Sie sind auf Seite 1von 11

SATRIO TOWER

STRENGTH CALCULATION of STEEL


DOUBLE UNP 150.75.9.12,5

22-01-16

Prepared by
Checked by

:
:

Yusuf Irawan

PT. TRIMATRA TATAGRAHA


Jl. Raya Gading Indah No. 8 Kav. A12
Kelapa Gading, Jakarta
ENGINEERING DIVISION

PT. TRIMATRA
TATAGRAHA

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara
ENGINEERING DIVISION

SPECIALIST & CONSULTANT IN


ARCHITECTURAL ALUMINIUM

Project : Satrio Tower


Subject : Design Criteria

Date: 30-01-15
Prepared : Yusuf Irawan

1. Design Criteria
Code of Practice for Design
Alumunium
BS 8118: Structural use alumunium
Glass
ASTM E 330
Material
Alumunium Extruded Section
2
Alloy Type Pb, Bending (kg/cm )
6063-T5
1100
6063-T6
1600
6061-T6
2400
Modulus Elasticity =

660
960
1440

1210
1760
2640

700000 kg/cm

Bolt
Grade =

4.6
2

Minimum Yield Stress (fy) =

2400 kg/cm

Ultimate ensile Stress (fu) =

4000 kg/cm

Shear Strength (Fv) =

1440 kg/cm

2
2

Glass
Allowable short term stress
Glass Type
Center Area
Float glass
250
Heat Strengthed
450
Tempered
750
Modulus Elasticity =

Pv, Shear (kg/cm ) Pa, Axial (kg/cm )

Edge Area
180
360
500
2

700000 kg/cm

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara

PT. TRIMATRA
TATAGRAHA
SPECIALIST & CONSULTANT IN
ARCHITECTURAL ALUMINIUM

Date : 22-01-16

Project : Satrio Office Tower


Subject : Calc of Steel UNP 150.75.9.12,5 Canopy

Prepared by : Yusuf

Calc of Steel UNP 150.75.9.12,5 Canopy

Properties
Modul (m) =
Length (L) =
Thickness of glass (tg) =
Wind Load (Wl) =
Live load (Ll) =
Load Factor L =

100 cm
773.4 cm
1.6 cm
2
100 kg/m

2
0.01 kg/cm
110 kg
1.2

Mullion Properties
Profile = Double UNP.150.75.9.12.5
Area of Mullion (Am) =
Heigth (Hm) =

2
61.18 cm
15 cm

Interia x axis (Ix) =

4
2100.00 cm

Modulus section (Zx) =

3
280.00 cm

Yield Stress Alloy (Fya) =


Elasticity Steel (Es) =
Max defl (L/360) =
Factor Reduksi () =

2
2400 kg/cm
2100000
2.15 cm or
0.90

BJ 37

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara

PT. TRIMATRA
TATAGRAHA
SPECIALIST & CONSULTANT IN
ARCHITECTURAL ALUMINIUM

Project : Satrio Office Tower

Date : 22-01-16

Subject : Calc of Steel UNP 150.75.9.12,5 Canopy


Calculation
3
Weigth of Profile (WT) = Am x 7.85 T/m
= 61.2 x 7.85T/m3
=
0.48 kg/cm

Weigth of glass (Wg) = 25 x tg / 10000


= 25 x 1.6 / 10000
=

2
0.004 kg/cm

Dead Load DL = mm x (wT + Wg)


= 100. x .004) + .48
=
0.88 kg/cm
Wind Load WL = Wp x m
= .01 x 100
=
1.00 kg/cm
Joint Reaction WL = WL x L / 2
= 1. x 773.4 / 2
=
386.70 kg
2
Moment Wind Load = WL x L / 8
= 1. x 773.4^2 / 8
=
74768.45 kg.cm
2
Momen Dead Load (MdL) = 1/8 x Load x L
= 1/8 x .88 x 773.4^2
=
65815.90 kg.cm

Moment Live Load (MlL) = P x L / 4


= 110. x 773.4 / 4
=

21268.5 kg.cm

Joint Reaction WL = WL x L / 2
= 1. x 773.4 / 2
=

386.70 kg

Joint Reaction DL = DL x L / 2
= 1/2 x .88 x 773.4
=
340.40 kg

Prepared by : Yusuf

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara

PT. TRIMATRA
TATAGRAHA
SPECIALIST & CONSULTANT IN
ARCHITECTURAL ALUMINIUM

Project : Satrio Office Tower

Date : 22-01-16

Subject : Calc of Steel UNP 150.75.9.12,5 Canopy


Joint Reaction LL = P / 2
= 110. / 2
=

Prepared by : Yusuf

55 kg

Load Combination
Bending Momen
1.4DL = 1.4 x 65815.9
=
92142.25 kg.cm
1.2DL + 0.5L= (1.2 x 65815.9) + (0.5 x 21268.5)
=
11042.73 kg.cm
1.2DL + 1.6LL + 0.8WL = (1.2 x 340.4) + (0.6 x 21268.5) + (0.8 x 74768.45)
=
72984.33 kg.cm
Joint Reaction
1.4DL = 1.4 x 340.4
=
476.56 kg.cm
1.2DL + 0.5L= 1.2 x 340.4 + 0.5 x 55.
=
435.98 kg.cm
1.2DL + 1.6LL + 0.8WL = 1.2 x 340.4 + 1.6 x 55. + 0.8 x 386.7
=
805.84 kg
Mmax =
Joint Reaction V =

92142.25 kg.cm
805.84 kg

Momen Capacity (MR) = Zx x fy x m


= 2400 x 280. x 0.9
=
604800.00 kg.cm
Ratio = Mmax / MR
= 92142.3 / 604800.
=
0.15 < 1

OK!

Check Defleksi di saat Waktu Layan


4
Deflection = (5 x [Dead Load + Wind Load] x L ) / (384 x E x Inertia)
= (5 x [.88 + 1.] x 773.4^4 ) / (384 x 2100000 x 2100.)
=
1.99 cm
<
2.15
OK!

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara
ENGINEERING DIVISION

PT. TRIMATRA
TATAGRAHA
SPECIALIST & CONSULTANT IN
ARCHITECTURAL ALUMINIUM

Project : Satrio Office Tower

Date : 20-01-16

Subject : Calc of Steel UNP 150.75.9.12,5 Canopy

Prepared by : Yusuf

Section Properties
Profile = Double UNP.150.75.9.12,5
2

Area of Mullion (Am) =


Heigth (Hm) =

61.18 cm
15 cm

Interia x axis (Ix) =

2100.00 cm

Modulus section (Zx) =

280.00 cm

4
3
2

2400 kg/cm
2100000

Yield Stress Alloy (Fya) =


Elasticity Steel (Es) =

End Plate Configuration Properties


Dimention d =
1.6 cm
Yield Stress fyb =
Grade =
Num. n =
Hor Edge Distance dh =
Ver Edge Distance d1 =
d2 =
End Plate Thickness t =
Height h =
Num Side Ns =

2400
4.6
2.0
19.1
1.7
4.5
1.0
12.1
2.0

minor diameter
2

kg/cm
pcs
cm
cm
cm
cm
cm
Side

Ultimate Stress fu =

4000.0 kg/cm

Yield Stress fy =

2400.0 kg/cm

Shear Force V =

805.84 kg
2

Area of Bolt A = x d / 4
= 3.14 x 1.6^2 / 4
=

2.01 cm

BJ 37

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara
ENGINEERING DIVISION

PT. TRIMATRA
TATAGRAHA
SPECIALIST & CONSULTANT IN
ARCHITECTURAL ALUMINIUM

Project : Satrio Office Tower

Date : 20-01-16

Subject : Calc of Steel UNP 150.75.9.12,5 Canopy

Prepared by : Yusuf

Kuat Geser = f x r1 fu x Ab
= 0.75 x 0.4 x 4000. x 2.01
=
2411.52 kg
Kuat Geser Total = Kuat Geser x n
= 2411.5 x 2
=
4823.04 kg
Check Kapasitas End Plate
Check Plat Penyambung akibat Geser
Ag = t x h
=
1 x 12.1
=

12.1 cm

f n = x 0.6 x fy x Ag x Ns
= .9 x 0.6 x 2400 x 12.1 x 2
=
31363.2 kg

=
<

805.8kg

0.9 Tabel 6.4-2


OK!

An = h - 2xd x Ns
= 12.1 - 2.x1.6 x 2
2

5.7 cm

Vn = x 0.6 x fu x An x Ns
= .9 x 0.6 x 4000 x 5.7 x 2
=
24624 kg

=
<

805.8kg

0.9 Tabel 6.4-2


OK!

Bending Momen = V x dh
Mu = 805.8 x 19.1
=
15391.49 kg.cm
2

Zp = Ns x t x h / 4
= 2 x 1 x 12.1^2 / 4
=

73.21 cm

Mn = fy x Zp x
= 2400 x 73.2 x .9
= 158,122.80 kg.cm
Check Kapasitas Las di End Plate
Tebal las Rencana tt =
Panjang Las Lw =
Yield Ultimate Weld fuw=

=
<

15391.5kg

0.60 cm
12.1 cm
2

2400 kg/cm

0.9 Tabel 6.4-2


OK!

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara
ENGINEERING DIVISION

PT. TRIMATRA
TATAGRAHA
SPECIALIST & CONSULTANT IN
ARCHITECTURAL ALUMINIUM

Project : Satrio Office Tower

Date : 20-01-16

Subject : Calc of Steel UNP 150.75.9.12,5 Canopy

Prepared by : Yusuf

Rnw = 0.75 x tt x (0.6 x f uw)


= 0.75 x .6 x (0.6 x 2400.)
=
648 kg
f Rnw = Rnw x f x Lw
= 648. x 0.75 x 12.1
=
5880.6 kg
Check Kapasitas Web UNP
Hor Edge Distance dh =
Ver Edge Distance d1 =
d2 =
Web Plate Thickness t =
Height h =
Num Side Ns =

19.1
1.7
2.4
0.6
10.0
2.0

cm
cm
cm
cm
cm
Side
2

Ultimate Stress fu =

4000.0 kg/cm

Yield Stress fy =

2400.0 kg/cm

Check Plat Penyambung akibat Geser


Ag = t x h
=
0.6 x 10
2

6 cm

f n = x 0.6 x fy x Ag x Ns
= .9 x 0.6 x 2400 x 6. x 2
=
15552 kg

=
<

805.8kg

0.9 Tabel 6.4-2


OK!

An = h - 2xd x Ns
= 10 - 2.x1.6 x 2
2

3.6 cm

Vn = x 0.6 x fu x An x Ns
= .9 x 0.6 x 4000 x 3.6 x 2
=
15552 kg
Bending Momen = V x dh
Mu = 805.8 x 19.1
=
15391.49 kg.cm
2

Zp = Ns x t x h / 4
= 2 x 0.6 x 10^2 / 4
=

30.00 cm

=
<

805.8kg

0.9 Tabel 6.4-2


OK!

JL. Raya Gading Indah No. 8 Kav. A12


Kelapa Gading - Jakarta Utara
ENGINEERING DIVISION

PT. TRIMATRA
TATAGRAHA
SPECIALIST & CONSULTANT IN
ARCHITECTURAL ALUMINIUM

Project : Satrio Office Tower

Date : 20-01-16

Subject : Calc of Steel UNP 150.75.9.12,5 Canopy


Mn = fy x Zp x
= 2400 x 30. x .9
=
64,800.00 kg.cm

Prepared by : Yusuf
=
<

15391.5kg

0.9 Tabel 6.4-2


OK!

Das könnte Ihnen auch gefallen