CERTIFICATE OF COMPLIANCE
PROJECT NUMBER: N186
CONTRACT NO.: 000001
MQM JOB NUMBER: Q13-093
SHIP TO:
West End High School
465 Topsail Road
St. John’s, Newfoundland,
AIEANI
This certifies that the design, supply, fabrication and erection of materials manufactured or
supplied to Marco Services Limited for West End High School meet or exceed specifications,
Purchase Order requirements and or drawings. Items have been manufactured under MQM
Quality Manufacturing Ltd Quality System Standard QA manual, issued March 21, 2014 and
meet all requirements as specified in your Customer Project Number and Contract Number
referenced above. The products have been supplied and inspected according to written MQM
Inspection Plans and are free from any known non-conformance. The raw materials meet Marco
Services Limited specifications and the materials manufacturers have certified conformance.
Date: October 30th, 2014 Subsection 40(1)
Jean-Charles Bewoit, P-Eng. ; ,
Quality Assurance Manager or et
MQM Quality Manufacturing Ltd. ees ansKM M CP. 3586, Succ. Bureau Chef
2676 Rue du Commerce
Quality Manufacturing Ltd Tracadie-Sheila, N.B TELEPHONE : 506-395-7777
EES mes oe
www.mqm.ca
October 30th, 2014
RE: Confirmation of welding engineer.
ATT: Garry Smith
have been employed at MQM since 1996, I am the leed Structural engineer and Project Manager
for MQM Quality Manufacturing Ltd. Since May 28", 2009, I have been the Welding engine
and Quality Assurance Manager for MQM Quality Manufacturing Ltd.
One of my responsibilities at MQM, is to develop, prepare and implement new and existing
welding procedures to our shops and field. These MQM’s welding procedures and other
prequalified procedures have been used on the West End High School project.
Subsection 40(1)
‘Subsection 40(1)
fean-Chartes Benoit, Peng.
Quality Assurance Manager
MQM Quality Manufacturing Ltdwe
amec
foster
wheeler
Trip Report No. 1CR - Structural
Date of trip Sept 9, 2015 W.O.File no. 167733,
Trip taken by Chris Rushton Date of report Sept 10, 2015
Person visited David McCall
Company name NL T&W
Address St. John’s, NL.
Project/Subject West End High School
Purpose of trip Site Inspection / Site Meetings
Follow-up date Follow-up by
Scott Bennett (AMEC)/ File
Rebecca Manual (AMEC)
REPORT DETAILS pat ey Subsection 40(1)
Weather conditions: 15°C / Partly cloudy
Structural — Chris Rushton ‘SIGNATURE:
Observation:
The following site review observations were recorded and discussed with David McCall and the
contractor:
1. Safety Issues: NA
2. Lateral supports were not installed as per typical steel details on drawing S1 (attached)
at many concrete block walls. Sample photos and descriptions as follows:
a. Photos #1-3 Block walls separating classrooms (Approximately 54 walls & 324
supports).
b. Photo # 4: Block walls at stairwells (typical at each stairwell).
. Photos #5-6: Holes cut in block and vertical rebar was welded to the underside of
steel on gridline 7 to support the top of the concrete block walls (David McCall
said that this method was used at various locations to remediate the missed
installations where there are concrete block shear walls). AMEC Foster Wheeler
(AFW) has concerns about the integrity of this work because:
‘Ames Foster Wheeler Americas
130 Elgon Subs Avenve, Suite 201
Daron, Nova Scola
Canada B38 204
Tal" [902) 420-6000
Fax (02) 420-0948
sunwamec comTRIP REPORT x
i. Detailed procedures were not submitted for review prior to installation as
previously requested.
il, Require written confirmation that the rebar used is weldable. Contract
documents specify 300W material round bars,
ii, Holes are cut into the blocks from one side only do not appear to provide
adequate space to properly weld the bars.
iv. Observed welds do not comply with the req
all around,
3. Photo #7: Debris and exposed rebar were observed in the cores at the top of the
concrete block walls along gridiine 7, where cores are required to be grouted.
ment for 6mm fillet welds
Resolution List; Documented, unresolved deficiency items were discussed with Steve
Mathews, David McCall and AFW personnel at AFW offices prior to our site visit.
Photographs:TRIP REPORT -3-
Photo #2
Photo #3TRIP REPORT op
Photo #4
Photo #5TRIP REPORT es
Photo #6
Photo #7TYPICA\ TAIL:
: 7
5 sony
eae
Te vison supeoer ne 1
‘ose coke BoC WATS
=.
sree BN
Sera te
Paso suron ne $a oe
aa tte Sc ste
‘ a
ae te
(Bent) \weuen
ites wipes 3c
Sea \ See
IvP_MASONRY SUPPORT TYPE 6
tise A oP a as
8 g
Eigen oe we ee,
op soy surron_ re
sFPSE AL a Ba ds
t
| on na
\