Sie sind auf Seite 1von 9

FY 2016-17 Water Project Funding Requests

Line
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

Project Title
Newberry Water & Wastewater Improvements
Alachua County Newnans Lake Improvement Initiative
High Springs Ph.4 North Sewer Extensions & Grinder Pump In-fill
Archer Collection and Treatment System
Hawthorne Downtown Water Main Replacement Phase II
Waldo Wastewater Collection System Evaluation and Rehabilitation
Glen St. Mary CDBG Northside Gravity Sewer Extensions
Macclenny System Wide Water Valve Replacements
Bay County North Bay SR 77 and CR 2300 Reuse Line
Bay County North Bay Wastewater Reuse Line
Callaway Sandy Creek Water System Improvements
Parker Water System Improvements
Springfield Water Infrastructure Capital Improvements
Bradford County Sampson Creek Evaluation and Improvements
Hampton Elevated Water Tank Project
Hampton Radio Controlled Water Metering System
Hampton Water Line Flood Proofing Project
Hampton Water Well Relocation Project
Starke Sewer System Improvement Project
Brevard County Groundwater Remediation
Brevard County Johnson Jr. High School Stormwater Pond Denitrification and
Phosphorus Reduction
Brevard County Merritt Island Inflow & Infiltration
Brevard County Pines Industrial Stormwater Pond Denitrification and
Phosphorus Reduction
Brevard County Scottsmoor Denitrification System
Brevard County South Beaches Inflow & Infiltration
Brevard County Treatment of Freshwater Discharges to the Indian River Lagoon
Brevard County-Brevard Zoo-Florida Institute of Technology - Restoring Natural
Filtration Systems
Cape Canaveral WWTP Improvements for Oxidation Ditch Rehabilitation
Palm Bay Septic Tank Elimination Near Estuary
Palm Bay Transmission Main Looping to Improve Water Quality
Titusville Indian River Lagoon Stormwater Treatment and Baffle Boxes
Melbourne Florida Avenue Area Water Quality and Flood Mitigation
Melbourne Eau Gallie Dam Design and Reconstruction
Palm Bay Stormwater Treatment at City Marina in High-Tech Corridor
Titusville Eliminating Nutrients from Knox McRae Watershed for a Healthier
Indian River Lagoon
Titusville Low-Impact Stormwater Treatment with LEED-certified Building
Deerfield Beach AMR System
Lauderdale Lakes Water Pollutant Reduction Tactics Project
Oakland Park Andrews Gardens Business District Drainage Improvements
Oakland Park Sanitary Sewer System Improvements
Pompano Beach Avondale Stormwater Improvements
Pompano Beach Esquire Lakes Stormwater Improvements
Pompano Beach Lyons Park Wastewater Infrastructure
Pompano Beach Reuse Distribution System Expansion
Pompano Beach Water Treatment Plant Electrical System Replacement
Pompano Beach Water Treatment Plant Filter Rehabilitation
Southwest Ranches Country Estates Drainage Improvement Project
Southwest Ranches Dykes Road Water Quality and Drainage
Southwest Ranches Frontier Trails Park Wetland Enhancement
Broward County Palm Beach County Regional Reclaimed Water Transmission
Line

County
Alachua
Alachua
Alachua
Alachua
Alachua
Alachua
Baker
Baker
Bay
Bay
Bay
Bay
Bay
Bradford
Bradford
Bradford
Bradford
Bradford
Bradford
Brevard

Amount
Requested
6,531,000
456,000
2,446,100
2,000,000
800,000
1,498,900
358,800
642,500
1,250,000
1,250,000
1,276,350
840,967
1,485,000
1,900,000
500,000
300,000
550,000
950,000
1,000,000
1,700,000

Brevard
Brevard

122,350
272,500

Brevard
Brevard
Brevard
Brevard

71,200
437,000
300,000
1,700,000

Brevard
Brevard
Brevard
Brevard
Brevard
Brevard
Brevard
Brevard

1,200,000
1,197,500
867,641
1,400,260
350,000
400,000
502,000
400,000

Brevard
Brevard
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward

105,000
350,000
1,500,000
1,000,000
1,000,000
250,000
1,657,990
1,478,975
4,830,432
759,500
3,100,000
2,150,000
145,000
400,000
1,000,000

Broward

5,000,000

51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105

Sunrise Irrigation Re-Use Distribution System


Sunrise Stormwater Master Plan
Coconut Creek Comprehensive Stormwater System Cleaning and Repair
Coconut Creek Pump Station Rehabilitation Project
Coconut Creek Reclaimed Water Extension Project
Coconut Creek Stormwater Drainage Improvements Project
Coconut Creek Wastewater Access Structure Rehabilitation Project
Coconut Creek Wastewater Pipe Rehabilitation Project
Margate Lemon Tree Lake Water Quality Improvement Project
Margate Sewer Piping Rehabilitation Phase II
Parkland Fire Hydrants and Mains - Pine Tree
Parkland Fire Hydrants and Mains - The Ranches
Broward County C-51 Reservoir Water Supply Expansion Phase 1
Broward County TY Park Reclaimed Water
Cooper City Replacement of Asbestos-Cement Water Mains
Dania Beach Watermain Replacement
Hollywood Design of Water Main Replacement Program from Hollywood Blvd to
Taft St
Hallandale Beach Reuse Irrigation Project
Pembroke Park John P. Lyons Lane Stormwater Pumping Station Project
Pembroke Pines Sewer Force Main Replacement Project
West Park Citywide Drainage Improvements
West Park Complete Street Drainage Improvement
West Park Preparation of Retention Ponds for Development
Miramar Flamingo Road Reclaimed Water Distribution System Expansion
Miramar Wastewater Reclamation Facility Reclaimed Water Expansion Phase I
Deerfield Beach Emergency Plant Generator
Deerfield Beach Water Plant Demolition and Replacement Infrastructure
Lauderdale-By-the-Sea Eliminate Possible Septic Leaching to Intracoastal
Waterway
Oakland Park Mainstreet Drainage Improvement
Tamarac Culvert and Headwall Improvement Project
Davie Eastside Infrastructure Improvement Project
Fort Lauderdale Drainage Canal Dredging
Fort Lauderdale River Oaks Preserve
Fort Lauderdale Stormwater Drainage Program
Lauderhill Lift Station 2 Rehabilitation Project
Lauderdale Lakes Stormwater Conveyance and Water Quality Improvement
Project
North Lauderdale Automatic Meter Reading System
North Lauderdale Sanitary Sewer Rehabilitation
Plantation Standby Generator for County EOC
Blountstown Wastewater Effluent Discharge
Charlotte County Sunshine Lake Floating Treatment Wetlands
Charlotte County East and West Spring Lakes Central Sewer Expansion
Citrus County CR 491 Phase 1 Regional Stormwater Facility
Crystal River Water Quality Improvement Plan
Citrus County Suncoast Parkway II Water Main Extension
Kings Bay Restoration Project
Green Cove Springs Historic Spring Park
Penney Farms Sewer Update
Collier County Golden Gate City Stormwater Improvement Project
Collier County Griffin Road Area Stormwater Improvement Project
Collier County Haldeman Creek Weir Replacement
Collier County Naples Park Area-Basin Infrastructure for Stormwater, Water,
and Sewer Phase II
Marco Island Marco Shores Alternative Water Solution
Marco Island San Marco Road Drainage Improvements
Columbia County Clay Hole Creek-Alligator Lake Stormwater Improvements

Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward

750,000
400,000
100,000
200,000
500,000
150,000
100,000
150,000
100,000
400,000
10,500,000
4,506,183
5,000,000
700,000
1,000,000
180,000

Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward

400,000
200,000
550,000
250,000
1,975,000
2,075,000
2,850,000
750,000
1,000,000
240,000
3,000,000

Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward

2,000,000
250,000
400,000
375,000
1,000,000
1,126,620
1,000,000
250,000

Broward
Broward
Broward
Broward
Calhoun
Charlotte
Charlotte
Citrus
Citrus
Citrus
Citrus
Clay
Clay
Collier
Collier
Collier

500,000
500,000
500,000
100,000
3,700,000
150,000
3,000,000
3,000,000
1,025,000
1,250,000
40,000,000
700,000
720,000
700,000
750,000
500,000

Collier
Collier
Collier
Columbia

1,650,000
1,000,000
150,000
800,000

106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

Columbia County Ellsiville WWTP Collection System Expansion


Lake City 18 Inch Potable Water Bypass
Virginia Gardens 37 Street Storm Water Improvements
Virginia Gardens Storm Water Rehabilitation
Doral Canal Bank Stabilization Program Year 5
Doral Stormwater Improvements at Sub Basin H-8
Miami-Dade County Extending Water Service to Residential Customers
Palmetto Bay Drainage Sub-Basin 59-60
Pinecrest Waterline Extension Project
Bay Harbor Islands Sewer Lateral Lining Project
Biscayne Park Stormwater Improvements
El Portal El Jardin Drainage Improvements
El Portal Septic to Sewer Project
Miami Shores Village 105th Street Drainage Study & Construction Plan
North Miami Arch Creek North-Arch Creek South Drainage Improvement
North Miami Gravity Sanitary Sewer Improvement
North Miami Tressler Street Drainage Improvement
Miami River Commission Miami River Environmental Restoration
Miami-Dade County NW 12 Street & NW 117 Ave Flood Control Structures
Improvements
Miami-Dade County NW 58 Street and NW 117 Ave Flood Control Structures
Improvements
Medley Asbestos Pipeline Removal & Remediation
Medley New Seawall
Medley NW 87th Avenue Utilities Adj. & Water Main Interconnect
Medley NW South River Drive Streetscape & Drainage Improvements
Miami Lakes Canal Bank Stabilization Project Phase II
Miami Lakes Lake Sarah Drainage Improvements Phase B, C, and D
Miami Lakes West Lakes Drainage Improvements Phase B, C, and D
Coral Gables Cocoplum Area Drainage
Coral Gables Miracle Mile and Giralda Avenue Drainage
Coral Gables Stormwater Outfall Baffles
Coral Gables Wet Well Rehabilitation
Cutler Bay Canal Bank Erosion Protection Project
Cutler Bay Point Royal Water Quality Improvement
Cutler Bay Saga Bay Water Quality Improvement
West Miami Potable Water Service Line - Phase I
Aventura NE 191 ST Stormwater Retrofits
Aventura NE 29 PLace South Stormwater Retrofits Phase II
Bal Harbour Village Potable Water System Improvements
Bal Harbour Village Sanitary Sewer System Improvements
Bal Harbour Village Storm Water System Improvements
North Miami Beach 19th Avenue Business District Sewering
North Miami Beach Corona Del Mar Business District Sewering Phase II
Sunny Isles Beach Central Island-Golden Shores Drainage
Florida City Culverting the Palm Drive Canal
Miami-Dade County South Miami Heights Water Treatment Plant
South Miami - Miami Twin Lakes - Cocoplum Sanitary Sewer Expansion
Program
South Miami Bioswales and Drainage Improvements
South Miami Stormwater Drainage Section A
South Miami Stormwater Drainage Section B
Surfside 92nd St Seawall Replacement
Surfside Sewage Flow Meter Replacement
Miami Beach Water Line Replacement on Alton Rd from Michigan Ave to North
Bay Rd
Miami-Dade County Extending Sewer Service to Residential Customers
Homestead Construction of New Pump Station
Homestead Inline Booster Pumps at Racetrack Water Tower

Columbia
Columbia
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade

700,000
891,950
550,000
350,000
1,000,000
850,000
2,500,000
450,000
750,000
1,000,000
250,000
1,300,000
1,500,000
150,000
496,750
500,000
250,000
150,000

Dade

33,750

Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade

246,750
1,400,000
886,000
1,027,600
1,400,000
1,000,000
400,000
500,000
700,000
200,000
110,000
80,000
245,000
400,000
165,250
500,000
450,000
436,000
600,000
600,000
600,000
362,500
512,500
750,000
3,106,000
3,000,000

Dade
Dade
Dade
Dade
Dade
Dade

200,000
120,000
360,000
80,000
110,000
20,000

Dade
Dade
Dade
Dade

1,000,000
2,500,000
3,200,000
97,500

161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217

Homestead Racetrack Water Tower Pump Station


Homestead Water and Wastewater Telemetry
Miami Beach Water Line Replacement Alton Rd 43rd-63rd St
North Bay Village Catch Basin Improvement Project
North Bay Village Outfall Improvement Project
Key Biscayne K-8 Stormwater Improvement Phase 1
Miami Wagner Creek-Seybold Canal Dredging Restoration Project
Miami-Dade County Centrate Disposal Well
Miami Gardens Culvert-Headwall Replacement Project
Miami Gardens NW 34 Court and NW 203 Street Drainage Project
Miami Gardens Vista Verde Project Phase 1C and 1D
Miami Gardens Vista Verde Project Phase 3
Opa-locka Water Quality Improvement Projects
Miami-Dade County West District Wastewater Treatment Plant
Sweetwater Phase IIB North Stormwater Improvements
Sweetwater Stormwater Improvements NW 108th Avenue (North) - Phase 1
Miami Gardens Neighborhood Stormwater Swale Re-grading Project
Miami Gardens NW 203 St Drainage Outfall Project
Miami-Dade County 72 Inch Force Main Rehabilitation Project
Miami-Dade County Little Arch Creek Salinity Control Structure Reconstruction
DeSoto County Lake Suzy Water Meters
DeSoto County Water-Sewer Extension US 17
Dixie County Flood Management Planning, Design, Permitting
Nature Coast Regional Water Authority Old Town Water System Extensions
Phase 2
Atlantic Beach Sanitary Sewer Main Rehabilitation
Jacksonville Dunn-Caney Stormwater Management Facility
Neptune Beach 400 and 500 Block Water Improvements
Neptune Beach Florida Boulevard Stormwater Culvert Improvements
Jacksonville Lower Eastside Drainage Improvement (Phase III)
Jacksonville Riverview Infrastructure Expansion (Phase I)
Jacksonville Trout-Moncrief Stormwater Management Facility
Jacksonville Grant Avenue Drainage Improvements
Jacksonville U.S. 1 Water Main Improvements
Jacksonville Julington-Cormorant Stormwater Improvements
Jacksonville Arlington-Pottsburg Stormwater Management Facility
Pensacola IHMC Storm Water Retention Treatment and Detention
Flagler Beach Ocean Palm Stormwater Improvement Plan Project
Flagler County Malacompra Basin Water Quality Enhancement Project (Phase I)
Flagler County Utility Water and Wastewater Project
Palm Coast WTP#2 Wellfield Expansion
Chattahoochee Waterline Replacement
Gretna Water Booster Station #2
Quincy Effluent Reuse System
Quincy SR 12 Potable Water Extension
Gilchrist County Otter Springs Sewer Service
Trenton Water System Improvements
Glades County Caloosahatchee River Area Wastewater Improvements
Moore Haven Avenue R Calooshatchee River Area Stormwater Conveyance &
Improvements
Port St. Joe Cape San Blas Sewer Project
Port St. Joe Gulf Beaches Sewer Project-Beacon Hill Sewer Project
Port St. Joe Jones Homestead Sewer Project
Jasper Water Plant
Bowling Green Wastewater Plant Effluent Disposal Improvements
Bowling Green Water Treatment Plant Improvements
Hardee County Regional Potable Water Service Improvements Phase 4
Hardee County Regional Wastewater Service Improvements Phase 4
Wauchula Stormwater Conveyance and Improvements

Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
DeSoto
DeSoto
Dixie

250,000
2,500,000
2,000,000
562,500
490,000
525,000
3,000,000
5,000,000
250,000
225,000
800,000
800,000
14,255,936
5,000,000
186,598
1,528,808
30,000
500,000
2,000,000
492,750
10,000
1,000,000
320,000

Dixie
Duval
Duval
Duval
Duval
Duval
Duval
Duval
Duval
Duval
Duval
Duval
Escambia
Flagler
Flagler
Flagler
Flagler
Gadsden
Gadsden
Gadsden
Gadsden
Gilchrist
Gilchrist
Glades

2,000,000
200,000
876,440
1,000,000
800,000
7,635,000
17,335,225
718,430
166,000
1,595,000
202,450
1,930,850
1,000,000
675,000
1,500,000
4,000,000
500,000
440,750
700,000
280,775
826,550
1,500,000
1,000,000
950,000

Glades
Gulf
Gulf
Gulf
Hamilton
Hardee
Hardee
Hardee
Hardee
Hardee

500,000
2,000,000
4,000,000
500,000
4,825,000
385,000
1,700,000
320,000
755,000
750,000

218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273

Wauchula Waterline Replacement Service Area 2 Phase 2 - So. First Ave.,


Green, MLK & Summit Area
Wauchula Waterline Replacement Service Area 3 Phase 2 - 7th-W. MainFlorida & Louisiana
Zolfo Springs Water Infrastructure Project
Hendry County Four Corners MSBU-County Line Ditch
Hendry County Wastewater Infrastructure on US27-SR80 - Phase Two
LaBelle Ft Thompson Water Quality Improvement Project
LaBelle Water Transmission Loop
Brooksville Horselake Creek Eastern Branch Drainage Restoration
Brooksville Saxon Brook Drainage Corrections Phase II
Hernando County Hunter's Lake Clean-up
Hernando County Pine Island Sewer
Esto and Noma Municipal Water Systems Improvement
Noma Elevated Water Storage Tank Renovation
Indian River County Enhancement of the PC Main Screening System
Indian River County North Sebastian Septic to Sewer Project
Indian River County Pilot Aquatic Plant-Based Pollutant Removal System
Project
Sebastian Treating Stormwater in Downtown Sebastian
Alford Wastewater Extension Phase I
Alford Water Improvements Project
Graceville Reuse System
Grand Ridge Wastewater Project
Jacob Water Meter Installation
Malone Water Improvements Project
Marianna Dieldrin Removal Project
Marianna Industrial Park Forcemain
Marianna Tara Estates Utility Improvements Project
Marianna Tara Estates Water and Sewer
Marianna West End Stormwater Acquisition Project
Sneads Stormwater Project
Jackson County Indian Springs Water Main Extension Phase I
Jackson County Indian Springs Water Main Extension Phase II
Marianna Dogwood Heights Water Main Extension
Marianna Putnam Street SWMF
Marianna Well #5 Land Acquisitions
Monticello Wastewater Lift Station Repair
Lafayette County Roosevelt Area - CR 300 Flooding Project
Clermont Alternative Water Supply Sunburst Lower Floridan Aquifer Wells
Clermont West Lake Wetlands
Groveland Eagle Ridge Phase 3 Reclaim Water Project
Lake County Magnolia Lane Water Quality Retrofit Lake Harris Basin
Lake County Mt. Plymouth-Sorrento Central Water and Sewer Feasibility Study
Fruitland Park Capital Lift Station and Force Main
Fruitland Park Wastewater Interconnection with the Town of Lady Lake
Eustis Eastern Wastewater Plant Expansion
Lake County East Lake Community Park Central Sewer Connection
Mount Dora Britt Road Reclaimed Water Line
Mount Dora Thrill Hill Reservoir
Tavares Downtown (CRA) Stormwater Improvements Phase II
Umatilla Lift Station Rehabilitation
Umatilla Stormwater Master Plan
Umatilla Wastewater Collection System Rehabilitation Phase II
Umatilla Water System Rehabilitation
Fort Myers Billy Creek Restoration
Gateway Services CDD Lake Remediation
Lee County Hendry Creek West Branch Restoration
Lee County Lakes Park Littoral Zone Project

Hardee

400,000

Hardee
Hardee
Hendry
Hendry
Hendry
Hendry
Hernando
Hernando
Hernando
Hernando
Holmes
Holmes
Indian River
Indian River

1,300,000
395,000
4,200,000
500,000
200,000
1,298,931
500,000
150,000
375,000
1,296,000
270,000
112,000
300,000
2,500,000

Indian River
Indian River
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jackson
Jefferson
Lafayette
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lake
Lee
Lee
Lee
Lee

150,000
100,000
1,696,579
462,786
279,687
1,700,000
230,450
271,481
461,688
3,637,203
998,111
1,412,912
25,000
2,841,452
1,070,851
2,700,000
801,000
350,000
272,000
125,000
900,000
1,980,000
4,306,750
1,192,265
700,000
300,000
1,401,469
1,367,720
2,500,000
1,000,000
875,000
750,000
2,500,000
2,250,000
125,000
750,000
4,000,000
750,000
5,000,000
1,200,000
200,000

274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327

Lee County Natural Resources Deep Lagoon Preserve Hydrologic Restoration


Lee County Sunniland-Nine Mile Run Drainage Improvements Project
Lehigh Acres Municipal Services Improvement District GS10 Caloosahatchee
Crosslink Sec 10 Design
Lehigh Acres Municipal Services Improvement District GS10 Caloosahatchee
Crosslink Sec 10 Purchase
Cape Coral Catch Basin Replacement
Cape Coral Reduce Fresh Water Discharges to Estuaries Project Phase1
Lee County Conservation 20/20 Lands Program Edison Farms
Sanibel Donax Wastewater Reclamation Facility Denitrification Modifications
Sanibel Donax Wastewater Reclamation Facility Plant 1 Upgrades Project
Leon County Ford's Arm Restoration
Leon County Harbinwood Estates Septic to Sewer
Leon County Woodville Sewer System
Leon County Centerville Trace Septic to Sewer
Leon County South Regional Water System
Tallahassee Lower Central Drainage Ditch Erosion Control Phase I
Tallahassee Public Water Supply Well #23 Rehabilitation and Treatment
Cedar Key Water and Sewer District Water Plant
Fanning Springs Wastewater System Extensions Phase II & III
Inglis Wastewater Sewer System Master Plan and Feasibility Study
Bristol Hall/Smith Circle Sewer Replacement
Bristol Water Supply Well
Hosford System Meter Replacement
Madison Barrsfield Well Emergency Generator
Madison Yellow Pine Water Service and Fire Protection
Manatee County Lake Manatee Water Supply and Water Quality Improvement
Project Phase 2
Belleview SE 132nd St. Rd Water & Sewer Ext
Belleview Sportsplex Reuse Irrigation
Belleview Utility Service Area Feasibilty Study
Marion County Rainbow Springs Infrastructure Development
Marion County Silver Springs Septic Tank Abatement
Ocala Silver Springs Stormwater Nutrient Reduction
Martin County Golden Gate Vacuum Sewer System
Martin County All American Ditch Stormwater Quality Retrofit Project
Martin County Old Palm City Vacuum Sewer System
Stuart Alternative Water Supply Feasibility Study
Stuart Sewer Expansion - Poppelton Sewer Basin
Stuart Sewer Expansion - Channel Sewer Basin
Stuart Sewer Expansion - Dolphin Sewer Basin
Stuart Sewer Expansion - Palm Beach Basin
Fernandina Beach Downtown Lining and Sealing Downtown Drainage
Fernandina Beach North Fletcher Basin C-1 & C-7
Hilliard Sewer System Rehabilitation
Nassau County Desnagging of Thomas Creek Next Phase
Callahan Water System Improvements
Okaloosa County Arbennie Pritchett WRF FOG Receiving System
Okaloosa County Bob Sikes Industrial Park- Pump Station and Force Main
Improvement Projects
Okaloosa County Bob Sikes WRF Absorption Bed Effluent Disposal Expansion
Okaloosa County Hwy 90E Water and Sewer Main Extensions
Okaloosa County Supplemental Reclaim Water Main
Fort Walton Beach Golf Club Reclaimed Water Pump Station Rehabilitation
Fort Walton Beach Stormwater Improvements on Alexandra Place SE
Fort Walton Beach Stormwater Improvements on Anchors Street NW
Fort Walton Beach Stormwater Improvements on First Street SW & Fourth
Avenue SW
Fort Walton Beach Stormwater Improvements on Harbeson Avenue SE

Lee
Lee

1,500,000
300,000

Lee

750,000

Lee
Lee
Lee
Lee
Lee
Lee
Leon
Leon
Leon
Leon
Leon
Leon
Leon
Levy
Levy
Levy
Liberty
Liberty
Liberty
Madison
Madison

3,000,000
350,000
500,000
10,000,000
900,000
850,000
3,970,000
2,500,000
3,600,000
1,000,000
1,500,000
1,000,000
1,000,000
900,000
600,000
125,000
946,567
475,190
354,200
69,500
49,000

Manatee
Marion
Marion
Marion
Marion
Marion
Marion
Martin
Martin
Martin
Martin
Martin
Martin
Martin
Martin
Nassau
Nassau
Nassau
Nassau
Nassau
Okaloosa

345,000
273,000
500,000
100,000
16,000,000
2,022,000
250,000
2,000,000
800,000
2,000,000
125,000
202,000
115,000
454,000
177,500
2,591,600
1,189,600
685,000
567,000
750,000
2,500,000

Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa

990,000
1,500,000
2,100,000
5,000,000
600,000
750,000
450,000

Okaloosa
Okaloosa

650,000
850,000

328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380

Fort Walton Beach Stormwater Improvements on Highland Drive NW & Silva


Drive NW
Fort Walton Beach Stormwater Improvements on Rainbow Drive NW
Fort Wlaton Beach Reclaimed Water System Upgrades
Mary Esther Critical Wastewater Infrastructure Upgrade
Valparaiso Gravity Sewer Rehabilitation
Valparaiso Lift Station and Force Main Replacements
Valparaiso Lift Station Rehabilitation-Tom's Bayou Force Main
Valparaiso Manhole Rehabilitation
Cinco Bayou Glenwood Park Stream Restoration
Crestview Elevated Water Storage Tank & Connecting Main
Laurel Hill Millside Road Water System Upgrades
Okeechobee County Whidden Ditch Stormwater Conveyance & Improved Water
Quality & Quantity Ph. 2 & 3
Okeechobee Utility Authority Basswood Eastern Water System Improvements
Okeechobee Utility Authority Pine Ridge Park Wastewater System
Improvements
Okeechobee Utility Authority Pine Ridge Park Water System Improvements
Orange County Lake Lawne C-6 Reuse Pond
Orange County Central Florida Regional Water Supply Booster Pump Station
Oakland South Lake Apopka Initiative
Apopka Orange County Potable Water Service Installations
Orange County Camp Thunderbird Septic Abatement and Pool Project
Apopka Asbestos-Cement Potable Water Main Replacement
Kissimmee Woodside Drainage
Tohopekaliga Water Authority Intercession City Galvanized Water Main
Replacement
Tohopekaliga Water Authority Marydia Sanitary Sewer Extension
Osceola County Lake Toho - Northern Everglades Restoration
St. Cloud Class V Well
Boynton Beach Mangrove Park Water Quality and Access Improvements
Lantana ICW Subaqueous Water Main Crossing Replacement Project
Lantana Lift Stations 1, 3, 4, & 9 Electrical Upgrades
Delray Beach Reclaimed Water System Expansion Area 12-C
Lake Worth Water Main
Palm Beach County Lake Worth Lagoon Initiative
Riviera Beach Singer Island Drainage Project
Jupiter Inlet Colony Neighborhood Rehabilitation Project
Loxahatchee River Preservation Initiative
Tequetsa Water System Improvement Project
Indian Trail Improvement District Indian Trail M-1 Canal Improvement
Indian Trail Improvement District M-1 Impoundment
Indian Trail Improvement District MO Canal Improvements
Wellington Reuse Water System
Royal Palm Beach Canal System Rehabilitation Project
Wellington Water & Wastewater Master Plan
Riviera Beach Avenue T Drainage Improvements
Riviera Beach RC-1 Canal Widening Project
Wellington Drinking Water Recharge System
West Palm Beach Currie Park Water Quality and Low Impact Development
Retrofits
Belle Glade NW 3rd Street Corridor Stormwater Conveyance Improvements
Pahokee Citizen's Villa - Storm Water Improvement Project
Pahokee City-Wide Storm Water Project
Pahokee East Lake Village Canal - Storm Water Improvement Project
Palm Beach County Freshwater Lake Restoration
Palm Beach County Lake Region Water Infrastructure Improvement Projects
Palm Beach Gardens Stormwater Maintenance Repairs And Operations
Program

Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa
Okaloosa

1,500,000
550,000
950,000
1,000,000
638,069
1,013,400
799,000
164,660
299,000
1,150,000
479,028

Okeechobee
Okeechobee

750,000
500,000

Okeechobee
Okeechobee
Orange
Orange
Orange
Orange
Orange
Orange
Osceola

350,000
250,000
1,700,000
1,000,000
2,000,000
920,000
1,254,500
2,000,000
500,000

Osceola
Osceola
Osceola
Osceola
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach

750,000
1,000,000
3,500,000
2,000,000
950,000
350,000
200,000
1,500,000
500,000
2,200,000
2,500,000
730,460
3,155,963
750,000
875,700
400,000
2,952,191
300,000
1,200,000
500,000
2,000,000
1,000,000
250,000

Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Palm Beach

200,000
800,000
290,000
725,000
435,000
165,000
1,000,000

Palm Beach

750,000

381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427

South Florida Water Management District Palm Beach County Corbett Levee
Flood Control
Dade City Downtown Stormwater Retro-fit Project
Pasco County Beneficial Water Reuse
Pasco County Crews Lake Natural System Enhancement
Pasco County Timber Oaks Flood Control
Pinellas Park 98th Avenue Pond Improvements
Pinellas Park Technical Services Pond Improvements
Bartow Water Reclamation Facility Phase 3 SBR 4th Tank Design &
Construction Expansion
Fort Meade Wastewater Facilities Plan Phase 1
Frostproof Polk Regional Water Supply Development-Frostproof Water CIP
Implementation
Lakeland Se7en Wetlands
Mulberry Pumping Station No. 1 and Wastewater Treatment Facility
Improvements
Lake Region Lakes Management District Rainfall Storage & Aquifer Recharge
Polk County Peace River MFL Augmentation
Lake Wales West SR 60 Expansion
Lake Hamilton-Dundee US27 Sewer Extension Project
Winter Haven Stormwater Assessment and Improvement Project
Palatka Wastewater Treatment Plant Bio-solids Treatment System
Improvements
Putnam County East Palatka Drainage Cleaning Project
Putnam County Water Transmission Main Extension Construction Phase
Milton East Milton Wastewater Reclamation and Effluent Disposal Facility
Santa Rosa County Holley By the Sea Camden Dr Outfall Improvements
Santa Rosa County Venetian Way and Coronado Drive Drainage Improvements
Gulf Breeze Wastewater Asset Management via SCADA and CMMS
Technology Improvements
Jay Water Well Maintenance Project
Peace River Manasota Regional Water Supply Authority Regional
Pipelines/Integrated Loop System
Sarasota County Alternative Water Supply Exploratory Well
Sarasota County Dona Bay Watershed Restoration Project Phase III
Sarasota County Sarasota Bay Watershed Restoration
Sarasota County Siesta Key Master Pump Station and Force Main
Englewood Water District Sewer Expansion Project
North Port Inflow & Infiltration Program
North Port Lift Station Rehabilitation
Venice Eastgate Water Distribution Improvement & Relocation Phase 1
Casselberry Septic Tank Elimination Project
Casselberry Water Reclamation Facility Energy Efficiency and Renewable
Energy Project
Sanford ASR System Enhancements
Sanford Nutrient Reduction Lake Jessup & Lake Monroe Watersheds
Altamonte Springs Advanced Wastewater Treatment
Altamonte Springs Direct Potable Reuse Pilot Project (Wekiva Basin)
Seminole County Lake Jesup Shoreline Restoration
Seminole County Wekiva Basin Bear Lake Chain of Lakes
St. Augustine Port, Waterway, and Beach District Summerhaven River
Restoration Project
St. Augustine West Augustine Sewer Expansion
St. Johns County Bannon Lakes 2.0 MG Reclaimed Water Ground Storage
Tank and Pump Station
St. Johns County Mill Creek Stormwater Harvesting and Reuse Project
St. Johns County Twin Creeks 1.5 MG Reclaimed Water Ground Storage Tank
and Pump Station

Palm Beach
Pasco
Pasco
Pasco
Pasco
Pinellas
Pinellas

3,000,000
1,900,000
1,700,000
1,200,000
3,300,000
100,000
100,000

Polk
Polk

950,000
7,242,389

Polk
Polk

1,400,000
900,000

Polk
Polk
Polk
Polk
Polk
Polk

2,120,000
1,750,000
50,000
663,866
1,200,000
400,000

Putnam
Putnam
Putnam
Santa Rosa
Santa Rosa
Santa Rosa

1,700,000
764,208
2,000,000
15,000,000
1,300,000
1,331,127

Santa Rosa
Santa Rosa

1,000,000
150,000

Sarasota
Sarasota
Sarasota
Sarasota
Sarasota
Sarasota
Sarasota
Sarasota
Sarasota
Seminole

3,000,000
250,000
250,000
500,000
250,000
950,000
450,000
272,812
2,100,000
1,100,000

Seminole
Seminole
Seminole
Seminole
Seminole
Seminole
Seminole

6,000,000
576,000
500,000
3,500,000
500,000
850,000
1,000,000

St. Johns
St. Johns

2,885,005
400,000

St. Johns
St. Johns

1,000,000
700,000

St. Johns

875,000

428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473

DEP Agreement S0769 Monitoring Discharges to the Indian River


Lagoon
Port St. Lucie McCarty Ranch Extension Water Quality Restoration Phase 1
Construction
Port St. Lucie Veterans Memorial Stormwater Quality Retrofit Phase I
Construction
St. Lucie County Culvert Replacement Project
St. Lucie County Indian River Lagoon North Hutchinson Island Nutrient Pollution
Reduction Project
St. Lucie County Indian River Lagoon South C23/C24 CERP Buffer-Teague
Preserve Rewatering Project
St. Lucie County Paradise Park Stormwater Improvements Phase 5A
St. Lucie North County US1 Water Main Extension
St. Lucie River Issues Team
Coleman Florida Avenue Drainage Improvements
Webster Gravity Collection for NW 8th Avenue Area
Wildwood North Well Water Treatment and Storage Facility
Live Oak Water Distribution Improvements
Suwannee County Water Distribution Line from Catalyst Site to US 90 I-10
interchange
New Smyrna Beach Islesboro Stormwater Master Plan
Ormond Beach Laurel Creek and Wilmette Avenue Pump Station Improvements
Ormond Beach Reclaimed Water Main Extension
Ormond Beach Water Main Replacement
Port Orange Monroe Street Drainage Improvements
Port Orange Virginia Avenue Drainage Improvements
Deltona Lake Monroe Phase 4A
Deltona Lakes WWTF AWT Upgrade
Deltona Lower Floridian Aquifer Water Treatment Plant - Final Design
Deltona Reclaimed Water System Extension
Deltona Soccer Complex Reclaimed Water Extension
Oak Hill Water & Wastewater Service Installation Ph B1
Orange City Blue Spring Nutrient Reduction Project
Volusia County Septic Tank Elimination for Protection of Mosquito-Indian River
Lagoon
Volusia County Water Supply for the Protection of Blue Spring
Daytona Beach Comprehensive Water Management Project - Halifax River and
Nova Canal Basins - Ph I
Daytona Beach Rapid Infiltration Basins (RIBs)
Holly Hill LPGA Canal Pump Station and LPGA Canal Pump Station and
Backflow Gate
Holly Hill Reclaim Water Storage
South Daytona Jones Street Stormwater Project
South Daytona Windle Lane Stormwater Project
Wakulla County Grieners Addition Sewer Project
Wakulla County Panacea Sewer-Stormwater Project
Wakulla County Sewer Forcemain Reroute
Wakulla County Wakulla Gardens Sewer Project
Wakulla County Wakulla Springs Basin On-site Septic System Inspection
DeFuniak Springs Water Main Replacement
Freeport Kylea Laird Drive & SR 20 Water System Upgrades
Freeport McDaniels Fish Camp Area Water System Upgrades
Freeport Watermain Extension to Bruce
Walton County Stormwater Improvements on Scenic Highway 30-A (Phase I
Design)
Chipley Reclaimed Water Capital Improvements
TOTAL AMOUNT REQUESTED

St. Lucie

500,000

St. Lucie

500,000

St. Lucie
St. Lucie

150,000
900,000

St. Lucie

4,750,000

St. Lucie
St. Lucie
St. Lucie
St. Lucie
Sumter
Sumter
Sumter
Suwannee

400,000
250,000
1,850,000
2,254,938
1,000,000
1,507,900
3,878,000
507,850

Suwannee
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia
Volusia

1,114,445
500,000
351,000
1,800,000
1,250,000
1,003,513
999,890
4,300,000
2,025,000
400,000
345,000
324,000
775,000
1,000,000

Volusia
Volusia

5,880,000
575,000

Volusia
Volusia

3,400,000
4,110,000

Volusia
Volusia
Volusia
Volusia
Wakulla
Wakulla
Wakulla
Wakulla
Wakulla
Walton
Walton
Walton
Walton

7,601,776
1,000,000
264,608
408,750
2,100,000
6,000,000
1,099,830
4,240,000
1,794,750
674,490
497,685
394,073
1,107,328

Walton
Washington

400,000
2,300,000
674,657,076

Das könnte Ihnen auch gefallen