance: 1 PROGRESS: Site inspection to review Structural works completed to date. The following items were noted during the site tour on Wednesday October 1°, 2014: ‘Structural 1. Roof of Area B was not inspected by AMEC prior to installation of roof insulation and base sheet. See Photo's 1 - 2. Could not confirm if decking fasteners were re-installed as required. Please provide photos or inspection record of reinstallation of deck fasteners in roof of Areas B, C and D. 2. Inthe MARCO Monthly Progress Report #14 100% completion of Structural Steel & Metals (01400) installation (01430) has been claimed. In order to accept this claim the following items will need to be completed/provided: © Various structural steel items to be installed as previously noted. See Photos 3 to 4 ‘© Provide inspection and testing results as specified in section 05 12 23 (3.5) of the contract documents. © To date the following inspection results have been received * ACUREN Plumb and Alignment of columns visual examination report dated 17 Dec 2013, = ACUREN Plumb and Alignment of columns visual examination report dated 25 Feb 2014 (torque testing discussed in results). + ACUREN Plumb and Alignment of columns visual examination report dated 21 May 2014 (torque testing discussed in results). PMF.08 Rev. 4 Project Site Report Report Date: October 1™, 2014 Page 2 » ‘© The following inspection results have not been received: = Plumb and alignment and torque testing inspection results for: ‘* Columns along 15, 15x and 15y. * Columns 17, 16T and 16S. * Welding inspection results. ‘© The above mentioned ACUREN inspection results were not all received by ‘AMEC within the time frame specified in the contract documents (05 12 23 - 3.5.4). © Provide Contractor inspection and testing results as specified in section 05 12 23 (3.5.6) of the contract documents, ©. Provide letter from fabricators welding engineer as specified in section 05 12 23 (1.7.1) of the contract documents. © Provide certification from fabricators of quality compliance as specified in section 05 12 23 (1.7.2) of the contract documents. twas brought to the attention of AMEC that the contractor may not intend to provide a repair detail for review and approval of the previously noted concrete quality issues (honeycombing) prior to remediation. This is a structural concem and the remediation should be reviewed and approved by the Structural Engineer(s) prior to installation. See Photo's 5 - 8 showing an example which was noted in previous reports and has not been remediated but has been partially covered up with masonry. Performed one spot check to establish if previously noted missing and damaged bridging has been fixed. It was noted that in this area the bridging has not yet been completed. See Photo 9. . At the time of this site visit some portions of lower masonry remediation were visible. See Photo 10. These portions that were visible appear to be acceptable according to the remediation detail. As discussed inspection of masonry remediation is required. (See Item 6) ‘As mentioned previously, “It was previously noted that the lower masonry remediation detail had not been installed properly. Contractor has begun installing exterior block (between gridlines 28 and 23 along grid line P) without contacting AMEC for an inspection of masonry remediation prior to installation of the exterior block. At the time, of this inspection no visible portions of lower masonry remediation were ready for inspection.” |AMEC Americas Limited 28:31 Pippy Place, Suite 2002 PO Box 9600 ‘St John's NL. Canada AIA 3C1 ‘Tel (709) 724-1900 Fax +(708) 738-5458, Project Site Report $09 October 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: October 1%, 2014 Page 3 MARCO responded that this issue was, “Being inspected by TW. TW to coordinate with AMEC’. ‘AMEC awaiting comment and/or documentation from Transportation and Works, clarifying that this area does not require remediation. (See Item 5) 7. As mentioned previously, “Large areas of ponding observed on concrete floor in Area C. See Photo 11”. MARCO responded with, “Slab within tolerances”. MARCO to provide inspection documentation/results for review. 8. As mentioned previously, “Masonry remediation detail has not yet been installed along gridline T between gridlines 18 and 22. Please see photo 10 from May 9", 2014 showing that at this time the masonry had been installed along this portion of the building. Considering the masonry remediation detail was issued May 20”, 2014 it is assumed that this portion of the wall requires remediation. Please provide documentation if for some reason this specific area does not require remediation. * MARCO responded with, “These walls were constructed as per drawing after issue was discovered”. MARCO to provide documentation (i.e. photos taken during construction of the wall) for review. 9. As previously mentioned one coat of primer is to be applied to all steel surfaces except as noted for specific situations. As shown in photo 11 and 12 the HSS Brick support structure requires painting and the exposed steel columns in Area B require repainting. 10. Awaiting photos showing installation of column masonry anchors and bar anchors for Penthouse masonry walls. See previous inspection report(s) for more information. 11. Investigate possible improper connection in brick masonry support structure. See photo 13. 12. Concrete installation incomplete in Area D. See Photo 14. 13. Rusting steel joists, bridging and decking noted. See Photo's 15 and 16. AMEC Americas Limited 29-31 Pippy Place, Sue 2002 PO Box 9600 St. John’s NL Canada “ATA 301 Tel +4709) 724-1900 Fax +(709) 730-5458 Project Site Report $09 October 1,2014 PMF.06 Rev. 0 Project Site Report Report Date: October 1%, 2014 Page 4 14, Items noted on previous inspections and not duplicated in this report must be completed if they have not yet been resolved, 15. Penthouse roof was not observed. DISTRIBUTION Subsection 40(1) Kirk Kendall, PMP ‘AMEC Americas Limited Steve Matthews, P.Eng Power & Process nuel AME Americas Limited 28-31 Pippy Place, Suite 2002 0 Box 9600 ‘St John's NL. Canada AIA 301 Tel +(709) 724-1900 Fax +(709) 739.5458 Project Site Report $09 October 1,2014 PMF.06 Rev. 0 Project Site Report : October 1%, 2014 jc TES Photo 1 AMEC America Limited 20:31 Pippy Place, Sut 2002 PO Box 9800 St. Joba's NL Canada “ATA 361 Tel +(709) 724-1900 Fax +(709) 739-5458 Project Ste Report $09 October 1,2014 2 PMF.06 Rev. 0 Project Site Report Report Date: October 1", 2014. Page 6 AMEC Americas Limited 28-31 Pippy Place, Suite 2002 PO Box 9800 St. John's NL Canada AIA 3C1 Tel +708) 724-1900 Fax +709) 739-5458, Project Ste Report $09 October 1,2014 2 PMF.06 Rev. 0 Project Site Report Report Date: October 1%, 2014 Page 7 AMEC Americas Limited 20:31 Pippy Place, Sute 2002, PO Box 9600 St. John’s NL Canada “ATA C1 Tol +(709) 724-1900 Fax +(709) 739-5458, Project Site Report $09 October 1,2014 2 PMF.06 Rev. 0 Project Site Report Report Date: October 1%, 2014. Page 8 Photo 8 ‘AMEC Americas Limits 29.31 Pippy Place, Sute 2002 PO Box 9600 St. John's NL Canada “AIA 301 Tel +709) 724-1900 Fax +709) 739-5458 Project Site Report $09 October 1,2014 2 PMF.06 Rev. 0 Project Site Report Report Date: October 1%, 2014 Page 9 ‘AMEC Americas Limited 28.31 Pippy Place, Sut 2002 PO Box 9600 St. John’s NL Canada “ATA 301 Tel +709) 724-1900 Fax +(709) 739-5458 Project Site Report $09 October 1,2014 2 PMF.06 Rev. 0 Project Site Report Report Date: October 1%, 2014 Page 10 Photo 12 ‘AME Americas Limited 128-31 Pippy Pace, Suite 2002 PO Box 8600 St John's NL Canada ‘AA 301 Tel +(709) 724-1900 Fax +700) 739-5458, Project Site Report $09 October 1,2014 2 PMF.06 Rev. 0 Project Site Report Report Date: October 1", 2014 Page 11 Photo 14 AMEC Americas Limited 128.31 Pippy Place, Suite 2002 PO Box 9600 St. John’s NL Canada ATA 3C1 Tel (708) 724-1900, Fax +{709) 739-5458 Project Site Report $09 October 1.2014 2 PMF.06 Rev. 0 Project Site Report Report Date: October 1%, 2014 Page 12 AMEC Americas Limited 28:31 Pippy Place, Sulte 2002 PO Box 9600 ‘St Joba's NL Canada ATA 3c1 Tal +(708) 724-1900 Fax +700) 736-5458, Project Site Report $09 October 1,2014 2 PMF.06 Rev. 0 ame PROJECT SITE REPORT S08 PROJECT: West End High School — CP2 PROJECT NO.: __167733 CLIENT:__Dept. of Transportation & Works REPORT DATE:_ September 16", 2014 CONTRACTOR:__MARCO VISIT DATE:__September 4", 2014 REPORT BY: Rebecca Manuel CATEGORY: ci Arch: [ Mech: Elect: ‘Struct: X PURPOSE: QualtyProgress Review: X Site Coordination: ‘Substantial Performance: 0 Final Performance: [| PROGRESS: Site inspection to review Structural works completed to date. The following items were noted during the site tour on Thursday September 4”, 2014: ‘Structural 1 2. Deck fasteners have not yet been re-installed in portions of roof of Area B. See Photo 1 Repair detail for previously noted concrete quality issues (honeycombing) has not yet been received for review and approval. See Photo's 2, 3, and 4. Contractor to identity locations where concrete deficiencies require rework and provide remediation detail for review. Performed spot check to establish if previously noted missing and damaged bridging has been fixed. It was noted that in the re-checked areas the bridging has not yet been completed. See Photo's 5 and 6. twas previously noted that the lower masonry remediation detail had not been installed properly. Contractor has begun installing exterior block (between gridlines 28 and 23 along grid line P) without contacting AMEC for an inspection of masonry remediation prior to installation of the exterior block. See Photo 9. At the time of this inspection no \isible portions of lower masonry remediation were ready for inspection. See Photos 7 and 8. Masonry remediation detail has not yet been installed along gridline T between gridlines 18 and 22. Please see photo 10 from May 9", 2014 showing that at this time the masonry had been installed along this portion of the building. Considering the masonry remediation detail was issued May 20", 2014 it is assumed that this portion of the wall PMF.06 Rev, 1 Project Site Report Report Date: September 16", 2014 Page 2 requires remediation. Please provide documentation if for some reason this specific area does not require remediation. 6. Large areas on ponding observed on concrete floor in Area C. See Photo 11 7. Roof of Area C was not inspected by AMEC prior to installation of roof insulation and base sheet. See Photo's 12 - 16. Could not confirm if decking fasteners were re- stalled as required. 8. Various structural steel items to be installed as previously noted. See Photos 17 to 19. 9. As per section 2.3 of 05 12 23 of the contract documents one coat of primer is to be applied to all steel surfaces except as noted for specific situations. As shown in photo 19 the HSS Brick support structure requires painting. 10. Column masonry anchors for Penthouse masonry walls not visible. See Photos 20 and 21 11. Bar anchors on underside of HSS for Penthouse masonry walls not installed at time of inspection. See Photos 20 and 21. 12. Items noted on previous inspections and not duplicated in this report must be completed if they have not yet been resolved. 13. Penthouse roof was not observed. DISTRIBUTION Subsection 40(1) Kirk Kendall, PMP AMEC Americas Limited Steve Matthews, P.Eng Rebecca Manuel AMEC Americas Lites 29.31 Pippy Place, Suite 2002 0 Box 9600 ‘St. John's NL Canada “ATA9C1 Tol +4709) 724-1900 Fax +709) 739-5458 Project Site Report $08 September 4.2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16", 2014 Page 3 Photo 1 ‘AME Americas Liited 29:3 Pippy Place, Sulte 2002 PO Box 9800 ‘St Joha's NL Canada AtA3Ct Tel +(709) 724-1900 Fax +(709) 739-5458 Project Site Report $08 September 4.2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16, 2014 Page 4 Photo 4 AME Americas Linited 2031 Pippy Place, Suite 2002 0 Box 9800 ‘St. John's NL Canada ATA 301 Tel +(709) 724-1900 Fax +709) 730-5458, Project Site Report $08 September 4.2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16”, 2014 Page 5 ‘AMEC Americas Liites 29:31 Pippy Pace, Suite 2002 0 Box 9600 ‘St John's NL Canada ATA 3Ct Tel +(709) 724-1900 Fax +709) 738-5458, Project Site Report $08 September 4.2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16”, 2014 Page 6 ‘AMEC Americas Liited 29:31 Pippy Pace, Sule 2002 PO Box 9500 ‘St Johe's NL Canada ATA 3ct Tel +(709) 724-1900 Fax +708) 7395458 Project Site Report $08 September 4.2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16", 2014 Page 7 AMEC Americas Limited 29.31 Pippy Place, Suite 2002 PO Box 9600 St, John's NL Canada “ATA3C1 Tel +708) 724-1900, Fax +(709) 739-5458 Project Ste Report $08 September 4.2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16", 2014 Page 8 ‘Photo 1 /AMEC Americas Lites 28:31 Pippy Place, Suite 2002 0 Box 9800 ‘St Joha's NL Canada ATA 301 Tel +(708) 724-1900 Fax +709) 738-5458, Project Site Report $08 September 4,2014 PMF 06 Rev. 0 Project Site Report Report Date: September 16", 2014 Page 9 AMEC Americas Limited 20:31 Pippy Place, Sut 2002 PO Box 9600 ‘St John's NL Canada ATA SC Tol +(709) 724-1900 Fax +(709) 739-5458 Project Ste Report $08 September 4.2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16", 2014 Page 10 ‘Photo 15 Photo 16 ‘AMEC Americas Limited 2931 Pippy Pace, Sute 2002 PO Box 8600 ‘Stohr’ NL (Canada AtA 301 Tel +(709) 724-1900 Fax #(709) 730-5458 Project Ste Report $08 September 4,2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16”, 2014 Page 11 OS Photo 18 -AMEC Americas Limited 23:31 Pippy Place, Suite 2002 PO Box 8600 St Johns NL Canada ATA 301 Tol +(709) 724-1900 Fax +709) 739-5458 Project Site Report S08 September 4,2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16", 2014 Page 12 Photo 20 [AMEC Americas Limited 128-31 Pippy Piace, Suite 2002 0 Box $600 ‘St John's NL. (Conada AIA 301 Tel +(708) 724-1900 Fax #(708) 738-5458 Project Ste Report $08 September 4,2014 PMF.06 Rev. 0 Project Site Report Report Date: September 16”, 2014 Page 13 AMEC Americas Limited 29.31 Pippy Place, Suite 2002 PO Box 9800 St, John's NL Ganada ATA Ct Tel +(709) 724-1900 Fax +(709) 739-5458 Project Ste Report $08 September 42014 PMF.06 Rev. 0 ame PROJECT SITE REPORT S07 PROJECT: West End High School — CP2 PROJECT NO.:__ 167733 CLIENT: _Dept. of Transportation & Works REPORT DATE:_August 5", 2014 CONTRACTOR:___MARCO_ VISIT DATI August 1*, 2014 REPORT BY: Rebecca Manuel CATEGORY: Civil: LJ Arch: LJ Mech: Li Elect: Struct: X PURPOSE: Quality/Progress Review: =X Site Coordination: = () ‘Substantial Performance: Final Performance: PROGRESS: Site inspection to review Structural works completed to date. The following items were noted during the site tour on Friday August 1", 2014: ‘Structural ‘* Incomplete connections noted between channel curtain supports and W460 beam along gridline 2X in Area C. See photo 1 ‘+ Doorway along gridline A requires dowels. See photo 2. ‘+ Two out of four anchor bolts appear to be missing on column B6 in Area C. See photo 3. * Some rebar has been tied (see photo 4) while other's have not (see photo 5) in Area D slab. ‘+ Reinforcement laying flush against the ground in slab depressions in Area D. See photo 6. Spot checked bracing deficiencies noted on previous inspection. Deficiencies remain. Poor installation of masonry remediation, grouting required. See photos 7 & 8. Concrete surface deficiencies noted in Area A stairwell between ground floor and second floor (between grid lines 22 & 23, R & S). See photo 9. Clip angles providing insufficient contact with masonry wall. See photo 10. Ponding on level 2 concrete floor near gridline 18. See photo 11. Missing clip angles and access door in Area B level 2 mechanical room. See photo 12. As previously noted, fasteners require reinstallation in portions of the roof of Area B & C. Lower Masonry remediation noted missing near column $27. See photo 13. Lower and upper masonry remediation noted missing in various parts of Area A (i.e. along grid line P between grid lines 23 & 24) PME.06 Rev. 1 Project Site Report Report Date: August 5, 2014 Page 2 ‘+ Ensure structural elements have been primed/painted as specified. Damaged elements or elements which have yet to be painted/primed must be cleaned and primed/painted. Contractor to demonstrate that members which have been enclosed have been painted/primed (See photos 14, 15 and 16). ‘+ Honeycombing was noted in some areas (See photo 17). Inspection should be completed to determine areas where honeycombing has occurred and remediation must. be completed in these areas. ‘* Items noted on previous inspections and not duplicated in this report must be completed if they have not yet been resolved. DISTRIBUTION ‘Subsection 40(1) Kendall, PMP ‘AMEC Americas Limited Steve Matthews, P.Eng Power & Process jecca Manuel ‘AMEC Americas Umited 28.31 Pippy Place, Suite 2002 PO Box 9600 St. John's NL. Canada ATA 3C1 Tel (708) 724-1900 Fax +(706) 738-5458 Project Ste Report $07 August 12014 PMF.08 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 3 Photo t Photo 2 ‘AMEC Americas United 29.51 Popy Place, Suite 2002 Fo box 8000 St dors NL Canada “ATA 301 Tal +(709) 724-1900 Fax +700) 730-5458 Project Site Report S07 August 1,2014 PMF.06 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 4 ‘AMEC Americas Limited 29-31 Pippy Place, Suite 2002 PO Box 9600 ‘St John's NU Canada AIA 301 Tel +(709) 724-1900 Fax +(709) 739-5458 Project Ste Report $07 August 12014 PMR. Rev. 0 Project Site Report Report Date: August 5, 2014 Page 5 AMEC Americas Limited 128-31 Pippy Place, Suite 2002 PO Box 9600 St. John's NL Canada “ATA 3¢1 Tel +(709) 724-1900 Fax #(709) 739-5458 Project Site Report $07 August 1.2014 PMF.08 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 6 Photo 8. AEC Americas Limited 29-31 Pippy Piace, Suite 2002 PO Box 9600 ‘St John’s NL. ‘Canada AIA 3c1 Tel +(708) 724-1900 Fax +(709) 730-5458 Project Ste Report $07 August 1,2014 PMF.06 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 7 Photo 10 AME Americas Limited 29-31 Pippy Place, Suite 2002 PO Box 9600 ‘St John's NL. Canada ATA 3C1 Tel +(708) 724-1900 Fax #(709) 739-5458 Project Site Report $07 August 12014 PMF.06 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 8 AMEC Americas Limited 29:31 Pippy Place, Sule 2002 PO Box 9600 St. Joba's NL Canada “ATA 301 Tel +(709) 724-1900 Fax +1709) 739-5458 Project Site Report 807 August 1.2014 PME.06 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 9 Photo 13 Photo 14 AMEC Amaricas Limited 29-31 Pippy Place, Suite 2002 0 Box 2600 'St John's NL. Canada AIA 301 Tel +(708) 724-1900 Fax +(708) 738-5458, Project Site Report S07 August 1.2014 PMF.06 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 10 ‘AMEC Americas Limited 28:31 Pippy Place, Sule 2002 0 Box 9600 ‘St Joha's NL Canada “ATA 301 Tel +(709) 724-1900 Fax +709) 739-5458 Project Ske Report $07 August 1,2014 PMF.06 Rev. 0 Project Site Report Report Date: August 5, 2014 Page 11 Photo 17 ‘AMEC Americas Limited 28.31 Pippy Place, Suite 2002 PO Box 9600 St. John's NL. Ganada “ANA 3C1 ‘Tel (708) 724-1900 Fax +(708) 739-5458 Project Site Report S07 August 1.2014 PMF.06 Rev. 0 ame® PROJECT SITE REPORT S06 PROJECT: West End High School - CP2 CLIENT:__Dept. of Transportation & Works CONTRACTOR:__ MARCO REPORT BY: Rebecca Manuel PROJECT NO.: __167733 REPORT DATE:_July 11", 2014 VISIT DATE:__July 08", 2014 CATEGORY: civ: O Arh: PURPOSE: Quality/Progress Review: ‘Substantial Performance: PROGRESS: Mech: (| Elect: |. Struct: X x Site Coordination: Qo Final Performance: [1] Site inspection to review Structural works completed to date. The following items were noted during the site tour on Tuesday July 8", 2014: Structural * Bridging was noted as missing in the report from progress claim #10. A couple of those locations were re-checked on the inspection which took place July 8°. In the locations checked, the issues noted on the previous inspection had not yet been corrected. The areas revisited are as follows: © L10 &J11 (See Photo 2247 & 2246 respectively) © Bridging missing near mechanical opening in Penthouse Roof Framing Plan. (See Photo 0126) + Hilti fasteners require reinstallation in portions of roof of Area B and what appears to be the entire roof of Area C. In these locations the fasteners were not previously reinstalled due to use of these locations for storage. Presumably, the refastening will occur once the storage items have been removed. At a glance it appears that fasteners have been reinstalled in the roof of Areas A & B (See Photo 0105). * Decking and roof framing not yet installed between gridlines 27 & 28/R & S. Awaiting installation of stairs to complete (See Photo 9931). * Items noted on previous inspections and not duplicated ir if they have not yet been resolved. DISTRIBUTION Kirk Kendall, PMP Steve Matthews, P.Eng this report must be completed Subsection 40(1) ‘AMEC Americas Limited Rebecca Manuel PMF.06 Rev. 1 Project Site Report Report Date: July 11, 2014 Page 2 Photo 2246 Photo 2247, AME Amarcas Lirited 29:31 Pippy Pace, Suite 2002 PO Box 8600 ‘St John's NL. Canada AIA 3Ct Tel +(708) 724-1900 Fax +{709) 736-5458, Project Site Report $06 July 8.2014 PM.06 Rev. 0 Project Site Report Report Date: July 11, 2014 Page 3 Photo 0105, AMEC Americas Limited 2-31 Pippy Place, Suite 2002 PO Box 9800 ‘St John's NL. (Canada AIA 301 Tel +(708) 724-1900 Fax +(709) 739-5458 Project Site Report $06 Juy 8.2014 PMF.06 Rev. 0 Project Site Report Report Date: July 11, 2014 Page 4 Photo 9931 AEC Americas Limited 129-31 Pippy Place, Suite 2002 PO Box 9600 St, John's NL Canada ATA 3C1 Tel +(709) 724-1900 Fax +(709) 739-5458 Project Site Roport $08 Juy 8.2014 PMF.06 Rev. 0 ame PROJECT SITE REPORT S05. PROJECT: West End High School — CP2 PROJECT NO.: __167733-9.4 CLIENT: __Dept. of Transportation & Works REPORT DATE:_June 03%, 2014 CONTRACTOR:__ MARCO VISIT DATE:__June 02, 2014 REPORT BY:. Rebecca Manuel ‘CATEGORY: Civil: Arch: | Mech: | Elect: | ‘Struct: X PURPOSE: QualityProgress Review: X Site Coordination: [] ‘Substantial Performance: a Final Performance: [] PROGRESS: Site inspection to review Structural works completed to date. The following items were noted during the site tour on Monday June 2, 2014: ‘Structural ‘+ Incorrect type of bridging installed in some areas. See Photos 2012 & 2013 for example located in Area C Level 3 Framing Plan between gridlines G & J/ 5 & 7. Top and Bottom chord bridging specified. Diagonal X-bridging installed. This is structurally acceptable and may be left as is, but contractor is responsible to correct any clashes this poses with potential services. ‘* Bridging missing near the following column locations: © F2(See Photo 2005) L10 (See Photo 2003) J11 (See Photo 2002) 17 (See Photo 2015) Q18 (See Photo 2016) Between gridiine 27 & 28/ P & Q (See Photo 2020) Between gridiine 17 & 18/ R & S (See Photo 2025) Between gridline 17 & 18/ Q & Px (See Photo 2027) Bridging missing near mechanical opening in Penthouse Roof Framing Plan. (See Photo 2038) This is not a complete list of all areas where bridging has not yet been installed. Bridging must be installed as per contract drawings. + Damaged Bridging near column D6. See Photo 2006. * _Itwas noted on a previous inspection that a damaged foundation wall in Area D at the intersection of gridlines M and 12 requires remediation. It appears that the remediation PMF.06 Rev. 4 Project Site Report Report Date: June 03, 2014 Page 2 was completed, however, could not verify considering the formwork for the remediation was still in place. See Photo 2004. ‘* Could not verify installation of OWSJ bridging for the Level 3 Framing Plan due to the concrete deck pour occurring in this area at the time of inspection. «Wire mesh and rebar not yet installad in some portions of Area B on Level 2 or near stairwell in Area A. See Photo's 2017 & 2019 respectively ‘+ Itwas noted on a previous inspection that some of the Hilt deck fasteners had not been properly installed. We have been advised that a representative from Hilti visited site last week for a demonstration on proper installation. The fasteners that have already been installed should be verified for proper installation. Fasteners to be installed must be installed correctly. See Photo 2030 showing area where fasteners had not been installed properly and now a new line of fasteners have been installed alongside of them. «Decking and roof framing not yet installed between gridlines 27 & 28/R & S. Awaiting installation of stairs to complete. See Photo 2012. ‘© Bowing of formwork observed in Penthouse along concrete curb. See Photo 2033 ‘© Cracking observed in concrete curb of Penthouse. See Photo 2035 ‘* As described in Project Site Report C07 it was communicated that base plate grouting and misalignment issues must be resolved prior to pouring of concrete decks. Concrete deck pouring has begun even though these issues were/are not resolved in all locations. ‘See Photo 3806 taken Thursday May 29", 2014. ‘* Items noted on previous inspections and not duplicated in this report must be completed if they are not yet resolved. DISTRIBUTION ‘Subsection 40(1) Kirk Kendall, PMP ‘AMEC Americas Limited ‘Steve Matthews, P.Eng Rebecca Manuel AME Americas Limited 29:31 Pippy Place, Suite 2002 0 Box 9600 St John's NL. Canada AIA 301 Tel +(708) 724-1900, Fax +(708) 738-5458 Project Se Report $05.docx PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 3 Photo 2013 ‘AMEC Americas Linited 128-31 Pippy Place, Sue 2002 PO Box 2600 St John’s NL Canada “A1A3C1 Tel +(708) 724-1900 Fax 4{708) 736-5458, Project Sit Report $05.docx PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 4 Photo 2005 Photo 2006, ‘ME Amaras Umited 20531 Poy Place, Sut 2002 0 Box 9500 St Jonnie Nt Senada "AYA2C1 Sat s709) 726-1000 Fox ¥700) 7305488 Project Site Report S0.docx PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 5 ‘Photo 2002 Photo 2003 ‘AMEC Americas Limited 20:31 Pippy Place, Sute 2002 PO Box 9600 St. Johw’s NL Canada “ATA C1 Tel +(709) 724-1800 Fax +(709) 739-5458 Project Site Report $05.doce PMF.06 Rev. 0 Project Site Report : June 03, 2014 Photo 2004 Photo 2015, ‘AMEC Americas Limited 28:31 Pippy Place, Sute 2002 0 Box 9600 ‘St John’ NL Canada AIA 301 Tel (708) 724-1900, Fax 4(708) 739-5458 Project Se Report $06 docx PMF.08 Rev. 0 Project Site Report June 03, 2014 Photo 2017, AMEC Americas Limited 231 Pippy Place, Sulte 2002 PO Box 9800 St, John’s NL Canada “ATA3C1 ‘Tel +708) 724-1900 Fax +(709) 739-5458 Project Site Report $05.docx PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 8 Photo 2019 Photo 2030 ‘AMEC Americas Lied 28.31 Pippy Place, Sule 2002 0 Box 9600 ‘St Joha's NL Canada ATA 3C1 Tel +(708) 724-1900 Fax +700) 730-5458, Project Site Report $05.doox PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 9 Photo 2020 Photo 2021 AMEC Americas Limited 29.31 Pippy Pace, Sute 2002 0 Box 9600 St Jo's NL Garada “A1A 301 Tet +(709) 724-1900 Fax +(709) 739-5458 Project Ste Report $06.docx PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 10 Photo 2025 Photo 2027 AMEC Americas Liited 28:31 Pippy Place, Sule 2002 0 Box 9600 St. John's NL Canada ATA 301 Tet +709) 724-1900 Fox +700) 736-5458, Project Site Report $05 docx PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 11 Photo 2035, AMEC Americas Limited 20:31 Pippy Prace, Sule 2002 PO Box 9600 St. John's NL Canada “ATA 3C1 Tel +(709) 724-1800 Fax +(709) 739-5458 Project Site Report $05.docx PMF.06 Rev. 0 Project Site Report Report Date: June 03, 2014 Page 12 Photo 2083 ‘AMEC Americas Limited 28.31 Popy Pace, Suite 2002 PO Box 9600 ‘St Jos NL Canada AIA 301 Tal +(708) 724-1900 Fax +(700) 730-5458, Project Site Report $05.doox PMF.06 Rev. 0 ame® PROJECT SITE REPORT - S04 PROJECT: West End High School - CP2 PROJECT NO.: __167733-9.4 CLIENT:__Dept. of Transportation & Works REPORT DATE:___Feb 7, 2014 CONTRACTOR:__MARCO VISIT DATE:__Feb 5, 2014 REPORT BY:. Sergey Panov CATEGORY: ci U Arch: \) Mech: |_ Elect: Struct: X PURPOSE: QualityProgress Review: -X Site Coordination: 01 Substantial Performance: 0 Final Performance: () PROGRESS: as per attached spreadsheet and certificate of payment Site inspection to review structural installation. During our site visit we have performed a spot checks and following concems need to be addressed ‘* Damaged anchor bolts and concrete piers were observed (as per Transportation and Works Site Visit inspection Report Dated February 3, 2014). Also see pictures 0439, 0438, 0435, ‘¢ _Ithas been noted that number of base plates of the columns were modified by drilling additional holes and installation of oversized washers (see pictures attached 2965, 2959, 2961). Our original drawings do not show any of those modifications. Thus, contractor would need to provide stamped drawings confirming that their proposed modification is adequate. Please see images attached Subsection 40(1) DISTRIBUTION AMEC Americas Limited PMF.06 Rev. 1 Project Site Report Feb 7, 2014 Page 2 AMBC America Limit 133 Crsbie Road PO Box 9600 St Joba's NE Canada AIA3CI Tel +(708) 7241900, 'F\P167733¥Fies09 Construction CP2 - BUILDING ENVELOPE AND COMPLETIONS 04 Fax +(709) 735.5458, Tnspecton RepetUnspecton Report 4, Progress Chim #6WProjet Site Repr SO doe PMF.06 Rev. 0 Project Site Report Feb 7, 2014 Page 3 133 Crasbie Road PO Box 9600 ‘St John’s NE (Canada AIA3CL ‘Tel +4708) 7261300 4P167739¥iles09 Construction! CP2- BUILDING ENVELOPE AND COMPLETIONS 0+ Fax 1708) 7395858, Inspection Repontinspetion Report #4, Progress Claim #6Projec iteRepart S04 doe PMF.06 Rev. 0 Project Site Report Feb 7, 2014 Page 4 AMEC Americas Limited 133 Crmbie Read PO Box 9600, St Jon's NE Canada_AIA3CI ‘Tel 4709) 7241900 F\P167733Fes09 Construction CP2 - BUILDING ENVELOPE AND COMPLETIONS04 Fax (708) 735.5458, Inspection Repertllaspcton Report #4, Progress Chim #6 Projet Site Report S04 doe PMF.06 Rev. 0 Project Site Report Feb 7, 2014 Page 5 |AMBC America Limited 133 Grobe Road PO Bor 9600 ‘St Jo's NE (Canada AIA3C1 ‘Tel (708) 7241900, FAPL6773 Files 09 Constructio\CP2- BUILDING ENVELOPE AND COMPLETIONS 04 Fax (709) 7385458, Inspection Reportinspestion Report #4, Progress Claim #6Prjet Site Report $04 doc PMF.06 Rev. 0 ame PROJECT SITE REPORT — S03 PROJECT: West End High School - CP2 PROJECT NO.: __167733 CLIENT: _Dept. of Transportation & Works REPORT DATE:__Jan. 13”, 2014 CONTRACTOR:__ MARCO VISIT DATE:__Jan. 9", 2014 REPORT B' ‘Sergey Panov CATEGORY: Civ: (Arch: [J = Mech: Elect: L’ Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: = ‘Substantial Performance: PROGRESS: c Final Performance: (1 as per attached spreadsheet and certificate of payment Site inspection to review structural installation. At time of inspection approximately 70% of concrete footings and foundation were installed. Structural steel was being erected over Area A. During the site visit spot checks were performed and the following concems should be addressed: * All four anchor bolts for the column located at grid line 27/T are bent. (see attached picture) ‘+ Surface of the concrete shear walls along gridline P between 27 and 28 and gridline 27 between R and S are quite rough. We understand that the contractor interds to carry out sandblasting in order t. prove the appearance of the finished wall, and wanted to bring attention to TW that they should follow up and ensure the desired architectural fnish. DISTRIBUTION Subsection 40(1) AMEC Americas Lintited Power & Process PMF.06 Rev. 4 Project Site Report Nov 1, 2013 Page 2 AMEC Americas Limited 133 Crabie Road PO Bor 9600 ‘St John’s NF Canada ALA3CL ‘Tel ~(905) 7241900, F\P167733¥iles.09 Construction CP2 - BUILDING ENVELOPE AND COMPLETIONS04 Fax *(708) 739-5458, Inspection Repertilnspecton Report, Proges Claie#S Projet Site Report S03 dee PMF.08 Rev. 0 ame PROJECT SITE REPORT - S02 PROJECT: West End High School - CP2 PROJECT NO.: __167733- 9. CLIENT:__Dept. of Transportation & Works REPORT DATE:__Dec. 9", 2013 CONTRACTOR:__MARCO VISIT DATE:___Dec. 5", 2013 REPORT BY:. Sergey Panov CATEGORY: civil: Arch: | Mech: |_ Elect: Struct: X PURPOSE: Quality/Progress Review: =X Site Coordination: = ‘Substantial Performance: Final Performance: (1 PROGRESS: {as per attached spreadsheet and certificate of payment Site inspection to review structural installation. At time of inspection approximately 70% of concrete footings and foundation were installed. Structural steel was being erected over Area A. This confirms that the listed Structural items (the areas of completed foundation walls and footings) in Marco's monthly progress report seem reasonable and accurate. ‘+ Concrete cover to reinforcement was measured at pier footings prepared to be poured at gtidiine 11/L and 11/K. In numerous locations along the underside of the footing pad “concrete cover’ was measured from 25 mm to 50mm. The minimum concrete cover in footings should be 75mm as indicated in general notes drawing S1. (pictures below.) AMEC recommends corrections be made to meet minimum concrete cover on rebar; minimum Code requirements should be adhered to. «As required by code, itis important to ensure 75m of clear cover between the reinforcing steel and the ground to prevent corrosion of the rebar. Corrosion of rebar will cause spalling of Concrete and loss of steel reinforcing material. Also the contractor should not deviate from our details without written approval before proceeding, ‘© These items need to be addressed ASAP. ‘Subsection 40(1) DISTRIBUTION AMEC Americas Limited Power & Process PMF.06 Rev. 1 Project Site Report Nov 1, 2013 Page 2 AMBC Americas Limited 133 Crosbie Road PO Box 9600 St John's NF Canada ALA 3Ct ‘Tel -+908) 724-1900, 'PAPI67733¥ies\09 Construcion\CP2 - BUILDING ENVELOPE AND COMPLETIONS\O4 Fax +705) 739.5458, Inspection Repatlaspection Report #2, Progress Clkma\Projet Site Report $02 doc PMF.06 Rev. 0 Project Site Report Nov 1, 2013 Page 3 AMEC Americas Limited 133 Crosbie Rend PO Box 9600 ‘St John’s NE (Canada AIA3C1 ‘Tel_-+08) 7241900 FAPL67733¥ies\09 Constcsion\CP2 - BUILDING ENVELOPE AND COMPLETIONSI0$ ex +1705) 7395458 Inspection Repotslnspection Report #2, Progress Caim\Project Site Report S2.éoc PMF.06 Rev. 0 ame® 167733 ~ PROJECT SITE REPORT - C07 PROJECT: West End High School - CP2 PROJECT NO. 4 CLIENT:__Dept. of Transportation & Works REPORT DATE:_March 31,2014 CONTRACTOR:___ MARCO. VISIT DATE:__March 28, 2014 REPORT BY: Dave Osborne CATEGORY: civ: X Arch: L! Mech: Ll Elect: |’ Struct: X PURPOSE: Quality/Progress Review: Site Coordination: Substantial Performance: (| Final Performance: | PROGRESS: (On March 28, 2014 there was a site visit to review the Civil and Structural progress to date, * All but two (2) of the Light Pole Bases are installed however the excavation for the underground conduits etc. has to be done in some cases. + There are some areas where the underground plumbing has been installed in Area A that aren't backfilled to grade as required. ‘The roadways around the site were very slippery. I spoke to Marco's site superintendent and was told that the area was salted and sanded earlier this morning and that more sand was being delivered for another application. Structural «The base plate grouting hasn't started yet. Note: There are some base plates that are sitting on the piers and there isn't any room for grout. * There are several locations where the base plates have been slotted due to the Ament of the anchor bolts. See attached sketch and Contractor to prepare a sketch c/w proposed method of repairs for each location and submit to the Structural Engineer for approval. ‘There are two (2) columns between Grids 17 & 18 on line P that haven't been installed as the piers are too low. See attached sketch and pics. ‘+ AtColumn Py16 there is an anchor bolt missing. See attached sketch and pic. ‘+ The masonry has started on the SE comer of the school. The area is enclosed with tarps however the area isn’t heated and the ambient temperatures have been below what is required as per Section 04 05 00 Item 1.7.1. Contractor must ensure that the masonry is installed as per the specifications. PMF.06 Rev. 1 Project Site Report ao foci ante ame Page 2 252 EL sPPVe Here fet F tekst Bs z é = = ANE Amercas Unites 2051 Pippy Place Suite 2088 PO Box s600 St ons NL Canada ATA SC1 \P167733\Files\09 ConstuctioriCP2 - BUILDING ENVELOPE AND. Tol +(708) 724-1800 (COMPLETIONS104 Inspection Repors\Civi Structural Inspection Report - Progress Fax +709) 739.5458 Claim #81167739-CP2.0.4.~ Project Ste Report March 17, 2014. docx PMF.08 Rev. 0 cok ter amec® March 31, 2014 Page 3 Pie 3334 - Column Q27 re 3338 - Columa R27 Pie 3337 - Column Q23. Pre 3338 - Column Q23. le 3339 - Column Q22. AMEC Americas Limited 29:31 Pippy Place ‘Suite 2002 PO Box 9600 ‘St Joba's NL Canada “ATASCt AP167733\Fes109 ConstructoriCP2 - BUILDING ENVELOPE AND, Tel +(709) 724-1900 ‘COMPLETIONS\0¢ Inspection Reports\Civi- Structural Inspection Report - Progress Fax +{709) 738-5458 Claim #81167739-CP2:5.4-- Project Ste Report March 17, 2014. doce PME.06 Rev. 0 Project Site Report mec March 31, 2014 a Page 4 ‘Pie 3341 - Column R22 Pie 3344 - Columa R18 AMEC Americas Limited 28.31 Pippy Place Suite 2002 PO Box 9600 St, John's NL Canada “ATA3Ct P167733\Flles\09 Construcon\©P2 - BUILDING ENVELOPE AND Tel +700) 724-1900 CCOMPLETIONS\0¢ Inspection Repors\CiviStructural Inspection Report - Progress Fax +(709) 739-5458 ‘Claim #81167733-CP2-5.4-- Project Ste Report March 17, 2014.dooe PMIF.06 Rev. 0 roster ame March 31, 2014 Page 5 le 3350 - Column Py16 Bolt Missing |AMEC Americas Limited 29:31 Pippy Place Suite 2002 PO Box 9600 ‘St Johe's NL Ganasa_ATA3C1 F\P167733\Flles\09 ConstuctoriCP2 - BUILDING ENVELOPE AND. Tol +(709) 724-1900 ‘COMPLETIONSI0¢ Inspection Repor's\Civi Structural Inspection Repot - Progress Fax +(709) 739-5458 Claim #8\167733-CP2-0.4- Project Ste Report March 17, 2014. doce PMF.06 Rev. 0 Project Site Report March 31, 2014 Page 6 Pic 3381 - Column Q 16 DISTRIBUTION Kirk Kendall - AMEC Lance Reid - AMEC Chris Rushton - AMEC AMEC Americas Lined 28:31 Pippy Place ‘Sulte 2002 PO Box 9600 St. John’s NL Canada “AtA3CI Tel +(708) 724-1900 Fax +(709) 739-5468 Ple 3351 - Column Q 16 AMEC Americas Limited jer & Process Dave Osborne FAP 167733\Fles\09 Construction\CP2 - BUILDING ENVELOPE AND CCOMPLETIONS\04 Inspection Reports\Civi Structural Inspection Report - Progress. Claim #6\167733-CP2-5.4-- Project Ste Ropor March 17, 2014. cooe PMF.08 Rev. 0 ame PROJECT SITE REPORT — C05. PROJECT: West End High School - CP2 PROJECT NO.: __167733-9.4 CLIENT:__Dept. of Transportation & Works REPORT DATE:_March 06", 2014 CONTRACTOR:__ MARCO VISIT DATE:__March 03", 2014 REPORT BY:., Dave Osborne CATEGORY: ivi: X Arch: L) Mech: || Elect: | Struct: X PURPOSE: Quality/Progress Review: =X Site Coordination: =) ‘Substantial Performance Final Performance: [1] PROGRESS: as per attached spreadsheet and certificate of payment Site inspection to review civil works completed to date. The follo 1g items are noted: The following items were noted during today’s site tour: Givil ‘* Light Pole Bases that are stored on the NW corner (area C) aren't properly marked off for snow clearing purposes. ‘+The backfiling on the outside of the building is substantially completed. The only areas remaining to be backfiled are the SW comer at the water entry and along Gridline M. (see attached pics 3086 & 3087) Note: At the time of the site visit the site was snow covered. * The contractor was backfiling on the interior between gridiines 11 & 12/ J & M, See attached pic 3092). * The road outside the construction gate is being maintained as required. Structural Honeycomb was noted on both sides of the Shearwall located in Area B on gridlines 18 /R&S (see pies 3108, 3109 & 3110). «There are 4 columns suspended above the bases between gridlines P & Q/17 818 (see pic 3116 attached). There are a number of base plates that were slotted during the structural steel installation. PMEF.06 Rev. + Project Site Report March 06, 2014 Page 2 DISTRIBUTION Lance Reid, P.Eng, AMEC Americas Limited Subsection 40(1) Power&Process Dave Osborne Pie 3086 AMEC Americas Limited 153 Crosbie Road PO Box 9600 St John’s NF Canada ATA3C1 ‘Tel +709) 726-1900 'F3P167733\Fles09 Construction CP2 - BUILDING ENVELOPE AND COMPLETIONS‘4 Fax +(709) 739-5458, Inspection Reports InspectionRepr #5, Progress Clim #7\Projet Site Report C0S.doex PMF 06 Rev. 0 Project Site Report March 06, 2014 Page 3 ‘Tel ~(708) 724-1900, F\P167733\les 09 Consttion\CP2- BUILDING ENVELOPE AND COMPLETIONS04| Fax *(708) 739.5458, Inspection ReporsinspectionRepor #5, Progress Claim #7 Projet Site Repo C05 docx PMF.06 Rev. 0 ame PROJECT SITE REPORT — MA01 PROJECT: West End High School - CP2 PROJECT NO.: ___167733-9.4 CLIENT: __Dept. of Transportation & Works REPORT DATE:_May 12", 2014 CONTRACTOR:__MARCO. VISIT DATE:__May 09", 2014 REPORT BY:. Rebecca Manuel CATEGORY: ivi: O Arch: (Mech: (Elect: Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: ‘Substantial Performance: 1 Final Performance: (1 PROGRESS: ‘The following items were noted during the site tour on Friday May 9”, 2014 to review Masonry works to date: ‘© Gap between masonry walls and columns must match dimensions specified on drawings. See photo 3611, Ensure openings at column bases are property finished. See photo 3610a. Masonry remediation is required in areas where horizontal reinforcement was omitted, dowels installed improperly and/or upper masonry wall angle brackets are not providing a sufficient overlap (See photo 1788 which was taken along gridiine 28). Masonry remediation detail to be issued shortly * Contractor to complete the remediation of damaged foundation wall in Area D at the intersection of gridlines M and 12. See photo 3646. At area of damaged concrete remove all loose materials using a wire brush and pressure wash. Install dowel(s) for masonry wall according to project drawings and manufacturer's instructions and use formwork to pour repair concrete. Ensure dowel splicing overlaps meet specified requirements. See photo 3618. Dowels appear tobe missing along grifine 9 betwoon gines Mand. Soe photos 3647 and + tes noted during the inspection that a gap exists between the HSS lintels and the masonry walls below them in areas C and D. The drawings show no gap between the masonry and HSS members in this area. See photos 3655 and 3699, Contractor is responsible to properly shore ‘masonry walls during construction. The 2x6's shown in photo 3655 are not adequate. DISTRIBUTION Subsection 40(1) Kirk Kendall, PMP AMEC Americas Limited Steve Matthews, P.Eng Power & Process Rebecca Manus PME.06 Rev. 4 Project Site Report March 09, 2014 Page 2 Photo 1788 Photo 3611 AMBC Americas Limited 133 Crosbie Road PO Box 9600 ‘St John’s NF Canada_“AIA 3C1 ‘Tel+(908) 724-1900 Ie 09 ConstrctoniCP2 - BUILDING ENVELOPE AND COMPLETIONS 04 Fax +708) 739-5458 Inspection ReporsiMasonry Inspection #1, MAO! Project Site Report MAO1 docx PMF.06 Rev. 0 Project Site Report March 09, 2014 Page 3 Photo 3646 AMEC Americas Limited 133 Crosbie Road PO Box 9500 St John’s NE Canada ALA 3C1 Tel. +(708) 724-1900, FAP167733¥les 09 Construston\CP2 - BUILDING ENVELOPE AND COMPLETIONS.04 Fax #(708) 739-5458, Inspection Reports Masonry Inspection #2, MAO! Project Site Report MAOI docx PMF.06 Rev. 0 Project Site Report March 09, 2014 Page 4 Photo 3618 Photo 3641 |AMBC Americas Limited 133 Crosbie Road PO Box 9600 St John’s NF (Canada AIA 3C1 Tel. +(705) 724-1900 Fax +(709) 739-5458 'FAP167738¥Files 09 ConstretoniCP2 - BUILDING ENVELOPE AND COMPLETIONS 04 Inspection ReporsMasomry Inspection #1, MAOI Projet Site Report MAOI docx PMF.06 Rev. 0 Project Site Report March 09, 2014 Page 5 Photo 3685 AMEC Americas Limited 133 Crosbie Road PO Box 9600 St Joba's NE Canada ALA3C1 ‘Tel 4708) 724-1900 FF\PI67733\Files09 Constutin\CP? - BUILDING ENVELOPE AND COMPLETIONS 0 Fax 1(708) 739-5458, Tnspoction Reports Masonry Ispestion #1, MAO! Project Site Report MAO docx PMF.06 Rev. 0 Project Site Report March 09, 2014 Page 6 AMEC Amevicas Limited 133 Crosbie Road PO Box 9600 ‘St John's NF Canada AIA3C1 ‘Tel -¥(708) 724-1900 F\P167733\le\09 Consirutio\CP2- BUILDING ENVELOPE AND COMPLETIONS'04 Fax +108) 739-5458 Inspection Reports Masonry Iapetion #1, MADI Projet Ste Report MAOI docx PMF.06 Rev. 0 ame PROJECT SITE REPORT PROJECT: West End High School - CP2 PROJECT NO.:__167733-9.4 CLIENT: __Dept. of Transportation & Works REPORT DATE:_April 24, 2014 CONTRACTOR:__MARCO. VISIT DATE:__April 24, 2014 REPORT BY: Dave Osbome & Leo Reddy CATEGORY: vil: Arch: X Mech: Elect: Struct: X PURPOSE: Quality/Progress Review: X Site Coordination: ‘Substantial Performance: Final Performance: PROGRESS: Masonry Block installation in Area A Site visit to review the construction of the perimeter masonry walls in Area A related to the dowel installation and the omission of horizontal joint reinforcement. While on site the following additional items were noted: 1, The top of the masonry wall on the South Elevation (Gridline T) is approximately 50 to 75mm below the bottom of the beam - not 25mm as required by drawing St - Type 1 ‘Typ. Masonry Support Detail. a. See Pic 3461 attached. b. Note: Ensure that the correct size angle is installed as noted on the applicable details. 2. Ensure that all head and bed joints are filled with motar and that the excess motar on the exterior is removed as required to allow the installation of the air/vapour retarder and cavity wall insulation. a. See Pics 4230020 & 21 attached. 3, The top of the masonry wall on the North Elevation (Gridline P) appears to be touching the u/s of the beam however a 25mm gap is required as per the Type 1 Masonry ‘Support detail. a. See Pic 3460 attached. 4, Ensure that the spacing of lateral support angles is correct. 5. Note that the specified “embed-type” brick masonry anchors have not yet been installed. AMEC awaits shop drawing submittal for these anchors. PME.06 Rev. 1 April 24, 2014 Page 2 ic 4230020, AME Amaricas Limited 29:31 Pippy Paco Suite 2002 PO Box 9600 St. John’s NL Canada “AIA9C1 CAUsorsieoreddyAppData\LocalMicrosoftWindows\ Temporary Internat Tel +700) 724-1900 Filos\Content. Outook\BA3D6743\167733-CP2-9 4- Project Ste Report Api 23 2014 Fax +709) 739-5458 (2.00% PMF.06 Rev. 0 soremnre amec9 April 24, 2014 Page 3 ie 4230021 Pic 3460 AMEC Americas Limited ‘St. John's NL Canada “ATA SCI lo.reday\AppDatal ocahMicrosoftWindows\Temporary Intret Tal +(709) 724-1900 Fls\ Corton. utoeh@ASDO/4SI677SS:GP2 0% Pj Se Repo Ap 252014 Fax +709) 739-5458 (@).d00% PMF.06 Rev. 0

Das könnte Ihnen auch gefallen