Sie sind auf Seite 1von 2

Project Name:

Job No.:
Client:
Date :
DD/MM/YYYY
Drawing Title : PIPING GENERAL ARRANGEMENT DRAWING
Notes:
1. This checklist is intended for checking of layout drawings.
2. As a minimum, the checklist shall be completed for the first issue of the layout drawing.
Drawing No. :

3. Items like Fire and Gas detectors and other E, I & T items (e.g. JBs, switch boards,
lighting fittings, etc.) need not be shown in Piping Layouts.
Sr. No
Check Points
Y/N
Remarks
DESIGN
1
Plant North is shown.
Grade and paving levels and paving extents are shown.
2
(Dimensions of paving not required.)
3
Equipment and instrument tag nos. are indicated as per P&ID.
All equipments are shown with locating coordinates/dimensions
4
and elevations (centerline, BTL, u/s of base plate, etc.).
All equipment nozzles and vendor package terminal points are
5
clearly identified and tagged.
All tie-in points and battery limits are clearly identified and
6
tagged and coordinates/elevations are indicated.
All lines are identified by line numbers and major locating
7
dimensions & elevation are given.
Flow directions and slope symbols are indicated as per the
8
P&IDs.
All secondary pipe supports (standard & special) are indicated
9
and tagged and the locating dimensions marked.
All primary pipe supports are identified by appropriate symbols
10
(e.g. guide, axial stop, etc.).
Laydown/dropdown areas, space for exchanger tube removal and
11
maintenance access areas are identified.
All buildings/shelters/technological structures are located with
12
coordinates/dimensions. Names/tag nos and overall dimensions
are given.
Structural grid numbers of pipe racks, buildings and shelters are
13
shown.
Piperacks and sleepers are shown with locating
14
coordinates/dimensions, widths, TOS elevations and tag numbers
(if applicable).
The cross sections of piperacks, multi-level technological
15
structures, culverts, etc., are shown wherever required.
All platforms and ladders/staircases are located with dimensions
16
and elevations are marked.
DRAFTING

17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

The drawing border conforms to the Project specifications or


Company standards, as applicable.
Drafting conventions e.g. font types/sizes, text styles, line types,
coordinate/dimension styles, layer structure, etc. are as per the
Project specifications or Company CAD standards, as applicable.
Drawing title, drawing number and revision number in the title
block are as per the TDR.
Electronic file name is indicated at appropriate location on the
drawing.
Revision block contains initials of the originator, checker and
approver (both Discipline & Project).
Drawing scale is stated in the title block and graphic scale (bar
scale) is shown.
The drawing scale conforms to the Project specifications or
Company standards, as applicable.
All general notes are checked and the units for dimensions,
coordinates & levels are given in the notes.
Legend for applicable symbols is shown (e.g. pipe supports,
new/existing facilities, demolition, scope cloud, etc.).
Reference drawing numbers and titles are listed and checked. List
shall include unit plot plan and piping key plan as a minimum.
Status stamp (e.g. For Construction) is shown.
Revision clouds, along with revision number triangles are marked
properly, if applicable.
Hold clouds, if applicable, are properly marked and the list of
Holds is indicated.
Key plan is shown and the applicable area/unit of the plot plan is
highlighted.
Match line co-ordinates and drawing limits are clearly marked
and are consistent with the Key Plan drawing. Continuation
drawing numbers are correctly written.
Prepared By
Checked By
Back Checked By Final Checked By

Name:
Designation:
Revision number: