Beruflich Dokumente
Kultur Dokumente
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
OWNER
PMC
LICENSOR
EPC CONTRACTOR
:
:
:
:
0
Rev.
17.12.10
PDA
KA
GCM
REV.
DATE
DESCRIPTION
PREPARED BY
CHECKED BY
APPROVED BY
RS
PM
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Contents
1. Introduction. 3
2. Executive Summary....4
3. Unit Description....5
4. Objective of Study...5
5. HAZOP Methodology & Techniques..6
6. HAZOP Assumptions..8
7. Basis of HAZOP Study..12
8. Documents Referred for HAZOP study...14
9. HAZOP Team ..16
10. Recommendations.18
Page 2 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
1. Introduction
The Hazard and operability study (HAZOP) has been carried out for Diesel Hydrodesulphurization unit
(DHU-Unit 1400), which forms part of Cuddalore Refinery project at Cuddalore,Tamil-Nadu. The HAZOP
proceeding was conducted at Samsung Engg. India Pvt. Ltd. w.e. f. 06/12/10 to 14/12/10.
The HAZOP study team consists of representative from the SEI, PMC, Licensor, NOCL and was lead by
an independent Chairman, HAZOP study was conducted by a multi discipline group.
The action points that have emerged from the study are presented in the action list appended at the end
of this report. Each action item is subjected to a number. A given action item may pertain to more than
one points. However priority categorization shall be done based on SIL study.
Page 3 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
2. Executive Summary
A total 31 nodes are identified for analysis resulting to- no. of action points. These nodes have been
described in outline enclosed in the report. Report is based on the HAZOP study conducted in presence
of concerned department officers/PMC/Licensors/NOCL representatives. All recommendations are listed
& annexed in the reports. Some of the information which were not available (seal system of hydrogen
compressor BHEL, backwashing system of filters etc.) needs to be identified & P&IDs shall be upgraded
accordingly.
Page 4 of 136
Nagarjuna Oil
Corporation Ltd.
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
3. Unit Description
The unit consists of the following sections:
Reaction
Recycle Gas Loop
Stripper and LP Absorber
- Reaction Section
The feed consists of SRHD, LVGO, LCGO, and LCO streams supplied from battery limits. The
gas oil blend flows to the back wash Feed Filter,A4 140-F-001, before entering theFeed Surge
Drum, 140-V-001. The feed drum is nitrogen blanketed and the drum pressureis under level
controlled using a split range control scheme. The oil feed is pumped to the reactor circuit on
flow control using the Gas Oil Feed Pump, 140-P-001 A/B. The feed drum level is controlled by
supplying excess DHU feed from storage. The level controller is sent to storage, Unit 2500,
outside battery limits.
Make-up hydrogen is supplied at 20 bar g, to the Make-up Gas Compressor K.O. Drum 140-V002, and then is compressed by the Hydrogen Make-up Compressor 140-K-001 A/B. The
make-up compressor has two stages and the interstage gas cooling is done with cooling water
in the Make-Up Compressor Interstage Cooler, 140-EE-008 A/B. The makeup gas flowrate to
the reaction section is controlled by means of a compressor spillback to the Make-up Gas
Compressor K.O. Drum, 140-V-002. The spill back is cooled by the Hydrogen Make-Up Kick
Back Cooler, 140-EE-004. A line is provided on the Make-up
Gas Compressor discharge to send Hydrogen to bullet storage. Before being sent to storage
outside battery limits the hydrogen is cooled in the Hydrogen Cooler, 140-EE-009.
The make-up and recycle gas streams are combined with the feed, and the total feed
mixture is heated up against the reactor effluent in the Reactor Feed / Effluent Exchanger,
140-EE-001 A/B/C/D. A bypass of all the shells is provided on the gas oil feed line to
facilitate the Hydrotreater Reactor Feed Heater, 140-H-001, operation at minimum
turndown. The preheated oil and hydrogen mixture is heated to the reactor inlet
temperature in the Hydrotreater Reactor Feed Heater, 140-H-001.
The Hydrotreater Reactor, 140-R-001, contains five catalytic beds. Recycle hydrogen is
used as the quench gas, for maintaining the desired WABT in each of the catalytic bed.
The top layer of the first catalytic bed in the reactor operates at a lower temperature, and
this bed saturates the feed olefins and diolefins. The inlet temperature to the Reactor is
adjusted so that the required inlet temperature is obtained for the subsequent HDS catalyst
in the same catalytic bed. The effluent from the first catalytic bed is quenched to control
the inlet temperature of the second catalytic bed. In the remaining four catalytic beds, the
targeted average WABT is about the same to complete the remaining reactions. The
quench gas is supplied on flow control, reset by the catalytic bed inlet temperature.
The reactor effluent is cooled by preheating the stripper feed in the Stripper Feed
Preheater, 140-EE-002, then by preheating the oil/hydrogen feed in the Feed/Effluent
Exchanger, 140-EE-001 A/B/C/D. Wash water is injected into the reactor effluent at the
outlet of the final Feed/Effluent Exchangers shell, in order to prevent any deposit of
ammonium salts. The wash water is a mixture of recycled water from the Stripper Reflux
Drum, 140-V-008, and the Coalescer, 140-V-009, plus make-up stripped sour water from
battery limits. Additional water injection facilities are provided for the last two shells, tube
side, of the Feed/Effluent Exchanger to wash out any salt deposits. This injection is
normally intermittent and usually not required. The wash water is pumped by the Wash
Water Pump, 140-P-002 A/B, from the Wash Water Drum, 140-V-004, on flow control to
the reactor effluent upstream of the Reactor Effluent Air Cooler, 140-EA-001, to avoid
ammonium salt deposit and the risk of corrosion. The Wash Water Drum, 140-V-004 is
nitrogen blanketed and the drum pressure is under level controlled using a split range
control scheme.
The Reactor Effluent then is cooled in the Reactor Effluent Air Cooler, 140-EA-001, and
the Reactor Effluent Trim Cooler, 140-EE-003. The reactor effluent is collected in the
Page out
5 of of
136the Separator Drum consists of the
Separator Drum, 140-V-006. The vapor phase
recycle and quench gas circulated by the recycle compressor. The Separator Drum is
used as the quench gas, for maintaining the desired WABT in each of the catalytic bed.
The top layer of the first catalytic bed in the reactor operates at a lower temperature, and
this bed saturates the feed olefins and diolefins. The inlet temperature to the Reactor is
adjusted so that the required inlet temperature is obtained for the subsequent HDS catalyst
in the same catalytic bed. The effluent from the first catalytic bed is quenched to control
the inlet temperature of the second catalytic bed. In the remaining four catalytic beds, the
HAZOP
REPORT
targeted average WABT is about the same to complete
theSTUDY
remaining
reactions. The
quench gas is supplied on flow control, reset by the catalytic bed inlet temperature.
The reactor effluent is cooled by preheating the stripper feed in the Stripper Feed
Client
Nagarjuna Oil
SO2331
0
Preheater, 140-EE-002,
then by PROCESS
preheating the oil/hydrogen
feedCS-140-PR-47-0001
in the Feed/Effluent
Corporation Ltd.
Exchanger, 140-EE-001 A/B/C/D. Wash water is injected into the reactor effluent at the
Plant
Unit (Unit -1400) Dept.
Document Number
outlet of the finalDHU
Feed/Effluent
Exchangers shell,Project
in order to prevent
any deposit Rev.
of
ammonium salts. The wash water is a mixture of recycled water from the Stripper Reflux
Drum, 140-V-008, and the Coalescer, 140-V-009, plus make-up stripped sour water from
battery limits. Additional water injection facilities are provided for the last two shells, tube
side, of the Feed/Effluent Exchanger to wash out any salt deposits. This injection is
normally intermittent and usually not required. The wash water is pumped by the Wash
Water Pump, 140-P-002 A/B, from the Wash Water Drum, 140-V-004, on flow control to
the reactor effluent upstream of the Reactor Effluent Air Cooler, 140-EA-001, to avoid
ammonium salt deposit and the risk of corrosion. The Wash Water Drum, 140-V-004 is
nitrogen blanketed and the drum pressure is under level controlled using a split range
control scheme.
The Reactor Effluent then is cooled in the Reactor Effluent Air Cooler, 140-EA-001, and
the Reactor Effluent Trim Cooler, 140-EE-003. The reactor effluent is collected in the
Separator Drum, 140-V-006. The vapor phase out of the Separator Drum consists of the
recycle and quench gas circulated by the recycle compressor. The Separator Drum is
equipped with a water boot, and adequate residence time is provided for obtaining a good
separation of the liquid and sour water streams. Sour water is separated from the
hydrocarbon liquid phase on HC/water interface level control from the settling zone of the
separator. Then the sour water is routed to the Sour Water Flash Drum, 140-V-017, before
being sent to FCC Sour Water Unit, Unit 550 outside battery limits. The hydrocarbon
liquid flows on level control to the stripping section. The separator also contains a
coalescing pad close to the feed inlet nozzle. In addition to coalescing the small water
droplets, the coalescing pad helps to streamline the HC/H2O flow in the settling zone.
- Recycle Gas Section
The recycle hydrogen stream leaving the Separator Drum, 140-V-006, is routed to the HP
Amine Absorber, 140-C-001 for HsS removal, through the HP Amine Absorber KO Drum,
140-V-007. The lean amine is a 40 wt% MDEA solution, supplied on flow control to the
HP Amine Absorber using the Lean Amine Booster Pump, 140-P-003 A/B. The rich amine
from the HP absorber bottoms is sent to the LP Amine Absorber, 140-C-003, on level
control, for flashing off the dissolved light ends.
The recycle gas leaving the HP Amine Absorber is routed to the Recycle Compressor, 140K-002, through the Recycle Compressor K.O. Drum, 140-V-005. There is a provision to
remove a small amount of the sweetened gas stream leaving the HP absorber on flow
control as a high pressure purge, to provide added flexibility during operation. However,
the unit is designed based on no purge gas flow, and hence normally there is no high
pressure purge gas leaving the unit. The recycle compressor is driven by a back-pressure
type steam turbine, 140-KT-002.
The reactor circuit pressure is controlled at the Separator Drum, 140-V-006. The pressure
is controlled through a hand switch sending a signal adjusting either the make-up hydrogen
supply to the reactor circuit or/and the HP purge gas.
The Recycle Compressor discharge is split into recycle gas and quench gas streams. The
recycle gas is combined with the make-up hydrogen and the gas oil feed. Then, the total
feed enters the reaction circuit.
- Stripper Section
The Stripper, 140-C-002, fractionates the diesel product and the wild naphtha from the
reactor effluent liquid stream supplied from the Separator Drum, 140-V-006.
Liquid Feed from the Separator is first preheated by heat exchange with the stripper
bottoms in the Stripper Feed/Bottoms Exchanger, 140-EE-006 A/B/C/D, followed by the
final heating with the reactor effluent in the Stripper Preheater, 140-EE-002. The stripper
feed temperature is controlled by varying the feed flow through the Stripper Feed
Preheater and the exchanger bypass streams.
The hot feed enters the Stripper onto the 22nd tray (counting from the bottom). The feed is
stripped of H2S and light ends from the diesel product using MP steam, which is
superheated to 237C. The MP Steam comes from the Recycle Compressor Steam
Page 6 of 136
Turbine, 140-KT-002.
The Stripper overhead vapor is condensed in an air cooled condenser, 140-EA-002, and the
Page 7 of 136
Nagarjuna Oil
Corporation Ltd.
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Page 8 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
4.Objective of study
The objective of HAZOP study was to identify the potential hazard and the operability problem by
systematic review of the Diesel hydrodesulphurization unit and to identify the action items to alleviate
such problems. The objective of the HAZOP study in nutshell is
- To provide process safety information
- Finding out of different HAZARD during plant operation
- To establishing safe operating procedure.
- To maintain safe work practice.
Page 9 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
5.8 Recording:
Records are documented through "recording by exception", i.e. to only record the deviations that cause
particular hazards or operating problems. If no deviations are discovered "N.A" /"NOW NEW CAUSE"
may be recorded against that node. In this way the amount of documentation can be kept at a
reasonable level.
5.9 Undertaking the study:
From the description of the HAZOP study it is clear that a study team will consider part of a process
design for a number of Deviation and Guidewords. Thus, a study meeting will follwo through a series of
steps repeatedly. The sequence of action for the HAZOP can be represented as given below. These are
Page 10 the
of 136
seven steps, whichare repeated, many times during
HAZOP.
problem existes and recommends that someone review it for potential solutions.
A full record of the HAZOP study was made on worksheets and these are presented in the Appendices
(Refer Annexure-III)..
HAZOP has been done on Excel work sheets.
Page 11 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
6. HAZOP ASSUMPTIONS
The following assumptions have been considered during HAZOP study:
- Mechanical protection device (PSV,TSV etc.) is expected to work.
- No quantitative analysis will be done during HAZOP session.
- Single check valve is adequate unless reverse flow may cause pressure exceeding the test pressure.
- No design work will be done.
The following have not been considered:
- Simultaneous occurrence of two unrelated incidents.
- Operator negligence.
- Simultaneous failure of more than one independent protection device.
- Natural calamity (flood earth quake etc.)
- Objects falling from sky.
- Sabotage.
Page 12 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
GUIDE WORD
PARAMETER
NO
PART
OF
REVERSE
OTHER
THAN
FLOW *
PRESSURE *
TEMPERATURE *
LEVEL
PHASE
COMPOSITION (SPECIFIC
COMPONENT)
OPERATION **
Page 13 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
* Normal Parameters
** Start-up / shutdown, isolation philosophy, different
operating modes, maintenance access, blow down, etc.
Not Used
Normally Used
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Most hazards will be protected against by a combination of hardware, instrumentation and / or operating
practices. Protection may be provided by a combination of the following:
x The intrinsic mechanical strength of the plant
x Process control response
Page 15 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Page 16 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
S.No.
Title
3
4
Document No.
C450-1400-PB-REV0
CA-140-PR-11-0001 to 0006
CS-140-PR-19-0001 to 0003
Plot Plan
CS-140-PI-16-0001,Rev1
CS-140-PR-15-0001 to 0027
CS-140-PR-15-0030 to 0041
CS-140-PR-15-0043 to 0044
6
7
Equipment List
CS-140-PR-50-0001
CS-140-PR-50-0008
CS-140-EL-12-0001
10
11
CS-140-PR-24-0001
12
Safeguarding Memorandum
CS-140-PR-45-0001
13
Vendor P&IDs
Refer Annexure 1
Page 17 of 136
Page 18 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
9. HAZOP TEAM
The HAZOP was carried out from 6th Dec. to 14th Dec.2010. A team of experienced engineers from Process, Operations/Commissioning and
Engineering were formed the list of participants is as below:
HAZOP Chairman: Mr. Gour Chandra Mitra.
SAMSUNG ENGG. INDIA
PVT. LTD.
PMC
NOCL
Licensor
Vendors
Mr. P. K. Gupta-Part
Mr. V. K. Bansal-Part
Mrs. Ketaki Adhikaray
Mr. K. Y. Nam-Part
Mr. Pawan K. Sharma-Part
Mrs. A. Chamundeswari-Part
Mr. Riji P. day
Mr. R. Manna-Part
Mr. Arun Goel-Part
Mr. Pradeep Amale
Mr. Ambrish Bajpai-Part
Mr. Amiya Ray
Mr. Ankur Agarwal-Part
Mr. Mayank Gupta
Mr. Y. K. Joshi
Mr. R. Y. Bloem-Part
Mr. S. Ravishankar
Mr. Bhaskar Das
Mr. Rajashekhran-Part
Mr. Raj Kumar-Part
Mr. Sebastian-Part
Mr. Aravindan-Part
BHEL
Mr.Krishnan-Part
NEA
Mr. Yogesh Kohil-Part
Mr. Subramanium-Part
Page 19 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
10. RECOMMENDATIONS
Page 20 of 136
Annexure I
Node No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Node Description
Page 21 of 136
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
CS-140-PR-15-0001
CS-140-PR-15-0001
SEI
CS-140-PR-15-0001
PMC/SEI
CS-140-PR-15-0001
PMC/SEI
10
11
CS-140-PR-15-0001,
CS-140-PR-15-0002,
CS-140-ME-E-03800002
SEI
Vendor/SEI
PMC/SEI
CS-140-PR-15-0002,
CS-140-PR-15-0003,
CS-140-PR-15-0004
SEI
CS-140-PR-15-0002
SEI/NOCL
CS-140-PR-15-0002
SEI
CS-140-PR-15-0002
SEI/NOCL
CS-140-PR-15-0002,
CS-140-PR-15-0003,
CS-140-PR-15-0004
SEI/NOCL
12
CS-140-PR-15-0002,
CS-140-PR-15-0003,
CS-140-PR-15-0004
SEI/NOCL
13
CS-140-PR-15-0007
SEI
Page 22 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
14
CS-140-PR-15-0004,
CS-140-PR-15-0006
15
CS-140-PR-15-0003,
CS-140-PR-15-0005,
CS-140-PR-15-0006,
CS-140-PR-15-0007,
CS-140-PR-15-0017
SEI
16
CS-140-PR-15-0006
NOCL
17
CS-140-PR-15-0008
SEI
18
19
20
21
22
23
24
SEI/NOCL
CS-140-PR-15-0008, CS140-PR-15-0021
CS-140-PR-15-0021
SEI
NOCL
CS-140-PR-15-0022
SEI/NOCL
CS-140-PR-15-0008
SEI/NOCL
CS-140-PR-15-0008
Axens/SEI
Page 23 of 136
Axens/SEI
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
25
26
27
P&ID no
Responsibility
CS-140-PR-15-0006
SEI/NOCL
CS-140-PR-15-0008
SEI
CS-140-PR-15-0006,
CS-140-PR-15-0007
SEI/NOCL
28
CS-140-PR-15-0006
SEI
29
CS-140-PR-15-0007
SEI / AXENS
CS-140-PR-15-0008
SEI / AXENS
SEI/NOCL
30
31
32
CS-140-PR-15-0003,
CS-140-PR-15-0006
SEI
33
CS-140-PR-15-0018,
CS-140-PR-15-0019
SEI
34
CS-140-PR-15-0018
SEI
35
CS-140-PR-15-0022
SEI
Page 24 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
36
CS-140-PR-15-0017
SEI
37
CS-140-PR-15-0017
Axens/PMC/SEI
38
CS-140-PR-15-0017
SEI
39
CS-140-PR-15-0017
SEI
40
CS-140-PR-15-0017
SEI
41
CS-140-PR-15-0018
SEI
42
43
44
CS-140-PR-15-0007,
CS-140-PR-15-0009,
CS-140-PR-15-0010,
CS-140-PR-15-0012
45
CS-140-PR-15-0011
CS-140-PR-15-0018,
CS-140-PR-15-0022
CS-140-PR-15-0017
Page 25 of 136
SEI
SEI
SEI/NOCL
SEI
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
46
CS-140-PR-15-0007
AXENS
47
CS-140-PR-15-0007
BHEL
48
CS-140-PR-15-0007
NOCL
49
CS-140-PR-15-0012
NOCL
50
CS-140-PR-15-0012
SEI
51
CS-140-PR-15-0011
SEI
52
CS-140-PR-15-0011
53
CS-140-PR-15-0011
54
CS-140-PR-15-0007,
CS-140-PR-15-0009,
CS-140-PR-15-0010, CS140-PR-15-0012
SEI
55
CS-140-PR-15-0010
Page 26 of 136
SEI/NOCL
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
CS-140-PR-15-0011,
CS-140-PR-15-0012
BHEL
57
CS-140-PR-15-0011,
CS-140-PR-15-0012
BHEL
58
CS-140-PR-15-0012
59
CS-140-PR-15-0003,
CS-140-PR-15-0005,
CS-140-PR-15-0006,
CS-140-PR-15-0011
SEI
CS-140-PR-15-0009,
CS-140-PR-15-0010,
CS-140-PR-15-0016
SEI
56
60
61
62
63
CS-140-PR-15-0009
SEI/NOCL
SEI/NOCL
CS-140-PR-15-0016
SEI
CS-140-PR-15-0016
NOCL/PMC
Page 27 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
64
65
66
67
Recommendations
P&ID no
Responsibility
CS-140-PR-15-0009
SEI
CS-140-PR-15-0009
SEI
CS-140-PR-15-0009
PMC/NOCL
CS-140-PR-15-0009
SEI
68
CS-140-PR-15-0009
69
CS-140-PR-15-0010,
CS-140-PR-15-0016
SEI
70
CS-140-PR-15-0009
PMC/NOCL
71
CS-140-PR-15-0021,
CS-140-PR-15-0016,
CS-140-PR-15-0006
SEI
72
CS-140-PR-15-0016
73
CS-140-PR-15-0017,
CS-140-PR-15-0018,
CS-140-PR-15-0019,
CS-140-PR-15-0022
SEI
74
CS-140-PR-15-0017
SEI
Page 28 of 136
SEI/NOCL
SEI/NOCL
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
CS-140-PR-15-0022
SEI
76
CS-140-PR-15-0022
SEI
77
CS-140-PR-15-0022
Vendor/SEI
78
CS-140-PR-15-0022
SEI/NOCL
79
Regular top up
procedures/schedules to be
mentioned in SOP.
CS-140-PR-15-0022
SEI/NOCL
80
CS-140-PR-15-0022
Vendor/SEI
81
CS-140-PR-15-0019
NOCL
82
CS-140-PR-15-0017,
CS-140-PR-15-0020,
CS-140-PR-15-0021,
CS-140-PR-15-0023
SEI
83
CS-140-PR-15-0021
SEI
CS-140-PR-15-0021
SEI
CS-140-PR-15-0021
SEI
75
84
85
Page 29 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
86
CS-140-PR-15-0017
SEI
87
CS-140-PR-15-0020
NOCL
88
CS-140-PR-15-0023
89
CS-140-PR-15-0007
SEI
90
CS-140-PR-15-0014,
CS-140-PR-15-0015
SEI/NOCL
91
CS-140-PR-15-0013
SEI
92
CS-140-PR-15-0007
SEI
93
CS-140-PR-15-0013
SEI
94
CS-140-PR-15-0013,
CS-140-PR-15-0014,
SEI/NEA
95
CS-140-PR-15-0013,
CS-140-PR-15-0014,
SEI
96
CS-140-PR-15-0013,
CS-140-PR-15-0014,
NOCL
Page 30 of 136
SEI/NOCL
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
97
CS-140-PR-15-0013,
SEI
98
CS-140-PR-15-0013,
CS-140-PR-15-0014,
NEA
99
CS-140-PR-15-0013,
CS-140-PR-15-0014,
NOCL
100
CS-140-PR-15-0013,
CS-140-PR-15-0014,
SEI
101
CS-140-PR-15-0013,
CS-140-PR-15-0014,
NEA/SEI
102
CS-140-PR-15-0013
SEI
103
CS-140-PR-15-0023,
CS-140-PR-15-0025
SEI
104
CS-140-PR-15-0023,
CS-140-PR-15-0025
NOCL
105
CS-140-PR-15-0024,
CS-140-PR-15-0026
SEI
CS-140-PR-15-0004
SEI
CS-140-PR-15-0004
SEI
106
107
Page 31 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
108
CS-140-PR-15-0004
SEI
109
CS-140-PR-15-0024,
CS-140-PR-15-0026
NOCL
110
CS-140-PR-15-0004
SEI
111
CS-140-PR-15-0030
BHEL/SEI
112
CS-140-PR-15-0030
SEI
113
CS-140-PR-15-0030
BHEL
114
CS-140-PR-15-0011
SEI
115
CS-140-PR-15-0032
SEI/NOCL
116
CS-140-PR-15-0032
NOCL
117
CS-140-PR-15-0032
SEI
Page 32 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
118
CS-140-PR-15-0031,
CS-140-PR-15-0033,
CS-140-PR-15-0034
SEI
119
CS-140-PR-15-0037,
CS-140-PR-15-0038
SEI/NOCL
120
CS-140-PR-15-0044
SEI
121
CS-140-PR-15-0044
SEI
122
CS-140-PR-15-0040
SEI
123
CS-140-PR-15-0038
SEI
124
CS-140-PR-15-0040
SEI / NOCL
125
CS-140-PR-15-0040
SEI
126
CS-140-PR-D-06600002
NEA
127
NEA
128
NEA
Page 33 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
129
NEA
130
NEA / AXENS
131
CS-140-PR-D-06600006
NEA
132
NEA
133
NEA
134
NEA
135
NEA
136
NEA
137
NEA
138
CS-140-PR-D-06600003
NEA / SEI
Page 34 of 136
Status
Client
PROCESS
SO2331
CS-140-PR-47-0001
Plant
Dept.
Project
Document Number
Rev.
Recommendations
P&ID no
Responsibility
139
NEA
140
NEA
141
NEA / SEI
CS-140-PR-15-0011,
CS-140-PR-15-0030,
1-336-00-33049(BHEL)
BHEL/SEI
CS-140-PR-15-0011,
CS-140-PR-15-0030,
1-336-00-33049(BHEL)
BHEL/SEI
1-336-00-33049(BHEL
P&ID)
BHEL/SEI
145
1-336-00-33049(BHEL
P&ID)
BHEL/SEI
146
1-336-00-33049(BHEL
P&ID)
BHEL/SEI/NOCL
147
1-336-00-33049(BHEL
P&ID)
BHEL/SEI/NOCL
142
143
144
Page 35 of 136
Status
HAZOP WORKSHEET
(Annexure-III)
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 01
Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU
DESIGN INTENTION
To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.
DRAWINGS
CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002
EQUIPMENT
STREAM DETAILS
Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)
AVAILABLE CONTROL
SCHEMES
PC-343
Operating/Design Parameters
SERVICE
Temperature (C)
Pressure ( bar g)
63 / 120
3.4/15.5
120,083
Note:
Node
Deviation
1.Low/No Flow
Causes
1.U/S disturbance in
Gas Oil Feed from
storage.
Consequences
Safeguards
Ref. No.
Recommendations
1.1.1.1.2
1.1.2.1.2
3. Feed from
1.1.2.1.3
storage is available.
3.Choking of Back
wash Filter
(140-F-001).
1.Refer safeguards
1.1.1.1.1, 1.1.1.1.2
and 1.1.1.1.3
1.1.3.2.1
Page 36 of 136
Responsibility
Remarks
1.Low/No Flow
HAZOP WORKSHEET
(Annexure-III)
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 01
Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU
DESIGN INTENTION
To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.
DRAWINGS
CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002
EQUIPMENT
STREAM DETAILS
Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)
AVAILABLE CONTROL
SCHEMES
PC-343
Operating/Design Parameters
SERVICE
Temperature (C)
3.Choking of Back
2.High Pressure drop in Feed
wash Filter
filter
(140-F-001).
63 / 120
Pressure ( bar g)
3.4/15.5
120,083
Note:
Node
Deviation
Causes
Consequences
Safeguards
3-Automatic
backwash facility is
available.
4.Automatic
backwash filter
system fails.
1. Refer Cause-1
consequence-1
5. Low/No flow of
backwash fluid to
filter.
1.PDI-310 is
provided. Also PDI329 with high alarm
is provided.
Ref. No.
Recommendations
Remarks
1.1.3.2.3
Details to discussed
separately in vendor
package HAZOP.
1.1.4.1.1
1.1.5.1.1
2.High Flow
Responsibility
1.2.1.1.1
Page 37 of 136
HAZOP WORKSHEET
(Annexure-III)
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 01
Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU
DESIGN INTENTION
To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.
DRAWINGS
CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002
EQUIPMENT
STREAM DETAILS
Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)
AVAILABLE CONTROL
SCHEMES
PC-343
Operating/Design Parameters
SERVICE
Temperature (C)
63 / 120
2.High Flow
Note:
Node
Pressure ( bar g)
Deviation
Causes
3.4/15.5
Consequences
Safeguards
2. PSV-302A/B is
designed for liquid
overfilling case.
Ref. No.
Recommendations
1.2.1.1.2
1.2.2.1.1
2.PC-343 failure
leading to PCV-343
fully open.
3.LC-501
malfunctions.
1.Refer safeguard
1.2.1.1.1 and
1.2.1.1.2
1.2.3.1.1
1.3
3. Reverse flow
4.Low Pressure
1. PC-343
malfunctions and
closes PCV-343
1.4.1.1.1
1.High supply
pressure from CDU.
120,083
1.4.2.1.
1. System is
designed for
maximum U/S
pressure.
1.5.1.1.1
5.High Pressure
Page 38 of 136
Responsibility
Remarks
HAZOP WORKSHEET
(Annexure-III)
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 01
Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU
DESIGN INTENTION
To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.
DRAWINGS
CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002
EQUIPMENT
STREAM DETAILS
Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)
AVAILABLE CONTROL
SCHEMES
PC-343
Operating/Design Parameters
SERVICE
Temperature (C)
Pressure ( bar g)
63 / 120
3.4/15.5
120,083
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks
5.High Pressure
2.External fire.
6.High Temperature
1.U/S disturbance
1.Potential overpressure in
filter.
1.Interface(LT-505) in FSD
may get affected due to high
temperature
1..5.2.1
No significant cause
1.7
8. High Level
Not applicable
1.8
9 Low level
Not applicable
1.9
10.Composition
1. Composition
change due to mixing
of different feed
streams in upstream
unit.
Vendor/SEI
SEI
7.Low Temperature
1. Higher exothermic
conditions in reaction section
due to more cracked feed.
1.Regular sampling
1.10.1.1.1
11.Others
1. Not applicable
1.11.1
Page 39 of 136
PMC/SEI
Determine cause of
overpressure.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 02
DESIGN INTENTION
To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.
DRAWINGS
EQUIPMENT
STREAM DETAILS
AVAILABLE CONTROL
SCHEMES
(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet
SERVICE
(C)
Operating/Design Parameters
Temperature
Pressure ( bar g)
63/120
91.3-101.0/127
120083
68.8/120
92.2-94.7/108
113540-121388
307.3-338.7/365
90.7-93.2/106.5
126850-127392
Note:
Node
2.Feed Surge Drum to Reactor
Feed Heater
Deviation
1.Low/No Flow
Causes
1.Tripping of Gas oil feed
pump(P-001A/B)
Consequences
Safeguards
Ref. No.
2.1.1.1.1
2.1.1.2.1
2.1.1.3.1
2 HH alarm at LI-503
2.1.1.3.2
Recommendations
Responsibility
SEI
3.1 PSV-302A/B is
2.1.1.3.3
designed for overfilling
case.
2.FC-408 malfunctions to close
2.1.2.1.1
1. Pump is protected
with
Min. flow bypass
2.1.2.2.1
8.Operating manual/SOP
should ensure periodical
checking of LG-506
4. FCV-407A/B malfunctions to
open
2.1.4.1.1
Page 40 of 136
SEI/NOCL
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 02
DESIGN INTENTION
To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.
DRAWINGS
EQUIPMENT
STREAM DETAILS
AVAILABLE CONTROL
SCHEMES
(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet
SERVICE
(C)
Operating/Design Parameters
Temperature
Pressure ( bar g)
63/120
91.3-101.0/127
120083
68.8/120
92.2-94.7/108
113540-121388
307.3-338.7/365
90.7-93.2/106.5
126850-127392
Note:
Node
Deviation
2.
3.
High Flow
As well as
4. Reverse/Misdirected
Flow
Causes
Consequences
Safeguards
Ref. No.
5. XZV-719 malfunctions to
close
1. Process upset
2.3.1.1.1
1. P-001 trips
2.4.1.1.1
2.2.1.1.1
2.2.2.1
5.
Low Pressure
1. PC 330 malfunctions
to open PCV-330B
6.
High Pressure
1. PC 330 malfunctions to open 1. Over pressurizing of the FSD (VPCV 330A and close PCV-330B 001)
2. Likely loss of feed to FSD.
1. PSV-302A/B
provided
2. Refer 1.1.1.1.1
2.6.1.1.1
2. P-001 trips
1. PSV-302A/B is
designed for liquid
overfilling case
2.6.2.1.1
Responsibility
2.1.5.1.1
Recommendations
2.6.3.1.1
Page 41 of 136
SEI/NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 02
DESIGN INTENTION
To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.
DRAWINGS
EQUIPMENT
STREAM DETAILS
AVAILABLE CONTROL
SCHEMES
(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet
SERVICE
(C)
High Pressure
Operating/Design Parameters
Temperature
Pressure ( bar g)
63/120
91.3-101.0/127
120083
68.8/120
92.2-94.7/108
113540-121388
307.3-338.7/365
90.7-93.2/106.5
126850-127392
Note:
Node
Deviation
Causes
3. FC-408 malfunctions to close
FCV-408.
4. XZV-719 malfunctions to
close
Consequences
2. Pump discharge line up to FCV408 is subjected to high pressure
Safeguards
2. Pump (P-001A/B)
discharge line is
designed for pump
shutoff pressure
1. Refer 2.1.1.1.1
7. Less/Low
Temperature
2.6.4.2
1.Depressureization
2.6.5.1.1
2.PSV-307A/B is
provided on Separator
drum.
2.6.5.1.2
2.6.3.2.2
2.6.4.1
2. Refer 2.1.1.2.2
5. External Fire
Ref. No.
2.7.1.1
2.7.1.2.1
2.7.2.1
2.8.1.1
Page 42 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 02
DESIGN INTENTION
To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.
DRAWINGS
EQUIPMENT
STREAM DETAILS
AVAILABLE CONTROL
SCHEMES
(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet
SERVICE
(C)
Operating/Design Parameters
Temperature
Pressure ( bar g)
63/120
91.3-101.0/127
120083
68.8/120
92.2-94.7/108
113540-121388
307.3-338.7/365
90.7-93.2/106.5
126850-127392
Note:
Node
Deviation
9.
Less/Low Level
Causes
Consequences
Safeguards
Ref. No.
2.9.1.1
Recommendations
11.Provision of local temp.
gauge to be provided for
ascertaining the temperature
before taking the sample.
12.Operating procedure
should ensure temp. of
sampling fluid below 80 C.
2.9.2.1
2.Small quantity of
2.9.3.1.2
water is not desirable
but acceptable as the
same will be vaporized
at operating conditions.
Water is not allowed at
reactor inlet.
10.
High Level
2.10.1.1
2. XZV-719 malfunctions to
close
2.10.2.1
Page 43 of 136
Responsibility
SEI/NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 02
DESIGN INTENTION
To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.
DRAWINGS
EQUIPMENT
STREAM DETAILS
AVAILABLE CONTROL
SCHEMES
(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet
SERVICE
(C)
Operating/Design Parameters
Temperature
Pressure ( bar g)
63/120
91.3-101.0/127
120083
68.8/120
92.2-94.7/108
113540-121388
307.3-338.7/365
90.7-93.2/106.5
126850-127392
High Level
Note:
Node
Deviation
Causes
Consequences
Safeguards
2.10.3.1
1. HH Alarm LI-503
2.10.4.1.1
2. PSV-302A/B is
designed for Liquid
overfilling case
2.10.4.1.2
Ref. No.
2.10.5
Refer 1.10.1.1.1
1. Contamination of product with feed
1. Analyzer AI-003 is
provided on product
line
2.12
2.13.1.1.1
Page 44 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 03
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0004,CS-140-PR-15-0005
EQUIPMENT
STREAM DETAILS
PC-899(For Detail see the Heater Firing P&ID for control system)
Project :
Operating/Design Parameters
Pressure ( bar g)
Temperature
(C)
SERVICE
Fired Heater Outlet to
Hydrotreater Reactor Inlet
86.4-88.9/106.5
318.3-362.5/400
126850-127392
Note:
Node
3. Reactor Feed
Heater
Deviation
1.
Causes
1. U/S disturbance.
Safeguards
Consequences
1. Loss of liquid feed causing possible
overheating of heater tubes leading to tube
failure.
1. U/S disturbances
Ref. No.
2. High alarm is
provided at TI-121 &
222(Skin temp.), TI122 &
223(COT)
3.1.1.1.2
3. TZ-123 HH temp.
will activate UZ-718
3.1.1.1.3
3.1.1.1.4
3.1.1.1.5
Responsibility
Remarks
3.2. .1.1
1. Low flow at FC-427
and low low trip at FZ428 is provided.
3.3. .1
3.4a.1.1
3.4b.1.1
Recommendations
1.Emergency
Depressurization
system is available
Page 45 of 136
3.4c.1.1.1
In current practices of
licensor is to provide
check valve at Heater
outlet.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 03
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0004,CS-140-PR-15-0005
EQUIPMENT
STREAM DETAILS
PC-899(For Detail see the Heater Firing P&ID for control system)
Project :
Operating/Design Parameters
Pressure ( bar g)
Temperature
(C)
SERVICE
Fired Heater Outlet to
Hydrotreater Reactor Inlet
86.4-88.9/106.5
318.3-362.5/400
126850-127392
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
6. High
Temperature
1. TI-121,TI-122,TI3.6.1.1.1
222 &TI-223 provided
with high alarm
2. TI-101 &TI-102
provided with high
alarm
Recommendations
Responsibility
3.6.1.1.2
3. TZ-123 HH will
3.6.1.1.3
activate UZ-718 to trip
the heater
7. Low pressure
1.U/S disturbances
8.High pressure
1. TI-121,TI-122,TI3.8.1.1.1
222 &TI-223 provided
with high alarm
9.Composition
10. Problem/Requirements
3.10.1.1.1
3.10.1.2.1
SEI
14.Operating procedure
should ensure safe
shutdown of the plant
SEI/NOCL
3.9.1
Page 46 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 04
DESIGN INTENTION
1.
To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.
2.
To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.
3.
DRAWINGS
EQUIPMENT
140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003
STREAM DETAILS
After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.
Operating/Design Parameters
SERVICE
Temperature (C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator
Pressure ( bar g)
185.5-397/430
80.2-83.4/102
45-65/130
78.8-.79.3/92
137867
144751
Note:
Node
4. Reactor inlet , Effluent Air
Cooler, Trim Cooler Up to
separator inlet
Deviation
1. Low/No Flow of liquid
stream
Causes
1. U/S disturbance
Consequences
Safeguards
Ref. No.
4.1.1.1.1.2
1. FZ-448 provided
with LL alarm to trip
the fired heater
4.1.1.2.1.2
1.Low hydrogen ratio leads to catalyst coking. 1. Low flow at FC427 and low low trip
at FZ-428 is
provided.
4.2.1.1.1
1. U/S disturbance
1. FC-412 /413/414/415
malfunction to close
FCV412/413/414/415 (quench
H2)
4.3.1.1.1
1. U/S disturbance
4.4.1.1.1
4.2.1.2
1. AI-003 is
provided on product
line
4.4.1.2.1
1.PDI-349~353,are
provided with high
alarms.
1. U/S disturbance
1.PDI-349~353,are
provided with high
alarms.
4.5.1.1.1
1. FC-412 /413/414/415
malfunction to fully open FCV
412/413/414/415
1. AI-003 is
provided on product
line
4.6.1.1.1
Page 47 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 04
DESIGN INTENTION
1.
To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.
2.
To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.
3.
DRAWINGS
EQUIPMENT
140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003
STREAM DETAILS
After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.
Operating/Design Parameters
SERVICE
Temperature (C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator
45-65/130
78.8-.79.3/92
137867
144751
Pressure ( bar g)
185.5-397/430
Deviation
1. FC-412 /413/414/415
malfunction to fully open FCV
412/413/414/415
Causes
Consequences
2.Increase in Pressure drop across catalyst
beds.
Safeguards
Ref. No.
1.PDI-349~353,are
provided with high
alarms.
4.6.1.2.1
7.Reverse flow
1.Emergency
Depressurization
system is available
4.7.1.1.1
8. Low Pressure
1.U/S disturbances.
4.8.1.1.1
2. AI-003 is
provided on product
line
4.8.1.1.2
1. PC-358 provided
with high alarm.
4.9.1.1.1
2. PSV-307A/B
provided.
4.9.1.1.2
9.High Pressure
10. Low
Temperature
1. Disturbance in Hydrogen
recycle loop.
4.10.1/2.1
1. Refer 4.6.1.1.1
2. U/S disturbances.
11. High
Temperature
1. Refer 4.3.1.1.1
1. High temp.
Alarms are provided
for each bed.
4.11.1.1.1
4.11.1.1.2
4.11.2.1.1
Page 48 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 04
DESIGN INTENTION
1.
To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.
2.
To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.
3.
DRAWINGS
EQUIPMENT
140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003
STREAM DETAILS
After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.
Operating/Design Parameters
11. High
Temperature
Temperature (C)
SERVICE
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator
45-65/130
78.8-.79.3/92
137867
144751
Note:
Node
Pressure ( bar g)
185.5-397/430
Deviation
Consequences
2. Higher hydrocarbons may condense in
HP Amine column (C-001) leading to foam
formation
Safeguards
Ref. No.
1. PC-358 is
provided with high
alarm
4.11.2.2.1
2. PSV-307A/B is
provided
4.11.2.2.2
4.11.2.2.3
4. Hydrocarbon
skimmer for both
HP & LP amine
absorber (C-001 and
C-003) is routed to
CBD instead of
amine drain.
4.11.2.2.4
5. Trim cooler is
designed
considering air
cooler failure also
separator is
designed for air
cooler failure
considering cooling
by trim cooler.
4.11.2.2.5
1. Recycle
compressor trip
4.11.2.3.1
4.11.3.1.1/2
Page 49 of 136
Recommendations
Responsibility
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 04
DESIGN INTENTION
1.
To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.
2.
To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.
3.
DRAWINGS
EQUIPMENT
140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003
STREAM DETAILS
After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.
Operating/Design Parameters
SERVICE
Temperature (C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator
Pressure ( bar g)
185.5-397/430
80.2-83.4/102
45-65/130
78.8-.79.3/92
137867
144751
Note:
Node
Deviation
12. Problem/Requirements
13. Composition
Causes
Consequences
Safeguards
1. PDI with high
alarm provided for
each bed
Ref. No.
4.12.2.1.1
4.12.3.1.1
1.Hydrocarbon
detector is provided
in cooling water
tower at OSBL.
4.14
14. Others
Page 50 of 136
Responsibility
NOCL
4.12.1.1.1
4.13.1
Recommendations
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet
Project :
FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum
Pressure ( bar g)
65-128/150
45.0/140
5221-6212
6.4/9
3310
Note:
Node
5. Wash Water
System
Deviation
1.
Low/No Flow
Causes
1. U/S disturbance in unit 550.
Consequences
1. Level of (V-004) may go down
Safeguards
Ref. No.
1. Stripped sour
water and recycle
water is available
for makeup
5.1.3.1.1
1. Stripped sour
water and BFW is
available for
makeup
5.1.4.1.1
1. LI-560A is
provided with
HH alarm
Page 51 of 136
5.1.5.1.1
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet
Project :
FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum
45.0/140
Note:
Node
Pressure ( bar g)
65-128/150
Deviation
Consequences
Safeguards
2. Stripped sour
water and BFW is
available for
makeup(*)
Ref. No.
5.1.5.1.2
5.1.5.2.1
7. P-002A/B trips
1. LC-516 is
provided with high
alarm
5.1.7.2.1
2. PSV-310A/B
designed for liquid
overfilling case
5.1.7.2.2
4. NRVs are
provided at all
injection points.
5.1.7.2.4
1.FZ-450 is
provided with
LL alarm
5.1.8.1.1
Page 52 of 136
5221-6212
6.4/9
3310
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet
Project :
FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum
Pressure ( bar g)
65-128/150
45.0/140
Note:
Node
Deviation
Consequences
Safeguards
High Flow
3310
Recommendations
Responsibility
5.1.8.1.2
5.1.8.2.2
5.1.9.1
Ref. No.
2.
5221-6212
6.4/9
5.1.10.1.1
2. FC-419
provided with low
alarm.
5.1.10.1.2
5.1.10.1.3
5.2.1.1.2
3.PSV-310A/B
designed for liquid
overfilling case
5.2.1.1.3
Page 53 of 136
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet
Project :
FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
2. High Flow
Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum
Pressure ( bar g)
65-128/150
45.0/140
5221-6212
6.4/9
3310
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
1. Refer 5.1.1.1.1~3.
1. Refer 5.1.1.1.1
and 5.1.1.1.2
5.2.3.1.1
1. PC-368 provided
with high alarm.
5.2.3.2.1
19.Provide additional
control scheme on V008 boot with LT (Low
low level signal), new
shutdown valve on
recycle water line from
V-008 to avoid gas
break through.
5.2.4.1
5.2.2.1
Remarks
5.2.4.2
1. Refer 5.1.1.1.1
and 5.1.1.1.2
Page 54 of 136
5.2.4.1.1
NPSHr of P-002A/B
is 1.9m and vessel
elevation is 5.5m
from grade. So no
cavitation.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet
Project :
FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum
Pressure ( bar g)
65-128/150
45.0/140
5221-6212
6.4/9
3310
Note:
Node
Deviation
Causes
Consequences
Safeguards
5.2.4.2
1. Refer 5.1.1.1.2
6. FC-419 at wash water pump 1. More wash water to EA-001,EEdischarge ,malfunction to open 001 (when in operation) no major concern.
FCV-419
2. Likely low level in V-004.
3.Reverse Flow
Ref. No.
5.2.5.1.1
5.2.6.1
1. LZ-518 provided
with low low alarm.
5.2.6.2.1
2. LC-516 is
provided with low
alarm
5.2.6.2.2
3. XZV-721 failure.
4.FCV-419 failure.
Page 55 of 136
Recommendations
21. Provide low alarm
for LI-560A at V-009
boot
Responsibility
SEI/NOCL
Remarks
Operating procedure
should ensure
periodical checking of
LG-545.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet
Project :
FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum
Pressure ( bar g)
65-128/150
45.0/140
5221-6212
6.4/9
3310
Note:
Node
Deviation
Causes
Consequences
Safeguards
4.
As well as
1. Contamination in Stripped
sour water.
5.
Low Pressure
1. PC-368 malfunctions to close 1. Pump may cavitate and wash water flow
PCV-368A and opens 368B
to EA-001 may be lost.
Ref. No.
Responsibility
5.4.1.1
1. NPSHa is
calculated
considering no
overpressure in
wash water drum.
5.5.1.1
1. PC-368
provided with low
alarm.
5.5.2.1.1
2. PI-806 at B.L is
provided with low
alarm
5.5.2.1.2
Recommendations
Page 56 of 136
Remarks
1. Ensure sampling
provision is given in
Unit
550 during detailing.
22. Operating
procedure should
ensure periodical
checking of PI369A/B at pump
suction..
SEI/NOCL
5.
Low Pressure
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet
Project :
FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum
Pressure ( bar g)
65-128/150
2. Stripped sour water can not be supplied to
wash water drum.
45.0/140
5221-6212
6.4/9
3310
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
5.5.3.2.2
2. FC-420 is
provided with low
alarm.
6.
High Pressure
7.Low temperature
8.High temperature
9. Problem/Requirements
10.Composition
1. No new cause
1. Maintenance
1. PSV-310 A/B is
provided to take
care of this
situation.
5.6.1.1.1
5.7
5.8
Axens/SEI
24.Operating procedure
to ensure Increase of
injection water flow rate
and/or plant capacity to
be decreased. To be
further checked for the
feasibility of this
operation.
25. Operating
procedure should
ensure periodical
checking of FI458/459/460/461
SEI/NOCL
SEI
5.10
1. High temp.(BFW) at suction in case of only 1. Pump P-002A/B
BFW is available.
Mechanical
designed is for 150
C.
Page 57 of 136
5.11.1.1.1
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 06
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0006,CS-140-PR-15-0007
EQUIPMENT
STREAM DETAILS
Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)
LC-514.LC-556,LC542
Project :
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L
Pressure ( bar g)
45/130
6.4-78.8/92
10085
45/120
4.0-6.4/9
10080
Note:
Node
6. Separator bottom to Sour water Flash
Drum and B/L
Deviation
1.
Low/No Flow
Causes
Consequences
Safeguards
1. LC-510 malfunctions to close 1. Boot level of V-006 may go high resulting 1. LI -512 is
LCV -510
in water carry over with gas oil product
provided with
leading to off-spec product.
HH alarm.
2. AI-003 is
provided at gas oil
product line.
2. Potential overpressure upstream TC191A/B due to higher vaporization,
Ref. No.
Recommendations
Responsibility
6.1.1.1.1
6.1.1.1.2
6.1.1.3
6.1.2.1.1
3. Automatic drain
facility to closed
drain is provided.
6.1.2.1.3
6.1.3.1.1
SEI/NOCL
Page 58 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 06
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0006,CS-140-PR-15-0007
EQUIPMENT
STREAM DETAILS
Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)
LC-514.LC-556,LC542
Project :
Operating/Design Parameters
SERVICE
Temperature(C)
3. LC-514 malfunctions to close 1. V-017 Hydrocarbon side level may go
45/130
LCV-514
high and ultimately over the period of time
HC carryover to V-010.
45/120
Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L
Pressure ( bar g)
10085
4.0-6.4/9
10080
Note:
Node
Deviation
2.
High Flow
Causes
Consequences
Safeguards
Ref. No.
6.1.3.1.2
1.Low pressure
alarm PI-999 is
provided.
6.1.4.1.1.
1. LC-510 malfunctions to
opens
LCV -510
1. LZ 513 is
provided with LL
alarm will activate
UZ-704 to close
XZV704.
6.2.1.1.1
Recommendations
Responsibility
Remarks
1. CBD vessel is
connected to flare.
6.2.2.1.1
SEI/NOCL
Operating procedure
should ensure
periodical checking of
LG-515/LCV-514.
PMC/\NOCL
1. Provision for HC
carryover with sour
water to be considered
in unit 550.
3. LC-556 malfunctions to open 1. V-017 water side level may go low and
LCV-556
HC may carry over with Sour water to B.L.
6.2.3.1
3. Reverse flow
6.3
4. High Pressure
6.4
5. Low pressure
6.5
Page 59 of 136
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 06
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0006,CS-140-PR-15-0007
EQUIPMENT
STREAM DETAILS
Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)
LC-514.LC-556,LC542
Project :
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L
Pressure ( bar g)
45/130
6.4-78.8/92
10085
45/120
4.0-6.4/9
10080
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
6.Low temperature
NO new causes
6.6
7. High temperature
NO new causes
6.7
8. Composition
NO new causes
6.8
9. Others
NO new causes
6.9
Page 60 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 07
DESIGN INTENTION
To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet
Pressure ( bar g)
45-51/130
11.9-78.8/92
41810-119768
213-260/390
8.9-10.3/75
119768
Note:
Node
Deviation
1.
Low/No Flow
Causes
1. XZV-703 malfunctions to
close.
Consequences
Safeguards
1. LC 507 high
alarm is provided.
Ref. No.
Recommendations
Responsibility
SEI/AXENS
None
7.1.1.3
1. Air cooler is
designed for 10%
higher heat duty.
Page 61 of 136
Remarks
7.1.1.1.1
7.1.1.4.1
SEI
1.
Low/No Flow
1. XZV-703 malfunctions to
close.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 07
DESIGN INTENTION
To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet
Pressure ( bar g)
45-51/130
11.9-78.8/92
41810-119768
213-260/390
8.9-10.3/75
119768
Note:
Node
Deviation
Causes
2. LC-507/FC-416 malfunctions
to close FCV-416.
Consequences
Safeguards
Ref. No.
5. Higher inlet temp. across the EE006A/B/C/D and inlet of air cooler EA-003.
7.1.1.5
7.1.2.1
1. PSV-930A/B is
provided at tube
side inlet line to
EE-006.
7.1.3.1.1
Recommendations
Responsibility
SEI
SEI
SEI
1. Mechanical
7.1.3.2.1
Limit stop
provided at TCV191A for minimum
flow to avoid total
blockage.
2. TI-192 at
stripper overhead
with low alarm is
provided.
7.1.3.2.2
3. Product
7.1.3.2.3
analyzer AI-003 is
provided.
1. Refer 7.1.1.4.1
7.1.3.3.1
7.1.4.1
Page 62 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 07
DESIGN INTENTION
To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet
Pressure ( bar g)
45-51/130
11.9-78.8/92
41810-119768
213-260/390
8.9-10.3/75
119768
Note:
Node
Deviation
Safeguards
Ref. No.
Recommendations
Responsibility
SEI
Remarks
None
7.1.5.1
Axens/PMC/SEI
37. Consider converting
TI-192 to TC and put
reflux on TC/FC cascade.
2.
3.
High Flow
As well as
1. LC-507/FC-416 malfunctions
to open FCV-416.
1. LZ-509 is
provided with low
low alarm which
will activate UZ703 to trip XZV703.
7.2.1.1.1
2. PSV-319A/B is
designed for gas
blow case.
7.2.1.1.2
7.2.2.1
No new cause.
7.3
Page 63 of 136
SEI
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 07
DESIGN INTENTION
To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet
Pressure ( bar g)
45-51/130
11.9-78.8/92
41810-119768
213-260/390
8.9-10.3/75
119768
Note:
Node
Deviation
4. Low interface level Boot)
Causes
Consequences
Safeguards
1. LC-510 malfunctions to
opens
LCV -510
1. LZ 513 is
provided with LL
alarm will activate
UZ-704 to close
XZV704.
Ref. No.
7.4.1.1.1/2/3
2. High alarm at
LC-514 is
provided.
3. High alarm at
LC-530 is
provided.
5. Low level
Refer 7.1.1.1.1
7.5
1. LC-510 malfunctions to close 1. Boot level of V-006 may go high resulting 1. LI -512 is
LCV -510
in water carry over with gas oil product
provided with
leading to off-spec product.
HH alarm.
7.6.1.1.1
2. AI-003 is
7.6.1.1.2
provided at gas oil
product line.
2. Potential overpressure upstream TC191A/B due to higher vaporization,
2. XZV-704 malfunctions to
close.
1. PI-903 is
7.6.1.2.1
provided with high
pressure alarm at
stripper overhead
7.6.1.3
7.6.2.1.1
Page 64 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 07
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet
Pressure ( bar g)
45-51/130
11.9-78.8/92
41810-119768
213-260/390
8.9-10.3/75
119768
Note:
Node
Deviation
Causes
Consequences
Safeguards
Recommendations
Responsibility
1.Low alarm at
LC-510 is
provided.
7.9.1.2.1
SEI
7.9.1.3
SEI
Ref. No.
7.6.2.3.1
2. PI-903 is
7.6.2.3.2
provided with high
pressure alarm at
stripper overhead
7. High level
8. Low
Temperature
7.7
1. TC-191
provided with low
alarm.
1. Refer 7.1.3.2.1
9. High
Temperature
1. Malfunction of TCV-191 A
7.8.1.1.1
7.8.1
1. Refer 7.1.5.1
7.9.1.1
1. Air cooler is
designed for 10%
higher heat duty.
3. Higher inlet temp. across the EE006A/B/C/D and inlet of air cooler EA-003.
Page 65 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 07
DESIGN INTENTION
To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper
Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet
Pressure ( bar g)
45-51/130
11.9-78.8/92
41810-119768
213-260/390
8.9-10.3/75
119768
Note:
Node
Deviation
10. Problem/Requirements
Causes
Consequences
Safeguards
1. PSV-319A/B is
provided for tube
rupture case.
Recommendations
Responsibility
7.10.1.1
SEI
7.10.1.2
SEI
SEI
Ref. No.
7.10.2.1.1
2. AI-003 is
7.10.2.1.2
provided at gas oil
product line.
2. Potential overpressurization of stripper
11. Operation/Maintenance
1. PI-903 With
high alarm is
provided.
No new cause.
7.10.2.2.1
7.11
Page 66 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 08
DESIGN INTENTION
1.
2.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor
45 /130
78.8/92
15891-18053
54/130
78.4/92
13337-15497
Note:
Node
8. Separator Overhead to
Recycle gas compressor Inlet
Deviation
1.
Causes
Consequences
Safeguards
Ref. No.
1. AI-001 is provided on
K-002 suction line
8.1.1.1.1
1. PC-358 is provided
with high alarm(*)
8.1.1.2.1
8.1.2.1
1. PI-689/377 is
provided with low alarm
8.1.2.1.1
2. FI-429 is provided
with low alarm
8.1.2.1.2
8.1.2.2.1
Recommendations
Responsibility
44.Operating procedure to
include operation of HS-822 to
select FCV-423 to purge H2S to
flare header
SEI/NOCL
SEI
46.Operating instruction to
include feed cut-off if system
pressure is below 80% of the
normal pressure.
47.BHEL to confirm if low low
suction pressure trip is required
for machine protection.
1. PSV-941A/B is
designed for this case.
8.1.2.3.1
Axens
BHEL
NOCL
1. Low level in V-007,stripper (C002)/(EE-006A/B/C/D) / (EE002)may subject to high pressure due to gas
blow by, possible damage to column
internals.
1. PSV-319A/B is
designed for this gas
blow by case
8.1.3.1.1
2. PI-903 is provided
with high alarm.
8.1.3.1.2
8.1.4.1.1
Page 67 of 136
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 08
DESIGN INTENTION
1.
2.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor
Note:
Node
Deviation
45 /130
78.8/92
15891-18053
54/130
78.4/92
13337-15497
Causes
Consequences
Ref. No.
1.PDI-688 is provided
8.1.6.1.1
7. Compressor trip.
8.1.7.1.1
2. Activation of UZ-705
leading to trip of heater
and liquid feed pumps.
8.1.7.1.2
1.None as anti-surge
valve (XCV-715)
discharge is not coming
back to suction of
compressor as suction
MOV is closed.
8.1.7.2.1
None
8.1.8.1
1. PI-689/377 is
provided with low alarm
8.1.9.1.1
8.1.9.1.2
SEI
Responsibility
8.1.4.1.2
5. XZV-702A malfunctions to
open.
Recommendations
8.1.5.1.1
SEI
BHEL/PMC/SEI/NOCL/A
xens
BHEL/PMC/SEI/NOCL/A
xens
53. System to be reviewed for
required protection.
Page 68 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 08
DESIGN INTENTION
1.
2.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor
45 /130
78.8/92
15891-18053
54/130
78.4/92
13337-15497
Note:
Node
Deviation
2.
High Flow
Causes
Consequences
Safeguards
8.2.1.1.1
8.2.1.2.1
3.
Low Pressure
1. XZV-702A malfunctions to
open.
1. Refer 8.1.5.1.1
4.
High Pressure
6.
High Level
7. Problem/Requirements
Recommendations
1. P&ID is to be updated to
show details of anti-surge
valve as per vendor P&ID.
8.4.1.1.2
8.5.1.1
8.5.2.1
8.6.1.1.1
1. LC-521 is provided
with
High alarm.
Remarks
SEI
1. U/S disturbance
2. LC-524 malfunctions to close 1. Liquid carry over with recycle gas to KLCV-524
002
1. Emergency
8.7.1.1.1
depressurization
safeguarding system UZ702 is provided.
Responsibility
8.3.1.1
2. PSV-307 A/B is
provided.
5. High
Temperature
Ref. No.
1.Anti-surge system is
available.
Page 69 of 136
SEI
SEI/NOCL
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 08
DESIGN INTENTION
1.
2.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor
45 /130
78.8/92
15891-18053
54/130
78.4/92
13337-15497
Note:
Node
Deviation
Causes
Consequences
Safeguards
8. Operation/Maintenance
Ref. No.
8.8
Recommendations
Responsibility
BHEL
Remarks
9.Composition
1. AI-001 is provided on
K-002 suction line
8.9.1.1.1
2. AI-003 is provided in
final gas oil product line.
8.9.1.1.2
1. PC-358 is provided
with high alarm
8.9.1.2.1
Page 70 of 136
SEI/NOCL
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 09
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0003,CS-140-PR-15-0005,CS-140-PR-15-0006,CS-140-PR-15-0011
EQUIPMENT
STREAM DETAILS
H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Recycle gas compressor to
Mixing point
75.7-79/150
92.5-95.2/108.5
4310-5022
Note:
Node
9. Recycle Gas compressor to
Mixing Point
Deviation
1.
Low/No Flow
Causes
1. K-002 trip Refer node 8
,compressor trip)
Consequences
1. No hydrogen supply to reactor.
Safeguards
1. UZ-705 will
activate
UZ-706
Ref. No.
9.1.1.1.1
9.1.1.2
9.1.1.3.1
1.NRV is provided
near to tie in point.
9.1.1.4.1
9.1.2.1
2.FC-412-415
9.1.3.1.2
provided with low flow
alarms.
3. TZ-123 is provided
with HH temp. trip.
9.1.3.1.3
9.1.4.1
Page 71 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 09
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0003,CS-140-PR-15-0005,CS-140-PR-15-0006,CS-140-PR-15-0011
EQUIPMENT
STREAM DETAILS
H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Recycle gas compressor to
Mixing point
75.7-79/150
92.5-95.2/108.5
4310-5022
Note:
Node
Deviation
Causes
Consequences
7. MOV-003 malfunctions to
close.
Safeguards
1. Anti surge valve
XCV715 provided.
High Flow
9.1.7.1.2
9.2.1.1.1
3. Reverse/Misdirected
Flow
2. K-002 trips
4.
High Pressure
Responsibility
1. FC-427 malfunction to open 1. Less Hydrogen to reactor/quench leading 1. FCFCV-427 (high flow in antisurge to low product quality.
412/413/414/415 is
line)
provided with low
alarm.
Recommendations
9.1.6.1
Ref. No.
9.1.5.1.1
9.2.2.1
1. NRV is provided.
9.3.2.1.1
Page 72 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 09
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0003,CS-140-PR-15-0005,CS-140-PR-15-0006,CS-140-PR-15-0011
EQUIPMENT
STREAM DETAILS
H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
4.
High Pressure
75.7-79/150
92.5-95.2/108.5
4310-5022
Note:
Node
Deviation
Causes
2.More flow of hydrogen from
MUG compressor.
5. High
Temperature
1. U/S disturbances.
Consequences
1.Potential overpressure of system
Safeguards
Ref. No.
1.PSV-307A/B is
provided at V-006
9.4.2.1.1
1. TI-643 is provided
with high alarm.
9.5.1.1.1
2. TZ-644A/B/C will
activate UZ-731.
9.5.1.1.2
9.5.1.2.1
1. Refer 9.4.1.1.1
9.5.2.1
6.High level
NA
9.6
7.Low level
NA
9.7
8.composition
NA
9.8
9.others
NA
9.9
Page 73 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 10
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)
STREAM DETAILS
Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column
FC-434,FC-424
Project :
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column
50 /85
9.5 /14
17649-18370
50 /130
9.5-86.5/92
57857
Note:
Node
10.
Deviation
Low/No Flow
Causes
1. U/S disturbance
Consequences
1. P-003A/B may starve and get damaged
Safeguards
1. PI-373 is provided with
low alarm
Ref. No.
10.1.1.1.1
10.1.1.2.1
10.1.1.3.1
10.1.1.4.3
1. Refer 10.1.1.4.3
1. Refer 10.1.1.3.2
10.1.2.1.1
1. Refer 10.1.1.1.1
10.1.2.2.1
Page 74 of 136
Responsibility
SEI/NOCL
61. Operating procedure should
ensure routing of off gas to flare
header when there is
disturbance in lean amine
supply to C-003
2. AI-001 provided on
10.1.1.3.2
recycle gas line overhead
of V-005 for monitoring.
Recommendations
SEI
NOCL/PMC
Remarks
10.
Low/No Flow
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 10
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)
STREAM DETAILS
Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column
FC-434,FC-424
Project :
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column
Note:
Node
Deviation
50 /85
9.5 /14
17649-18370
50 /130
9.5-86.5/92
57857
Consequences
2. back flow from HP Amine absorber to
lean amine pump(P003A/B)
1. Refer 10.1.2.1.1
High Flow
Ref. No.
1. AI-001 provide on
recycle gas line for
monitoring
Responsibility
10.1.2.2.2
10.2.4.1.1
10.2.5.1
1. AI-001 provide on
recycle gas line for
monitoring
10.2.6.1.1
10.2.6.1.2
10.2.1.1.2
3. Reverse/Misdirected
Flow
1. U/S disturbance
4. Low pressure
No new cause
Recommendations
1. Refer 10.1.2.1.1
2.
Safeguards
10.3.1.1.1
10.4
Page 75 of 136
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 10
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)
STREAM DETAILS
Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column
FC-434,FC-424
Project :
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column
50 /85
9.5 /14
17649-18370
50 /130
9.5-86.5/92
57857
Note:
Node
Deviation
5.
High Pressure
6. Low
Temperature
Causes
Consequences
Safeguards
Ref. No.
1. FC-424 malfunctions to close 1. System up to FCV-424 from PFCV-424(Lean Amine to C003 may get pressurized
001)
2. XZV-720 malfunctions to
close Lean Amine to C-001)
1. U/S disturbance
Recommendations
Responsibility
2. TDI-213 is provided
10.6.1.1.2
with low alarm (for C001),TDI-214 is provided
with low alarm (for C-003)
3. Antifoaming agent
dosing is provided
10.6.1.1.3
4. PDI-372/392 are
provided with high alarms
at C-001 & C-003
respectively.
10.6.1.1.4
7. High
Temperature
1. AI-001/AI-002 is
provided for monitoring
Page 76 of 136
10.6.1.2
SEI
10.6.1.2
10.7.1.1.1
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 10
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)
STREAM DETAILS
Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column
FC-434,FC-424
Project :
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column
50 /85
9.5 /14
17649-18370
50 /130
9.5-86.5/92
57857
Note:
Node
Deviation
Causes
8. High level
9. Low level
1. Refer 10.1.1.1.1
10. Composition
1.Contamination of CO/CO2 in
lean amine supply
11. Others
No new cause
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
10.8.1
10.9.1
1.Accumulation of CO/CO2 in the system
leading to reduction in catalyst activity.
10.1.1.1.
10.11
Page 77 of 136
SEI/NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 11
Rich Amine from HP Amine absorber system to LP amine absorber bottom to B/L
DESIGN INTENTION
To supply Rich amine from HP amine absorber column to LP amine absorber column
DRAWINGS
CS-140-PR-15-0010, CS-140-PR-15-0016
EQUIPMENT
STREAM DETAILS
Rich amine from HP Amine absorber column(C-001) bottom to LP Amine absorber column(C-003)
Temperature (C)
SERVICE
Rich amine from HP
amine absorber column to LP
Amine absorber column
56-57/130
6.2-78.6/92
60413
Note:
Node
Deviation
2.
Less/No flow
High Flow
Causes
Consequences
Safeguards
1. LC-521 Malfunctions to
Close LCV-521
2. XZV-709 Malfunctions to
close
1. LC-521 is provided
with
High alarm.
11.1.2.1.1
3. LC-532 Malfunctions to
Close
LCV-532
1. LA-560 is provided
with
HH alarm.
11.1.3.1.1
1. LZ-523 LL alarm
will activate UZ-709.
11.2.1.1.1
11.2.1.2.1
11.1.1.1
4. Low pressure
Recommendations
Responsibility
SEI
PMC/NOCL
3. Reverse/Misdirected
Flow
Ref. No.
11.2.2.2
1. NRV is provided at
B.L
11.3.1.1.1
2. LC-532 is provided
with high alarm.
11.3.1.1.2
3. LI-560 is provided
with high high alarm.
11.3.1.1.3
1.Refer 8.3.1.1
11.4.1
Page 78 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 11
Rich Amine from HP Amine absorber system to LP amine absorber bottom to B/L
DESIGN INTENTION
To supply Rich amine from HP amine absorber column to LP amine absorber column
DRAWINGS
CS-140-PR-15-0010, CS-140-PR-15-0016
EQUIPMENT
STREAM DETAILS
Rich amine from HP Amine absorber column(C-001) bottom to LP Amine absorber column(C-003)
Temperature (C)
SERVICE
Rich amine from HP
amine absorber column to LP
Amine absorber column
56-57/130
6.2-78.6/92
60413
Note:
Node
Deviation
5. High pressure
Causes
Consequences
Safeguards
2.External fire
Ref. No.
11.5.1
1.PSV-318A/B design
covers external fire
case
11.5.2.2.1
6. Low
Temperature
11.6.1
7.
1. Refer 10.7.1.1.1
11.7.1
11.8.1
High Temperature
8. High level
9. Low level
10. Composition
No new cause.
11.8.1.1.1
2.LC-532 is provided
with high alarm
11.8.1.1.2
3.LI-560 is provided
with high high alarm.
11.8.1.1.3
11.9.1
11.1
11. Others
11.11
Page 79 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 12
LP Amine absorber system (LP Amine Column KOD, Off gas KOD) to B/L
DESIGN INTENTION
To Supply Off /Fuel gases from sour water flash drum and stripper reflux drum to B/L Unit-350.
DRAWINGS
CS-140-PR-15-0021, CS-140-PR-15-0016,CS-140-PR-15-0006
EQUIPMENT
Stripper Reflux Drum (140-V-008),LP Amine KOD(140-V-010), LP Amine Absorber Column (140-C-003), Off gas KOD (140-V-018) ,Sour water flash Drum(140-V-017)
STREAM DETAILS
Flash gas from flash drum(V-017)and off gases from Reflux drum (V-008) is collected to KOD of LP Amine absorber column (C-010) where it is treated with amine solution and send to B/L or Fuel gas header
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Off gases from reflux drum to
KOD of LP Amine absorber
Off gases/Fuel gases LP
amine KOD to B/L
45.0 /65
6.4 /8
1172-1371
45.0 / 65
2.6 - 6.3 /8
512-741
Note:
Node
Deviation
Less/No flow
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
2.
High Flow
2. LC-551 malfunctions to close 1. V-018 level will increase & Liquid may
LCV-551 located at Off gas
carryover with off gas/fuel gas
KOD(V-018).
12.1.2.1
SEI
3. LC-530 malfunctions to close 1. V-010 level will increase & Liquid may
LCV-530 when required.
carryover with off gas to C- 003 leads to
foaming in C-003.
12.1.3.1
SEI/NOCL
12.2.1.2.1
12.2.1.2.2
12.2.2.1
Page 80 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 12
LP Amine absorber system (LP Amine Column KOD, Off gas KOD) to B/L
DESIGN INTENTION
To Supply Off /Fuel gases from sour water flash drum and stripper reflux drum to B/L Unit-350.
DRAWINGS
CS-140-PR-15-0021, CS-140-PR-15-0016,CS-140-PR-15-0006
EQUIPMENT
Stripper
2.
HighReflux
Flow Drum (140-V-008),LP Amine KOD(140-V-010), LP Amine Absorber Column (140-C-003), Off gas KOD (140-V-018) ,Sour water flash Drum(140-V-017)
STREAM DETAILS
Flash gas from flash drum(V-017)and off gases from Reflux drum (V-008) is collected to KOD of LP Amine absorber column (C-010) where it is treated with amine solution and send to B/L or Fuel gas header
Operating/Design Parameters
Pressure ( bar g)
Temperature (C)
SERVICE
Off gases from reflux drum to
KOD of LP Amine absorber
Off gases/Fuel gases LP
amine KOD to B/L
45.0 /65
6.4 /8
1172-1371
45.0 / 65
2.6 - 6.3 /8
512-741
Note:
Node
Deviation
Causes
Consequences
3. Reverse/Misdirected flow
4.
High Pressure
2. External fire
Safeguards
Ref. No.
1. Overpressurization of C-003,V-018,V-017
5. Low temp.
No new cause
6. High
Temperature
12.3.1.1
2. PSV-318A/B is
provided.
12.4.1.1.2
12.4.2.1.1
12.5
12.6.1.1.1
12.6.1.1.2
3. TDI-214 is provided.
12.6.1.1.3
12.7
7. Low level
8. high level
12.8
9. composition
No new cause
12.9
10. others
No new cause
12.1
Page 81 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 13
Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)
STREAM DETAILS
Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.
Pressure ( bar g)
65-252.1/300
40.0/ 140
7.3-11.8/15
115553
5.0-7.3 /9
115214
Note:
Node
13. Stripper bottom to Gas oil Air 1.
cooler, Coalescer and Salt Dryer
to B/L
Deviation
Less/No flow
Causes
1. P-005A/B trips.
Consequences
1. C-002 level will increase, ultimately
leading to filling of column.
Safeguards
1. LC-535 on stripper
provided with high alarm
Ref. No.
Recommendations
Responsibility
13.1.1.1.1
13.1.2.1.1
3. LC-535(maintaing stripper
bottom level)/FC-454
malfunctions to close FCV454(Start-up recirculation line).
13.1.3.1
Page 82 of 136
SEI
Remarks
Less/No flow
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 13
Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)
STREAM DETAILS
Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.
Pressure ( bar g)
65-252.1/300
40.0/ 140
7.3-11.8/15
115553
5.0-7.3 /9
115214
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Refer 13.1.2.2.1
Refer 13.1.2.2.1
7. FC-436 malfunctions to close 1. Product quality upset (Flash point ,sulfur 1. SC-011(type B) is
FCV-436
content of Gas oil)
provided at downstream
of salt dryer.
2.
High Flow
3. Reverse/Misdirected
Flow
13.1.7.1.1
13.1.7.1.2
13.1.8.1.1
8. XZV-717 malfunctions to
close
1. LC-535/FC-442 malfunctions
to open FCV-442.
13.1.5.1.1
SEI
SEI
2. LC-535/FC-454 malfunctions
to open FCV-454(Start-up
recirculation line).
1. LZ-538 is provided
with LL alarm to activate
UZ-712.
13.2.2.1.1
1. NRV provided in
Rundown line at B.L.
13.3.1.1.1
Page 83 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 13
Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)
STREAM DETAILS
Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.
Pressure ( bar g)
65-252.1/300
40.0/ 140
7.3-11.8/15
115553
5.0-7.3 /9
115214
Note:
Node
Deviation
4.
Low Pressure
Causes
1. U/S disturbance
Consequences
1. P-005 capacity reduces and level in
column will rise.
Safeguards
1. LZ-537 HH will
activate
UZ-717 to close XZV717 on M.P steam line.
1. EA-003 trips
Ref. No.
Recommendations
Responsibility
13.4.1.1.1
13.4.2
13.5.1.1.1
2. Separate electric
13.5.1.1.2
supply line is provided for
the fans in EA-003.
6. Problem/Requirements
1. Refer 13.5.1.1.1 ~2
1. Refer 7.8.1.1.1
13.5.2.1
13.5.3.1.1
13.5.3.1.2
1. Water may carry over with diesel product. 1. SC-011 is provided for 13.6.2.1.1
sampling
2. PDI-923 is provided
with high alarm.
Page 84 of 136
13.6.1.1.1
13.6.2.1.2
SEI/VENDOR
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 13
Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)
STREAM DETAILS
Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.
Pressure ( bar g)
65-252.1/300
40.0/ 140
7.3-11.8/15
115553
5.0-7.3 /9
115214
Note:
Node
Deviation
Causes
3. Leakage through Seal in P005A/B
Consequences
1. Possible fire
Safeguards
2. HZ-850 is provided at
safe distance to activate
UZ-712.
Ref. No.
Recommendations
Responsibility
13.6.3.1.2
13.6.4.1
7. Operation/Maintenance
13.7
Page 85 of 136
NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 14
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.
Pressure ( bar g)
45/140
45/140
9.5-11.5/15
6.0-11/15
9105
2956
Note:
Node
14. Stripper Overhead system
Deviation
1. Low/No Flow of overhead
vapors
Causes
Consequences
Safeguards
Respons
ibility
14.1.2.1
14.1.2.2
1. LC-540 is provided
with high alarm.
14.2.1.1.1
1. FC-439/441 is
provided with low alarm
14.2.1.2.1
14.2.1
1. LC-540 is provided
with high alarm.
Page 86 of 136
14.2.3.1.1
Remarks
In case TC/FC cascaded
rearrangement is accepted
then FC-439 low alarm is
there.
14.1.1.1.2
1. No hazardous consequences.
Recommendations
Ref. No.
SEI
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 14
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0017,
2. Low/no flow of refluxCS-140-PR-15-0020, CS-140-PR-15-0021,CS-140-PR-15-0023
EQUIPMENT
STREAM DETAILS
Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.
Pressure ( bar g)
45/140
45/140
9.5-11.5/15
6.0-11/15
9105
2956
Note:
Node
Deviation
Causes
4. LC-540 malfunction to close
LCV-540B/FCV-441
Consequences
Safeguards
2. LC-530 is provided
with low level alarm.
Ref. No.
14.2.4.1.1
Recommendations
Respons
ibility
Remarks
83.Consider providing
SEI
independent level
transmitters with high alarm
and delete the high alarm
from LC-540
84.Consider Providing
independent level
transmitters with high
alarm and delete the high
alarm from LC-540
14.2.4.1.2
High Flow
14.3.1.1.1
1. LC-540 is provided
with low alarm.
14.3.1.2.1
1. LC-540 is provided
with low alarm.
14.3.2.1.1
1. FC-441/FC-439 is
provided with Low alarm
14.3.3.1.1
Page 87 of 136
SEI
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 14
DESIGN INTENTION
3. High Flow
To Supply Wild Naphtha to B/L.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.
Pressure ( bar g)
45/140
45/140
9.5-11.5/15
6.0-11/15
9105
2956
Note:
Node
Deviation
Causes
Consequences
2. Pump will loose suction.
Safeguards
1. Sufficient time is
available for V-008 to
loose liq. Level.
Ref. No.
NA
14.4
5.
14.5.1.1.1
6. High
Temperature
14.5.1.2.1
14.6.1.1.1
14.6.1.1.2
Respons
ibility
Remarks
14.3.3.1.1
4. Reverse/Misdirected
Flow
Low Pressure
Recommendations
14.6.1.2
85.Consider Providing
independent level
transmitters with high
alarm and delete the high
alarm from LC-540
SEI
1. PSV-319A/B is
14.6.1.2.1
designed for reflux failure
case
2. TI-208 is provided with 14.6.1.2.2
high alarm
Page 88 of 136
SEI
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 14
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.
Pressure ( bar g)
45/140
45/140
9.5-11.5/15
6.0-11/15
9105
2956
Note:
Node
Deviation
7. Low temp.
Causes
Consequences
9. Operation/Maintenance
Ref. No.
2.Reflux failure
14.6.2.1
14.6.3.1
1.U/S disturbances.
14.7.1.1.1
Safeguards
Recommendations
Respons
ibility
14.7.2.1.2
14.8.1.1
87.Confirm that
hydrocarbon detectors are
provided in cooling tower
area.
NOCL
14.9.1.1
SEI/NOC
L
2. overdosing of corrosion
inhibitor
14.9.2.1
Page 89 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 15
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)
STREAM DETAILS
Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg
Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.
Pressure ( bar g)
45 /120
20 /26
2457
Note:
Node
15. Makeup H2
Compressor system
Deviation
1.
Low/No Flow
Causes
1. U/S disturbance
Consequences
Safeguards
Ref. No.
1. FI-432 at hydrogen
makeup line from B/L, is
provided with low alarm.
15.1.1.1.1
1. PC-383 is provided
with low alarm
15.1.1.2.1
2. PZ-385/PZ-956 LL
alarm will activate UZ707 to trip K-001A/B
15.1.1.2.2
Recommendations
89. Provide low alarm at PI358A on separator drum.
Responsibility
SEI
Remarks
P&ID is to be updated for
HydroCOM signals.
15.1.2.1.1
2 Vendor P&ID is to be
updated for all operator
controls, DCS interfaces of
HydroCOM.
3. XZV-707 at compressor discharge line to
reaction section, malfunction to close
15.1.3.1.1
15.1.3.2.1
1. FI-432 is provided
with low alarm
15.1.4.1.1
1. PC-974 is provided
with high alarm
15.1.5.1.1
Page 90 of 136
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 15
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)
STREAM DETAILS
Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg
Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.
Pressure ( bar g)
20 /26
Note:
Node
45 /120
Deviation
Causes
Safeguards
2. PSV-316/317 is
provided.
9. Demister choke-up
2. Low/no flow(V),P&ID-0014
Ref. No.
15.1.5.1.2
Recommendations
Responsibility
VENDOR
1. PSV-952A/B is
provided.
15.1.8.1.1
1. PC-383 is provided
with low alarm.
15.1.9.1.1
2. PSV-315 is provided.
15.1.9.1.2
3. PZ-901 is provided to
trip the compressor.
15.1.9.1.3
1.U/S disturbances
15.2.1.1
2.Compressor trip.
15.2.1.2
2457
1. PDI-901 is provided.
15.2.1.1
15.2.2.2.1
15.2.2.3.1
15.2.2.3.2
Page 91 of 136
Remarks
Vendor P&IDs are to be
updated for consistency in tag
no.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 15
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0013,
CS-140-PR-15-0014, CS-140-PR-15-0015
2. Low/no flow(V),P&ID-0014
EQUIPMENT
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)
STREAM DETAILS
Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg
Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.
Pressure ( bar g)
45 /120
20 /26
2457
Note:
Node
Deviation
Causes
Consequences
4. High motor current
Safeguards
1.Motor overload trip is
provided (from MCC).
High Flow
1. FC-431/PC-383/PC-974 malfunctions to
close FCV431(Makeup line)
4. High flow(V),P&ID-0014
15.2.2.4.1
15.3.1.1.2
15.3.2.1
1. Refer 15.1.4.1.1
15.3.2.2.1
1. Refer 15.1.7.1
15.3.3.1
1. Refer 15.1.6.1.1
15.3.4.1
15.4.1.1
15.4.2.1.1
15.4.2.1.2
15.4.2.1.3
15.4.2.2.1
Recommendations
15.2.2.5
Ref. No.
Page 92 of 136
15.4.2.2.2
SEI
93.Confirm that the suction
system can either withstand
with the high suction pressure
and PSV is designed for the
same.
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 15
DESIGN INTENTION
DRAWINGS
EQUIPMENT
4. High flow(V),P&ID-0014
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)
STREAM DETAILS
Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg
Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.
Pressure ( bar g)
45 /120
20 /26
2457
Note:
Node
Deviation
5. Reverse/Misdirected
Flow
Causes
7.
Low Pressure
Safeguards
Ref. No.
1. K-001A/B trips.
1. NRV is provided in
15.5.1.1.1
make up hydrogen line to
Recycle gas.
6. Reverse/Misdirected
Flow(V),P&ID-0014
Consequences
15.5.1.1.2
15.5.2.1.1
Not applicable.
1. Compressor malfunctioning
15.4.3.1.1
16
1. PI-036/037 is
provided with low alarm
15.7.1.1.1
2. PZ-385A/956A is
15.7.1.1.2
provided with LL alarm to
activate UZ-707.
9.
High Pressure
15.8
15.9
Page 93 of 136
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 15
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)
STREAM DETAILS
Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg
Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.
Pressure ( bar g)
45 /120
20 /26
2457
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
15.1
1. Compressor may get damaged
1. TI-904/954 provided
with high alarm.
15.11.1.1.1
1. TI-904/954 is
15.11.2.1.1
provided with High alarm
1. TI-178 is provided
with
HH alarm
15.11.3.1.1
2. TI-901/951 is
15.11.3.1.2
provided with High alarm
1. TI-211 is provided
with high alarm
15.11.4.1.1
5. U/S disturbance
1. TI-231/233 is
15.11.5.1.1
provided with High alarm
2. TI-180/182 is
15.11.5.1.2
provided with High alarm.
1.U/S disturbance.
Page 94 of 136
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 15
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)
STREAM DETAILS
Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg
Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.
Note:
Node
Pressure ( bar g)
45 /120
20 /26
Causes
13.
High Level
Safeguards
Ref. No.
2457
Recommendations
Responsibility
1. LI-527 is
15.13.1.1.1
provided with High alarm.
2. LZ-529 HH
alarm will activate UZ707 to trip compressor.
15.13.1.1.2
15.14.1.1.1
1.High level in 2nd stage suction KO pot( Tube 1. Compressor may get damage due to
leak in interstage cooler EE-008A/B when
carryover of liquid.
machine is down and water collection in KOD).
1.LAH-901 is provided.
15. Problem/Requirements
1. Tube leak in EE- 004/008A/B/009 when unit 1. Hydrogen may ingress in cooling water.
is in running condition.
No major concern for
small leak. For major leak system will loose
hydrogen and compressor suction pressure
may go down.
1. PC-383 is provided
with low alarm
15.15.1.1.1
NOCL
17. Operation/Maintenance
15.16.1
1.Contamination
1. No safeguard
Page 95 of 136
15.17.1.1.1
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 16
Chemical Injection package (Only DMDS package is covered in HAZOP. All the applicable recommendations in this node are applicable to other injection packages.
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0023, CS-140-PR-15-0025
EQUIPMENT
Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System
STREAM DETAILS
Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System
AVAILABLE CONTROL
SCHEME
Operating/Design Parameters
Temperature(C)
Pressure ( bar g)
SERVICE
Sulfiding Agent
Antifoulant
Corrosion Inhibitor Antifoaming
Anti Oxidant
Ambient/65
Ambient /65
Ambient /65
Ambient/65
Ambient/65
1.5-7.5/13
0.0-4.0/6
0-10.8/13
0-11/12
0-7.5/10
1600
14.0
1.6
0.34/0.11
6.0
Note:
Node
Deviation
1.
Low/No Flow
Causes
1. P-007A trips( during
sulfidation)
Consequences
1. Discharge pressure will go down.
Delaying in sulfiding process.
Safeguards
1. Sulfiding process is
attended activity, LG549 is provided for
monitoring.
Ref. No.
Recommendations
16.1.1.1.1
Responsibility
Remarks
1. Licensor recommends to
have flow meter in DMDS
supply line from pump
discharge.
2. It is suggested to have
installed spare for DMDS pump
as to ensure continuous
operation of pump during
startup period of 26 hrs.
Reliability is to be ensured if
ware
High Flow
3. Reverse/Misdirected
Flow
4. Low pressure
5.
High Pressure
16.1.1.1.2
1. No significant consequences
1. possible contamination
16.2.1.1
16.3.1.1.1
16.3.2.1.1
16.3.2.2.1
16.4.1
16.4.2.1
16.5.1.1.1/2
2. External fire
16.5.2
Page 96 of 136
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 16
Chemical Injection package (Only DMDS package is covered in HAZOP. All the applicable recommendations in this node are applicable to other injection packages.
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0023, CS-140-PR-15-0025
EQUIPMENT
Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System
STREAM DETAILS
Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System
AVAILABLE CONTROL
SCHEME
Operating/Design Parameters
Temperature(C)
Pressure ( bar g)
SERVICE
Sulfiding Agent
Antifoulant
Corrosion Inhibitor Antifoaming
Anti Oxidant
Ambient/65
Ambient /65
Ambient /65
Ambient/65
Ambient/65
1.5-7.5/13
0.0-4.0/6
0-10.8/13
0-11/12
0-7.5/10
1600
14.0
1.6
0.34/0.11
6.0
Note:
Node
Deviation
6.
Low Level
7.High level
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
16.6.1
16.7.1.1.1/2
8. Low temperature
No major issues.
16.8
9. High temperature
No major issues.
16.9
10. Composition
No major issues.
16.1
11. Others
16.11.1.1
Page 97 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 17
DESIGN INTENTION
To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.
DRAWINGS
CS-140-PR-15-0024, CS-140-PR-15-0026
EQUIPMENT
STREAM DETAILS
SERVICE
Temperature(C)
Fuel Gas
Fuel Oil
Pressure ( bar g)
25/70
180/210
3.5/5
11/18
416
615
Note:
Node
17. Fuel oil, Fuel gas and
Heater Firing System
Deviation
1.
Causes
1. PC -820 malfunctions to
close
PCV-820(fuel gas line)
Consequences
Safeguards
Ref. No.
17.1.1.1.1
17.1.1.2.1
2. XZV-718A/C malfunctions to
close (fuel gas line)
17.1.3.1.1
4. XZV-718E/F malfunctions to
close (pilot gas line)
17.1.4.1.1
Recommendations
Responsibilit
y
Remarks
17.1.2.1
17.1.4.1.3
Page 98 of 136
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 17
DESIGN INTENTION
To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.
DRAWINGS
CS-140-PR-15-0024, CS-140-PR-15-0026
EQUIPMENT
STREAM DETAILS
SERVICE
Temperature(C)
Fuel Gas
Fuel Oil
Pressure ( bar g)
25/70
180/210
3.5/5
11/18
416
615
Note:
Node
Deviation
Causes
Consequences
2. Fuel oil pressure may come down.
6. XZV-718N malfunctions to
close (Fuel oil line)
Safeguards
Ref. No.
17.1.6.1
8. Strainer choking.
17.1.8.1.1
17.1.8.1.2
17.1.8.1.3
9. PC-899/HCV-830
malfunctions to close.
Responsibilit
y
1. Refer 17.1.4.1.1 ~ 3
Recommendations
17.1.7.1.1
17.1.7.2.1
105.Provide additional
flushing oil return taping
upstream of XZV-718 M
for flushing.
SEI
SEI
Page 99 of 136
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 17
DESIGN INTENTION
To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.
DRAWINGS
CS-140-PR-15-0024, CS-140-PR-15-0026
EQUIPMENT
STREAM DETAILS
SERVICE
Fuel Gas
Fuel Oil
Operating/Design Parameters
Pressure ( bar g)
25/70
180/210
3.5/5
11/18
416
615
Note:
Node
Deviation
Causes
2.
High Flow
Consequences
3. PDC-826 malfunctions to
open
PCV-826
Ref. No.
17.1.9.2.1
17.1.9.3.1
17.1.10.1.1
17.1.10.1.2
17.2.1.1.1
17.2.1.1.2
17.2.2.1.1
17.2.2.2.2
17.2.3.1.1
2. PC -820 malfunctions to
open PCV-820(fuel gas line)
Safeguards
Recommendations
108. Low oxygen alarm at
AI-004 is to be provided
Responsibilit
y
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 17
DESIGN INTENTION
To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.
DRAWINGS
CS-140-PR-15-0024, CS-140-PR-15-0026
EQUIPMENT
STREAM DETAILS
SERVICE
Temperature(C)
Fuel Gas
Fuel Oil
Pressure ( bar g)
25/70
180/210
3.5/5
11/18
416
615
Note:
Node
Deviation
Causes
4. PC-899/HCV-830
malfunctions to open.
3. Reverse/Misdirected flow
4.
Low Pressure
5. High pressure
Consequences
Safeguards
Ref. No.
17.2.3.2.2
17.2.4.1.1
1. Damper open/close
indications are provided.
17.2.4.2.1
17.3.1.1.1
17.3.1.1.2
17.4.1.1.1
2. PC -820 malfunctions to
close
PCV-820(fuel gas line)
17.4.2.1
17.4.3.1
17.5.1
17.5.2
17.5.3
Recommendations
Responsibilit
y
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 17
DESIGN INTENTION
To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.
DRAWINGS
CS-140-PR-15-0024, CS-140-PR-15-0026
EQUIPMENT
STREAM DETAILS
SERVICE
Temperature(C)
Fuel Gas
Fuel Oil
Pressure ( bar g)
25/70
180/210
3.5/5
11/18
416
615
Note:
Node
Deviation
6. Low
Temperature
Causes
1. U/S disturbance (fuel gas
line)
Consequences
1. Carryover of condensate with
fuel gas line leading to backfiring in the
furnace.
1. Increase in fuel oil viscosity leading to
improper atomization and sooty flame.
Safeguards
1. Fuel gas KOD is provided
and Steam tracing is also
provided d/s V-025.
17.6.1.1.1
17.6.2.1.1
8. Low level
No new cause.
9.
High Level
Ref. No.
Recommendations
Responsibilit
y
17.6.3
17.7.1.1
NOCL
17.8
10. Problem/Requirements (Soot 1. Low/No flow of M.P steam to 1. Soot blowing will not be possible leading
blower)
soot blower(Fuel oil operation
to lower heat transfer.
only).
17.9.1.1.1
17.9.1.1.2
17.10.1.1.1
17.10.1.1.2
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 17
DESIGN INTENTION
To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.
DRAWINGS
CS-140-PR-15-0024, CS-140-PR-15-0026
EQUIPMENT
STREAM DETAILS
SERVICE
Temperature(C)
Fuel Gas
Fuel Oil
Pressure ( bar g)
25/70
180/210
3.5/5
11/18
416
615
Note:
Node
Deviation
Causes
Consequences
Safeguards
11. Operation/Maintenance
(Decoking system is not
HAZOPed as it is manual &
attended operation)
12. Operation/Maintenance
(heater maintenance)
Ref. No.
17.11
17.12.1
Recommendations
Responsibilit
y
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 18
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0030
EQUIPMENT
STREAM DETAILS
TCV-239
Project :
Operating/Design Parameters
SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW
Pressure ( bar g)
388/405
184/252
128/150
27437
1500
7687
Note:
Node
18.
HP/MP Steam
& MP BFW
Deviation
1.
Low/No Flow
Causes
1. U/S disturbance (HP Steam supply
failure)
Consequences
Safeguards
Ref. No.
1. KT-002 trips
1. PI-810 is provided
with low alarm.
1. XZV-835 in MP
boiler feed water line
closes if RGC turbine
trips(UZ-705)
18.1.1.1.1
18.1.1.3.1
18.1.2.1.1
1. FI-804A is provided
with low alarm
2. PI-808 is provided
with low alarm.
2. No supply of MP steam to soot-blower
when required.
18.1.2.2.2
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 18
1.
Low/No
To supply
HPFlow
steam ,MP steam and MP BFW
DRAWINGS
CS-140-PR-15-0030
EQUIPMENT
STREAM DETAILS
TCV-239
Project :
Operating/Design Parameters
2. U/S disturbance (MP Steam supply
from OSBL fails)
Temperature(C)
SERVICE
HP STEAM
MP STEAM
MP BFW
Pressure ( bar g)
388/405
184/252
128/150
27437
1500
7687
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
1. HH turbine speed
18.1.2.4.1
trip SZ-002 is provided.
Responsibility
BHEL/SEI
18.1.2.3.1
18.1.2.4.2
2. Low low back
pressure trip PZ678A/B/C is provided.
Recommendations
Remarks
18.
HP/MP Steam
& MP BFW
1.
Low/No Flow
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 18
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0030
EQUIPMENT
STREAM DETAILS
TCV-239
Project :
Operating/Design Parameters
SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW
Pressure ( bar g)
388/405
184/252
128/150
27437
1500
7687
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
18.1.3.1
1. Refer 18.1.3.1
18.1.4.1
1. Steam trap is
provided.
18.2.1.1.1
3. Reverse/Misdirected flow.
1.Turbine trip.
18.3.1.1.1
4.
Low Pressure
18.4.1
5.
High Pressure
1. Refer 18.2.1.1.1
18.5.1
2.
High Flow
Recommendations
112.Line from
Desuperheater
downstream upto steam
trap is to be designed for
two phase flow.
Responsibility
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 18
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0030
EQUIPMENT
STREAM DETAILS
TCV-239
Project :
Operating/Design Parameters
SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW
Pressure ( bar g)
388/405
184/252
128/150
53.5/58
10/12
24/35
27437
1500
7687
Note:
Node
Deviation
6. Low temp.
Causes
1.Upset in U/S desuperheater
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
BHEL
18.6.1.1
18.6.1.2
114. TI-627 is to be
provided with low temp.
alarm in DCS.
7. High temp.
No significant cause.
18.7
8. Composition
NA
18.8
9. Others
NA
18.9
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 19
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0032
EQUIPMENT
STREAM DETAILS
Cooling water is supplied to all cooling water exchangers from B/L and similarly cooling water return from all exchangers to header
Project :
SERVICE
Temperature(C)
Cooling water supply
Cooling water return
Pressure ( bar g)
33/70
44/70
4/7
3/7
688411
688411
Note:
Node
19. Cooling water system
Deviation
1.
Low/No Flow
Causes
Consequences
Safeguards
Ref. No.
1. U/S disturbance
2.High flow
1. U/S disturbance
3.Reverse/Misdirected flow
1. No significant causes
identified.
19.3.1
4.Low pressure
1. Refer 19.1.1.1.1
19.4.1
5.High pressure
1. Refer 19.2.1.1
19.5.1
6.Low temp.
1. No significant causes
identified.
7. High
Temperature
19.1.1.1.1
19.2.1.1
19.5.2.1.1
19.6.1
19.7.1.1.1
19.7.1.1.2
Recommendations
Responsibility
Remarks
7. High
Temperature
Node
Deviation
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
19.7.2.2.1
8.Low level
NA
19.8
9. High level
NA
19.9
10. Problem/Requirements
11.Composition
19.11.1.1
SEI/NOCL
19.11.2.1
NOCL
1.Hydraulic Check is
carried out based on
actual plant layout.
12.Others
13. Operation/Maintenance
19.10.1.1.1
19.12
1. Unit shut down, cooling water
header maintenance.
19.13.1.1
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 20
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.
SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen
Pressure ( bar g)
152/200
Amb. /65
Amb./65
Amb./66
Amb./66
Amb/65
2818
1000(1)
1000(1)
518
215
430(2)
Node
20. Portable/Service Water, LP
Steam,
Plant/Instrument Air
and Nitrogen
Deviation
1.
Low/No Flow
Causes
Consequences
Safeguards
Ref. No.
1. No significant consequences
20.1.1.1
1. No significant consequences
20.1.2.1
1. No significant consequences
20.1.3.1
1. PI-802 is provided 20.1.4.1.1
with low alarm.
2. Instrument air
backup for 20 min. is 20.1.4.1.2
provided from OSBL.
3. All instruments will
go to fail safe mode.
20.1.4.1.3
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 20
DESIGN INTENTION
DRAWINGS
20.
Portable/Service Water, LP
Steam,
Plant/Instrument
Air
EQUIPMENT
and Nitrogen
CS-140-PR-15-0031,
CS-140-PR-15-0033, CS-140-PR-15-0034
1.
Low/No Flow
STREAM DETAILS
Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.
SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen
Pressure ( bar g)
152/200
Amb. /65
Amb./65
Amb./66
Amb./66
Amb/65
2818
1000(1)
1000(1)
518
215
430(2)
Node
Deviation
Causes
6.
Consequences
U/S disturbance (LP Steam) 1. No/Low flow in header will result in low
pressure of snuffing/purging steam available
when required
Safeguards
Ref. No.
2. High flow
1. No significant cause
20.2.1
3. Reverse/misdirected flow
1. No significant cause
20.3.1
4. Low pressure
20.4.1
5. High Pressure
1. No significant cause
20.5.1
6. Low level
1. NA
7. High level
1. NA
8. Composition
1. NA
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 20
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.
SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen
Pressure ( bar g)
152/200
Amb. /65
Amb./65
Amb./66
Amb./66
Amb/65
2818
1000(1)
1000(1)
518
215
430(2)
Node
Deviation
9. Others
Causes
1. wrong connection for hoses
Consequences
1. Hazardous consequence if nitrogen is
connected when air is required.
Safeguards
Ref. No.
20.9.1.1
Recommendations
118. Ensure different
connections are available
for air and nitrogen hose
stations to avoid wrong
connections.
Responsibility
SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 21
Flare System
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0037, CS-140-PR-15-0038
EQUIPMENT
STREAM DETAILS
PSV discharge collected in Flare K.O drum (140-V-023) where liquid and gaseous phase is separated .Liquid HC is sent to slop header through flare K.O. drum pump (140-P-015A/B) and gaseous HC is sent to main flare header for burning.
SERVICE
Temperature(C)
Flare Gas From Flare
KOD to Flare header
Flare KOD/CBD Pump to
Slops Tank
Flare system
1.
Low/No Flow
2. High flow
45
57/250
5.5/14.5
57
Causes
Consequences
Safeguards
Ref. No.
21.1.2.1.1
1. Pump to autostart on
high level.
21.2.1.1.1
21.2.1.1.2
3. Low pressure
4. High pressure
5. Low Level
Pressure ( bar g)
45/250
21.1.1.1.1
2. Nitrogen backup is
available.
21.1.1.1.2
Recommendations
Responsibility
21.3.1
21.4.1
1. Pump will run dry.
6. High level
21.6.1
7. Low temp.
21.7.1
8. High temp.
21.8.1
SEI/NOCL
Remarks
21.
Flare system
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 21
Flare System
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0037, CS-140-PR-15-0038
EQUIPMENT
STREAM DETAILS
PSV discharge collected in Flare K.O drum (140-V-023) where liquid and gaseous phase is separated .Liquid HC is sent to slop header through flare K.O. drum pump (140-P-015A/B) and gaseous HC is sent to main flare header for burning.
SERVICE
Temperature(C)
Flare Gas From Flare
KOD to Flare header
Flare KOD/CBD Pump to
Slops Tank
Pressure ( bar g)
45/250
0.25/3.5
45
57/250
5.5/14.5
57
1. NA
10.Others
1. NA
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 22
Amine System
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0043, CS-140-PR-15-0044
EQUIPMENT
STREAM DETAILS
Amine effluent collected in Amine drain drum (140-V-022) where liquid and gaseous phase is separated .Liquid HC is sent to ARU Unit through amine drain pump( 140-P-014A/B) and gaseous HC is sent to flare header for burning.
SERVICE
Temperature(C)
Pressure ( bar g)
57/120
Amine
0.25/3.5
27634
Note:
Node
22. Amine drain system
Deviation
Causes
Consequences
Safeguards
Ref. No.
22.1.1.1
1. U/S disturbance
1. U/S disturbance
1. RO-801 is
provided.
22.3.1.1.1
2. Vessel is floating
with flare header.
22.3.1.1.2
4. Reverse/Misdirected
Flow
1. No new cause
5. Low Level
6. High level
1. Refer 22.1.1.1
7. Low temp.
8 .High temp.
1. U/S disturbance
9.Low pressure
1. No significant cause
22.9.1
10.High pressure
22.10.1
11.Composition
1. No significant cause
Recommendations
Responsibility
SEI
SEI
22.4.1
22.5.1.1
22.6.1
22.7.1
1. Likely to degrade amine.
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 22
Amine System
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0043, CS-140-PR-15-0044
EQUIPMENT
STREAM DETAILS
Amine effluent collected in Amine drain drum (140-V-022) where liquid and gaseous phase is separated .Liquid HC is sent to ARU Unit through amine drain pump( 140-P-014A/B) and gaseous HC is sent to flare header for burning.
SERVICE
Temperature(C)
Pressure ( bar g)
57/120
Amine
0.25/3.5
27634
Note:
Node
Deviation
Causes
12. Others
1. No significant cause
13. Problem/Requirements
1. No significant cause
14. Operation/Maintenance
1. No significant cause
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 23
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0039, CS-140-PR-15-0040
EQUIPMENT
STREAM DETAILS
HC effluent collected in HC drain drum 140-V-021 where liquid and gaseous phase is separated .Liquid HC is sent to SLOP through closed drain pump 140-013A/B and gaseous HC is sent to flare header for burning.
SERVICE
Temperature(C)
Hydrocarbon
Pressure ( bar g)
40/150
7500
Note:
Node
23. Hydrocarbon drain system
Deviation
Causes
Consequences
Safeguards
1. U/S disturbance
1. U/S disturbance
4. Reverse/Misdirected
Flow
23.4.1
5. Low temp.
1. No significant cause
23.5.1
6. High
Temperature
1. LI on V-021 is
provided.
Ref. No.
1. RO-802 is
provided.
Responsibility
SEI
SEI
SEI/NOCL
Remarks
23.3.1.1.1
1. Cooling water
provision is there.
23.1.1.1.1
Recommendations
23.6.2.1.1
7. Low Level
23.7.1.1
8. High level
1. Refer 23.1.1.1.1
23.8.1
9. Low pressure
1. No significant cause
23.9.1
SEI
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 23
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0039, CS-140-PR-15-0040
EQUIPMENT
STREAM DETAILS
HC effluent collected in HC drain drum 140-V-021 where liquid and gaseous phase is separated .Liquid HC is sent to SLOP through closed drain pump 140-013A/B and gaseous HC is sent to flare header for burning.
SERVICE
Temperature(C)
Hydrocarbon
Pressure ( bar g)
40/150
7500
Note:
Node
Deviation
Causes
1. Refer 23.3.1.1.1
11. Composition
1. No significant cause
12. Others
1. No significant cause
13 . Problem/Requirements
1. No significant cause
14. Operation/Maintenance
1. No significant cause
Consequences
Safeguards
Ref. No.
23.10.1
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 24
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0041
EQUIPMENT
STREAM DETAILS
Condensate from steam traps is collected in LP/MP/HP headers & drained to ND after cooling
SERVICE
Temperature(C)
Pressure ( bar g)
102/252
0.1/3.5
102/405
0.1/3.5
350
Note:
Node
24. Condensate Collection
system
Deviation
Causes
1. Low/No Flow
1. No new cause
2. High flow
1. No new cause
3. Low pressure
1. No new cause
4. High pressure
1. No new cause
5. Low Level
1. No new cause
6. High level
1. No new cause
7. Low temp.
1. No new cause
8. High temp.
1. Coolling water failure
9. Composition
1. No new cause
10.Others
1. No new cause
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 25
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600002
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
50
Lube oil
.
Note:
Node
25. Makeup H2
Compressor -Lube oil system
Deviation
Causes
Consequences
1. Low/No Flow
Safeguards
Ref. No.
25.1.1.1.1
25.1.1.1.2
25.1.1.1.3
25.1.2.1
3. Cooler leak
1. Cooler is designed
following API 10/13 rule.
25.1.3.1.1
1. Thermostatic self
actuating type of
valve,During any type of
failure two ports are
available.
25.1.4.1.1
Recommendations
Responsibility
NEA
Remarks
25. Makeup H2
Compressor -Lube oil system
1. Low/No Flow
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 25
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600002
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
50
Lube oil
.
Note:
Node
Deviation
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
25.1.6.1.1
2.
High Flow
7. Lubricator failure
1. No significant consequances.
1.FAL-901 is provided.
25.1.7.1.1
25.2.1.1
3. Reverse/Misdirected
Flow
1. No significant causes.
25.3.1
4.
Low Pressure
25.4.1
5.
High Pressure
6. High
Temperature
1. PSV-907/908 is
provided
1. Reduced lubrication effect leading to
damage to compressor parts at high temp.
(beyond 60 C).
25.5.1.1
NEA
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 25
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600002
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
50
Lube oil
.
Note:
Node
6. High
Temperature
Deviation
Causes
Consequences
Safeguards
2. Malfunction of TCV-901
7.
High Level
8. Low level
Ref. No.
Recommendations
Responsibility
NEA
NEA
25.6.2
1. No significant causes.
1. Low level in oil reservoir
due to leakage in lube oil
system.
25.7.1
1. Less lube oil flow and pressure leading to
compressor damage.
25.8.1.1.1
10. Composition
25.10.1.1
11. Operation/Maintenance
1. Poor Lubrication.
Leakage of Oil to Process may contaminate
the process fluid leading to off spec. product.
25.11.1.1
9. Problem/Requirements
25.8.2.1.1
25.9
NEA/Axens
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 26
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600006
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
cooling water
50
Note:
Node
26. Makeup H2
Compressor -Closed cooling water system
Deviation
1.
Low/No Flow
Causes
1. main cooling water pump
failure.
Consequences
1.Less cooling water flow and pressure
leading to higher process gas temp.
Safeguards
1. Cooling water pump
with auto start though
PT-912 is provided.
26.1.1.1.1
26.1.1.1.2
3. Cooler leak
1. No significant consequences.
Ref. No.
Recommendations
Responsibility
26.1.1.2.1
26.1.1.2.2
26.1.2.1.1
26.1.3.1
1.Bypass will be used
26.1.4.1.1
during filter maintinance.
NEA
NEA
Remarks
26. Makeup H2
Compressor -Closed cooling water system
1.
Low/No Flow
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 26
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600006
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
SERVICE
Temperature(C)
cooling water
50
Note:
Node
Deviation
Causes
2.
High Flow
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
NEA
NEA
26.1.5.1.1
1. No significant cause.
26.2.1
3. Reverse/Misdirected
Flow
1. No significant causes.
26.3.1
4.
Low Pressure
26.4.1
5.
High Pressure
6. High
Temperature
7. Low temp.
1. Winter season
26.7.1.1
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 26
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600006
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
7. Low temp.
cooling water
Temperature(C)
1. Winter season
Pressure ( bar g)
50
Note:
Node
Deviation
8.
High Level
Causes
Consequences
Safeguards
1. No significant causes.
Ref. No.
Recommendations
Responsibility
SEI
26.9.1.1.1
NEA
26.10.1.1
NEA
26.8.1
9. Low level
10. Problem/Requirements
1. Packing leakage/failure.
11. Composition
1. Not applicable
12. Operation/Maintenance
1. No significant causes.
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 27
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600003
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
Nitrogen
Amb.
1.5(packing)
1(distance piece)
Note:
Node
27. Makeup H2
Compressor -Distance piece/packing purge
Deviation
1. Low/No Flow
Causes
1. External nitrogen supply
failure
Consequences
1. Hydrogen accumulation.
Safeguards
1. Vent is connected to
flare.Not affecting the
environment.
Ref. No.
27.1.1.1.1
2.
High Flow
3. Reverse/Misdirected
Flow
4.
Low Pressure
5.
High Pressure
1. Refer 27.2.1.1
Recommendations
Responsibility
NEA/SEI
NEA
27.2.1.1
1.NRVs are provided in
upstream and
downstream of distance
piece.
27.3.1.1.1
27.4.1
1. PSV-909/910 are
provided.
27.5.1.1.1
6. High
Temperature
1. No significant causes.
27.6.1
7. Low temp.
1. No significant causes.
27.7.1
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 27
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600003
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
Nitrogen
Amb.
1.5(packing)
1(distance piece)
Note:
Node
Deviation
8.
High Level
Causes
Consequences
9. Low level
1. Not applicable
10. Problem/Requirements
1. No significant causes.
11. Composition
1. Not applicable
12. Operation/Maintenance
1. No significant causes.
Safeguards
Ref. No.
27.8.1.1.1
2. LG-904 is provided
for monitoring.
27.8.1.1.2
Recommendations
141. Drain line from
packing drain pot to be
routed to CBD
Responsibility
NEA/SEI
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 27
DESIGN INTENTION
DRAWINGS
CS-140-PR-D-06600003
EQUIPMENT
140-K-001A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
Nitrogen
Amb.
1.5(packing)
1(distance piece)
Note:
Node
Deviation
13. Others
Causes
1. Nitrogen Mode
Consequences
Safeguards
Ref. No.
27.13.1
Recommendations
Responsibility
NEA
Remarks
1. Machine needs separate
control and trip set points for
nitropgen case
2.Separate modes of
operation to be pragrammed
in DCS and in safeguarding
system.
3. Pressure can be developed
up to 24 barg with suction
pressure of 7 barg.
4. Flow rate of nitrogen
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 27
Recycle Compressor- Lube oil (No HAZOP was done except for deviation 1 & 2. The same need to be carried out later with the vendor).
DESIGN INTENTION
DRAWINGS
0-336-00-32088
EQUIPMENT
140-K-002A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Lube Oil
Pressure ( bar g)
Amb.
1.5(packing)
1(distance piece)
Note:
Node
28. Recycle
Compressor -Lube Oil
Deviation
Causes
Consequences
Safeguards
Ref. No.
1.
Low/No Flow
2.
High Flow
1. PSV is available in
28.2.1.1.1
pump discharge.
2. PCV 602 will maintain
the bearing header
pressure.
3. PCV 601 will maintain
the pump discharge
pressure.
1. N/A
1. N/A
1. N/A
3. Reverse/Misdirected Flow
4.
Low Pressure
5.
High Pressure
6.
High Temperature
7. Low temp.
28.1.1.1.1
28.3.1.1.1
Recommendations
Responsibility
Remarks
28. Recycle
Compressor -Lube Oil
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 27
Recycle Compressor- Lube oil (No HAZOP was done except for deviation 1 & 2. The same need to be carried out later with the vendor).
DESIGN INTENTION
DRAWINGS
0-336-00-32088
EQUIPMENT
140-K-002A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Lube Oil
Pressure ( bar g)
Amb.
1.5(packing)
1(distance piece)
Note:
Node
Deviation
8.
High Level
9. Low level
10. Problem/Requirements
11. Composition
12. Operation/Maintenance
13. Others
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 29
Recycle Compressor- Seal Gas ( Vendor is expected to revise the seal gas system P&ID,Accordingly no HAZOP was done. The same need
to be carried out later once the design is firmed up by the vendor).
DESIGN INTENTION
DRAWINGS
1-336-00-31116
EQUIPMENT
140-K-002A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Nitrogen
Pressure ( bar g)
Amb.
1.5(packing)
1(distance piece)
Note:
Node
29. Recycle
Compressor -Seal Gas
Deviation
1.
Low/No Flow
2.
High Flow
3. Reverse/Misdirected
Flow
4.
Low Pressure
5.
High Pressure
6. High
Temperature
7. Low temp.
8.
High Level
9. Low level
10. Problem/Requirements
11. Composition
12. Operation/Maintenance
13. Others
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 32
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0011,CS-140-PR-15-0030,1-336-00-33049(BHEL)
EQUIPMENT
STREAM DETAILS
HP Steam will be supplied from B/L to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP. MP steam is
supplied to main lube oil pump from where it converts to LP steam
SCV-002A
Operating Parameters
SERVICE
Temperature(C)
HP STEAM
MP STEAM
Pressure ( bar g)
388
184
33000
1500
Note:
Node
30.
Deviation
Low/No Flow
Causes
1. U/S disturbance (HP Steam
Failure)
Consequences
1. KT-002 trips
Safeguards
Ref. No.
1. PI-810 is provided
with low alarm.
30.1.1.1.1
2. FI-805 is provided.
30.1.1.1.2
Recommendations
30.1.2.1
30.1.2.2
1.Oil clarifier is
available.
30.1.2.3.1
1.Aux. pump is
available.
30.1.3.1.1
Responsibility
BHEL/SEI
Remarks
30.
Low/No Flow
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 32
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0011,CS-140-PR-15-0030,1-336-00-33049(BHEL)
EQUIPMENT
STREAM DETAILS
HP Steam will be supplied from B/L to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP. MP steam is
supplied to main lube oil pump from where it converts to LP steam
SCV-002A
Operating Parameters
SERVICE
Temperature(C)
HP STEAM
MP STEAM
Pressure ( bar g)
388
184
33000
1500
Note:
Node
Deviation
Causes
4. No flow of cooling water to gland
steam condensor
Consequences
1. Steam does not condense as in normal
operation.Steam leaks from gland causing
unsafe work environment.
Safeguards
Ref. No.
Recommendations
Responsibility
BHEL/SEI/NOCL
1. No New Cause
30.2.1
3. Reverse/Misdirected
Flow
1. No New Cause
30.3.1
4.
Low Pressure
1. PI-810 is provided
with low alarm.
30.4.1.1.1
5.
High Pressure
6. High
Temperature
1. No New Cause
7. Low temp.
1. No New Cause
1. PI-810 is provided
with high alarm.
30.5.1.1.1
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 32
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0011,CS-140-PR-15-0030,1-336-00-33049(BHEL)
EQUIPMENT
STREAM DETAILS
HP Steam will be supplied from B/L to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP. MP steam is
supplied to main lube oil pump from where it converts to LP steam
SCV-002A
Operating Parameters
SERVICE
Temperature(C)
HP STEAM
MP STEAM
Pressure ( bar g)
388
184
33000
1500
Note:
Node
Deviation
8.
High Level
Causes
1. NA
9. Low level
1. NA
10. Problem/Requirements
1. NA
11. Composition
1. NA
12. Operation/Maintenance
1. NA
13. Others
1. NA
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 26
Recycle Compressor- cooling water System (No HAZOP was done. The same need to be carried out later with the vendor).
DESIGN INTENTION
To supply cooling water to gland steam condensor, lube oil coolers and lube oil pump turbine bearings
DRAWINGS
3-336-00-34042
EQUIPMENT
140-K-002A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
cooling water
Note:
Node
31. Recycle compressor-cooling water
system
Deviation
1.
2.
Low/No Flow
High Flow
3. Reverse/Misdirected
Flow
4.
Low Pressure
5.
High Pressure
6. High
Temperature
7. Low temp.
8.
High Level
9. Low level
10. Problem/Requirements
Causes
Consequences
Safeguards
Ref. No.
31.1.1
31.1.2
31.1.3
Recommendations
Responsibility
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 26
Recycle Compressor- cooling water System (No HAZOP was done. The same need to be carried out later with the vendor).
DESIGN INTENTION
To supply cooling water to gland steam condensor, lube oil coolers and lube oil pump turbine bearings
DRAWINGS
3-336-00-34042
EQUIPMENT
140-K-002A/B
Project :
STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
cooling water
Note:
Node
Deviation
11. Composition
12. Operation/Maintenance
Causes
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
Remarks