Sie sind auf Seite 1von 3

METHOD STATEMENT

FOR
VAC AIR BALANCING SYSTEM

Rev.

Date

Description

Prepared By

CONTENTS

Reviewed by

Approved

1
2
3
4
5

PURPOSE
SCOPE
RESPONSIBILITIES
REFERENCES
APPLICABLE FORMS

6 PROCEDURE
7 RISK ASSESSMENT

1.0

PURPOSE
The purpose of this Method Statement is to outline the sequences and the methods
of works intended to be used for VAC Air balancing System.

2.0

SCOPE
The scope of works comprises:
VAC Air balancing System.

3.0

RESPONSIBILITIES
3.1 Project Manager:
Overall in-charge of the project and report to the
Management.
3.2 Engineers

:
Ensure that all related works are carried-out in
accordance with the approved drawings,
specifications schedule, quality, safety. They will
report to the project manager.

3.3 Supervisor or Foreman:


Supervise the entire installation at the field and
report to the assigned Engineers.
4.0

REFERENCES
1. Manufacturers Manual
2. Project Specifications.
3. Quality Assurance Manual
4. Health, Safety and Environmental Manual
5. Approved Drawings.

5.0

APPLICABLE FORMS
Inspection Request form (IR)

6.0

PROCEDUER
Please find attached the Supplier Procedure.

Das könnte Ihnen auch gefallen