Sie sind auf Seite 1von 8
Mi M CP. 3586, Succ. Bureau Chef 2676 Rue du Commerce Quality Manufacturing Lad Tracadie-Sheila, N.B TELEPHONE : 506-395-777 EE me ane www.mqm.ca CERTIFICATE OF COMPLIANCE PROJECT NUMBER: N186 CONTRACT NO.: 000001 MQM JOB NUMBER: Q13-093 SHIP TO: West End High School 465 Topsail Road St. John’s, Newfoundland, AIEANI This certifies that the design, supply, fabrication and erection of materials manufactured or supplied to Marco Services Limited for West End High School meet or exceed specifications, Purchase Order requirements and or drawings. Items have been manufactured under MQM Quality Manufacturing Ltd Quality System Standard QA manual, issued March 21, 2014 and meet all requirements as specified in your Customer Project Number and Contract Number referenced above. The products have been supplied and inspected according to written MQM Inspection Plans and are free from any known non-conformance. The raw materials meet Marco Services Limited specifications and the materials manufacturers have certified conformance. Date: October 30th, 2014 Subsection 40(1) Jean-Charles Bewoit, P-Eng. ; , Quality Assurance Manager or et MQM Quality Manufacturing Ltd. ees ans KM M CP. 3586, Succ. Bureau Chef 2676 Rue du Commerce Quality Manufacturing Ltd Tracadie-Sheila, N.B TELEPHONE : 506-395-7777 EES mes oe www.mqm.ca October 30th, 2014 RE: Confirmation of welding engineer. ATT: Garry Smith have been employed at MQM since 1996, I am the leed Structural engineer and Project Manager for MQM Quality Manufacturing Ltd. Since May 28", 2009, I have been the Welding engine and Quality Assurance Manager for MQM Quality Manufacturing Ltd. One of my responsibilities at MQM, is to develop, prepare and implement new and existing welding procedures to our shops and field. These MQM’s welding procedures and other prequalified procedures have been used on the West End High School project. Subsection 40(1) ‘Subsection 40(1) fean-Chartes Benoit, Peng. Quality Assurance Manager MQM Quality Manufacturing Ltd we amec foster wheeler Trip Report No. 1CR - Structural Date of trip Sept 9, 2015 W.O.File no. 167733, Trip taken by Chris Rushton Date of report Sept 10, 2015 Person visited David McCall Company name NL T&W Address St. John’s, NL. Project/Subject West End High School Purpose of trip Site Inspection / Site Meetings Follow-up date Follow-up by Scott Bennett (AMEC)/ File Rebecca Manual (AMEC) REPORT DETAILS pat ey Subsection 40(1) Weather conditions: 15°C / Partly cloudy Structural — Chris Rushton ‘SIGNATURE: Observation: The following site review observations were recorded and discussed with David McCall and the contractor: 1. Safety Issues: NA 2. Lateral supports were not installed as per typical steel details on drawing S1 (attached) at many concrete block walls. Sample photos and descriptions as follows: a. Photos #1-3 Block walls separating classrooms (Approximately 54 walls & 324 supports). b. Photo # 4: Block walls at stairwells (typical at each stairwell). . Photos #5-6: Holes cut in block and vertical rebar was welded to the underside of steel on gridline 7 to support the top of the concrete block walls (David McCall said that this method was used at various locations to remediate the missed installations where there are concrete block shear walls). AMEC Foster Wheeler (AFW) has concerns about the integrity of this work because: ‘Ames Foster Wheeler Americas 130 Elgon Subs Avenve, Suite 201 Daron, Nova Scola Canada B38 204 Tal" [902) 420-6000 Fax (02) 420-0948 sunwamec com TRIP REPORT x i. Detailed procedures were not submitted for review prior to installation as previously requested. il, Require written confirmation that the rebar used is weldable. Contract documents specify 300W material round bars, ii, Holes are cut into the blocks from one side only do not appear to provide adequate space to properly weld the bars. iv. Observed welds do not comply with the req all around, 3. Photo #7: Debris and exposed rebar were observed in the cores at the top of the concrete block walls along gridiine 7, where cores are required to be grouted. ment for 6mm fillet welds Resolution List; Documented, unresolved deficiency items were discussed with Steve Mathews, David McCall and AFW personnel at AFW offices prior to our site visit. Photographs: TRIP REPORT -3- Photo #2 Photo #3 TRIP REPORT op Photo #4 Photo #5 TRIP REPORT es Photo #6 Photo #7 TYPICA\ TAIL: : 7 5 sony eae Te vison supeoer ne 1 ‘ose coke BoC WATS =. sree BN Sera te Paso suron ne $a oe aa tte Sc ste ‘ a ae te (Bent) \weuen ites wipes 3c Sea \ See IvP_MASONRY SUPPORT TYPE 6 tise A oP a as 8 g Eigen oe we ee, op soy surron_ re sFPSE AL a Ba ds t | on na \

Das könnte Ihnen auch gefallen