PETRONAS RAPID PROJECT


(REFINERY TANK FARM)

MECHANICAL DATA SHEET


FOR
AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(5100-A-502 )

OWNER Approval:
Name:
Date (DD-MMM-YY):
Signature:

Document Class:

Pages modified under this revision: 3,5,6,7,9,10

Ravi Ranjan Singh


2015.07.20
12:42:46 +05'30'

20-Jul-15

Nihar Kumar Mohanty


2015.07.20 12:43:11
+05'30'

Nihar Kumar
Mohanty
2015.07.20
12:43:24 +05'30'

IFD - Issued for Design

Ravi S.

Nihar M.

Nihar M.

19-Jun-15

IFR - Issued for Review

Saurabh P.

Nihar M.

Nihar M.

20-May-15

IFR - Issued for Review

Ravi S.

Nihar M.

Nihar M.

REV.

DATE
DD-MMM-YY

STATUS - REVISION MEMO

WRITTEN BY

CHECKED BY

APPROVED BY

Sections changed in last revision are identified by a vertical line in the margin.
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of
this company and subject to return on demand.

Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project

Package

Originator

Discipline

Doc. Type

Unit n

Serial n

Rev.

Page

RAPID

P0022

PUNJ

MEC

TDS

5100

0004

2/10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(5100-A-502 )
(REFINERY TANK FARM)

HOLD n

REF.

Page 7 of 10

DESCRIPTION
Dimensions and Pit filling flow rate of AOC Collection Basin 2-5100-T502 will be confirmed by civil.

ACTIONS
To be confirmed by
Civil.

This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way
detrimental to the interest of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project

Package

Originator

Discipline

Doc. Type

Unit n

Serial n

Rev.

Page

RAPID

P0022

PUNJ

MEC

TDS

5100

0004

3/10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(5100-A-502 )
(REFINERY TANK FARM)

CONTENT
Description
AMENDMENTS / COMPLEMENTS TO RAPID-FE1-TPX-MEC-SPN-0001-0200 PROJECT SPECIFICATION - GENERAL TECHNICAL REQUIREMENTS FOR
PACKAGES
REFERENCE DOCUMENTS/SPECIFICATIONS

DESIGN REQUIREMENTS AND PACKAGE PERFORMANCES

DETAILED TECHNICAL REQUIREMENT OF EQUIPMENT

Sl. No.
1

Page No.
4
5
6
7-8

DETAILED TECHNICAL REQUIREMENT - OTHERS

NOTES

10

This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest
of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project

Package

Originator

Discipline

Doc. Type

Unit n

Serial n

RAPID

P0022

PUNJ

MEC

TDS

5100

0004

Rev

Page

4/10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(REFINERY TANK FARM)
1

AMENDMENTS TO RAPID-FE1-TPX-MEC-SPN-0001-0200 - Project Specification - General Technical Requirements for Packages

Type of amendment

Chapter
number

Description of amendment

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

NOTES
Unless otherwise stated in this Data Sheet, RAPID-FE1-TPX-MEC-SPN-0001-0200 - Project Specification - General Technical Requirements for Packages
is fully applicable to the Package.
Bidder shall provide with his tender a list of deviation (if any) to above requirements and to other specification as per procedure transmitted with the call of
tender. If no such list is provided, Bidder tender is assumed to be fully compliant.

38
39
40
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any
way detrimental to the interest of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project

Package

Originator

Discipline

Doc. Type

Unit n

Serial n

Rev.

Page

RAPID

P0022

PUNJ

MEC

TDS

5100

0004

5/10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER
PACKAGE
(REFINERY TANK FARM)
REFERENCE DOCUMENTS/SPECIFICATIONS/STANDRADS
Process Data Sheet - AOC Slop Oil RAPID-P0022-PUNJ-PRO-TDS-5100Skimming and Transfer Package
0008
(5100-A-502)

P&ID for Refinery Storage AOC


Collection Basin 1

RAPID-P0022-PUNJ-PRO-PID5100-0010

Design Basis for Package


Equipment

RAPID-P0022-PUNJ-MEC-DES-51000001

Project Specification - Welding of


Metals

RAPID-FE1-TPX-MCI-SPN-00010101

Project Specification-General
Requirements for Packages

RAPID-FE1-TPX-MEC-SPN-0001-0200 Project Specification-Design of


Pressure Vessels

Project Specification Pressure


Vessel-( Based on ASME Section
VIII)

RAPID-FE1-TPX-MEC-SPN-0001-0101 Technical Specification-Pressure PTS 31.22.20.31


Vessels- (Based on ASME Section
VIII)

Piping Specifications and Classes

RAPID-P0022-PUNJ-PIP-SPN-51001001

Piping General Requirements

PTS 31.38.01.11

Instrumentation and Control


Specification for Package
Equipment

RAPID-P0022-PUNJ-INC-SPN-51000009

Instrumentation for Equipment


Packages.

PTS 32.31.09.31

Electrical Specification for Package RAPID-P0022-PUNJ-ELE-DES-5100unit


0007

Electrical Engineering Guidelines

PTS 33.64.10.10

Project Specification Electrical


Machines- Cage Induction Types

Electrical Machines Cage


Induction Types

PTS 33.66.05.31

Project Specification - Radiographic RAPID-FE1-TPX-MCI-SPN-0001-0104


Inspection

Procedural Specification Radiographic Inspection

PTS 71.00.08.30

Project Specification - Ultrasonic


Examination

Procedural SpecificationUltrasonic Examination

PTS 71.00.08.31

RAPID-FE1-TPX-ELE-SPN-0001-0014

RAPID-FE1-TPX-MCI-SPN-0001-0105

RAPID-FE1-TPX-MEC-DES-00010101

Project Specification - Installation of RAPID-FE1-TPX-CMM-SPN-0001-0901 Petronas Technical Standard


PTS 31.29.00.10
Rotating Equipment
Installation of Rotating Equipment.
Protective Coating and Lining
RAPID-FE1-TPX-CVS-DES-0001-9003 Protective Coating and Lining.
(Supplement to PTS 30.48.00.31-P

PTS 30.48.00.31-P

Instrumentation & Control


Specification for Package items

RAPID-FE1-TPX-INC-DES-0001-0007

Material Traceability and Positive


Material Identification (PMI)

PTS 31.10.00.10

Project Specification- Piping


General Requirements.

RAPID-FE1-TPX-PIP-DES-0001-9014

Electrical Specification for


Package Items

RAPID-FE1-TPX-ELE-DES-00010007

Piping Classes-Refining &


Chemical(Supplement to PTS
31.38.01.12A dated Jan. 2010)

RAPID-FE1-TPX-PIP-DES-0001-9015

Noise Control

PTS 31.10.00.31, Nov. 2010

Project Specification - Noise &


Vibration Control Philosophy.

RAPID-FE1-TPX-MEC-DES-0001-0001 Pump- Type selection and basic


design requirements

Project Specification - Noise


Control

RAPID-FE1-TPX-MEC-DES-0001-0002 AC Electrical Variable Speed Drive PTS 33.66.05.33


Systems

General Field Instrument


Specification

RAPID-P0022-PUNJ-INC-SPN-51000013

Nameplate with Bracket for vessel


and HE Equipment

S10.114-B

Project Specification - Equipment


Noise Specification

PTS 31.29.02.11

RAPID-FE1-TPX-MEC-TDS-00010001

This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way
detrimental to the interest of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0007_0

Document Number
Project
Package
RAPID

P0022

Originator

Discipline

Doc. Type

Unit n

Serial n

PUNJ

MEC

TDS

5100

0004

Rev

Page

6/10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(REFINERY TANK FARM)
DESIGN REQUIREMENTS AND PACKAGE PERFORMANCES

DESIGN DATA

2
3
4

Ref. Process Datasheet Doc. No. RAPID-P0022-PUNJ-PRO-TDS-5100-0009 and P&ID No. P0022-PUNJPRO-PID-5100-0010.

Package design

Package scope of supply

Site conditions

Design life

Installation

10

Package construction

11

Criticality Rating

Bidder proposal

Note 4

General requirements

Requirement

RAPID-P0022-PUNJ-MEC-SPN5100-0002
Note 8
Refer to
RAPID-FE1-TPX-MEC-SPN-00010200
years

20
outdoor
RAPID-P0022-PUNJ-MEC-SPN5100-0002
3

12

UTILITY DATA
Requirement

13
14

Electrical supply for main consumers

400V/ 50Hz

15

Others utility needed for Package operation (for available utilities, refer to RAPID-FE1-TPX-PRO-DES-00010001 - Design Basis - Utilities Conditions)

Bidder proposal

Note 5
by Bidder

16
PERFORMANCE GUARANTEES

17
18

Requirement

19

Utilities consumption rates

Vendor to Advice (VTA), if any

20

Electrical power consumption (absorbed power @ normal / rated conditions)

21

Bidder proposal

Vendor to Advice (VTA), if any


85 (PTS 31.10.00.31 , RAPIDFE1-TPX-MEC-DES-0001-0001,
dB(A) RAPID-FE1-TPX-MEC-DES-00010002 &RAPID-FE1-TPX-MECTDS-0001-0001 )

Noise level @ rated conditions

22
LIMITS OF SUPPLY

23
24

Electrical

Requirement

Bidder proposal

Terminal strips in junction boxes


at edge of package.
- Earthing lugs provided on skid
(As per RAPID-P0022-PUNJ-ELEDES-5100-0007 (Electrical
Specification for Package unit) &
PTS 33.64.10.10)

25

26
27
28
29
30
31
32
33
34

NOTES

35

Right column shall be filled-in (with compliance statement or value by Bidder) and sent with Tender.

36
37
38
39
40

This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest
of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project

Package

Originator

Discipline

Doc. Type

Unit n

Serial n

RAPID

P0022

PUNJ

MEC

TDS

5100

0004

Rev

Page

7/ 10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(REFINERY TANK FARM)
DETAILED TECHNICAL REQUIREMENT OF EQUIPMENT

1
2

Requirement

3
4

Package requirements:

Overall package dimensions

Overall package weight (empty / in operation / full of water for hydrotest)

m xm xm
kg

Approx.(3x2x3) (Note 2)
By Bidder
Zone 2, Gas Group IIA, Temp. Class
T3 (Note 16)

Hazardous area classification

General Data:

Quantity

1 Package for AOC Collection Basin2


5100-T-502

10

Service

AOC Floating oil skimming

11

Location

12

Installation

13

AOC/ACC Collection Basins: (Length / Width / Depth)

14

Process Data :

15

Temperature (Operation / Design)

16

Liquid Name

17

Specific gravity at pumping temp.

18

PIT Filling Flow rate

m/h

150 (Note 1)

19

Water oil content

ppm

500 (max)

20

Expected minimum oil concentration in SLOP

21

Operation

22

Maximum SLOP Volume / Batch

23

Equipment Specification:

Outdoor
Above ground
m

10 / 30 / 3.5 (Note 1) HOLD 1

28 / 75
Oily Water
0.994

90
Intermittent

m3

By Bidder

24

Oil Skimmer:

25

Quantity per package

26

Type

27

Working capacity

28

Operation

29

Funnel Diameter

30

Overall Diameter

By Bidder

31

Draught

By Bidder

32

Overall height

By Bidder

33

weight

kg

34

Design Pressure

35

Material

36

Corrosion Allowance

37

1 number
Oleophilic, Fixed
t/h

Slop oil pumps:

39

SPARE ITEM

40

QUANTITY per package

41

SERVICE

42

TYPE

43

OPERATION

44

Handled Product:

45

Product

46

Auto-ignition temperature

47

Corrosive/Erosive

48

Normal pumping temp. Tp

49

Viscosity at Tp

50

Vapor pressure at Tp

51

Specific gravity at Tp

By Bidder
Intermittent

mbarg

By Bidder

By Bidder
0.01 / -0.005
SA 240 TP 304L

mm

0
Connecting flexible pipes to slop oil
transfer pump.

Accessories as a minimum

38

Bidder proposal

(Note 8b)
1 Number
Slop oil pump
Progressive cavity (Rotary, SelfPriming Positive Displacement Pump
as per API676 & PTS 31.29.02.11)
Intermittent

Oil with water


C

<250
NO / NO

28

cP

0.5

bara

0.1
0.7

52
53

NOTES

54

Right column shall be filled-in (with compliance statement or value by Bidder) and sent with Tender.

55
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of
this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project
Package
RAPID

P0022

Originator

Discipline

Doc. Type

Unit n

Serial n

PUNJ

MEC

TDS

5100

0004

Rev

Page

8/ 10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(REFINERY TANK FARM)
DETAILED TECHNICAL REQUIREMENT OF EQUIPMENT

1
2

Requirement

3
4

Bidder proposal

Slop oil pumps

Normal flowrate

m/h

5 (Note 2,6 )

Minimum flowrate

m/h

By Bidder

Rated flowrate

m/h

6.5

Discharge pressure

barg

4.7

Suction pressure

barg

-0.23 (Note 2)

10

Differential pressure

bar

4.9 (Note 2)

11

Differential height

71 (Note 2)

12

Available NPSH

8.82 (Note 2)

13

Pressure Required At Package Tie in

14

Normal shaft power (est.)

15

Normal electrical consumption (est.)

16

Operating temperature

17

Design temperature

18

Suction design pressure

barg

19

Driver type : normal

20

Spare

21

Speed control

NO

22

Speed control by :

N/A

23

Turbine speed control

24

Expected speed range

25

Open valve start-up

barg

kW

1.2

kW

By Bidder
28
75
0.0 / -0.18 (Note 2)
Electrical Motor As per
RAPID-FE1-TPX-ELE-DES0001-0007, RAPID-P0022PUNJ-ELE-DES-5100-0007
& PTS 33.64.10.10 (Note 7)
Electrical Motor

Manual / Auto
rpm

N/A
N/A
YES

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

NOTES

50

Right column shall be filled-in (with compliance statement or value by bidder and sent with Tender.

51
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to
the interest of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project

Package

Originator

Discipline

Doc. Type

Unit n

Serial n

RAPID

P0022

PUNJ

MEC

TDS

5100

0004

Rev

Page

9/10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(REFINERY TANK FARM)
1

DETAILED TECHNICAL REQUIREMENT - OTHERS

INSTRUMENTATION
Requirement

3
4

General requirements / applicable standards

Bidder proposal

Refer to RAPID-FE1-TPX-INCDES-0001-0007 , RAPIDP0022-PUNJ-INC-SPN-51000009 & PTS 32.31.09.31,


Note 11
P2

Package type

7
8
9
10
11
12
13
PACKAGE PIPING WITHIN PACKAGE BATTERY LIMITS

14

Requirement

15

Bidder proposal

As per RAPID-FE1-TPX-PIPDES-0001-9014, RAPID-FE1TPX-PIP-DES-0001-9015,


RAPID-P0022-PUNJ-PIP-SPN5100-1001 & PTS 31.38.01.11

16

Piping design

17

Materials of construction

18

Post Weld Heat Treatment required

19

All piping correctly supported and anchored

Required

20

" piping and smaller supported in tray

Required

21

Process isolation valves required for all on line mounted instruments

22

Piping special items

23

Flanges to be weld neck type. Slip on flanges are not permitted

24

Material certification

Note 14

25

Piping terminations at skid edge

Required

26

Drip pan drains piped to skid edge and terminated in flange connections

Required

27

All process piping drains routed to skid edge and terminated in flange connections

Required

28

RT Requirement (Spot) (Note 2)

By Bidder

29

Acceptable nozzle loads (Note 12)

By Bidder

Bidder to advise
As per code

Required
Bidder to advise
Required

30
ELECTRICAL

31
32

Requirement

33

General requirements / applicable standards

As per RAPID-FE1-TPX-ELEDES-0001-0007, RAPIDP0022-PUNJ-ELE-DES-51000007 & PTS 33.64.10.10

34

Cable glands (cables within battery limits):

Required

35

Earthing lugs:

2 per skid

36

Location

37

All non-current carrying metal bonded to lugs

Required

38

Inspection requirement for surface preparation and coating (As per RAPID-FE1-TPX-CVS-DES-0001-9003 &
PTS 30.48.00.31-P)

Required

Bidder proposal

Diametrically opposed on
equipment base frames

39
40
41
42
43

Right column shall be filled-in (with compliance statement or value by bidder) and sent with Tender.

44
45
46
47
48

This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the
interest of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Document Number
Project

Package

Originator

Discipline

Doc. Type

Unit n

Serial n

RAPID

P0022

PUNJ

MEC

TDS

5100

0004

Rev

Page

10 /10

MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE
(REFINERY TANK FARM)
NOTES

Preliminary Pit Filling Flow Rate and Dimensions for AOC Collection Basin 1 - 5100-T-502 are provided but will be confirmed later by civil. (HOLD 1)

To be confirmed by vendor.

Refrence P&ID is RAPID-P0022-PUNJ-PRO-PID-5100-0011.

Refer to RAPID-FE1-TPX-MEC-SPN-0001-0200 Project Specification - General Technical Requirements for Packages for further general design requirements and applicable
Project Specifications.

Refer to RAPID-P0022-PUNJ-ELE-DES-5100-0007 (Electrical Specification for Package Unit) for the applicable voltage supply for each consumer (depending on consumer
nominal power). Vendor shall give the a preliminary consumer list with offer.

Slop extraction is a batch operation under operator control. Running time per batch to be confirmed by Bidder according to pump flowrates.

Vendor to supply high efficiency motor.

SCOPE OF SUPPLY :
Each AOC Collection Basins will contain one Skimming package. As a minimum, the package shall include, but shall not be limited the following typical equipment:
(a) One oil skimmer with slop oil pump.
(b) One Common Spare Slop Oil pump in warehouse for both oil skimming package 5100-A-501 and 5100-A-502.
(c) All interconnecting pipe work within battery limits,
(d) All necessary accessories (filters, valves, instruments etc.)
The package shall be complete and supplied by a single VENDOR who shall ensure compatibility of various items to meet .

PROCESS DISCRIPTION :
AOC Collection Basin 2 - 5100-T-502 is to collect Rain Water potentially polluted by oil from spillage and leaks (first flush) from pump station 1 and 2, pressurized flare, 5150LCN Storage spheres (5150-V-002A/B) and from tanks dype drain one by one in a controlled way to refinery tank farm. AOC effluent is sent at low flow to the AOC Treatment
Package Unit - 6320. From oil-water mixture in basin, skimmed oil is sent to the light slop oil tank 5190-T-001 with the help of slop oil transfer pump provided in the package.

10

DEFINITIONS AND ABBREVIATIONS :


ACC - Accidently Chemically Contaminated
AOC - Accidently Oily Contaminated

11

Refer to RAPID-P0022-PUNJ-INC-SPN-5100-0009 (Instrument and control specification for package equipment) & RAPID-P0022-PUNJ-INC-SPN-5100-0013 (General Field
Instrument Specification) for package instrumentation.

12

The nozzle loads and moments shall be as per PTS 31.22.20.31.

13

Third Party Inspection : As per Note 14

14

Material Certifications to EN 10204 3.1 shall be supplied for all process wetted and Pressure containing parts and Material Certification to EN 10204 2.2 shall be supplied for
non-Pressure containing parts.

15

Requirement of steam out condition to be confirmed after getting details from bidder.

16

Bidder shall take into account any hazardous source, internal to the package, which can modify the above specified classified area.

17

Name plate shall be as per Petronas Standard Drawing S10.114-B (Nameplate with Bracket for vessel and HE Equipment).

This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the
interest of this company and subject to return on demand.
Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0

Das könnte Ihnen auch gefallen