HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

OWNER
PMC
LICENSOR
EPC CONTRACTOR

:
:
:
:

0
Rev.

NAGARJUNA OIL CORPORATION LTD.


CB&I, LUMMUS
AXENS, IFP GROUP TECHNOLOGY
SAMSUNG ENGINEERING INDIA PVT. LTD.

HAZOP Study Report


For

Diesel Hydrodesulphurization Unit


Unit 1400

17.12.10

Issued for Design

PDA

KA

GCM

REV.

DATE

DESCRIPTION

PREPARED BY

CHECKED BY

APPROVED BY

RS

PM

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

Contents
1. Introduction. 3
2. Executive Summary....4
3. Unit Description....5
4. Objective of Study...5
5. HAZOP Methodology & Techniques..6
6. HAZOP Assumptions..8
7. Basis of HAZOP Study..12
8. Documents Referred for HAZOP study...14
9. HAZOP Team ..16
10. Recommendations.18

Annexure I: Node details & HAZOP P&IDs( 60 sheets )


Annexure II: Recommendations( 15 sheets )
Annexure III: HAZOP Worksheets( 104 sheets )
Annexure IV: Attendance( 2 sheets )

Page 2 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

1. Introduction

The Hazard and operability study (HAZOP) has been carried out for Diesel Hydrodesulphurization unit
(DHU-Unit 1400), which forms part of Cuddalore Refinery project at Cuddalore,Tamil-Nadu. The HAZOP
proceeding was conducted at Samsung Engg. India Pvt. Ltd. w.e. f. 06/12/10 to 14/12/10.
The HAZOP study team consists of representative from the SEI, PMC, Licensor, NOCL and was lead by
an independent Chairman, HAZOP study was conducted by a multi discipline group.
The action points that have emerged from the study are presented in the action list appended at the end
of this report. Each action item is subjected to a number. A given action item may pertain to more than
one points. However priority categorization shall be done based on SIL study.

Page 3 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

2. Executive Summary
A total 31 nodes are identified for analysis resulting to- no. of action points. These nodes have been
described in outline enclosed in the report. Report is based on the HAZOP study conducted in presence
of concerned department officers/PMC/Licensors/NOCL representatives. All recommendations are listed
& annexed in the reports. Some of the information which were not available (seal system of hydrogen
compressor BHEL, backwashing system of filters etc.) needs to be identified & P&IDs shall be upgraded
accordingly.

Page 4 of 136

HAZOP STUDY REPORT


Client

Nagarjuna Oil
Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

3. Unit Description
The unit consists of the following sections:
Reaction
Recycle Gas Loop
Stripper and LP Absorber
- Reaction Section
The feed consists of SRHD, LVGO, LCGO, and LCO streams supplied from battery limits. The
gas oil blend flows to the back wash Feed Filter,A4 140-F-001, before entering theFeed Surge
Drum, 140-V-001. The feed drum is nitrogen blanketed and the drum pressureis under level
controlled using a split range control scheme. The oil feed is pumped to the reactor circuit on
flow control using the Gas Oil Feed Pump, 140-P-001 A/B. The feed drum level is controlled by
supplying excess DHU feed from storage. The level controller is sent to storage, Unit 2500,
outside battery limits.
Make-up hydrogen is supplied at 20 bar g, to the Make-up Gas Compressor K.O. Drum 140-V002, and then is compressed by the Hydrogen Make-up Compressor 140-K-001 A/B. The
make-up compressor has two stages and the interstage gas cooling is done with cooling water
in the Make-Up Compressor Interstage Cooler, 140-EE-008 A/B. The makeup gas flowrate to
the reaction section is controlled by means of a compressor spillback to the Make-up Gas
Compressor K.O. Drum, 140-V-002. The spill back is cooled by the Hydrogen Make-Up Kick
Back Cooler, 140-EE-004. A line is provided on the Make-up
Gas Compressor discharge to send Hydrogen to bullet storage. Before being sent to storage
outside battery limits the hydrogen is cooled in the Hydrogen Cooler, 140-EE-009.
The make-up and recycle gas streams are combined with the feed, and the total feed
mixture is heated up against the reactor effluent in the Reactor Feed / Effluent Exchanger,
140-EE-001 A/B/C/D. A bypass of all the shells is provided on the gas oil feed line to
facilitate the Hydrotreater Reactor Feed Heater, 140-H-001, operation at minimum
turndown. The preheated oil and hydrogen mixture is heated to the reactor inlet
temperature in the Hydrotreater Reactor Feed Heater, 140-H-001.
The Hydrotreater Reactor, 140-R-001, contains five catalytic beds. Recycle hydrogen is
used as the quench gas, for maintaining the desired WABT in each of the catalytic bed.
The top layer of the first catalytic bed in the reactor operates at a lower temperature, and
this bed saturates the feed olefins and diolefins. The inlet temperature to the Reactor is
adjusted so that the required inlet temperature is obtained for the subsequent HDS catalyst
in the same catalytic bed. The effluent from the first catalytic bed is quenched to control
the inlet temperature of the second catalytic bed. In the remaining four catalytic beds, the
targeted average WABT is about the same to complete the remaining reactions. The
quench gas is supplied on flow control, reset by the catalytic bed inlet temperature.
The reactor effluent is cooled by preheating the stripper feed in the Stripper Feed
Preheater, 140-EE-002, then by preheating the oil/hydrogen feed in the Feed/Effluent
Exchanger, 140-EE-001 A/B/C/D. Wash water is injected into the reactor effluent at the
outlet of the final Feed/Effluent Exchangers shell, in order to prevent any deposit of
ammonium salts. The wash water is a mixture of recycled water from the Stripper Reflux
Drum, 140-V-008, and the Coalescer, 140-V-009, plus make-up stripped sour water from
battery limits. Additional water injection facilities are provided for the last two shells, tube
side, of the Feed/Effluent Exchanger to wash out any salt deposits. This injection is
normally intermittent and usually not required. The wash water is pumped by the Wash
Water Pump, 140-P-002 A/B, from the Wash Water Drum, 140-V-004, on flow control to
the reactor effluent upstream of the Reactor Effluent Air Cooler, 140-EA-001, to avoid
ammonium salt deposit and the risk of corrosion. The Wash Water Drum, 140-V-004 is
nitrogen blanketed and the drum pressure is under level controlled using a split range
control scheme.
The Reactor Effluent then is cooled in the Reactor Effluent Air Cooler, 140-EA-001, and
the Reactor Effluent Trim Cooler, 140-EE-003. The reactor effluent is collected in the
Page out
5 of of
136the Separator Drum consists of the
Separator Drum, 140-V-006. The vapor phase
recycle and quench gas circulated by the recycle compressor. The Separator Drum is

used as the quench gas, for maintaining the desired WABT in each of the catalytic bed.
The top layer of the first catalytic bed in the reactor operates at a lower temperature, and
this bed saturates the feed olefins and diolefins. The inlet temperature to the Reactor is
adjusted so that the required inlet temperature is obtained for the subsequent HDS catalyst
in the same catalytic bed. The effluent from the first catalytic bed is quenched to control
the inlet temperature of the second catalytic bed. In the remaining four catalytic beds, the
HAZOP
REPORT
targeted average WABT is about the same to complete
theSTUDY
remaining
reactions. The
quench gas is supplied on flow control, reset by the catalytic bed inlet temperature.
The reactor effluent is cooled by preheating the stripper feed in the Stripper Feed
Client
Nagarjuna Oil
SO2331
0
Preheater, 140-EE-002,
then by PROCESS
preheating the oil/hydrogen
feedCS-140-PR-47-0001
in the Feed/Effluent
Corporation Ltd.
Exchanger, 140-EE-001 A/B/C/D. Wash water is injected into the reactor effluent at the
Plant
Unit (Unit -1400) Dept.
Document Number
outlet of the finalDHU
Feed/Effluent
Exchangers shell,Project
in order to prevent
any deposit Rev.
of
ammonium salts. The wash water is a mixture of recycled water from the Stripper Reflux
Drum, 140-V-008, and the Coalescer, 140-V-009, plus make-up stripped sour water from
battery limits. Additional water injection facilities are provided for the last two shells, tube
side, of the Feed/Effluent Exchanger to wash out any salt deposits. This injection is
normally intermittent and usually not required. The wash water is pumped by the Wash
Water Pump, 140-P-002 A/B, from the Wash Water Drum, 140-V-004, on flow control to
the reactor effluent upstream of the Reactor Effluent Air Cooler, 140-EA-001, to avoid
ammonium salt deposit and the risk of corrosion. The Wash Water Drum, 140-V-004 is
nitrogen blanketed and the drum pressure is under level controlled using a split range
control scheme.
The Reactor Effluent then is cooled in the Reactor Effluent Air Cooler, 140-EA-001, and
the Reactor Effluent Trim Cooler, 140-EE-003. The reactor effluent is collected in the
Separator Drum, 140-V-006. The vapor phase out of the Separator Drum consists of the
recycle and quench gas circulated by the recycle compressor. The Separator Drum is
equipped with a water boot, and adequate residence time is provided for obtaining a good
separation of the liquid and sour water streams. Sour water is separated from the
hydrocarbon liquid phase on HC/water interface level control from the settling zone of the
separator. Then the sour water is routed to the Sour Water Flash Drum, 140-V-017, before
being sent to FCC Sour Water Unit, Unit 550 outside battery limits. The hydrocarbon
liquid flows on level control to the stripping section. The separator also contains a
coalescing pad close to the feed inlet nozzle. In addition to coalescing the small water
droplets, the coalescing pad helps to streamline the HC/H2O flow in the settling zone.
- Recycle Gas Section
The recycle hydrogen stream leaving the Separator Drum, 140-V-006, is routed to the HP
Amine Absorber, 140-C-001 for HsS removal, through the HP Amine Absorber KO Drum,
140-V-007. The lean amine is a 40 wt% MDEA solution, supplied on flow control to the
HP Amine Absorber using the Lean Amine Booster Pump, 140-P-003 A/B. The rich amine
from the HP absorber bottoms is sent to the LP Amine Absorber, 140-C-003, on level
control, for flashing off the dissolved light ends.
The recycle gas leaving the HP Amine Absorber is routed to the Recycle Compressor, 140K-002, through the Recycle Compressor K.O. Drum, 140-V-005. There is a provision to
remove a small amount of the sweetened gas stream leaving the HP absorber on flow
control as a high pressure purge, to provide added flexibility during operation. However,
the unit is designed based on no purge gas flow, and hence normally there is no high
pressure purge gas leaving the unit. The recycle compressor is driven by a back-pressure
type steam turbine, 140-KT-002.
The reactor circuit pressure is controlled at the Separator Drum, 140-V-006. The pressure
is controlled through a hand switch sending a signal adjusting either the make-up hydrogen
supply to the reactor circuit or/and the HP purge gas.
The Recycle Compressor discharge is split into recycle gas and quench gas streams. The
recycle gas is combined with the make-up hydrogen and the gas oil feed. Then, the total
feed enters the reaction circuit.
- Stripper Section
The Stripper, 140-C-002, fractionates the diesel product and the wild naphtha from the
reactor effluent liquid stream supplied from the Separator Drum, 140-V-006.
Liquid Feed from the Separator is first preheated by heat exchange with the stripper
bottoms in the Stripper Feed/Bottoms Exchanger, 140-EE-006 A/B/C/D, followed by the
final heating with the reactor effluent in the Stripper Preheater, 140-EE-002. The stripper
feed temperature is controlled by varying the feed flow through the Stripper Feed
Preheater and the exchanger bypass streams.
The hot feed enters the Stripper onto the 22nd tray (counting from the bottom). The feed is
stripped of H2S and light ends from the diesel product using MP steam, which is
superheated to 237C. The MP Steam comes from the Recycle Compressor Steam
Page 6 of 136
Turbine, 140-KT-002.
The Stripper overhead vapor is condensed in an air cooled condenser, 140-EA-002, and the

supply to the reactor circuit or/and the HP purge gas.


The Recycle Compressor discharge is split into recycle gas and quench gas streams. The
recycle gas is combined with the make-up hydrogen and the gas oil feed. Then, the total
feed enters the reaction circuit.
- Stripper Section
The Stripper, 140-C-002, fractionates the diesel product
the wildREPORT
naphtha from the
HAZOPand
STUDY
reactor effluent liquid stream supplied from the Separator Drum, 140-V-006.
Liquid Feed from the Separator is first preheated by heat exchange with the stripper
bottoms in the Stripper
Exchanger,
140-EE-006 A/B/C/D,
followed 0by the
Client
Nagarjuna Feed/Bottoms
Oil
PROCESS
SO2331
CS-140-PR-47-0001
Ltd. effluent in the Stripper Preheater, 140-EE-002. The stripper
final heating withCorporation
the reactor
Plant
DHU
(Unit -1400)by
Dept.
Project
Document
Number
feed temperature
is Unit
controlled
varying the feed
flow through the
Stripper
FeedRev.
Preheater and the exchanger bypass streams.
The hot feed enters the Stripper onto the 22nd tray (counting from the bottom). The feed is
stripped of H2S and light ends from the diesel product using MP steam, which is
superheated to 237C. The MP Steam comes from the Recycle Compressor Steam
Turbine, 140-KT-002.
The Stripper overhead vapor is condensed in an air cooled condenser, 140-EA-002, and the
trim condenser, 140-EE-005. The sour off-gas product from the Stripper Reflux Drum,
140-V-008, is sent to the LP Amine Absorber K.O. Drum, 140-V-010, where it is mixed
with any Flash Gas coming out of the Sour Water Flash Drum, 140-V-017. Then the sour
off-gas is sent to the LP Amine Absorber, 140-C-003, where it is contacted with lean
amine from battery limits. In the LP Absorber, H2S is removed from the offgas, which then
flows to the Off Gas K.O Drum, 140-V-018 before being directed to battery limits.
The stripper circuit pressure is controlled by the pressure controller located on the LP
Amine Absorber overhead, downstream of the Off Gas K.O. Drum, 140-V-018. The LP
Amine absorber is operated at a high enough pressure to route the sweet off-gas product to
either Unit 350 or to fuel gas. High pressure rich amine from the HP Amine Absorber is let
down to LP Amine Absorber, and the combined rich amine is sent from the LP Amine
Absorber under level control to the Amine Regeneration Unit. The water condensate
containing dissolved H2S and traces of NH3 is removed from the
Stripper Reflux Drum waterboot on interface level control. This sour water is recycled to
the Wash Water Drum, 140-V-004, for water injection upstream of the Reactor Effluent
Air cooler, 140-EA-001. The stripper reflux is returned to the tower on flow control, and
the Wild Naphtha overhead product is sent to the battery limits on flow control, reset by
the reflux drum level. The wild naphtha product is normally sent to Unit 200, with
provisions for routing to Unit 160.
The stripped diesel product is pumped by the Stripper Bottoms Pump, 140-P-005 A/B, to
the battery limits on level control of the stripper bottoms. Heat is recovered from the diesel
product by preheating the stripper feed in the Stripper Feed/Bottom Exchanger, 140-EE006 A/B/C/D, and the Stripper Preheater, 140-EE-002. The diesel product is further cooled
in the Gas Oil Air Cooler, 140-EA-003 and Gas Oil Trim Cooler, 140-EE-007. The
dissolved water in the diesel product settles out as free water as the product stream is
cooled. The entrained water is first taken out in the Product Coalescer, 140-V-009. The
Product Coalescer, 140-V-009 water is recycled under interface level control to the Wash
Water Drum, 140-V-004 to be used as Wash Water. Water is further removed from the
diesel product to meet water specification in the Salt Dryer, 140-V-019 before being
routed to the storage, Unit 2500, outside battery limits.

Page 7 of 136

HAZOP STUDY REPORT


Client

Nagarjuna Oil
Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

Page 8 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

4.Objective of study
The objective of HAZOP study was to identify the potential hazard and the operability problem by
systematic review of the Diesel hydrodesulphurization unit and to identify the action items to alleviate
such problems. The objective of the HAZOP study in nutshell is
- To provide process safety information
- Finding out of different HAZARD during plant operation
- To establishing safe operating procedure.
- To maintain safe work practice.

Page 9 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

5. HAZOP Methodology & Technique


5.1 Methodology
HAZOP studies are undertaken by application of formal, systematic and critical approach to examine the
process the process engineering intentions of process design. The potential of hazard is thus assessed,
and the chances of malfunction of individual equipment and its consequences for the whole system are
identified.
Identical equipment and associated system are subjected to a generic approach including where two or
more system operate in partial.
5.2 Technique
The HAZOP study involve a rigorous and systematic examination of all known deviations from normal
operating condition using a series of guidewords and covering every parameter of system under review.
Deviation (ie-guideword+chosen parameter) are identified by application of standard list guide words.
The guide words are used were: No,More,Less,Reverse other than etc.
The following parameters relevant to the system under review were considered:
Flow, temperature, Pressure, Level, Composition, Others.
5.3 Intention:
The intention defines how the system is expected to operate at the nodes. It thus provides a point of
reference for developing deviations.
5.4 Deviation:
These are departures from the design intention that are discovered by systematically applying the
guidewords to each parameter at each node (e.g. HIGH + TEMPERATURE = HIGH TEMPERATURE). It
is not unusual to have more than one deviation from the application of a same guideword. For example,
"MORE FLOW" could mean either that there is a higher FLOWRATE, or more quantity is flowed.
5.5 Causes:
These are the reasons why deviations may occur. Not all possible deviations are meaningful and tehh
HAZOP team identified meaningful deviations with credible causes. These causes can be equipment
failures, human errors or external (e.g. loss of power).
5.6 Consequences:
These are the results of the deviations should they occur (e.g. release of toxic materials). Note that the
consequences of a deviation offten differ for each cause of the deviation.
5.7 Actions/Recommendations
These are either suggested actions to prevent the consequences of a deviation, or a need to obtain
further information before the particular deviation can be properly assessed. The HAZOP study is
intended to identify problems, not necessarily solve them where a solution is not obvious, a potentila
problem existes and recommends that someone review it for potential solutions.

5.8 Recording:
Records are documented through "recording by exception", i.e. to only record the deviations that cause
particular hazards or operating problems. If no deviations are discovered "N.A" /"NOW NEW CAUSE"
may be recorded against that node. In this way the amount of documentation can be kept at a
reasonable level.
5.9 Undertaking the study:
From the description of the HAZOP study it is clear that a study team will consider part of a process
design for a number of Deviation and Guidewords. Thus, a study meeting will follwo through a series of
steps repeatedly. The sequence of action for the HAZOP can be represented as given below. These are
Page 10 the
of 136
seven steps, whichare repeated, many times during
HAZOP.

problem existes and recommends that someone review it for potential solutions.

HAZOP STUDY REPORT


5.8 Recording:
Records Nagarjuna
are documented
through "recording by exception",
to only record
the deviations that cause
0
Client
Oil Corporation Ltd.
PROCESS i.e. SO2331
CS-140-PR-47-0001
particular
hazards
or
operating
problems.
If
no
deviations
are
discovered
"N.A"
/"NOW
NEW
CAUSE"
Plant
DHU Unit (Unit -1400)
Dept.
Project
Document Number
Rev.
may be recorded against that node. In this way the amount of documentation can be kept at a
reasonable level.
5.9 Undertaking the study:
From the description of the HAZOP study it is clear that a study team will consider part of a process
design for a number of Deviation and Guidewords. Thus, a study meeting will follwo through a series of
steps repeatedly. The sequence of action for the HAZOP can be represented as given below. These are
seven steps, whichare repeated, many times during the HAZOP.
a) Apply the guideword
b) Develop a deviation
c) Examine possible causes
d) Examine consequences
e) Consider hazards or operatability problems
f) Decide upon action
g) Make a record of the discussion and decision

A full record of the HAZOP study was made on worksheets and these are presented in the Appendices
(Refer Annexure-III)..
HAZOP has been done on Excel work sheets.

Page 11 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

6. HAZOP ASSUMPTIONS
The following assumptions have been considered during HAZOP study:
- Mechanical protection device (PSV,TSV etc.) is expected to work.
- No quantitative analysis will be done during HAZOP session.
- Single check valve is adequate unless reverse flow may cause pressure exceeding the test pressure.
- No design work will be done.
The following have not been considered:
- Simultaneous occurrence of two unrelated incidents.
- Operator negligence.
- Simultaneous failure of more than one independent protection device.
- Natural calamity (flood earth quake etc.)
- Objects falling from sky.
- Sabotage.

Page 12 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

GUIDE WORD
PARAMETER

NO

MORE LESS AS WELL AS

PART
OF

REVERSE

OTHER
THAN

FLOW *

PRESSURE *

TEMPERATURE *

LEVEL

PHASE

COMPOSITION (SPECIFIC
COMPONENT)

OPERATION **

Page 13 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

* Normal Parameters
** Start-up / shutdown, isolation philosophy, different
operating modes, maintenance access, blow down, etc.

Not Used

Normally Used

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

Most hazards will be protected against by a combination of hardware, instrumentation and / or operating
practices. Protection may be provided by a combination of the following:
x The intrinsic mechanical strength of the plant
x Process control response

Page 15 of 136

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

7. BASIS OF HAZOP STUDY


Nodes considered for Diesel Hydrodesulphurizing unit HAZOP study:
Refer to Annexure-I for Node details & Scanned copies of P&IDs used during HAZOP study.

Page 16 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

8 Documents referred for HAZOP study


Following is the list of documents referred during this study:

S.No.

Title

Process Data Book

Process flow diagram

3
4

Document No.
C450-1400-PB-REV0

CA-140-PR-11-0001 to 0006

Material Selection Diagram

CS-140-PR-19-0001 to 0003

Plot Plan

CS-140-PI-16-0001,Rev1

Piping & instrumentation diagram


(Process)

CS-140-PR-15-0001 to 0027

Piping & instrumentation diagram


(Utilities)

CS-140-PR-15-0030 to 0041
CS-140-PR-15-0043 to 0044

6
7

Equipment List

CS-140-PR-50-0001

Flare load summary

CS-140-PR-50-0008

Area Classification layout

CS-140-EL-12-0001

10

Process data sheet of equipments

11

Cause and effect Diagram

CS-140-PR-24-0001

12

Safeguarding Memorandum

CS-140-PR-45-0001

13

Vendor P&IDs

Refer Annexure 1

Page 17 of 136

Page 18 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

9. HAZOP TEAM

The HAZOP was carried out from 6th Dec. to 14th Dec.2010. A team of experienced engineers from Process, Operations/Commissioning and
Engineering were formed the list of participants is as below:
HAZOP Chairman: Mr. Gour Chandra Mitra.
SAMSUNG ENGG. INDIA
PVT. LTD.

PMC

NOCL

Licensor

Vendors

Mr. P. K. Gupta-Part
Mr. V. K. Bansal-Part
Mrs. Ketaki Adhikaray
Mr. K. Y. Nam-Part
Mr. Pawan K. Sharma-Part
Mrs. A. Chamundeswari-Part
Mr. Riji P. day
Mr. R. Manna-Part
Mr. Arun Goel-Part
Mr. Pradeep Amale
Mr. Ambrish Bajpai-Part
Mr. Amiya Ray
Mr. Ankur Agarwal-Part
Mr. Mayank Gupta

Mr. Y. K. Joshi
Mr. R. Y. Bloem-Part

Mr. S. Ravishankar
Mr. Bhaskar Das
Mr. Rajashekhran-Part
Mr. Raj Kumar-Part
Mr. Sebastian-Part
Mr. Aravindan-Part

Mr. Stephane Chapot

BHEL
Mr.Krishnan-Part

NEA
Mr. Yogesh Kohil-Part
Mr. Subramanium-Part

Detailed attendence list is attached as Annexure-V)

Page 19 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

10. RECOMMENDATIONS

The total number of recommendations are 147. (Attached as Annexure II)

Page 20 of 136

Annexure I
Node No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

24
25

26
27

28
29

30
31

Node Description

Feed from B/L to Feed Surge Drum


Feed Surge Drum to Reactor Feed Heater
Reactor Feed Heater
Reactor Feed Heater Outlet to Reactor, Effluent Air Cooler, Trim Cooler Up to separator inlet
Wash Water System
Separator bottom to Sour water Flash Drum and B/L
Separator Drum to Stripper Inlet
Separator Overhead to Recycle gas compressor Inlet
Recycle Gas compressor to Mixing Point
Lean Amine from B/L to LP and HP Amine Absorber column
Rich Amine from HP Amine Absorber ,LP Amine Absorber bottom to B/L.
LP Amine Absorber system (LP Amine column KOD, Off Gas KOD) to B/L
Stripper bottom to Gas oil Air cooler, Coalescer and Salt Dryer to B/L
Stripper Overhead system
Makeup H2 Compressor system
Chemical Injection System
Fuel oil, Fuel gas and Heater Firing System
HP/MP Steam & MP BFW
Cooling water system
Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen
Flare system
Amine drain system
Hydrocarbon drain system
Condensate Collection system
Makeup H2 Compressor-Lube oil System
Makeup H2 Compressor- Closed cooling water System
Makeup H2 Compressor- Distance piece/packing purge
Recycle Compressor- Lube oil
Recycle Compressor- Seal Gas ( Vendor is expected to revise the seal gas system
P&ID,Accordingly no HAZOP was done.
Recycle Compressor- Steam & drain
Recycle Compressor- cooling water System ( No HAZOP was done. The same need to be
carried out later with the vendor).

Page 21 of 136

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

CS-140-PR-15-0001

Provide low alarm for PC-343.

Design case for overpressure in


filter is to be reviewed.

High temperature alarm to be


provided on TI-107 and TI-343.

CS-140-PR-15-0001

SEI

LCO,LCGO flow rate indications to


be duplicated in DHU graphics.

CS-140-PR-15-0001

PMC/SEI

Feed stream ratio indication with


alarm to be repeated in DHU
graphics.

CS-140-PR-15-0001

PMC/SEI

Provide TDI (TI-129 and TC-124)on


the first bed with high alarm set at
differential temp. of 30 C.

Ensure proper thermal expansion in


Mechanical design is considered in
case of depressurization temp. of
405 C for all shells.

Operating manual/SOP should


ensure periodical checking of LG506

Manual isolation valves


downstream of FCV-407A/B,to be
LO.

10

Operating procedure should ensure


periodical checking of LG-506.

11

CS-140-PR-15-0001,
CS-140-PR-15-0002,
CS-140-ME-E-03800002

SEI

Vendor/SEI

PMC/SEI

CS-140-PR-15-0002,
CS-140-PR-15-0003,
CS-140-PR-15-0004

SEI

CS-140-PR-15-0002

SEI/NOCL

CS-140-PR-15-0002

SEI

CS-140-PR-15-0002

SEI/NOCL

Provision of local temp. gauge to be


provided for ascertaining the
temperature before taking the
sample.

CS-140-PR-15-0002,
CS-140-PR-15-0003,
CS-140-PR-15-0004

SEI/NOCL

12

Operating procedure should ensure


temp. of sampling fluid below 80 C.

CS-140-PR-15-0002,
CS-140-PR-15-0003,
CS-140-PR-15-0004

SEI/NOCL

13

Provide low pressure alarm at PC358 at 140-V-006 gas outlet.

CS-140-PR-15-0007

SEI

Page 22 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

14

Operating procedure should ensure


safe shutdown of the plant.

CS-140-PR-15-0004,
CS-140-PR-15-0006

15

All pump motor trip alarms to be


provided in DCS.

CS-140-PR-15-0003,
CS-140-PR-15-0005,
CS-140-PR-15-0006,
CS-140-PR-15-0007,
CS-140-PR-15-0017

SEI

16

Maintenance schedule for vibration


checking is to be strictly followed on
regular basis.

CS-140-PR-15-0006

NOCL

17

Manual isolation valves


downstream of FCV-455A/B,to be
LO.

CS-140-PR-15-0008

SEI

18

Confirm gas break through LCV542A case is considered for PSV310A/B

19

Provide additional control scheme


on V-008 boot with LT (Low low
level signal), new shutdown valve
on recycle water line from V-008 to
avoid gas break through.

20

Review the impact of vapor break


through/liquid HC in unit 550.

21

Provide low alarm for LI-560A at V009 boot

22

Operating procedure should ensure


periodical checking of PI369A/B at pump suction..

23

24

Provide high temp. Alarm at TI210.

Operating procedure to ensure


Increase of injection water flow rate
and/or plant capacity to be
decreased. To be further checked
for the feasibility of this operation.

SEI/NOCL

CS-140-PR-15-0008, CS140-PR-15-0021

CS-140-PR-15-0021

SEI

SEI/ PMC/ NOCL/


Axens

CS-140-PR-15-0003, CS140-PR-15-0006, CS-140PR-15-0008, CS-140-PR15-0021, CS-140-PR-150022, CS-140-PR-15-0030,


CS-140-PR-15-0037

NOCL

CS-140-PR-15-0022

SEI/NOCL

CS-140-PR-15-0008

SEI/NOCL

CS-140-PR-15-0008

Axens/SEI

CS-140-PR-15-0003, CS140-PR-15-0006, CS-140PR-15-0008, CS-140-PR15-0021, CS-140-PR-150022, CS-140-PR-15-0030,


CS-140-PR-15-0037

Page 23 of 136

Axens/SEI

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

25

Operating procedure should ensure


periodical checking of FI458/459/460/461

26

check working of P-002A/B,when


operating only on BFW(128 C)

27

P&ID no

Responsibility

CS-140-PR-15-0006

SEI/NOCL

CS-140-PR-15-0008

SEI

Operating procedure should


ensure periodical checking of LG515

CS-140-PR-15-0006,
CS-140-PR-15-0007

SEI/NOCL

28

Ensure LG-515 facing with LCV-514


bypass valve

CS-140-PR-15-0006

SEI

29

Consider FC-416 low alarm is set


below turndown flow.

CS-140-PR-15-0007

SEI / AXENS

CS-140-PR-15-0008

SEI / AXENS

CS-140-PR-15-0007, CS140-PR-15-0017, CS-140PR-15-0018

SEI/NOCL

30

Consider installation of limiting


temp. controller (TI-120) in heater
inlet.

31

SOP to address lining of quench


gas in the bottom bed which will
help in reducing the reactor outlet
temp. minimizing the disturbance.

32

Check the impact on the inlet piping


and equipments due to increased
inlet temp. to EE-001A/B/C/D and
reactor effluent air cooler EA-001

CS-140-PR-15-0003,
CS-140-PR-15-0006

SEI

33

Check the impact on the inlet piping


and equipments due to increased
inlet temp. to EE-006A/B/C/D and
gas oil air cooler EA-003.

CS-140-PR-15-0018,
CS-140-PR-15-0019

SEI

34

Provide DCS PI with high alarm


upstream of EE-006A/B/C/D.

CS-140-PR-15-0018

SEI

35

Provide high alarm at analyzer AI003.

CS-140-PR-15-0022

SEI

Page 24 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

36

Provide high temp. alarm TI-192.

CS-140-PR-15-0017

SEI

37

Consider converting TI-192 to TC


and put reflux on TC/FC cascade.

CS-140-PR-15-0017

Axens/PMC/SEI

38

Check the system integrity


upstream of TCV-191A/B during
gas break through.

CS-140-PR-15-0017

SEI

39

Check the impact on the inlet piping


and equipments due to increased
inlet temp. to EE-001A/B/C/D and
reactor effluent air cooler EA-001

CS-140-PR-15-0017

SEI

40

Check the impact on the inlet piping


and equipments due to increased
inlet temp. to EE-006A/B/C/D and
gas oil air cooler EA-003.

CS-140-PR-15-0017

SEI

41

Check if downstream product tank


can be pressurized due to tube
rupture.

CS-140-PR-15-0018

SEI

42

Consider increase in operating


pressure of product.

43

Check the overpressurization of


system and confirm that PSVs are
sized for this case.

44

Operating procedure to include


operation of HS-822 to select FCV423 to purge H2S to flare header

CS-140-PR-15-0007,
CS-140-PR-15-0009,
CS-140-PR-15-0010,
CS-140-PR-15-0012

45

low low suction pressure


compressor trip PZ-378 is not
required as per process reason and
to be deleted.

CS-140-PR-15-0011

CS-140-PR-15-0018,
CS-140-PR-15-0022

CS-140-PR-15-0017

Page 25 of 136

SEI

SEI

SEI/NOCL

SEI

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

46

Operating instruction to include


feed cut-off if system pressure is
below 80% of the normal pressure.

CS-140-PR-15-0007

AXENS

47

BHEL to confirm if low low suction


pressure trip is required for
machine protection.

CS-140-PR-15-0007

BHEL

48

Ensure refinery fuel gas


composition has considered
addition of hydrogen from this unit.

CS-140-PR-15-0007

NOCL

49

Flow indication of hydrogen to fuel


gas unit is to be repeated in fuel
gas unit.

CS-140-PR-15-0012

NOCL

50

Move high alarm from PC-394 to


PI-999.

CS-140-PR-15-0012

SEI

51

Provide high alarm on PDI-688.

CS-140-PR-15-0011

SEI

52

BHEL recommends the closing of


MOVs with a time delay while rpm
is reduced to 500.

CS-140-PR-15-0011

BHEL/ PMC/ SEI/


NOCL/ Axens

53

System to be reviewed for required


protection, when potential liquid
carryover tocompressor as there is
a time delay in closer of suction
MOV.

CS-140-PR-15-0011

BHEL/ PMC/ SEI/


NOCL/ Axens

54

Check the feasibility of Nitrogen


startup operation for refractory
dryout feed heaterresulting in
Possible high suction temp. leading
to high discharge temp. (higher
than current design).

CS-140-PR-15-0007,
CS-140-PR-15-0009,
CS-140-PR-15-0010, CS140-PR-15-0012

SEI

55

Operating procedure to monitor LG522 for HC carry over. When HC


level builds up it should be drained
to CBD by using Skim line.

CS-140-PR-15-0010

Page 26 of 136

SEI/NOCL

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

Confirm that the max. allowable trip


temp. (while running in nitrogen
service) & all trip set points for
machine safeguards for startup
nitrogen case are not different from
the normal operating case.

P&ID no

Responsibility

CS-140-PR-15-0011,
CS-140-PR-15-0012

BHEL

57

If set points are different separate


modes of operation to be
programmed in DCS and in
safeguarding system.

CS-140-PR-15-0011,
CS-140-PR-15-0012

BHEL

58

Operating procedure to include


operation of HS-822 to select FCV423 to purge H2S to flare header.

CS-140-PR-15-0012

59

Considering full flow through FCV427, verify low-low flow alarm on


FZ-428.

CS-140-PR-15-0003,
CS-140-PR-15-0005,
CS-140-PR-15-0006,
CS-140-PR-15-0011

SEI

CS-140-PR-15-0009,
CS-140-PR-15-0010,
CS-140-PR-15-0016

SEI

56

60

61

For low flow alarm FC-424 and low


low trip FZ-443,trip values are
presently given as per process
point of view, which needs to be
verified based on pump vendor min
flow requirement. So UZ-720
should also activate UZ-710 to trip
pump (P-003A/B)-logic to be
implemented Consider clubbing of
UZ-710 & UZ-720).

Operating procedure should ensure


routing of off gas to flare header
when there is disturbance in lean
amine supply to C-003

62

Provide high alarm at AI-002.

63

Check unit 350 design for possible


increase of H2S in feed gas from
DHU.

CS-140-PR-15-0009

SEI/NOCL

SEI/NOCL

CS-140-PR-15-0016

SEI

CS-140-PR-15-0016

NOCL/PMC

Page 27 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

64

65

66

67

Recommendations

UZ-720 should activate UZ-710 to


trip pump (P-003A/B)

Provide low alarm at TI-170.

Ensure the provision of Hot


insulation on the lean amine line
coming from ARU (Outside DHU
B/L).
Provide High alarm on TI-170 at
lean amine B.L

P&ID no

Responsibility

CS-140-PR-15-0009

SEI

CS-140-PR-15-0009

SEI

CS-140-PR-15-0009

PMC/NOCL

CS-140-PR-15-0009

SEI

68

SOP to address regular sampling of


recycle gas for CO/CO2.

CS-140-PR-15-0009

69

LG-522A/B (Magnetic type) are to


be provided with high high alarm
with switch.

CS-140-PR-15-0010,
CS-140-PR-15-0016

SEI

70

Ensure this gas breakthrough case


has been considered in design of
safety valve in ARU (Receiving
flash drum vessel).

CS-140-PR-15-0009

PMC/NOCL

71

LG-552 to be converted to Mag.


Type with provision of high level
alarm with switch.

CS-140-PR-15-0021,
CS-140-PR-15-0016,
CS-140-PR-15-0006

SEI

72

Periodical checking of interface in


LG-533A/B/C/D.

CS-140-PR-15-0016

73

Keep the spectacle blind located in


startup recirculation line in open
position to maintain unit under
circulation during upset without
loosing much time.

CS-140-PR-15-0017,
CS-140-PR-15-0018,
CS-140-PR-15-0019,
CS-140-PR-15-0022

SEI

74

FC-436 should be force closed


when UZ-717 is activated.

CS-140-PR-15-0017

SEI

Page 28 of 136

SEI/NOCL

SEI/NOCL

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

Provide high alarm for FC-442.

CS-140-PR-15-0022

SEI

76

Provide independent DCS low low


alarm from LZ-537

CS-140-PR-15-0022

SEI

77

Possibility of dissolution of salt in


gas oil product is to be confirmed.

CS-140-PR-15-0022

Vendor/SEI

78

Operating procedure should ensure


draining of salt dryer at regular
intervals by checking LG554.

CS-140-PR-15-0022

SEI/NOCL

79

Regular top up
procedures/schedules to be
mentioned in SOP.

CS-140-PR-15-0022

SEI/NOCL

80

P&ID is to be updated for


maintenance /Top up
discharge/bypassing salt dryer
procedure.

CS-140-PR-15-0022

Vendor/SEI

81

Confirm that hydrocarbon detectors


are provided in cooling tower area.

CS-140-PR-15-0019

NOCL

82

TBC from vendor regarding the


requirement of min. flow to avoid
churning.

CS-140-PR-15-0017,
CS-140-PR-15-0020,
CS-140-PR-15-0021,
CS-140-PR-15-0023

SEI

83

Consider providing independent


level transmitters with high alarm
and delete the high alarm from LC540

CS-140-PR-15-0021

SEI

CS-140-PR-15-0021

SEI

CS-140-PR-15-0021

SEI

75

84

85

Consider Providing independent


level transmitters with high alarm
and delete the high alarm from LC540

Consider Providing independent


level transmitters with high alarm
and delete the high alarm from LC540

Page 29 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

86

Provide high temp alarm on TI-192

CS-140-PR-15-0017

SEI

87

Confirm that hydrocarbon detectors


are provided in cooling tower area.

CS-140-PR-15-0020

NOCL

88

SOP to ensure that the proper


dosing rate is maintained and
confirmed with proper lineup.

CS-140-PR-15-0023

89

Provide low alarm at PI-358A on


separator drum.

CS-140-PR-15-0007

SEI

90

Check the time required to startup


spare compressor .

CS-140-PR-15-0014,
CS-140-PR-15-0015

SEI/NOCL

91

PT with high alarm is to be provided


instead of PI-953.

CS-140-PR-15-0013

SEI

92

Low pressure alarm at PC-358 is to


be provided on V-006.

CS-140-PR-15-0007

SEI

93

Confirm that the suction system


can either withstand with the high
suction pressure and PSV is
designed for the same.

CS-140-PR-15-0013

SEI

94

HydroCOM vendor to clarify for the


consequences of sudden loading
and how tp prevent tripping of
compressor and implement solution
to provide the same.

CS-140-PR-15-0013,
CS-140-PR-15-0014,

SEI/NEA

95

Consider forced PCV-922 close


when compressor trips.

CS-140-PR-15-0013,
CS-140-PR-15-0014,

SEI

96

Confirm that hydrocarbon detectors


are provided in cooling tower area.

CS-140-PR-15-0013,
CS-140-PR-15-0014,

NOCL

Page 30 of 136

SEI/NOCL

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

97

Provide High alarm at TI-176.

CS-140-PR-15-0013,

SEI

98

Provide High high level


compressor trip for 2nd stage
suction vessel

CS-140-PR-15-0013,
CS-140-PR-15-0014,

NEA

99

Confirm that hydrocarbon detectors


are provided in cooling tower area.

CS-140-PR-15-0013,
CS-140-PR-15-0014,

NOCL

100

Provide low point drain valve at the


shell side outlet of EE-009 and
SOP to ensure checking of leakage
of cooling water after any
maintenance.

CS-140-PR-15-0013,
CS-140-PR-15-0014,

SEI

101

Inspection opening of 2nd stage


suction vessel shall be located
closer to the vanepack for
inspection purpose.

CS-140-PR-15-0013,
CS-140-PR-15-0014,

NEA/SEI

102

Venting/purge facility to flare at EE009 outlet is to be provided near


B/L.

CS-140-PR-15-0013

SEI

103

PI-304 to be provided with low


pressure alarm.

CS-140-PR-15-0023,
CS-140-PR-15-0025

SEI

104

Ensure that blockage of carbon


canister is not possible.

CS-140-PR-15-0023,
CS-140-PR-15-0025

NOCL

105

Provide additional flushing oil return


taping upstream of XZV-718 M for
flushing.

CS-140-PR-15-0024,
CS-140-PR-15-0026

SEI

CS-140-PR-15-0004

SEI

CS-140-PR-15-0004

SEI

106

107

Damper open/close indications are


provided (P&ID is to be updated
accordingly).
Startup and shut down overrides for
damper control to be included in
P&ID note.

Page 31 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

108

Low oxygen alarm at AI-004 is to


be provided

CS-140-PR-15-0004

SEI

109

Ensure that upstream system is


properly monitored to avoid any
vaporization.

CS-140-PR-15-0024,
CS-140-PR-15-0026

NOCL

110

MP steam for soot blower tapping


to be downstream of FI-409.(P&ID
to be updated).

CS-140-PR-15-0004

SEI

111

HH pressure trip PZ-678A/B/C


requirement is to be reviewed from
vendor in view of turbine back
pressure.

CS-140-PR-15-0030

BHEL/SEI

112

Line from Desuperheater


downstream upto steam trap is to
be designed for two phase flow.

CS-140-PR-15-0030

SEI

113

Vendor to provide min. temp. of


steam acceptable at turbine inlet,
irrespective of min. operating temp.
specified in B/L condition.

CS-140-PR-15-0030

BHEL

114

TI-627 is to be provided with low


temp. alarm in DCS.

CS-140-PR-15-0011

SEI

115

SOP to ensure checking of leakage


of cooling water after any
maintenance.

CS-140-PR-15-0032

SEI/NOCL

116

Confirm that hydrocarbon detectors


are provided in cooling tower area.

CS-140-PR-15-0032

NOCL

117

Provide 3" jumpover connection line


(with valve and spec. blind)
between cooling water supply and
return headers near dead end.
Jumpover will be used for initial
passivation during commissioning.

CS-140-PR-15-0032

SEI

Page 32 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

118

Ensure different connections are


available for air and nitrogen hose
stations to avoid wrong
connections.

CS-140-PR-15-0031,
CS-140-PR-15-0033,
CS-140-PR-15-0034

SEI

119

SOP to ensure Manual intervention


of HS-908

CS-140-PR-15-0037,
CS-140-PR-15-0038

SEI/NOCL

120

Provide high high alarm at LI-800

CS-140-PR-15-0044

SEI

121

Provide low low alarm at LI-801

CS-140-PR-15-0044

SEI

122

Provide high high alarm at LI-902

CS-140-PR-15-0040

SEI

123

Provide NRV in the flare KOD


pump discharge line no. P803 near
to tie in point to slop header.

CS-140-PR-15-0038

SEI

124

Operating procedure should


prevent draining of hot hydrocarbon
in Hydrocarbon drain drum.

CS-140-PR-15-0040

SEI / NOCL

125

Provide low low alarm at LI-902

CS-140-PR-15-0040

SEI

126

Provide differential pressure gauge


across the suction strainer.

CS-140-PR-D-06600002

NEA

127

Consider PSV set point change to


8.7 barg as per project philosophy.

900001-1-05 (NEA P&ID)

NEA

128

Trip of aux. pump with time delay is


to be ensured when compressor is
tripped (refer vendor cause and
effect diagram).

900001-1-05 (NEA P&ID)

NEA

Page 33 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

129

Manual sampling arrangement is to


be provided.

900001-1-05 (NEA P&ID)

NEA

130

Provide possible leakage quantity


to process gas and specification,
including all impurities in the oil
used for cylinder lubrication.Axens
will confirm the acceptance.

900001-1-05 (NEA P&ID)

NEA / AXENS

131

Vendor operation manual should


mention bypass operation.

CS-140-PR-D-06600006

NEA

132

Vendor operating manual should


mention closing of manual isolation
valve located in pump minimum
circulation line in case both
compressors are in operation
during changeover.

900001-1-09 (NEA P&ID)

NEA

133

Gate valve in min circulation line to


be changed to globe valve.

900001-1-09 (NEA P&ID)

NEA

134

Vendor to recheck requirement of


low temp alarmTI-932 and
compressor start permissive (refer
vendor cause & effect page 4).

900001-1-09 (NEA P&ID)

NEA

135

Gas dew point to be confirmed.

900001-1-09 (NEA P&ID)

NEA

136

Suitable makeup water connection


to cooling water tank is to be
provided.

900001-1-09 (NEA P&ID)

NEA

137

Cooling water tank vent should be


provided at safe location.

900001-1-09 (NEA P&ID)

NEA

138

PCV-902/903 set points to be


reviewed in view of max. flare back
pressure of 2 barg (during general
power failure).

CS-140-PR-D-06600003

NEA / SEI

Page 34 of 136

Status

HAZOP STUDY REPORT

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

CS-140-PR-47-0001

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

Rev.

The recommendations of HAZOP study are listed below:


(Annexure II)
S.No

Recommendations

P&ID no

Responsibility

139

Isolation valve in vent line to flare


is to be LO.

900001-1-06 (NEA P&ID)

NEA

140

PSV discharge and Goose neck


provided on distance piece, to be
routed to safe location.

900001-1-06 (NEA P&ID)

NEA

141

Drain line from packing drain pot to


be routed to CBD

900001-1-06 (NEA P&ID)

NEA / SEI

CS-140-PR-15-0011,
CS-140-PR-15-0030,
1-336-00-33049(BHEL)

BHEL/SEI

CS-140-PR-15-0011,
CS-140-PR-15-0030,
1-336-00-33049(BHEL)

BHEL/SEI

1-336-00-33049(BHEL
P&ID)

BHEL/SEI

145

Standby PSV requirement for PSV691 is to be checked as per project


standards (considering PSV-691
failure).

1-336-00-33049(BHEL
P&ID)

BHEL/SEI

146

All condensate collections having


temp<70 C will be routed to ND
system and others having temp.>
70 C will be routed to condensate
collection system.

1-336-00-33049(BHEL
P&ID)

BHEL/SEI/NOCL

147

SOP to ensure mentioning of gland


steam condenser isolation and
steam is to be vented out through
local vent.

1-336-00-33049(BHEL
P&ID)

BHEL/SEI/NOCL

142

143

144

All drains to be properly routed.

All condensate collections having


temp<70 C will be routed to ND
system and others having temp.>
70 C will be routed to condensate
collection system.

BHEL confirmed that PCV-691 is


fail to close.

Page 35 of 136

Status

HAZOP WORKSHEET

(Annexure-III)

Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 01

Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU

DESIGN INTENTION

To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.

DRAWINGS

CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002

EQUIPMENT

Feed Filter (140-F-001), Feed Surge Drum(140-V-001)

STREAM DETAILS

Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)

AVAILABLE CONTROL
SCHEMES

PC-343

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
SERVICE

Temperature (C)

Gas Oil Feed from B/L to Feed


Surge Drum

Pressure ( bar g)

Flow rate (Kg/hr)

63 / 120

3.4/15.5

120,083

Note:

Node

Deviation

1. Feed from B/L to Feed Surge


Drum

1.Low/No Flow

Causes

1.U/S disturbance in
Gas Oil Feed from
storage.

Consequences

1.Low level in FSD likely


leading to No level causing
damage to pump accessories.

Safeguards

Ref. No.

Recommendations

1.Low level alarm


(LC501) provided at
1.1.1.1.1
FSD.

2.Low Low Level


Trip alarm (LZ504).

1.1.1.1.2

3. Feed from CDU is


available through
1.1.1.1.3
PCV-343.
2.U/S disturbance in 1.Low level in FSD likely
Gas Oil Feed from leading to No level causing
CDU
damage to pump accessories.

1.Low level alarm


(LC501) provided at
1.1.2.1.1
FSD.

2.Low Low Level


Trip alarm (LZ504).

1.1.2.1.2

3. Feed from
1.1.2.1.3
storage is available.
3.Choking of Back
wash Filter
(140-F-001).

2.High Pressure drop in Feed


filter

1.Refer safeguards
1.1.1.1.1, 1.1.1.1.2
and 1.1.1.1.3

1.1.3.2.1

2.High Alarm of PDI329 provided


1.1.3.2.2

Page 36 of 136

Responsibility

Remarks

1.Low/No Flow

HAZOP WORKSHEET

(Annexure-III)

Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 01

Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU

DESIGN INTENTION

To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.

DRAWINGS

CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002

EQUIPMENT

Feed Filter (140-F-001), Feed Surge Drum(140-V-001)

STREAM DETAILS

Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)

AVAILABLE CONTROL
SCHEMES

PC-343

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
SERVICE

Temperature (C)
3.Choking of Back
2.High Pressure drop in Feed
wash Filter
filter
(140-F-001).
63 / 120

Gas Oil Feed from B/L to Feed


Surge Drum

Pressure ( bar g)

Flow rate (Kg/hr)

3.4/15.5

120,083

Note:

Node

Deviation

Causes

Consequences

Safeguards

3-Automatic
backwash facility is
available.

4.Automatic
backwash filter
system fails.

1. Refer Cause-1
consequence-1

5. Low/No flow of
backwash fluid to
filter.

1.No adequate backwash


leading to more frequent
backwash cycle.

1.PDI-310 is
provided. Also PDI329 with high alarm
is provided.

Ref. No.

Recommendations

1. High flow from


upstream.

1.Feed Flow to FSD will


increase
.Liquid Overfilling can be
possible.

Remarks

1.1.3.2.3

Details to discussed
separately in vendor
package HAZOP.

1.1.4.1.1

1.PDI-329 with high


alarm is provided.
Currently there is no
control of backwash
fluid. This can result in
intermittent high peak
flow rate from the
stripper through the
coalescer and the salt
dryer leading to loss of
product quality and
plant stability. This has
to be discussed with
filter vendor for
reduction in backwash
flow.

1.1.5.1.1

2.High Flow

Responsibility

1. High alarm (LC501) and


independent High
High alarm (LI-503)
provided.

1.2.1.1.1

Page 37 of 136

HAZOP WORKSHEET

(Annexure-III)

Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 01

Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU

DESIGN INTENTION

To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.

DRAWINGS

CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002

EQUIPMENT

Feed Filter (140-F-001), Feed Surge Drum(140-V-001)

STREAM DETAILS

Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)

AVAILABLE CONTROL
SCHEMES

PC-343

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
SERVICE

Temperature (C)

Gas Oil Feed from B/L to Feed


Surge Drum

Flow rate (Kg/hr)

63 / 120
2.High Flow

Note:

Node

Pressure ( bar g)

Deviation

1. High flow from


upstream.

Causes

3.4/15.5

Consequences

Safeguards

2. PSV-302A/B is
designed for liquid
overfilling case.

Ref. No.

Recommendations

1.2.1.1.2

1.2.2.1.1
2.PC-343 failure
leading to PCV-343
fully open.

3.LC-501
malfunctions.

1.Feed Flow to FSD will


increase
.Liquid Overfilling can be
possible.

1.Feed Flow to FSD will


increase
.Liquid Overfilling can be
possible.

1.Refer safeguard
1.2.1.1.1 and
1.2.1.1.2

1.2.3.1.1

1.3

3. Reverse flow

4.Low Pressure

1. PC-343
malfunctions and
closes PCV-343

1.Same as Low/No flow.

1.4.1.1.1

2.ow supply pressure


1.Same as Low/No flow.
from CDU.

1.High supply
pressure from CDU.

120,083

1.Feed Flow to FSD will


increase
.Liquid Overfilling can be
possible.

1. System may experience


higher than the operating
pressure

1.4.2.1.

1. System is
designed for
maximum U/S
pressure.

1.Provide low alarm for PCSEI


343.

1.5.1.1.1

5.High Pressure

Page 38 of 136

Responsibility

Remarks

HAZOP WORKSHEET

(Annexure-III)

Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 01

Gas oil feed From B/L to Feed Surge Drum, including gas oil feed from CDU

DESIGN INTENTION

To Supply Gas Oil Feeds from Unit B/L to Feed Surge Drum through Back Wash Filter.

DRAWINGS

CS-140-PR-15-001, CS-140-PR-15-002,CS-140-ME-E-03800002

EQUIPMENT

Feed Filter (140-F-001), Feed Surge Drum(140-V-001)

STREAM DETAILS

Gas Oil Feed from B/L (including feed from CDU) to Feed Filter (F-001) and send to Feed Surge Drum (V-001)

AVAILABLE CONTROL
SCHEMES

PC-343

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
SERVICE

Temperature (C)

Gas Oil Feed from B/L to Feed


Surge Drum

Pressure ( bar g)

Flow rate (Kg/hr)

63 / 120

3.4/15.5

120,083

Note:

Node

Deviation

Causes

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

Remarks

5.High Pressure

2.External fire.

6.High Temperature

1.U/S disturbance

1.Potential overpressure in
filter.

1.Interface(LT-505) in FSD
may get affected due to high
temperature

1..5.2.1

1.System is rated for


B/L
1.6.1.1.1
design temperature

No significant cause

1.7

8. High Level

Not applicable

1.8

9 Low level

Not applicable

1.9

10.Composition

1. Composition
change due to mixing
of different feed
streams in upstream
unit.

2..Design case for


overpressure is to be
reviewed.

3.High temperature alarm


to be provided on TI-107
and TI-343.

Vendor/SEI

SEI

7.Low Temperature

1. Higher exothermic
conditions in reaction section
due to more cracked feed.

1.Regular sampling

1.10.1.1.1

2. Lower product Cetane due


to high LCO content in feed.

4. LCO, LCGO flow rate


indications to be duplicated
in DHU graphics.
5. Ratio indication with
alarm to be repeated in
DHU graphics.
6. Provide TDI (TI-129 and
TC-124)on the first bed with
high alarm set at differential
temp. of 30 C.

11.Others

1. Not applicable

1.11.1

Page 39 of 136

PMC/SEI

Determine cause of
overpressure.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 02

Feed Surge Drum to Reactor


Fired Heater Inlet

DESIGN INTENTION

To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.

DRAWINGS

CS-140-PR-15-002, CS-140-PR-15-003, CS-140-PR-15-004

EQUIPMENT

Feed Surge Drum(140-V-001),Gas Oil Feed Pump(140-P-001),Reactor Feed Effluent


Exchanger
(140-E-001A/B/C/D)
Gas Oil from
Feed Surge Drum

STREAM DETAILS
AVAILABLE CONTROL
SCHEMES

(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet

SERVICE

(C)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

Temperature

Gas Oil Feed pump to


Mixing Point
Mixing Point to Feed/ Effluent
Exchanger Inlet
Feed/Effluent Exchanger to Fired
Heater Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

63/120

91.3-101.0/127

120083

68.8/120

92.2-94.7/108

113540-121388

307.3-338.7/365

90.7-93.2/106.5

126850-127392

Note:
Node
2.Feed Surge Drum to Reactor
Feed Heater

Deviation
1.Low/No Flow

Causes
1.Tripping of Gas oil feed
pump(P-001A/B)

Consequences

Safeguards

Ref. No.

1.Reaction section losses gas oil feed

1 FC- 408 provided


with low alarm.

2.1.1.1.1

2.High level in FSD(V-001)

1. FZ-448 provide with


LL alarm to trip the
fired heater

2.1.1.2.1

3.Possible overfilling of FSD V-001

1 High alarm LC-501

2.1.1.3.1

2 HH alarm at LI-503

2.1.1.3.2

Recommendations

Responsibility

7. Ensure proper thermal


expansion in Mechanical
design is considered in case of
depressurization temp. of 405
C for all shells.

SEI

3.1 PSV-302A/B is
2.1.1.3.3
designed for overfilling
case.
2.FC-408 malfunctions to close

1. Refer 2.1.1.1.1 and 2.1.1.2.1

1 FZ-448 provide with


LL alarm to trip the
fired heater

2.1.2.1.1

2.P-001A/B likely damage

1. Pump is protected
with
Min. flow bypass

2.1.2.2.1

3.LC-505 malfunctions to close

1.V-001 water/oil interface may get disturbed 1.Small quantity of


2.1.3.1.1
& possibilities of water going with gas oil
water is not desirable
feed.
but acceptable as the
same will be vaporized
at operating conditions.
Water is not allowed at
reactor inlet.

8.Operating manual/SOP
should ensure periodical
checking of LG-506

4. FCV-407A/B malfunctions to
open

1. Refer 2.1.1.1.1 and 2.1.1.2.1

9. Manual isolation valves


downstream of FCV-407A/B,to
be LO.

2.1.4.1.1

Page 40 of 136

SEI/NOCL

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 02

Feed Surge Drum to Reactor


Fired Heater Inlet

DESIGN INTENTION

To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.

DRAWINGS

CS-140-PR-15-002, CS-140-PR-15-003, CS-140-PR-15-004

EQUIPMENT

Feed Surge Drum(140-V-001),Gas Oil Feed Pump(140-P-001),Reactor Feed Effluent


Exchanger
(140-E-001A/B/C/D)
Gas Oil from
Feed Surge Drum

STREAM DETAILS
AVAILABLE CONTROL
SCHEMES

(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet

SERVICE

(C)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

Temperature

Gas Oil Feed pump to


Mixing Point
Mixing Point to Feed/ Effluent
Exchanger Inlet
Feed/Effluent Exchanger to Fired
Heater Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

63/120

91.3-101.0/127

120083

68.8/120

92.2-94.7/108

113540-121388

307.3-338.7/365

90.7-93.2/106.5

126850-127392

Note:
Node

Deviation

2.

3.

High Flow

As well as

4. Reverse/Misdirected
Flow

Causes

Consequences

Safeguards

Ref. No.

5. XZV-719 malfunctions to
close

1. Refer 2.1.1.1.1 and 2.1.1.2.1

1. FC-408 malfunctions to full


open

1. H2 to HC ratio will change and may


adversely affect the product quality

2. LC-505 malfunctions to full


open (sour water)

1. Loss of Gas oil feed to close drain no


hazardous consequence

1. Water comes with Gas oil


feed

1. Process upset

1. High Level alarm in


LC- 505.

2.3.1.1.1

1. P-001 trips

1. Back flow from high pressure side


(Reaction section) ,leading to
overpressurization of FSD.

1. UZ-719 will activate


& close XZV-719.

2.4.1.1.1

1.High flow alarm is


available at FI-448.

2.2.1.1.1

2.2.2.1

5.

Low Pressure

1. PC 330 malfunctions
to open PCV-330B

6.

High Pressure

1. PC 330 malfunctions to open 1. Over pressurizing of the FSD (VPCV 330A and close PCV-330B 001)
2. Likely loss of feed to FSD.

1. PSV-302A/B
provided
2. Refer 1.1.1.1.1

2.6.1.1.1

2. P-001 trips

1. PSV-302A/B is
designed for liquid
overfilling case

2.6.2.1.1

1. Liquid overfilling of FSD(V-001)


may occur

3. FC-408 malfunctions to close 1. Refer 2.1.1.1.1 and 2.1.1.2.1


FCV-408.

Responsibility

2.1.5.1.1

2.Two Check valve


2.4.1.1.2
available. One at pump
discharge and double
check valves at
upstream of 140-EE001.
1. P-001A/B may cavitate

Recommendations

1. Safety margin of 2.3 2.5.1.1.1


m is available in
NPSHr even at low
FSD pressure.

2.6.3.1.1

Page 41 of 136

10. Operating procedure


should ensure periodical
checking of LG-506.

SEI/NOCL

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 02

Feed Surge Drum to Reactor


Fired Heater Inlet

DESIGN INTENTION

To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.

DRAWINGS

CS-140-PR-15-002, CS-140-PR-15-003, CS-140-PR-15-004

EQUIPMENT

Feed Surge Drum(140-V-001),Gas Oil Feed Pump(140-P-001),Reactor Feed Effluent


Exchanger
(140-E-001A/B/C/D)
Gas Oil from
Feed Surge Drum

STREAM DETAILS
AVAILABLE CONTROL
SCHEMES

(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet

SERVICE

(C)

High Pressure

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

Temperature

Gas Oil Feed pump to


Mixing Point
Mixing Point to Feed/ Effluent
6.
Exchanger Inlet
Feed/Effluent Exchanger to Fired
Heater Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

63/120

91.3-101.0/127

120083

68.8/120

92.2-94.7/108

113540-121388

307.3-338.7/365

90.7-93.2/106.5

126850-127392

Note:
Node

Deviation

Causes
3. FC-408 malfunctions to close
FCV-408.

4. XZV-719 malfunctions to
close

Consequences
2. Pump discharge line up to FCV408 is subjected to high pressure

Safeguards
2. Pump (P-001A/B)
discharge line is
designed for pump
shutoff pressure

1. Refer 2.1.1.1.1

7. Less/Low
Temperature

1.Potential overpressure in the H.P. section


causing likely fire and explosion.

2. FC-408 malfunctions to open 1. Low temp. at heater inlet. Upset in


FCV-408 fully.
downstream section.
8. High
Temperature

2.6.4.2
1.Depressureization

2.6.5.1.1

2.PSV-307A/B is
provided on Separator
drum.

2.6.5.1.2

1. TC-119 malfunctions to open 1. Low temp. at heater inlet may lead to


TCV-119
operational upsets

2. Reactor effluent temp., downstream of


140-EE-001 will be high and likely potential
corrosion in air cooler due to higher
concentration of ammonium bisulfide.

1. TC-119 malfunctions to close 1. No major concern w.r.t. safety.


TCV-119.

2.6.3.2.2

2.6.4.1

2. Refer 2.1.1.2.2
5. External Fire

Ref. No.

2.7.1.1

1.High temp. alarm is


provided at TI-162.

2.7.1.2.1

High flow alarm at FI448 is provided.

2.7.2.1

2.8.1.1

Page 42 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 02

Feed Surge Drum to Reactor


Fired Heater Inlet

DESIGN INTENTION

To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.

DRAWINGS

CS-140-PR-15-002, CS-140-PR-15-003, CS-140-PR-15-004

EQUIPMENT

Feed Surge Drum(140-V-001),Gas Oil Feed Pump(140-P-001),Reactor Feed Effluent


Exchanger
(140-E-001A/B/C/D)
Gas Oil from
Feed Surge Drum

STREAM DETAILS
AVAILABLE CONTROL
SCHEMES

(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet

SERVICE

(C)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

Temperature

Gas Oil Feed pump to


Mixing Point
Mixing Point to Feed/ Effluent
Exchanger Inlet
Feed/Effluent Exchanger to Fired
Heater Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

63/120

91.3-101.0/127

120083

68.8/120

92.2-94.7/108

113540-121388

307.3-338.7/365

90.7-93.2/106.5

126850-127392

Note:
Node

Deviation
9.

Less/Low Level

Causes

Consequences

1. FC-408 malfunctions to open 1. Refer 2.2.1.1.1 and 2.2.2.1


FCV-408

Safeguards

Ref. No.
2.9.1.1

Recommendations
11.Provision of local temp.
gauge to be provided for
ascertaining the temperature
before taking the sample.
12.Operating procedure
should ensure temp. of
sampling fluid below 80 C.

2. LC-505 malfunctions to open 1. Refer 2.2.1.1.1 and 2.2.2.1


LCV-505
3. LC-501 malfunctions to close 1. P-001A/B may cavitate
250 LCV-011A/B/C

2.9.2.1

1. LZ-504 will activate 2.9.3.1.1


UZ701 which will trip the
pump

2.Small quantity of
2.9.3.1.2
water is not desirable
but acceptable as the
same will be vaporized
at operating conditions.
Water is not allowed at
reactor inlet.

10.

High Level

1. FC-408 malfunctions to close 1. Refer Low/No Flow of this node


FCV-408

2.10.1.1

2. XZV-719 malfunctions to
close

2.10.2.1

1. Refer Low/No Flow of this node

Page 43 of 136

Responsibility
SEI/NOCL

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 02

Feed Surge Drum to Reactor


Fired Heater Inlet

DESIGN INTENTION

To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.

DRAWINGS

CS-140-PR-15-002, CS-140-PR-15-003, CS-140-PR-15-004

EQUIPMENT

Feed Surge Drum(140-V-001),Gas Oil Feed Pump(140-P-001),Reactor Feed Effluent


Exchanger
(140-E-001A/B/C/D)
Gas Oil from
Feed Surge Drum

STREAM DETAILS
AVAILABLE CONTROL
SCHEMES

(V-001)
pumped to feed Effluent
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Exchanger train (E001A/B/C/D) and then send to
Reactor Feed Heater (H-001)
Inlet

SERVICE

(C)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

Temperature

Gas Oil Feed pump to


Mixing Point
Mixing Point to Feed/ Effluent
Exchanger Inlet
Feed/Effluent Exchanger to Fired
Heater Inlet
10.

Pressure ( bar g)

Flow rate (Kg/hr)

63/120

91.3-101.0/127

120083

68.8/120

92.2-94.7/108

113540-121388

307.3-338.7/365

90.7-93.2/106.5

126850-127392

High Level

Note:
Node

Deviation

Causes

Consequences

Safeguards

3. LC-505 malfunctions to close 1. Refer Low/No Flow of this node


LCV-505

4. LC-501 malfunctions to open 1. Overfilling of FSD (V-001)


250-LCV-011A/B/C (located at
OSBL).

2.10.3.1

1. HH Alarm LI-503

2.10.4.1.1

2. PSV-302A/B is
designed for Liquid
overfilling case

2.10.4.1.2

5.PC-343 malfunctions to open


fully
12.Composition
13. Problem/Requirements

1. Tube leakage in (EE001A/B/C/D)

Ref. No.

2.10.5
Refer 1.10.1.1.1
1. Contamination of product with feed

1. Analyzer AI-003 is
provided on product
line

2.12
2.13.1.1.1

Page 44 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 03

Reactor Feed Heater

DESIGN INTENTION

To heat Gas Oil Feed +H2 mixture to Reactor inlet temperature.

DRAWINGS

CS-140-PR-15-0004,CS-140-PR-15-0005

EQUIPMENT
STREAM DETAILS

Reactor Feed Heater (140-H001)


After preheating from feed/effluent heat exchanger post heating is done in Fired Heater

AVAILABLE CONTROL SCHEMES

PC-899(For Detail see the Heater Firing P&ID for control system)

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

Operating/Design Parameters
Pressure ( bar g)

Temperature

Flow rate (Kg/hr)

(C)

SERVICE
Fired Heater Outlet to
Hydrotreater Reactor Inlet

86.4-88.9/106.5

318.3-362.5/400

126850-127392

Note:
Node
3. Reactor Feed
Heater

Deviation
1.

Low/No Flow of liquid feed.

Causes
1. U/S disturbance.

2.Low/No flow of gaseous feed.

4.b. High Flow of gaseous


stream
4.c. Reverse flow

Safeguards

1.Possible coking in heater tubes leading to


tube failure.

3. Low/No flow of off gas from


MEROX unit.

4.a. High Flow of liquid stream

Consequences
1. Loss of liquid feed causing possible
overheating of heater tubes leading to tube
failure.

1. U/S disturbances

Ref. No.

2. High alarm is
provided at TI-121 &
222(Skin temp.), TI122 &
223(COT)

3.1.1.1.2

3. TZ-123 HH temp.
will activate UZ-718

3.1.1.1.3

4. Low low flow trip is


provided at FZ-448.

3.1.1.1.4

5. Low flow alarm at


FC-408 is provided.

3.1.1.1.5

Responsibility

Remarks

3.2. .1.1
1. Low flow at FC-427
and low low trip at FZ428 is provided.

1.No significant consequences.

3.3. .1

1.No major causes identified on safety issues.

3.4a.1.1

1.No major causes identified on safety issues.

3.4b.1.1

1.Tube rupture leading to


1.Fire and explosion
reverse flow to heater tubes from
downstream system

Recommendations

1. TC-124 controls the 3.1.1.1.1


firing of heater

1.Emergency
Depressurization
system is available

Page 45 of 136

3.4c.1.1.1

In current practices of
licensor is to provide
check valve at Heater
outlet.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 03

Reactor Feed Heater

DESIGN INTENTION

To heat Gas Oil Feed +H2 mixture to Reactor inlet temperature.

DRAWINGS

CS-140-PR-15-0004,CS-140-PR-15-0005

EQUIPMENT
STREAM DETAILS

Reactor Feed Heater (140-H001)


After preheating from feed/effluent heat exchanger post heating is done in Fired Heater

AVAILABLE CONTROL SCHEMES

PC-899(For Detail see the Heater Firing P&ID for control system)

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

Operating/Design Parameters
Pressure ( bar g)

Temperature

Flow rate (Kg/hr)

(C)

SERVICE
Fired Heater Outlet to
Hydrotreater Reactor Inlet

86.4-88.9/106.5

318.3-362.5/400

126850-127392

Note:
Node

Deviation

Causes

Consequences

Safeguards

Ref. No.

5. Low Temperature from


Heater outlet

1. TC-124 malfunctions & less


firing in the heater

1. Desired reactor temp. will not be


achieved. Leads to gas oil product quality
upsets.

1.Low alarm at TI-123 2.5.1.1.1


is provided.

6. High
Temperature

1. TC-124 malfunctions and


over firing in heater

1. Possible coke formation in heater tubes

1. TI-121,TI-122,TI3.6.1.1.1
222 &TI-223 provided
with high alarm

2. TI-101 &TI-102
provided with high
alarm

Recommendations

Responsibility

3.6.1.1.2

3. TZ-123 HH will
3.6.1.1.3
activate UZ-718 to trip
the heater
7. Low pressure

1.U/S disturbances

1. Desired reactor temp./partial pressure of


hydrogen, will not be achieved. Leads to gas
oil product quality upsets.

1.Low alarm at PI-689 3.7.1.1.1


is provided at
compressor suction.

8.High pressure

1.Coking in furnace tubes.

1.Unequal flow distribution leading to high


skin temp.

1. TI-121,TI-122,TI3.8.1.1.1
222 &TI-223 provided
with high alarm

9.Composition

1.No new cause.

10. Problem/Requirements

1. Heater tube leak

1. Fire box temp. high, possible heater


damage

1.High temp alarm at


TI-101&TI-102

3.10.1.1.1

2. Fire box pressure high.

1. PC-899 high alarm


provided.PZ-900
provided with HH
alarm and activate
UZ-718 to trip the
heater

3.10.1.2.1

13.Provide low pressure


alarm at PC-358 at 140-V006 gas outlet.

SEI

14.Operating procedure
should ensure safe
shutdown of the plant

SEI/NOCL

3.9.1

Page 46 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 04

Reactor ,Effluent air cooler, Trim Cooler up to Separator inlet

DESIGN INTENTION

1.

To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.

2.

To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.

3.

To maintain reactor temperature by Hydrogen Guarding.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0005, CS-140-PR-15-0006, CS-140-PR-15-0007,CS-140-PR-15-0017

EQUIPMENT

140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003

STREAM DETAILS

After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.

AVAILABLE CONTROL SCHEMESFC-412,FC-413,FC-414,FC-415,TC-124,TC-131,TC-137,TC-143,TC-151

Operating/Design Parameters
SERVICE
Temperature (C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator

Pressure ( bar g)

Flow rate (Kg/hr)

185.5-397/430

80.2-83.4/102

45-65/130

78.8-.79.3/92

137867
144751

Note:
Node
4. Reactor inlet , Effluent Air
Cooler, Trim Cooler Up to
separator inlet

Deviation
1. Low/No Flow of liquid
stream

Causes
1. U/S disturbance

Consequences

Safeguards

Ref. No.

1. Potential channeling in rector, below


turndown

1 FC- 408 provided


with low alarm.

4.1.1.1.1.2

2. Loss of product quality

1. FZ-448 provided
with LL alarm to trip
the fired heater

4.1.1.2.1.2

1.Low hydrogen ratio leads to catalyst coking. 1. Low flow at FC427 and low low trip
at FZ-428 is
provided.

4.2.1.1.1

2. Low/No flow of gaseous


stream

1. U/S disturbance

3 Low/No flow of Quench gas

1. FC-412 /413/414/415
malfunction to close
FCV412/413/414/415 (quench
H2)

1. Temperature excursion than normal op.


1. High temp.
temp., Likely coke formation in catalyst beds. alarms are provided
for each bed.

4.3.1.1.1

4. High Flow of liquid stream

1. U/S disturbance

1. Possible incomplete reaction due to


decreased Hydrogen /HC ratio resulting in
poor product quality.

4.4.1.1.1

2. Loss of product quality.

2.Increase in Pressure drop across catalyst


beds.

4.2.1.2

1. AI-003 is
provided on product
line

4.4.1.2.1
1.PDI-349~353,are
provided with high
alarms.

5.High flow of gaseous stream

1. U/S disturbance

1. Increase in Pressure drop across catalyst


beds.

1.PDI-349~353,are
provided with high
alarms.

4.5.1.1.1

6.High flow of Quench gas

1. FC-412 /413/414/415
malfunction to fully open FCV
412/413/414/415

1. Reactor bed temp. decreases &


may lead to incomplete reaction resulting in
poor product quality.

1. AI-003 is
provided on product
line

4.6.1.1.1

Page 47 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 04

Reactor ,Effluent air cooler, Trim Cooler up to Separator inlet

DESIGN INTENTION

1.

To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.

2.

To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.

3.

To maintain reactor temperature by Hydrogen Guarding.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0005, CS-140-PR-15-0006, CS-140-PR-15-0007,CS-140-PR-15-0017

EQUIPMENT

140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003

STREAM DETAILS

After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.

AVAILABLE CONTROL SCHEMESFC-412,FC-413,FC-414,FC-415,TC-124,TC-131,TC-137,TC-143,TC-151

Operating/Design Parameters
SERVICE
Temperature (C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator

Flow rate (Kg/hr)


80.2-83.4/102

45-65/130

78.8-.79.3/92

137867
144751

6.High flow of Quench gas


Note:
Node

Pressure ( bar g)

185.5-397/430

Deviation

1. FC-412 /413/414/415
malfunction to fully open FCV
412/413/414/415
Causes

Consequences
2.Increase in Pressure drop across catalyst
beds.

Safeguards

Ref. No.

1.PDI-349~353,are
provided with high
alarms.

4.6.1.2.1

7.Reverse flow

1.Tube rupture leading to


1.Fire and explosion
reverse flow to heater tubes from
downstream system

1.Emergency
Depressurization
system is available

4.7.1.1.1

8. Low Pressure

1.U/S disturbances.

1.Low alarm at PI689 is provided at


compressor suction.

4.8.1.1.1

2. AI-003 is
provided on product
line

4.8.1.1.2

1. PC-358 provided
with high alarm.

4.9.1.1.1

2. PSV-307A/B
provided.

4.9.1.1.2

9.High Pressure

10. Low
Temperature

1. Disturbance in Hydrogen
recycle loop.

1. More quench Hydrogen flow


to reactor

1. Desired reactor temp./partial pressure of


hydrogen, will not be achieved. Leads to gas
oil product quality upsets.

1. Likely pressurization of the system.

4.10.1/2.1

1. Refer 4.6.1.1.1

2. U/S disturbances.

11. High
Temperature

1. Low quench gas to reactor

2. EA-001 Fan motor trips

1. Refer 4.3.1.1.1

1. Pressure buildup due to less


condensation

1. High temp.
Alarms are provided
for each bed.

4.11.1.1.1

2. Low flow alarm


at FC412/413/414/415.

4.11.1.1.2

1 High alarm at TI163

4.11.2.1.1

Page 48 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 04

Reactor ,Effluent air cooler, Trim Cooler up to Separator inlet

DESIGN INTENTION

1.

To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.

2.

To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.

3.

To maintain reactor temperature by Hydrogen Guarding.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0005, CS-140-PR-15-0006, CS-140-PR-15-0007,CS-140-PR-15-0017

EQUIPMENT

140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003

STREAM DETAILS

After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.

AVAILABLE CONTROL SCHEMESFC-412,FC-413,FC-414,FC-415,TC-124,TC-131,TC-137,TC-143,TC-151

Operating/Design Parameters
11. High
Temperature
Temperature (C)

SERVICE
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator

Flow rate (Kg/hr)


80.2-83.4/102

45-65/130

78.8-.79.3/92

137867
144751

Note:
Node

Pressure ( bar g)

185.5-397/430

Deviation

2. EA-001 Fan motor trips


Causes

Consequences
2. Higher hydrocarbons may condense in
HP Amine column (C-001) leading to foam
formation

3. Cooling water failure in EE003

Safeguards

Ref. No.

1. PC-358 is
provided with high
alarm

4.11.2.2.1

2. PSV-307A/B is
provided

4.11.2.2.2

3. TI-167 high alarm


and TI-212 high
alarm is also
provided

4.11.2.2.3

4. Hydrocarbon
skimmer for both
HP & LP amine
absorber (C-001 and
C-003) is routed to
CBD instead of
amine drain.

4.11.2.2.4

5. Trim cooler is
designed
considering air
cooler failure also
separator is
designed for air
cooler failure
considering cooling
by trim cooler.

4.11.2.2.5

3. High inlet temp. to recycle compressor.

1. Recycle
compressor trip

4.11.2.3.1

1. Refer 4.11.2.1.1 and 4.11.2.2.1~5.

1.High temp. alarm


at TI-212 is
provided.

4.11.3.1.1/2

2. High temp. alarm


at TI-167 is provided
at 140-V-006 outlet.

Page 49 of 136

Recommendations

15. All pump motor trip


alarms to be provided in
DCS.

Responsibility

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 04

Reactor ,Effluent air cooler, Trim Cooler up to Separator inlet

DESIGN INTENTION

1.

To hydro treat Gas Oil Feed in Reactor for desulphurization, denitrogenation & aromatic saturation.

2.

To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.

3.

To maintain reactor temperature by Hydrogen Guarding.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0005, CS-140-PR-15-0006, CS-140-PR-15-0007,CS-140-PR-15-0017

EQUIPMENT

140-R-001,140-EE-002,140-EE-001A/B/C/D,140-EA-001,140-EE-003

STREAM DETAILS

After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.

AVAILABLE CONTROL SCHEMESFC-412,FC-413,FC-414,FC-415,TC-124,TC-131,TC-137,TC-143,TC-151

Operating/Design Parameters
SERVICE
Temperature (C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator

Pressure ( bar g)

Flow rate (Kg/hr)

185.5-397/430

80.2-83.4/102

45-65/130

78.8-.79.3/92

137867
144751

Note:
Node

Deviation
12. Problem/Requirements

13. Composition

Causes

Consequences

Safeguards
1. PDI with high
alarm provided for
each bed

Ref. No.

1. Coking in reaction bed

1. High pressure drop in reactor bed

2. Vibration in Air cooler (EA001)


fans

1. Possible damage of EA-001 components 1.None

4.12.2.1.1

3. Tube leakage EE-003

1. Hydrocarbon may ingress in cooling


water

4.12.3.1.1

1.Hydrocarbon
detector is provided
in cooling water
tower at OSBL.

4.14

14. Others

Page 50 of 136

Responsibility

16. Maintenance schedule


for vibration checking is to
be strictly followed on
regular basis.

NOCL

4.12.1.1.1

4.13.1

1.No new cause.

Recommendations

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0006,CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022,CS-140-PR-15-0030,CS-140-PR-15-0037

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet

AVAILABLE CONTROL SCHEMES

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum

Pressure ( bar g)

65-128/150
45.0/140

Flow rate (Kg/hr)


5.0-24.0/25

5221-6212

6.4/9

3310

Note:
Node
5. Wash Water
System

Deviation
1.

Low/No Flow

Causes
1. U/S disturbance in unit 550.

Consequences
1. Level of (V-004) may go down

Safeguards

Ref. No.

1. BFW & Recycle 5.1.1.1.1


water is available
for make up.

2. Low alarm for FC- 5.1.1.1.2


420 is provided.

3. Low alarm for LC- 5.1.1.1.3


516 is provided.

2. FC-420 malfunctions to close


FCV-420

1. Level of (V-004) may go down

1. BFW & Recycle 5.1.2.1.1


water is available
for make up

2. Low alarm for LC- 5.1.2.1.2


516 is provided.

3. FC-451 malfunctions to close


FCV-451

1. Level of (V-004) may go down

1. Stripped sour
water and recycle
water is available
for makeup

5.1.3.1.1

2. Low alarm for LC- 5.1.3.1.2


516 is provided.
4. LC-542 malfunction to close
LCV-542A

1. Level of (V-004) may go down

1. Stripped sour
water and BFW is
available for
makeup

5.1.4.1.1

2. Low alarm for LC- 5.1.4.1.2


516 is provided.
5. LC-544 malfunction to close 1. Interface level of V-009 boot will
LCV-544
be high

1. LI-560A is
provided with
HH alarm

Page 51 of 136

5.1.5.1.1

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0006,CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022,CS-140-PR-15-0030,CS-140-PR-15-0037

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet

AVAILABLE CONTROL SCHEMES

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum

45.0/140

Note:
Node

Pressure ( bar g)

65-128/150

Deviation

5. LC-544 malfunction to close


LCV-544
Causes

Consequences

Safeguards
2. Stripped sour
water and BFW is
available for
makeup(*)

2. Water may carry over with diesel product. 1. SC-015 is


provided.

Ref. No.
5.1.5.1.2

5.1.5.2.1

6. LC-516 malfunction to close


FCV-420/451& LCV-542B

1. Level of (V-004) may go down

1. LZ-518 LL alarm 5.1.6.1.1


will activate UZ-713
to trip wash water
pumps and activate
UZ-721to close
XZV-721

7. P-002A/B trips

1. Level of (V-004) may go high

1 LI-559 is provided 5.1.7.1.1


with
HH alarm

2. Back flow from reaction section

1. LC-516 is
provided with high
alarm

5.1.7.2.1

2. PSV-310A/B
designed for liquid
overfilling case

5.1.7.2.2

3. FZ-450 LL alarm 5.1.7.2.3


will activate UZ-721
to close XZV-721

8. FC-419 at pump discharge,


malfunction to close
FCV-419

1. No wash water to EA-001, will increase


salt deposition

4. NRVs are
provided at all
injection points.

5.1.7.2.4

1.FZ-450 is
provided with
LL alarm

5.1.8.1.1

Page 52 of 136

Flow rate (Kg/hr)


5.0-24.0/25

5221-6212

6.4/9

3310

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0006,CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022,CS-140-PR-15-0030,CS-140-PR-15-0037

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet

AVAILABLE CONTROL SCHEMES

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum

Pressure ( bar g)

65-128/150
45.0/140

Note:
Node

Deviation

8. FC-419 at pump discharge,


malfunction to close
FCV-419
Causes

Consequences

2. High level in V-004.

Safeguards

9. XZV-721 at pump discharge, 1. Refer 5.1.8.1.1~2 and 5.1.8.2.1~2


malfunction to close

High Flow

1. FC 420 on stripped sour


water line from OSBL,
malfunctions to open FCV-420.

3310

Recommendations

Responsibility

5.1.8.1.2

5.1.8.2.2

5.1.9.1

1. Less wash water available for injection to 1 FZ-450 is


EA-001, resulting salt deposition in tubes.
provided with
LL alarm

1. Level of (V-004) may go high

Ref. No.

1. LI-559 is provided 5.1.8.2.1


with
HH alarm
2.LC-516 is
provided with high
alarm

2.

5221-6212

6.4/9

1. No wash water to EA-001, will increase


salt deposition

2.High tem. Alarm


TI-162 is provided
at the inlet of air
cooler.

10. FC-455A/B at pump min.


circulation line, malfunctions to
full open FCV-455A/B

Flow rate (Kg/hr)


5.0-24.0/25

5.1.10.1.1

2. FC-419
provided with low
alarm.

5.1.10.1.2

3.High tem. Alarm


TI-162 is provided
at the inlet of air
cooler.

5.1.10.1.3

1. LC-516 provided 5.2.1.1.1


with
High alarm.
2. LI-559 provided
with HH
alarm.

5.2.1.1.2

3.PSV-310A/B
designed for liquid
overfilling case

5.2.1.1.3

Page 53 of 136

17. Manual isolation


valves downstream of
FCV-455A/B,to be LO.

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0006,CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022,CS-140-PR-15-0030,CS-140-PR-15-0037

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet

AVAILABLE CONTROL SCHEMES

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544
2. High Flow
Operating/Design Parameters

SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum

Pressure ( bar g)

65-128/150
45.0/140

Flow rate (Kg/hr)


5.0-24.0/25

5221-6212

6.4/9

3310

Note:
Node

Deviation

Causes

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

2. FC-451 in MP BFW line


malfunctions to open
FCV-451

1. Refer 5.1.1.1.1~3.

3. LC-542 at recycle water line


from stripper reflux drum,
malfunction to open
LCV-542A

1. Level of (V-004) may go high

1. Refer 5.1.1.1.1
and 5.1.1.1.2

5.2.3.1.1

18. Confirm gas break


SEI
through LCV-542A case
is considered for PSV310A/B

2. Boot level of V-008 may go down, HC


carry over to V-004 may lead to high
pressure

1. PC-368 provided
with high alarm.

5.2.3.2.1

19.Provide additional
control scheme on V008 boot with LT (Low
low level signal), new
shutdown valve on
recycle water line from
V-008 to avoid gas
break through.

5.2.4.1

20. Review the impact of NOCL


vapor break
through/liquid HC in unit
550.

5.2.2.1

4.LC-542 malfunctions to open 1.Boot level of V-008 may go down, HC carry


LCV-542B
over to unit 550

2.. Possible damage to P-002A/B due to


cavitation (due to presence of naphtha).

4. LC-544 at the outlet of V-009 1. Level of (V-004) may go high


boot, malfunction to open
LCV-544

Remarks

5.2.4.2

1. Refer 5.1.1.1.1
and 5.1.1.1.2

Page 54 of 136

5.2.4.1.1

SEI/PMC/NOCL Low level alarm can


/Axens
be provided on
magnetic LG-543
with switch to enable
operator action for
closing control valve
(upstream isolation
valve).
Wash water pump
operation to be
checked for HC carry
over in wash water.

NPSHr of P-002A/B
is 1.9m and vessel
elevation is 5.5m
from grade. So no
cavitation.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0006,CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022,CS-140-PR-15-0030,CS-140-PR-15-0037

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet

AVAILABLE CONTROL SCHEMES

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum

Pressure ( bar g)

65-128/150
45.0/140

Flow rate (Kg/hr)


5.0-24.0/25

5221-6212

6.4/9

3310

4. LC-544 at the outlet of V-009


boot, malfunction to open
LCV-544

Note:
Node

Deviation

Causes

Consequences

Safeguards

2. Boot level of V-009 may go down, HC


carry over to the reaction section. As this is
stabilized gas oil no pressure increase is
expected

5. LC-516 malfunction to open


FCV-420/451& LCV-542B

1. Level of (V-004) may go high

5.2.4.2

1. Refer 5.1.1.1.2

6. FC-419 at wash water pump 1. More wash water to EA-001,EEdischarge ,malfunction to open 001 (when in operation) no major concern.
FCV-419
2. Likely low level in V-004.

3.Possible water level rise in V-006.

3.Reverse Flow

1.High level In wash water drum.

Ref. No.

5.2.5.1.1

5.2.6.1

1. LZ-518 provided
with low low alarm.

5.2.6.2.1

2. LC-516 is
provided with low
alarm

5.2.6.2.2

1.High high alarm is 5.2.6.3.1


provided at LI-512.
1.Check valves are 5.3.1.1
provided on all feed
lines and also in
pump discharge.

2.Pump P-002 A/B failure.

3. XZV-721 failure.

4.FCV-419 failure.

Page 55 of 136

Recommendations
21. Provide low alarm
for LI-560A at V-009
boot

Responsibility
SEI/NOCL

Remarks
Operating procedure
should ensure
periodical checking of
LG-545.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0006,CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022,CS-140-PR-15-0030,CS-140-PR-15-0037

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet

AVAILABLE CONTROL SCHEMES

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum

Pressure ( bar g)

65-128/150
45.0/140

Flow rate (Kg/hr)


5.0-24.0/25

5221-6212

6.4/9

3310

Note:
Node

Deviation

Causes

Consequences

Safeguards

4.

As well as

1. Contamination in Stripped
sour water.

5.

Low Pressure

1. PC-368 malfunctions to close 1. Pump may cavitate and wash water flow
PCV-368A and opens 368B
to EA-001 may be lost.

2. Nitrogen supply failure.

1. Water washing of EA-001 may get


affected.

Ref. No.

1.vessel operating pressure is disturbed.

1. BFW may enter into sour water line

Responsibility

5.4.1.1

1. NPSHa is
calculated
considering no
overpressure in
wash water drum.

5.5.1.1

1. PC-368
provided with low
alarm.

5.5.2.1.1

2. PI-806 at B.L is
provided with low
alarm

5.5.2.1.2

3. Pump is designed 5.5.2.1.3


to work with low
NPSH (1.9m) even
in absence of
nitrogen pressure.

3. Low supply pressure of sour


water from unit 550

Recommendations

1. NRV is provided 5.5.3.1.1


downstream of FCV420.

2. Stripped sour water can not be supplied to 1. Recycle water


5.5.3.2.1
wash water drum.
from stripper reflux
drum, coalescer and
MP BFW is
available.

Page 56 of 136

Remarks
1. Ensure sampling
provision is given in
Unit
550 during detailing.

22. Operating
procedure should
ensure periodical
checking of PI369A/B at pump
suction..

SEI/NOCL

5.

Low Pressure

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0006,CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022,CS-140-PR-15-0030,CS-140-PR-15-0037

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts and also in EE-001 A/B tube side inlet

AVAILABLE CONTROL SCHEMES

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

FC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544

Operating/Design Parameters

3. Low supply pressure of sour


water from unit 550

SERVICE
Temperature(C)
Sour Water/MP BFW supply to Wash
water Drum
Sour Water from Reflux
Drum

Pressure ( bar g)

65-128/150
2. Stripped sour water can not be supplied to
wash water drum.

45.0/140

Flow rate (Kg/hr)


5.0-24.0/25

5221-6212

6.4/9

3310

Note:
Node

Deviation

Causes

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

5.5.3.2.2
2. FC-420 is
provided with low
alarm.
6.

High Pressure

1. PC-368 malfunctions to open 1. V-004 may experience high pressure.


PCV-368A and closes PCV368B.

7.Low temperature

No significant safety issue.

8.High temperature

1. Stripped sour water is not


available from unit 550.

9. Problem/Requirements

1. Misdistribution of wash water


in air cooler tube bundles.

10.Composition

1. No new cause

11. Part of Maintenance

1. Maintenance

1. PSV-310 A/B is
provided to take
care of this
situation.

5.6.1.1.1

5.7

1. No effective washing and this can not be


continued for a long duration due to corrosion
and pressure drop issues and cooler
efficiency.

1. Salt may deposit on air cooler tubes.

5.8

23.Provide high temp.


Alarm at TI-210.

Axens/SEI

24.Operating procedure
to ensure Increase of
injection water flow rate
and/or plant capacity to
be decreased. To be
further checked for the
feasibility of this
operation.

1. Individual FI's are 5.9.1.1


available at each
injection point.

25. Operating
procedure should
ensure periodical
checking of FI458/459/460/461

SEI/NOCL

26. check working of P002A/B,when operating


only on BFW(128 C)

SEI

5.10
1. High temp.(BFW) at suction in case of only 1. Pump P-002A/B
BFW is available.
Mechanical
designed is for 150
C.

Page 57 of 136

5.11.1.1.1

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 06

Separator bottom to sour water flash Drum and B/L

DESIGN INTENTION

To separate the sour water from HC in Separator and send to B/L.

DRAWINGS

CS-140-PR-15-0006,CS-140-PR-15-0007

EQUIPMENT

Sour water Flash Drum(140-V-017)

STREAM DETAILS

Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)

AVAILABLE CONTROL SCHEMES

LC-514.LC-556,LC542

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

SERVICE
Temperature(C)
Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L

Pressure ( bar g)

Flow rate (Kg/hr)

45/130

6.4-78.8/92

10085

45/120

4.0-6.4/9

10080

Note:
Node
6. Separator bottom to Sour water Flash
Drum and B/L

Deviation
1.

Low/No Flow

Causes

Consequences

Safeguards

1. LC-510 malfunctions to close 1. Boot level of V-006 may go high resulting 1. LI -512 is
LCV -510
in water carry over with gas oil product
provided with
leading to off-spec product.
HH alarm.
2. AI-003 is
provided at gas oil
product line.
2. Potential overpressure upstream TC191A/B due to higher vaporization,

Ref. No.

Recommendations

Responsibility

6.1.1.1.1

6.1.1.1.2

1. PI-903 is provided 6.1.1.2.1


with high pressure
alarm at stripper
overhead

3. Potential overpressure in stripper, leading


to water carryover in wild naphtha as well as
in diesel .Major system upset.

2. LC-556 malfunctions to close 1. V-017 water side level may go high


LCV-556
leading to water carry over to closed drain
system, resulting in water carryover to LP
amine absorber KO pot leading to potential
foaming in amine system and contamination
of amine.

6.1.1.3

1.Low alarm at FI417 is provided..

6.1.2.1.1

2. High alarm at LC- 6.1.2.1.2


514 is provided.

3. Automatic drain
facility to closed
drain is provided.

6.1.2.1.3

4. High alarm at LC- 6.1.2.1.4


530 is provided.

3. LC-514 malfunctions to close 1. V-017 Hydrocarbon side level may go


LCV-514
high and ultimately over the period of time
HC carryover to V-010.

1.High alarm at LC556 is provided.

6.1.3.1.1

27. Operating procedure


should ensure periodical
checking of LG515

SEI/NOCL

28. Ensure LG-515 facing SEI


with LCV-514 bypass valve

Page 58 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 06

Separator bottom to sour water flash Drum and B/L

DESIGN INTENTION

To separate the sour water from HC in Separator and send to B/L.

DRAWINGS

CS-140-PR-15-0006,CS-140-PR-15-0007

EQUIPMENT

Sour water Flash Drum(140-V-017)

STREAM DETAILS

Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)

AVAILABLE CONTROL SCHEMES

LC-514.LC-556,LC542

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

SERVICE

Temperature(C)
3. LC-514 malfunctions to close 1. V-017 Hydrocarbon side level may go
45/130
LCV-514
high and ultimately over the period of time
HC carryover to V-010.
45/120

Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L

Pressure ( bar g)

Flow rate (Kg/hr)


6.4-78.8/92

10085

4.0-6.4/9

10080

Note:
Node

Deviation

2.

High Flow

Causes

Consequences

Safeguards

Ref. No.

2.High alarm at LC530 is provided.

6.1.3.1.2

4. Low pressure in LP amine


absorber

1.Over filling of vessel

1.Low pressure
alarm PI-999 is
provided.

6.1.4.1.1.

1. LC-510 malfunctions to
opens
LCV -510

1. Boot level of V-006 may go low resulting


in hydrocarbon carry over with Sour water to
sour water flash drum.

1. LZ 513 is
provided with LL
alarm will activate
UZ-704 to close
XZV704.

6.2.1.1.1

2 Potential HC carryover to LP amine


absorber KOD and eventually leading to
foaming in LP amine absorber.

Recommendations

Responsibility

Remarks

2. High alarm at LC514 is provided.


3. High alarm at LC530 is provided.

2. LC-514 malfunctions to open 1.Gas break through to CBD and potential


LCV-514
reduction of pressure in amine column

1. CBD vessel is
connected to flare.

6.2.2.1.1

SEI/NOCL

Operating procedure
should ensure
periodical checking of
LG-515/LCV-514.

PMC/\NOCL

1. Provision for HC
carryover with sour
water to be considered
in unit 550.

2. PI-999 is provided 6.2.2.1.2


with low alarm at LP
amine absorber top.

3. LC-556 malfunctions to open 1. V-017 water side level may go low and
LCV-556
HC may carry over with Sour water to B.L.

6.2.3.1

3. Reverse flow

Refer 6.1.2.1.1 ~ 6.1.2.1.4

6.3

4. High Pressure

Refer 6.1.1.1.1, 6.1.1.1.2,


6.1.1.2.1 and 6.1.1.3

6.4

5. Low pressure

Refer 6.2.2.1.1 and 6.2.2.1.2

6.5

Page 59 of 136

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 06

Separator bottom to sour water flash Drum and B/L

DESIGN INTENTION

To separate the sour water from HC in Separator and send to B/L.

DRAWINGS

CS-140-PR-15-0006,CS-140-PR-15-0007

EQUIPMENT

Sour water Flash Drum(140-V-017)

STREAM DETAILS

Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)

AVAILABLE CONTROL SCHEMES

LC-514.LC-556,LC542

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

SERVICE
Temperature(C)
Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L

Pressure ( bar g)

Flow rate (Kg/hr)

45/130

6.4-78.8/92

10085

45/120

4.0-6.4/9

10080

Note:
Node

Deviation

Causes

Consequences

Safeguards

Ref. No.

6.Low temperature

NO new causes

6.6

7. High temperature

NO new causes

6.7

8. Composition

NO new causes

6.8

9. Others

NO new causes

6.9

Page 60 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 07

Separator drum to stripper inlet

DESIGN INTENTION

To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0017, CS-140-PR-15-0018

EQUIPMENT

Separator Drum(140-V-006),Stripper Feed / Bottom Exchanger(140-EE-006),Stripper


Preheater (140-V-002)

STREAM DETAILS

Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-416,TC-191

Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

45-51/130

11.9-78.8/92

41810-119768

213-260/390

8.9-10.3/75

119768

Note:
Node

Deviation

7. Separator Drum to Stripper


Inlet

1.

Low/No Flow

Causes
1. XZV-703 malfunctions to
close.

Consequences

Safeguards

1. Level of V-006 increases

1. LC 507 high
alarm is provided.

2. Liquid HC carryover in vapor line leading


to foaming in HP amine absorber C-001.

1. K.O.D V-007 is 7.1.1.2.1


provided with high
level alarm.

Ref. No.

Recommendations

Responsibility

2. Deviation alarm 7.1.1.2.2


at XZV-703 is
provided

V-006 is designed for


14min holdup time
between normal and
high levels.

29. Consider FC-416 low


alarm is set below
turndown flow.

SEI/AXENS

3. High level alarm 7.1.1.2.3


LI-509 is provided
at V-006.

3. High temp to stripper preheater EE-002,


leading to high heater temp. Making the
heater firing control difficult (firing turn down
issues), leading to high temp. to reactor

None

7.1.1.3

30. Consider installation of AXENS/SEI


limiting temp. controller
(TI-120) in heater inlet.

31. SOP to address lining SEI/NOCL


of quench gas in the
bottom bed which will help
in reducing the reactor
outlet temp. minimizing
the disturbance.

4. Higher inlet temp. across EE-001 A/B/C/D


and inlet of air cooler EA-001.

1. Air cooler is
designed for 10%
higher heat duty.

Page 61 of 136

Remarks

7.1.1.1.1

7.1.1.4.1

32. Check the impact on


the inlet piping and
equipments due to
increased inlet temp. to
EE-001A/B/C/D and
reactor effluent air cooler
EA-001

SEI

7. Separator Drum to Stripper


Inlet

1.

Low/No Flow

1. XZV-703 malfunctions to
close.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 07

Separator drum to stripper inlet

DESIGN INTENTION

To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0017, CS-140-PR-15-0018

EQUIPMENT

Separator Drum(140-V-006),Stripper Feed / Bottom Exchanger(140-EE-006),Stripper


Preheater (140-V-002)

STREAM DETAILS

Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-416,TC-191

Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

45-51/130

11.9-78.8/92

41810-119768

213-260/390

8.9-10.3/75

119768

Note:
Node

Deviation

Causes

2. LC-507/FC-416 malfunctions
to close FCV-416.

Consequences

Safeguards

Ref. No.

5. Higher inlet temp. across the EE006A/B/C/D and inlet of air cooler EA-003.

7.1.1.5

1. Refer 7.1.1.1.1, 7.1.1.2.1 and 7.1.1.2.3

7.1.2.1

3. TC-191 malfunctions to close 1. Pressure of system up to EE-002 may


TCV-191B
increase

2. Low stripper inlet temperature possibly


leading to product off spec.

1. PSV-930A/B is
provided at tube
side inlet line to
EE-006.

7.1.3.1.1

Recommendations

Responsibility

33. Check the impact on


the inlet piping and
equipments due to
increased inlet temp. to
EE-006A/B/C/D and gas
oil air cooler EA-003.

SEI

34. Provide DCS PI with


high alarm upstream of
EE-006A/B/C/D.

SEI

35. Provide high alarm at


analyzer AI-003.

SEI

1. Mechanical
7.1.3.2.1
Limit stop
provided at TCV191A for minimum
flow to avoid total
blockage.

2. TI-192 at
stripper overhead
with low alarm is
provided.

7.1.3.2.2

3. Product
7.1.3.2.3
analyzer AI-003 is
provided.
1. Refer 7.1.1.4.1

7.1.3.3.1

3.Reduced duty of EE-002 leading to high


temp to EE-001 A/B/C/D

4. TC-191 malfunctions to open 1. Refer 7.1.3.1.1, 7.1.3.2.1~3 and 7.1.3.3.1.


TCV-191A

7.1.4.1

Page 62 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 07

Separator drum to stripper inlet

DESIGN INTENTION

To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0017, CS-140-PR-15-0018

EQUIPMENT

Separator Drum(140-V-006),Stripper Feed / Bottom Exchanger(140-EE-006),Stripper


Preheater (140-V-002)

STREAM DETAILS

Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-416,TC-191

Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

45-51/130

11.9-78.8/92

41810-119768

213-260/390

8.9-10.3/75

119768

Note:
Node

Deviation

4. TC-191 malfunctions to open Consequences


Causes
TCV-191A
2. Higher outlet temp. at EE-002

5 TC-191 malfunctions to close 1. Higher stripper inlet temp. leading to loss


TCV-191A
of diesel to wild naphtha.

Safeguards

Ref. No.

Recommendations

Responsibility

36. Provide high temp.


alarm TI-192.

SEI

Remarks

1. Line is designed 7.1.4.2.1


for 390 C.

None

7.1.5.1

Axens/PMC/SEI
37. Consider converting
TI-192 to TC and put
reflux on TC/FC cascade.

2.

3.

High Flow

As well as

1. LC-507/FC-416 malfunctions
to open FCV-416.

1. Level of V-006 decreases and down


stream system will face high pressure
due to gas break through.

1. LZ-509 is
provided with low
low alarm which
will activate UZ703 to trip XZV703.

7.2.1.1.1

2. PSV-319A/B is
designed for gas
blow case.

7.2.1.1.2

2. TC-191 malfunctions to open 1. Refer 7.1.1.3


TCV-191B

7.2.2.1

No new cause.

7.3

Page 63 of 136

38. Check the system


SEI
integrity upstream of TCV191A/B during gas break
through.

SEI

Min. flow stop limit


note ref. from TCV191A is to be
removed from P&ID
and Data sheet.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 07

Separator drum to stripper inlet

DESIGN INTENTION

To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0017, CS-140-PR-15-0018

EQUIPMENT

Separator Drum(140-V-006),Stripper Feed / Bottom Exchanger(140-EE-006),Stripper


Preheater (140-V-002)

STREAM DETAILS

Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-416,TC-191

Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

45-51/130

11.9-78.8/92

41810-119768

213-260/390

8.9-10.3/75

119768

Note:
Node

Deviation
4. Low interface level Boot)

Causes

Consequences

Safeguards

1. LC-510 malfunctions to
opens
LCV -510

1. Boot level of V-006 may go low resulting


in hydrocarbon carry over with Sour water to
sour water flash drum.

1. LZ 513 is
provided with LL
alarm will activate
UZ-704 to close
XZV704.

2 Potential HC carryover to LP amine


absorber KOD and eventually leading to
foaming in LP amine absorber.

Ref. No.
7.4.1.1.1/2/3

2. High alarm at
LC-514 is
provided.
3. High alarm at
LC-530 is
provided.

5. Low level

6. High interface level Boot)

Refer 7.1.1.1.1

7.5

1. LC-510 malfunctions to close 1. Boot level of V-006 may go high resulting 1. LI -512 is
LCV -510
in water carry over with gas oil product
provided with
leading to off-spec product.
HH alarm.

7.6.1.1.1

2. AI-003 is
7.6.1.1.2
provided at gas oil
product line.
2. Potential overpressure upstream TC191A/B due to higher vaporization,

2. XZV-704 malfunctions to
close.

1. PI-903 is
7.6.1.2.1
provided with high
pressure alarm at
stripper overhead

3 Potential overpressure in stripper, leading


to water carryover in wild naphtha as well as
in diesel .Major system upset.

7.6.1.3

1. Boot level of V-006 may go high resulting 1. LI 512 is


in water carry over with gas oil product.
provided with
HH alarm.

7.6.2.1.1

Page 64 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 07

Separator drum to stripper inlet

DESIGN INTENTION

6. High interface level Boot)


To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0017, CS-140-PR-15-0018

EQUIPMENT

Separator Drum(140-V-006),Stripper Feed / Bottom Exchanger(140-EE-006),Stripper


Preheater (140-V-002)

STREAM DETAILS

Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-416,TC-191

Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

45-51/130

11.9-78.8/92

41810-119768

213-260/390

8.9-10.3/75

119768

Note:
Node

Deviation

Causes

Consequences

Safeguards

2. Potential overpressure upstream TC191A/B due to higher vaporization,

1. Deviation alarm 7.6.2.2.1


at XZV-704 is
provided

Recommendations

Responsibility

3 Potential overpressure in stripper, leading


to water carryover in wild naphtha as well as
in diesel .Major system upset.

1.Low alarm at
LC-510 is
provided.

7.9.1.2.1

39. Check the impact on


the inlet piping and
equipments due to
increased inlet temp. to
EE-001A/B/C/D and
reactor effluent air cooler
EA-001

SEI

7.9.1.3

40. Check the impact on


the inlet piping and
equipments due to
increased inlet temp. to
EE-006A/B/C/D and gas
oil air cooler EA-003.

SEI

Ref. No.

7.6.2.3.1

2. PI-903 is
7.6.2.3.2
provided with high
pressure alarm at
stripper overhead
7. High level

8. Low
Temperature

Refer 7.2.1.1.1 and 7.2.1.1.2

7.7

1. Failure of heating medium in 1. Low stripper inlet temperature possibly


EE-006A/B/C/D
leading to product off spec

1. TC-191
provided with low
alarm.

1. Refer 7.1.3.2.1

9. High
Temperature

1. Malfunction of TCV-191 A

7.8.1.1.1

7.8.1

1. Refer 7.1.5.1

2. Higher inlet temp. across EE-001 A/B/C/D


and inlet of air cooler EA-001.

7.9.1.1

1. Air cooler is
designed for 10%
higher heat duty.

3. Higher inlet temp. across the EE006A/B/C/D and inlet of air cooler EA-003.

Page 65 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 07

Separator drum to stripper inlet

DESIGN INTENTION

To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0017, CS-140-PR-15-0018

EQUIPMENT

Separator Drum(140-V-006),Stripper Feed / Bottom Exchanger(140-EE-006),Stripper


Preheater (140-V-002)

STREAM DETAILS

Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-416,TC-191

Operating/Design Parameters
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

45-51/130

11.9-78.8/92

41810-119768

213-260/390

8.9-10.3/75

119768

Note:
Node

Deviation
10. Problem/Requirements

Causes

Consequences

1. Tube leak in EE-006

1. Stripper bottom will ingress in unstable


gas oil. Product contamination and potential
overpressure in product tank.

2. Tube leak in EE-002

1. Reactor effluent may ingress in


Unstable gas oil leading to off-spec product

Safeguards

1. PSV-319A/B is
provided for tube
rupture case.

Recommendations

Responsibility

7.10.1.1

41. Check if downstream


product tank can be
pressurized due to tube
rupture.

SEI

7.10.1.2

42. Consider increase in


operating pressure of
product.

SEI

43. Check the


overpressurization of
system and confirm that
PSVs are sized for this
case.

SEI

Ref. No.

7.10.2.1.1

2. AI-003 is
7.10.2.1.2
provided at gas oil
product line.
2. Potential overpressurization of stripper

11. Operation/Maintenance

1. PI-903 With
high alarm is
provided.

No new cause.

7.10.2.2.1

7.11

Page 66 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 08

Separator over head to Recycle gas compressor inlet

DESIGN INTENTION

1.

To remove H2S from separator overhead stream in HP Amine Absorber.

2.

To feed Recycle Gas to recycle gas Compressor.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0012

EQUIPMENT

Separator (140-V-006),HP Absorber KOD(140-V-007), HP Amine absorber (140-C001),Recycle compressor KOD(140-V-005)

STREAM DETAILS

Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-519,HC-826.LC-521,LC-524

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor

45 /130

78.8/92

15891-18053

54/130

78.4/92

13337-15497

Note:
Node
8. Separator Overhead to
Recycle gas compressor Inlet

Deviation
1.

Causes

Low/No Flow to compressor 1. HCV-826 malfunction to full


suction
open (No flow through to
column)

Consequences

Safeguards

Ref. No.

1. High H2S concentration in recycle gas


lead to off spec product(*)

1. AI-001 is provided on
K-002 suction line

8.1.1.1.1

2. System pressure may increase due to


non removal of H2S(*)

1. PC-358 is provided
with high alarm(*)

8.1.1.2.1

2. PC-358(at separator)/FC1. Suction pressure comes down and


423(at recycle gas KOD
potentially leads to surge.
downstream) malfunction to
open FCV-423(Less flow in
Recycle gas compressor Suction
line)

8.1.2.1

1. PI-689/377 is
provided with low alarm

8.1.2.1.1

2. FI-429 is provided
with low alarm

8.1.2.1.2

2. Low pressure in reaction section leading to 1.Low low suction


off spec. product.
pressure trip PZ690A/B/C (2oo3) is
provided.

8.1.2.2.1

Recommendations

Responsibility

44.Operating procedure to
include operation of HS-822 to
select FCV-423 to purge H2S to
flare header

SEI/NOCL

45.low low suction pressure


compressor trip PZ-378 is not
required as per process reason
and to be deleted.

SEI

46.Operating instruction to
include feed cut-off if system
pressure is below 80% of the
normal pressure.
47.BHEL to confirm if low low
suction pressure trip is required
for machine protection.

3. Fuel gas line may subjected to high


pressure.

1. PSV-941A/B is
designed for this case.

8.1.2.3.1

48. Ensure refinery fuel gas


composition has considered
addition of hydrogen from this
unit.

Axens

BHEL

NOCL

49. Flow indication is to be


repeated in fuel gas unit.

3. LC-519 malfunction to open


LCV-519

4. LC-524 malfunction to open


LCV-524

1. Low level in V-007,stripper (C002)/(EE-006A/B/C/D) / (EE002)may subject to high pressure due to gas
blow by, possible damage to column
internals.

1. PSV-319A/B is
designed for this gas
blow by case

8.1.3.1.1

2. PI-903 is provided
with high alarm.

8.1.3.1.2

1. Level loses in V-005, Gas blow by may 1. PC-394 is provided


happen to C-003, damage to C-003 internals with high alarm.

8.1.4.1.1

Page 67 of 136

50. Move high alarm from PC394 to PI-999.

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 08

Separator over head to Recycle gas compressor inlet

DESIGN INTENTION

1.

To remove H2S from separator overhead stream in HP Amine Absorber.

2.

To feed Recycle Gas to recycle gas Compressor.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0012

EQUIPMENT

Separator (140-V-006),HP Absorber KOD(140-V-007), HP Amine absorber (140-C001),Recycle compressor KOD(140-V-005)

STREAM DETAILS

Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-519,HC-826.LC-521,LC-524

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor

Note:
Node

Deviation

45 /130

78.8/92

15891-18053

54/130

78.4/92

13337-15497

4. LC-524 malfunction to open


LCV-524

1. Level loses in V-005, Gas blow by may


happen to C-003, damage to C-003 internals

Causes

Consequences

50. Move high alarm from PC394 to PI-999.


Safeguards
2. PSV-318A/B is
designed for this gas
blowby case.

Ref. No.

1.Compressor is likely to go on surge, in case 1. Anti-surge system is


of sudden pressure drop.
provided.

6. Compressor suction strainer


choked

1. Suction pressure comes down and


potentially leads to surge.

1.PDI-688 is provided

8.1.6.1.1

7. Compressor trip.

1. Potential hot spots in the reactor.

1. Bed temp. alarms are


provided on reactor.

8.1.7.1.1

2. Activation of UZ-705
leading to trip of heater
and liquid feed pumps.

8.1.7.1.2

1.None as anti-surge
valve (XCV-715)
discharge is not coming
back to suction of
compressor as suction
MOV is closed.

8.1.7.2.1

8.Compressor trip is initiated due 1.Potential liquid carryover to compressor as


to high level in the suction
there is a time delay in closure of suction
KOD(LZ-526).
MOV.

None

8.1.8.1

9. MOV-002 misoperate to close.

1. PI-689/377 is
provided with low alarm

8.1.9.1.1

2. Low low suction


pressure trip PZ690A/B/C (2oo3) is
provided.

8.1.9.1.2

1. Suction pressure comes down and


potentially leads to surge.

SEI
Responsibility

8.1.4.1.2

5. XZV-702A malfunctions to
open.

2. Suction and discharge MOVs-002/003


respectively will close automatically leading
to compressor in surge

Recommendations

8.1.5.1.1

51. Provide high alarm on PDI688.

SEI

BHEL/PMC/SEI/NOCL/A
xens

52. BHEL recommends the


closing of MOVs with a time
delay while rpm is reduced to
500.

BHEL/PMC/SEI/NOCL/A
xens
53. System to be reviewed for
required protection.

3.If full open signal is lost 8.1.9.1.3


interlock system will trip
the compressor.

Page 68 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 08

Separator over head to Recycle gas compressor inlet

DESIGN INTENTION

1.

To remove H2S from separator overhead stream in HP Amine Absorber.

2.

To feed Recycle Gas to recycle gas Compressor.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0012

EQUIPMENT

Separator (140-V-006),HP Absorber KOD(140-V-007), HP Amine absorber (140-C001),Recycle compressor KOD(140-V-005)

STREAM DETAILS

Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-519,HC-826.LC-521,LC-524

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor

45 /130

78.8/92

15891-18053

54/130

78.4/92

13337-15497

Note:
Node

Deviation
2.

High Flow

Causes

Consequences

1. Compressor speed controller 1 Possibility of machine surge as anti-surge


malfunctions to high speed.
valve XCV-715 opens in case of system
could not consume the higher flow.

Safeguards
8.2.1.1.1

2. Possible compressor damage due to max. 1.High high speed trip


speed.
SZ-002 is available.

8.2.1.2.1

3.

Low Pressure

1. XZV-702A malfunctions to
open.

1. Refer 8.1.5.1.1

4.

High Pressure

1. Higher than required flow


from MUG compressor/
Reduction in feed.

1. Over pressurizing the system.

6.

High Level

7. Problem/Requirements

Recommendations

1. P&ID is to be updated to
show details of anti-surge
valve as per vendor P&ID.

1. PC-358 provided with 8.4.1.1.1


high alarm.

8.4.1.1.2

1. Refer Node-4, high temp.

8.5.1.1

2. Nitrogen startup operation for


refractory dryout feed heater.

1. Possible high suction temp. leading to high Not known


discharge temp. (higher than current design).

8.5.2.1

54. Check the feasibility of this


operation

1. LC-519 malfunction to close


LCV-519

1. HC Liquid carry over to C-001

8.6.1.1.1

55. Operating procedure to


monitor LG-522 for HC carry
over. When HC level builds up it
should be drained to CBD by
using Skim line.

1. LC-521 is provided
with
High alarm.

Remarks

SEI

1. U/S disturbance

2. LC-524 malfunctions to close 1. Liquid carry over with recycle gas to KLCV-524
002

1. LZ-526 provided with 8.6.2.1.1


HH alarm which will
activate UZ-705 to trip the
compressor.

1. Over pressurization of the


system due to some
emergencies

1. Emergency
8.7.1.1.1
depressurization
safeguarding system UZ702 is provided.

1. Possible loss of life and property.

Responsibility

8.3.1.1

2. PSV-307 A/B is
provided.
5. High
Temperature

Ref. No.

1.Anti-surge system is
available.

Page 69 of 136

SEI

SEI/NOCL

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 08

Separator over head to Recycle gas compressor inlet

DESIGN INTENTION

1.

To remove H2S from separator overhead stream in HP Amine Absorber.

2.

To feed Recycle Gas to recycle gas Compressor.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0012

EQUIPMENT

Separator (140-V-006),HP Absorber KOD(140-V-007), HP Amine absorber (140-C001),Recycle compressor KOD(140-V-005)

STREAM DETAILS

Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-519,HC-826.LC-521,LC-524

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor

45 /130

78.8/92

15891-18053

54/130

78.4/92

13337-15497

Note:
Node

Deviation

Causes

Consequences

Safeguards

8. Operation/Maintenance

Ref. No.
8.8

Recommendations

Responsibility

56. Confirm that the max.


allowable trip temp. (while
running in nitrogen service) & all
trip set points for machine
safeguards for startup nitrogen
case are not different from the
normal operating case.

BHEL

Remarks

57. If set points are different


separate modes of operation to
be programmed in DCS and in
safeguarding system.

9.Composition

1. HCV-826 malfunction to full


open (No flow through to
column)

1. High H2S concentration in recycle gas


lead to off spec product

2. System pressure may increase due to


non removal of H2S

1. AI-001 is provided on
K-002 suction line

8.9.1.1.1

2. AI-003 is provided in
final gas oil product line.

8.9.1.1.2

1. PC-358 is provided
with high alarm

8.9.1.2.1

Page 70 of 136

58. Operating procedure to


include operation of HS-822 to
select FCV-423 to purge H2S to
flare header.

SEI/NOCL

1.Purity of recycle gas is to


maintained as per
limitation on primary seal
is to be confirmed by seal
vendor.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 09

Recycle gas compressor to mixing point

DESIGN INTENTION

To supply recycle gas from recycle gas compressor to Reaction section

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0005,CS-140-PR-15-0006,CS-140-PR-15-0011

EQUIPMENT

Recycle gas compressor (140-K-002)

STREAM DETAILS

H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-427

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Recycle gas compressor to
Mixing point

75.7-79/150

92.5-95.2/108.5

4310-5022

Note:
Node
9. Recycle Gas compressor to
Mixing Point

Deviation
1.

Low/No Flow

Causes
1. K-002 trip Refer node 8
,compressor trip)

Consequences
1. No hydrogen supply to reactor.

Safeguards
1. UZ-705 will
activate
UZ-706

2. Reduction in makeup hydrogen flow and


ultimately make hydrogen flow is likely to
stop.

Ref. No.
9.1.1.1.1

9.1.1.2

3. Gas oil may enter Compressor discharge 1. NRV is provided.


line

9.1.1.3.1

2. UZ-706 will activate 9.1.1.3.2


UZ719(back flow
protection system) to
close XZV-719

4.Liquid backup in recycle and makeup gas


line from mixing point.

2. FC-427 malfunction to close


FCV-427(Antisurge line)

3. Malfunctioning of XCV715(Antisurge valve) to open

1.NRV is provided
near to tie in point.

1. Possibly more hydrogen to Reactor


section. NO major concern.)

9.1.1.4.1

9.1.2.1

1.Low hydrogen-HC ratio leading to catalyst 1.FC-427 low alarm is 9.1.3.1.1


coking and potential damage to heater tubes. provided.FZ-428 will
initiate UZ-706.

2.FC-412-415
9.1.3.1.2
provided with low flow
alarms.

3. TZ-123 is provided
with HH temp. trip.

4. FC-427 malfunction to open 1. Same as low flow in anti-surge line with


FCV-427(Recycle gas and
less severity
quench gas line)

9.1.3.1.3

9.1.4.1

Page 71 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 09

Recycle gas compressor to mixing point

DESIGN INTENTION

To supply recycle gas from recycle gas compressor to Reaction section

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0005,CS-140-PR-15-0006,CS-140-PR-15-0011

EQUIPMENT

Recycle gas compressor (140-K-002)

STREAM DETAILS

H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-427

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Recycle gas compressor to
Mixing point

75.7-79/150

92.5-95.2/108.5

4310-5022

Note:
Node

Deviation

Causes

Consequences

5. High pressure drop in the


downstream system.

1. Less recycle gas flow will lead to possible


surging of compressor.

6. SC-002A malfunctions and


lower the speed of turbine.

1.Less recycle gas flow (Refer low flow case


of recycle gas)(*)

7. MOV-003 malfunctions to
close.

1.Compressor likely to see surge.

Safeguards
1. Anti surge valve
XCV715 provided.

High Flow

9.1.7.1.2

9.2.1.1.1

2. FZ-428 is provided 9.2.1.1.2


with
LL alarm

1. Refer 8.2.1.1.1 and 8.2.1.2.1

3. Reverse/Misdirected
Flow

2. K-002 trips

1. Make up hydrogen may back up in


recycle compressor discharge

4.

1.Compressor K-002 high speed. 1. Potential surging of compressor.

High Pressure

Responsibility

1.Anti-surge system is 9.1.7.1.1


provided

1. FC-427 malfunction to open 1. Less Hydrogen to reactor/quench leading 1. FCFCV-427 (high flow in antisurge to low product quality.
412/413/414/415 is
line)
provided with low
alarm.

2. SC-002A malfunctions and


increases the speed of turbine.

Recommendations

9.1.6.1

2.If full open signal is


lost interlock system
will trip the
compressor.
2.

Ref. No.
9.1.5.1.1

9.2.2.1

1. NRV is provided.

9.3.2.1.1

1.Anti-surge system is 9.4.1.1.1


provided

Page 72 of 136

59. Considering full flow


SEI
through FCV-427, verify lowlow flow alarm on FZ-428.

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 09

Recycle gas compressor to mixing point

DESIGN INTENTION

To supply recycle gas from recycle gas compressor to Reaction section

DRAWINGS

CS-140-PR-15-0003,CS-140-PR-15-0005,CS-140-PR-15-0006,CS-140-PR-15-0011

EQUIPMENT

Recycle gas compressor (140-K-002)

STREAM DETAILS

H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-427

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE

4.

High Pressure

Recycle gas compressor to


Mixing point

75.7-79/150

92.5-95.2/108.5

4310-5022

Note:
Node

Deviation

Causes
2.More flow of hydrogen from
MUG compressor.

5. High
Temperature

1. U/S disturbances.

Consequences
1.Potential overpressure of system

1. High discharge temperature may lead to


compressor damage

2.Low quench efficiency leading to potential


reactor damage.

2. High speed of compressor

Safeguards

Ref. No.

1.PSV-307A/B is
provided at V-006

9.4.2.1.1

1. TI-643 is provided
with high alarm.

9.5.1.1.1

2. TZ-644A/B/C will
activate UZ-731.

9.5.1.1.2

1.HH alarm TIs are


available on the
reactor.

9.5.1.2.1

1. Refer 9.4.1.1.1

9.5.2.1

6.High level

NA

9.6

7.Low level

NA

9.7

8.composition

NA

9.8

9.others

NA

9.9

Page 73 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 10

Lean Amine from B/L to LP and HP amine absorber column

DESIGN INTENTION

Lean Amine supply to HP and LP amine absorber columns.

DRAWINGS

CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0016

EQUIPMENT

Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)

STREAM DETAILS

Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column

AVAILABLE CONTROL SCHEMES

FC-434,FC-424

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column

50 /85

9.5 /14

17649-18370

50 /130

9.5-86.5/92

57857

Note:
Node
10.

Lean Amine from B/L to LP and HP 1.


Amine Absorber column

Deviation
Low/No Flow

Causes
1. U/S disturbance

Consequences
1. P-003A/B may starve and get damaged

Safeguards
1. PI-373 is provided with
low alarm

Ref. No.
10.1.1.1.1

2. No flow will be available to L.P./H.P. Amine 1. FZ-443 provided with


Absorbers.
LL alarm to activate UZ720(Lean amine to C001)

10.1.1.2.1

3. Less/No removal of H2S from recycle gas 1. FC-434/424 are


leading to off spec product hue to high partial provided with low flow
pressure of H2S in recycle gas.
alarm.

10.1.1.3.1

4. Less/No removal of H2S from off gas


leading to high H2S in unit 350.

3. AI-002 provided on off


gas drum outlet

10.1.1.4.3

1. Refer 10.1.1.4.3

1. Refer 10.1.1.3.2

10.1.2.1.1

2. back flow from HP Amine absorber to


lean amine pump(P003A/B)

1. Refer 10.1.1.1.1

10.1.2.2.1

Page 74 of 136

Responsibility

60. For low flow alarm FC-424


SEI
and low low trip FZ-443,trip
values are presently given as
per process point of view, which
needs to be verified based on
pump vendor min flow
requirement. So UZ-720 should
also activate UZ-710 to trip
pump (P-003A/B)-logic to be
implemented Consider clubbing
of UZ-710 & UZ-720).

SEI/NOCL
61. Operating procedure should
ensure routing of off gas to flare
header when there is
disturbance in lean amine
supply to C-003

2. AI-001 provided on
10.1.1.3.2
recycle gas line overhead
of V-005 for monitoring.

2. P-003A/B trips Lean Amine


to
C-001)

Recommendations

62. Provide high alarm at AI002.

63. Check unit 350 design for


possible increase of H2S in feed
gas from DHU.

SEI

NOCL/PMC

Remarks

10.

Lean Amine from B/L to LP and HP 1.


Amine Absorber column

Low/No Flow

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 10

Lean Amine from B/L to LP and HP amine absorber column

DESIGN INTENTION

Lean Amine supply to HP and LP amine absorber columns.

DRAWINGS

CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0016

EQUIPMENT

Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)

STREAM DETAILS

Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column

AVAILABLE CONTROL SCHEMES

FC-434,FC-424

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column

Note:
Node

Deviation

50 /85

9.5 /14

17649-18370

50 /130

9.5-86.5/92

57857

2. P-003A/B trips Lean Amine


to
Causes
C-001)

3. FC-434 malfunction to close


FCV-434(Lean Amine to C003)

Consequences
2. back flow from HP Amine absorber to
lean amine pump(P003A/B)

1. Refer 10.1.2.1.1

4. FC-424 malfunctions to close 1. Refer 10.1.2.1.1


FCV-424(Lean Amine to C001)
5. XZV-720 malfunctions to
close Lean Amine to C-001)

High Flow

1. FC-434 malfunction to open


FCV-434(Lean Amine to C003)

2. NRVs at the pump


discharge and inlet of C003 are provided.

1. C-003 level increases, possible column


flooding

Ref. No.

1. AI-001 provide on
recycle gas line for
monitoring

Responsibility

10.1.2.2.2

10.2.4.1.1

10.2.5.1

1. AI-001 provide on
recycle gas line for
monitoring

10.2.6.1.1

2. FC-424 provided with


Low alarm

10.2.6.1.2

1. LC-532 is provided with 10.2.1.1.1


high alarm
2. LI-560 is provided with
HH alarm

10.2.1.1.2

2. FC-424 malfunctions to open 1. C-001 level increases, possible column


FCV-424(Lean Amine to Cflooding
001)

1. LC-521 is provided with 10.2.2.1.1


high alarm

3. Reverse/Misdirected
Flow

1. U/S disturbance

1. NRVs are provided in


both the lines.

4. Low pressure

No new cause

1. Off/Fuel gas may come from OSBL (unit


350/fuel gas return header)

Recommendations

1. AI-002 provided on off 10.2.3.1.1


gas drum outlet

1. Refer 10.1.2.1.1

6. FC-456A/B malfunction to full 1. Refer 10.1.2.1.1


open FCV-456A/B(Low flow of
Lean amine to C-001)

2.

Safeguards

10.3.1.1.1

10.4

Page 75 of 136

64. UZ-720 should activate UZ710 to trip pump (P-003A/B)

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 10

Lean Amine from B/L to LP and HP amine absorber column

DESIGN INTENTION

Lean Amine supply to HP and LP amine absorber columns.

DRAWINGS

CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0016

EQUIPMENT

Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)

STREAM DETAILS

Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column

AVAILABLE CONTROL SCHEMES

FC-434,FC-424

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column

50 /85

9.5 /14

17649-18370

50 /130

9.5-86.5/92

57857

Note:
Node

Deviation
5.

High Pressure

6. Low
Temperature

Causes

Consequences

Safeguards

Ref. No.

1. FC-424 malfunctions to close 1. System up to FCV-424 from PFCV-424(Lean Amine to C003 may get pressurized
001)

1. System is designed for 10.5.1.1.1


shut off pressure of the
pump P-003.

2. XZV-720 malfunctions to
close Lean Amine to C-001)

1. System up to XZV-720 from P003 may get pressurized

1. System is designed for 10.5.2.1.1


shut off pressure of the
pump P-003.

1. U/S disturbance

1. HC may condense in amine solution


leading to foaming.

1. TI-171 is provided with 10.6.1.1.1


low alarm (for C-001), TI186 is provided with low
alarm (for C-003)

Recommendations

Responsibility

2. TDI-213 is provided
10.6.1.1.2
with low alarm (for C001),TDI-214 is provided
with low alarm (for C-003)

3. Antifoaming agent
dosing is provided

10.6.1.1.3

4. PDI-372/392 are
provided with high alarms
at C-001 & C-003
respectively.

10.6.1.1.4

2. Temp. drop due to low ambient temp.


leading to low amine temp. at B/L.

7. High
Temperature

1. U/S disturbance- Refer


10.1.1.4.3

1. Poor removal of H2S from


Recycle gas/Off gas

1. AI-001/AI-002 is
provided for monitoring

Page 76 of 136

10.6.1.2

65. Provide low alarm at TI170.

SEI

10.6.1.2

66. Ensure the provision of Hot PMC/NOCL


insulation on the lean amine line
coming from ARU (Outside DHU
B/L).

10.7.1.1.1

67. Provide High alarm on TI170 at lean amine B.L

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 10

Lean Amine from B/L to LP and HP amine absorber column

DESIGN INTENTION

Lean Amine supply to HP and LP amine absorber columns.

DRAWINGS

CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0016

EQUIPMENT

Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)

STREAM DETAILS

Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column

AVAILABLE CONTROL SCHEMES

FC-434,FC-424

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column

50 /85

9.5 /14

17649-18370

50 /130

9.5-86.5/92

57857

Note:
Node

Deviation

Causes

8. High level

1. Refer 10.2.1.1.1~2, 10.2.2.1.1

9. Low level

1. Refer 10.1.1.1.1

10. Composition

1.Contamination of CO/CO2 in
lean amine supply

11. Others

No new cause

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

10.8.1
10.9.1
1.Accumulation of CO/CO2 in the system
leading to reduction in catalyst activity.

10.1.1.1.

10.11

Page 77 of 136

68. SOP to address regular


sampling of recycle gas for
CO/CO2.

SEI/NOCL

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 11

Rich Amine from HP Amine absorber system to LP amine absorber bottom to B/L

DESIGN INTENTION

To supply Rich amine from HP amine absorber column to LP amine absorber column

DRAWINGS

CS-140-PR-15-0010, CS-140-PR-15-0016

EQUIPMENT

HP Amine absorber column (140-C-001), LP Amine absorber column (140-C-003)

STREAM DETAILS

Rich amine from HP Amine absorber column(C-001) bottom to LP Amine absorber column(C-003)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-521


Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Rich amine from HP
amine absorber column to LP
Amine absorber column

56-57/130

6.2-78.6/92

60413

Note:
Node

Deviation

11. Rich Amine from HP Amine 1.


Absorber ,LP Amine Absorber
bottom to B/L.

2.

Less/No flow

High Flow

Causes

Consequences

Safeguards

1. LC-521 Malfunctions to
Close LCV-521

1. Level of C-001 may go high.

2. XZV-709 Malfunctions to
close

1. Level of C-001 may go high.

1. LC-521 is provided
with
High alarm.

11.1.2.1.1

3. LC-532 Malfunctions to
Close
LCV-532

1. Level of C-003 may go high.

1. LA-560 is provided
with
HH alarm.

11.1.3.1.1

1. LZ-523 LL alarm
will activate UZ-709.

11.2.1.1.1

1. PSV-318 A/B sized


for gas break through
case.

11.2.1.2.1

1. LC-521 Malfunctions to open 1. Level of C-001 may go down.


LCV-521

2. Possible gas breakthrough leading to


overpressurization of C-003.
2. LC-532 Malfunctions to open 1. Level of C-003 may go down.
LCV-532

11.1.1.1

4. Low pressure

1. Reverse flow of Rich amine


from B.L to C-003 bottom.

1. Level in C-003 may go high

Recommendations

Responsibility

69. LG-522A/B (Magnetic


type) are to be provided
with high high alarm with
switch.

SEI

70. Ensure this gas


breakthrough case has
been considered in design
of safety valve in ARU
(Receiving flash drum
vessel).

PMC/NOCL

1. Low low alarm at LA- 11.2.2.1.1


560 is provided.

2. Possible gas breakthrough to ARU .

3. Reverse/Misdirected
Flow

Ref. No.

11.2.2.2

1. NRV is provided at
B.L

11.3.1.1.1

2. LC-532 is provided
with high alarm.

11.3.1.1.2

3. LI-560 is provided
with high high alarm.

11.3.1.1.3

1.Refer 8.3.1.1

11.4.1

Page 78 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 11

Rich Amine from HP Amine absorber system to LP amine absorber bottom to B/L

DESIGN INTENTION

To supply Rich amine from HP amine absorber column to LP amine absorber column

DRAWINGS

CS-140-PR-15-0010, CS-140-PR-15-0016

EQUIPMENT

HP Amine absorber column (140-C-001), LP Amine absorber column (140-C-003)

STREAM DETAILS

Rich amine from HP Amine absorber column(C-001) bottom to LP Amine absorber column(C-003)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-521


Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Rich amine from HP
amine absorber column to LP
Amine absorber column

56-57/130

6.2-78.6/92

60413

Note:
Node

Deviation
5. High pressure

Causes

Consequences

Safeguards

1. Refer 8.4.1.1.1 and 8.4.1.1.2

2.External fire

Ref. No.
11.5.1

1.Overpressurization of Column C-001

1.PSV-312 designed for 11.5.2.1.1


external fire case

2.Overpressurization of Column C-003.

1.PSV-318A/B design
covers external fire
case

11.5.2.2.1

6. Low
Temperature

1. Refer 10.6.1.1.1~4 and


10.6.1.2

11.6.1

7.

1. Refer 10.7.1.1.1

11.7.1

1. Refer 11.1.1.1, 11.1.2.1.1 and


11.1.3.1.1

11.8.1

High Temperature

8. High level

1. Low pressure in C-003

9. Low level

1. Refer 11.2.1.1.1 and 11.2.2.1.1

10. Composition

No new cause.

1.No sufficient pressure in C-003 to push rich 1.Low alarm at PI-999


amine to ARU leading to increase in level in is provided on C-003.
column.

11.8.1.1.1

2.LC-532 is provided
with high alarm

11.8.1.1.2

3.LI-560 is provided
with high high alarm.

11.8.1.1.3

11.9.1

11.1

11. Others

11.11

Page 79 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 12

LP Amine absorber system (LP Amine Column KOD, Off gas KOD) to B/L

DESIGN INTENTION

To Supply Off /Fuel gases from sour water flash drum and stripper reflux drum to B/L Unit-350.

DRAWINGS

CS-140-PR-15-0021, CS-140-PR-15-0016,CS-140-PR-15-0006

EQUIPMENT

Stripper Reflux Drum (140-V-008),LP Amine KOD(140-V-010), LP Amine Absorber Column (140-C-003), Off gas KOD (140-V-018) ,Sour water flash Drum(140-V-017)

STREAM DETAILS

Flash gas from flash drum(V-017)and off gases from Reflux drum (V-008) is collected to KOD of LP Amine absorber column (C-010) where it is treated with amine solution and send to B/L or Fuel gas header

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-394,LC-551

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Off gases from reflux drum to
KOD of LP Amine absorber
Off gases/Fuel gases LP
amine KOD to B/L

45.0 /65

6.4 /8

1172-1371

45.0 / 65

2.6 - 6.3 /8

512-741

Note:
Node

Deviation

12. LP Amine Absorber system 1.


(LP Amine column KOD, Off Gas
KOD) to B/L

Less/No flow

Causes

Consequences

1. PC-394 malfunctions to close 1 Increase in pressure in sour water flash


PCV-394A/B.
drum and stripper resulting in improper
flashing of HC leading to HC carryover with
Sour water and off spec product due to poor
stripping in stripper.

Safeguards

Ref. No.

Recommendations

Responsibility

1. PSV-318A/B is provided 12.1.1.1.1


2. PI-903 is provided with
high alarm at C-002
overhead
3. AI-003 is provided

2.

High Flow

2. LC-551 malfunctions to close 1. V-018 level will increase & Liquid may
LCV-551 located at Off gas
carryover with off gas/fuel gas
KOD(V-018).

12.1.2.1

71. LG-552 to be converted


to Mag. Type with provision
of high level alarm with
switch.

SEI

3. LC-530 malfunctions to close 1. V-010 level will increase & Liquid may
LCV-530 when required.
carryover with off gas to C- 003 leads to
foaming in C-003.

12.1.3.1

72. Periodical checking of


interface in LG-533A/B/C/D.

SEI/NOCL

1. PC-394 malfunctions to open 1. Column level in C-003 will increase due


PCV-394A/B.
to fall in system pressure

1. LC-532 is provided with 12.2.1.1.1


high alarm.
2. AI-002 is provided for
monitoring.
3. Pressure transmitter
PT-999 is provided with
low alarm at top of C003.

2. Less removal of H2S from off gas


(Also Refer 10.1.1.4.3)

1. LI-560 is provided with


HH alarm.

12.2.1.2.1

2. H2S analyzer (AI-002)


in the product line
indicates off-spec off gas

12.2.1.2.2

2. LC-551 malfunctions to open


LCV-551.
1. Gas break through

12.2.2.1

Page 80 of 136

Remarks

12. LP Amine Absorber system


(LP Amine column KOD, Off Gas
KOD) to B/L

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 12

LP Amine absorber system (LP Amine Column KOD, Off gas KOD) to B/L

DESIGN INTENTION

To Supply Off /Fuel gases from sour water flash drum and stripper reflux drum to B/L Unit-350.

DRAWINGS

CS-140-PR-15-0021, CS-140-PR-15-0016,CS-140-PR-15-0006

EQUIPMENT

Stripper
2.
HighReflux
Flow Drum (140-V-008),LP Amine KOD(140-V-010), LP Amine Absorber Column (140-C-003), Off gas KOD (140-V-018) ,Sour water flash Drum(140-V-017)

STREAM DETAILS

Flash gas from flash drum(V-017)and off gases from Reflux drum (V-008) is collected to KOD of LP Amine absorber column (C-010) where it is treated with amine solution and send to B/L or Fuel gas header

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-394,LC-551

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

Temperature (C)

SERVICE
Off gases from reflux drum to
KOD of LP Amine absorber
Off gases/Fuel gases LP
amine KOD to B/L

45.0 /65

6.4 /8

1172-1371

45.0 / 65

2.6 - 6.3 /8

512-741

Note:
Node

Deviation

Causes

Consequences

3. LC-530 malfunctions to open 1. Gas break through to CBD leading to low


LCV-530.
pressure in LP amine absorber.

3. Reverse/Misdirected flow
4.

High Pressure

1. Choking of Packed Beds in


C-003

2. External fire

Safeguards

Ref. No.

1. Pressure transmitter PI- 12.2.3.1.1


999 is provided with low
alarm at top of C003.

1.Reverse flow from ARU,unit-350,fuel gas


return header

1. NRVs are provided on


respective lines

1. High Pressure drop in Column leading to


Improper H2S removal.

1. PDI-392 provided with 12.4.1.1.1


high alarm.

1. Overpressurization of C-003,V-018,V-017

5. Low temp.

No new cause

6. High
Temperature

1. U/S disturbance (from V-008) 1. Possible condensation of Heavier HC in


C-003 resulting in foaming in C-003.

12.3.1.1

2. PSV-318A/B is
provided.

12.4.1.1.2

1.PSVs are provided


covering fire case.

12.4.2.1.1

12.5

1. TI-208 at V-008 top is


provided with high alarm.

12.6.1.1.1

2. TI-184 on inlet of C003 is provided with high


alarm.

12.6.1.1.2

3. TDI-214 is provided.

12.6.1.1.3
12.7

7. Low level

Same as high flow

8. high level

Same as low flow

12.8

9. composition

No new cause

12.9

10. others

No new cause

12.1

Page 81 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 13

Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L

DESIGN INTENTION

To supply Hydro treated gas oil from Stripper Bottom to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0018, CS-140-PR-15-0019, CS-140-PR-15-0022

EQUIPMENT

Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)

STREAM DETAILS

Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-442,LC-535,LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.

Pressure ( bar g)

Flow rate (Kg/hr)

65-252.1/300
40.0/ 140

7.3-11.8/15

115553

5.0-7.3 /9

115214

Note:
Node
13. Stripper bottom to Gas oil Air 1.
cooler, Coalescer and Salt Dryer
to B/L

Deviation
Less/No flow

Causes
1. P-005A/B trips.

Consequences
1. C-002 level will increase, ultimately
leading to filling of column.

Safeguards
1. LC-535 on stripper
provided with high alarm

Ref. No.

Recommendations

Responsibility

13.1.1.1.1

2. Continued steam supply to the stripper will 1. LZ-537 is provided n


13.1.1.2.1
damage the trays.
stripper C-002 with HH
alarm & activates UZ-717
to isolate MP Steam to C002

3. System pressure at pump P-005 D/S will


come down, will lead to non-availability of
backwash fluid for feed filter

2. LC-535/FC-442 malfunctions 1. System will face P-005 shut off pressure


to close FCV-442(downstream of
salt dryer).

1.Pressure transmitter PT- 13.1.1.3.1


444 is provided with low
alarm downstream of V019, before FCV-442 on
line P-103.

1. System is designed for


pump shut off pressure.

13.1.2.1.1

2. High pressure alarm PI444 is provided.

2. C-002 level will increase, ultimately


leading to filling of column.

3. LC-535(maintaing stripper
bottom level)/FC-454
malfunctions to close FCV454(Start-up recirculation line).

1. Same as safeguards 1, 13.1.2.2.1


2 for cause 1 in this
node.

1. Refer 13.1.2.1.1 and 13.1.2.2.1

13.1.3.1

Page 82 of 136

73. .Keep the spectacle


blind located in startup
recirculation line in open
position to maintain unit
under circulation during
upset without loosing much
time.

SEI

Remarks

13. Stripper bottom to Gas oil Air 1.


cooler, Coalescer and Salt Dryer
to B/L

Less/No flow

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 13

Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L

DESIGN INTENTION

To supply Hydro treated gas oil from Stripper Bottom to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0018, CS-140-PR-15-0019, CS-140-PR-15-0022

EQUIPMENT

Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)

STREAM DETAILS

Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-442,LC-535,LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.

Pressure ( bar g)

Flow rate (Kg/hr)

65-252.1/300
40.0/ 140

7.3-11.8/15

115553

5.0-7.3 /9

115214

Note:
Node

Deviation

Causes

Consequences

4. MOV -004 in closed condition 1. Pump will run dry.


Refer -13.1.1.1.1, 13.1.1.2.1 and 13.1.1.3.1
for remaining consequences

Safeguards

Ref. No.

Recommendations

Responsibility

1.If MOV-004 full open


13.1.4.1.1
signal is lost, interlock will
stop the pump.
2.Start permissive is
included as a part of safe
guarding system for Pump
P-005A/B.

5. Choking of coalescer in V009

Refer 13.1.2.2.1

1.PDI-914 provided with


High alarm.

6. Choking of salt dryer in V019

Refer 13.1.2.2.1

1. PDI-923 Provided with 13.1.6.1.1


High alarm

7. FC-436 malfunctions to close 1. Product quality upset (Flash point ,sulfur 1. SC-011(type B) is
FCV-436
content of Gas oil)
provided at downstream
of salt dryer.

2.

High Flow

3. Reverse/Misdirected
Flow

13.1.7.1.1

2. AI-003 is provided for


monitoring

13.1.7.1.2

13.1.8.1.1

8. XZV-717 malfunctions to
close

1. Refer 13.1.7.1.1 and 13.1.7.1.2

1. FC-436 provided with


low alarm.

1. LC-535/FC-442 malfunctions
to open FCV-442.

1. Level of C-002 may go down.


2. Product quality may get affected due to
less residence time in V009/V-019 respectively.

13.1.5.1.1

74. FC-436 should be force


closed when UZ-717 is
activated.

SEI

1. LZ-538 is provided with 13.2.1.1.1


LL alarm to activate UZ712.
13.2.1.2.1

75. Provide high alarm for


FC-442.

SEI

76. Provide independent


SEI
DCS low low alarm from LZ537

2. LC-535/FC-454 malfunctions
to open FCV-454(Start-up
recirculation line).

1. Level of C-002 may go down and


ultimately pump may run dry damaging the
accessories.

1. LZ-538 is provided
with LL alarm to activate
UZ-712.

13.2.2.1.1

1. P-005 A/B trips

1. Gas oil may backup from storage

1. NRV provided in
Rundown line at B.L.

13.3.1.1.1

Page 83 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 13

Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L

DESIGN INTENTION

To supply Hydro treated gas oil from Stripper Bottom to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0018, CS-140-PR-15-0019, CS-140-PR-15-0022

EQUIPMENT

Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)

STREAM DETAILS

Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-442,LC-535,LC-544

Operating/Design Parameters
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.

Pressure ( bar g)

Flow rate (Kg/hr)

65-252.1/300
40.0/ 140

7.3-11.8/15

115553

5.0-7.3 /9

115214

Note:
Node

Deviation
4.

Low Pressure

Causes
1. U/S disturbance

Consequences
1. P-005 capacity reduces and level in
column will rise.

Safeguards
1. LZ-537 HH will
activate
UZ-717 to close XZV717 on M.P steam line.

2. Refer low no flow P-005A/B


trips conseq. 3.(*)
5. High
Temperature

1. EA-003 trips

Ref. No.

Recommendations

Responsibility

13.4.1.1.1

13.4.2

1. Likely Poor performance of V009/V-019. If temp. raises above 60 C


melting/caking of salt in salt dryer may take
place.

1. High alarm provided


at TI-203/204.

13.5.1.1.1

77. Possibility of dissolution Vendor/SEI


of salt in gas oil product is to
be confirmed.

2. Separate electric
13.5.1.1.2
supply line is provided for
the fans in EA-003.

6. Problem/Requirements

2. Cooling water failure in EE007

1. Refer 13.5.1.1.1 ~2

3. Cooling medium failure in


EE-006

1. Refer 7.8.1.1.1

13.5.2.1

1. High alarm provided


at TI-203.

13.5.3.1.1

2. High alarm provided


at TI-204.

13.5.3.1.2

1. Not Draining of salt dryer

1. Water may carry over with diesel product 1.AI-003 is provided


leading to off spec product quality

2. Loss of salt in salt dryer

1. Water may carry over with diesel product. 1. SC-011 is provided for 13.6.2.1.1
sampling

2. PDI-923 is provided
with high alarm.

Page 84 of 136

13.6.1.1.1

13.6.2.1.2

78. Operating procedure


SEC/NOCL
should ensure draining of
salt dryer at regular intervals
by checking LG554.

79. Regular top up


SEI/NOCL
procedures/schedules to be
mentioned in SOP.
80. P&ID is to be updated
for maintenance /Top up
discharge/bypassing salt
dryer procedure.

SEI/VENDOR

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 13

Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L

DESIGN INTENTION

To supply Hydro treated gas oil from Stripper Bottom to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0018, CS-140-PR-15-0019, CS-140-PR-15-0022

EQUIPMENT

Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)

STREAM DETAILS

Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-442,LC-535,LC-544


6. Problem/Requirements
Operating/Design Parameters
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.

Pressure ( bar g)

Flow rate (Kg/hr)

65-252.1/300
40.0/ 140

7.3-11.8/15

115553

5.0-7.3 /9

115214

Note:
Node

Deviation

Causes
3. Leakage through Seal in P005A/B

Consequences
1. Possible fire

Safeguards

2. HZ-850 is provided at
safe distance to activate
UZ-712.

4. Tube leak in EE-007

Ref. No.

Recommendations

Responsibility

1. Pump is provided with 13.6.3.1.1


double mechanical seal

1. Stripper bottom will ingress in cooling


water line

13.6.3.1.2

13.6.4.1

7. Operation/Maintenance

13.7

Page 85 of 136

81. Confirm that


hydrocarbon detectors are
provided in cooling tower
area.

NOCL

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 14

Stripped overhead system, including corrosion inhibitor injection

DESIGN INTENTION

To Supply Wild Naphtha to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0020, CS-140-PR-15-0021,CS-140-PR-15-0023

EQUIPMENT

Stripper Air Condenser(140-EA-002), Stripper Trim Condenser(140-EE-005),Stripper


Reflux Drum(140-V-008), Stripper Reflux Pumps(140-P004A/B)

STREAM DETAILS

Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-542,FC-439,FC-441,LC-540

Operating/Design Parameters
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.

Pressure ( bar g)

Flow rate (Kg/hr)

45/140
45/140

9.5-11.5/15
6.0-11/15

9105
2956

Note:
Node
14. Stripper Overhead system

Deviation
1. Low/No Flow of overhead
vapors

Causes

Consequences

1. U/S disturbance (stripping


steam failure/Low feed inlet
temperature to C-002)

1. Product quality may get affected


(Gas oil) due to poor stripping.

Safeguards

2. Low/no flow of reflux

1. P-004A/B trips (reflux)

Respons
ibility

14.1.2.1

2 Pump running in zero forward flow leading


to potential damage.

14.1.2.2

1. V-008 level may go high

1. LC-540 is provided
with high alarm.

14.2.1.1.1

2. C-002 overhead pressure &


temp. may increase.

1. FC-439/441 is
provided with low alarm

14.2.1.2.1

2. PI-903 is provided with 14.2.1.2.2


high alarm.
3. PSV-319A/B is
14.2.1.2.3
designed for reflux failure
case
2. FC 439 malfunctions to close 1. Refer 14.1.2.1 and 14.1.2.2
FCV-439

14.2.1

1. LC-540 is provided
with high alarm.

Page 86 of 136

14.2.3.1.1

Remarks
In case TC/FC cascaded
rearrangement is accepted
then FC-439 low alarm is
there.

14.1.1.1.2

1. No hazardous consequences.

3. FC 441 malfunctions to close 1. V-008 level may go high


FCV-441.

Recommendations

1. AI-003 is provided on 14.1.1.1.1


gas oil product line.

2. TI-192 with low alarm


is provided.
2. Feed failure

Ref. No.

82. TBC from vendor


regarding the requirement
of min. flow to avoid
churning.

SEI

14. Stripper Overhead system

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 14

Stripped overhead system, including corrosion inhibitor injection

DESIGN INTENTION

To Supply Wild Naphtha to B/L.

DRAWINGS

CS-140-PR-15-0017,
2. Low/no flow of refluxCS-140-PR-15-0020, CS-140-PR-15-0021,CS-140-PR-15-0023

EQUIPMENT

Stripper Air Condenser(140-EA-002), Stripper Trim Condenser(140-EE-005),Stripper


Reflux Drum(140-V-008), Stripper Reflux Pumps(140-P004A/B)

STREAM DETAILS

Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-542,FC-439,FC-441,LC-540

Operating/Design Parameters
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.

Pressure ( bar g)

Flow rate (Kg/hr)

45/140
45/140

9.5-11.5/15
6.0-11/15

9105
2956

Note:
Node

Deviation

Causes
4. LC-540 malfunction to close
LCV-540B/FCV-441

Consequences

Safeguards

1. V-008 level may go high causing


1. FI-438 with high alarm
overpressurization of stripper, liquid carryover is provided .
to V-010 and potential foaming in LP amine
absorber.

2. LC-530 is provided
with low level alarm.

Ref. No.
14.2.4.1.1

Recommendations

Respons
ibility

Remarks

83.Consider providing
SEI
independent level
transmitters with high alarm
and delete the high alarm
from LC-540

1. Provide flow totalizer


(FI-446 & 441) with low
alarm

84.Consider Providing
independent level
transmitters with high
alarm and delete the high
alarm from LC-540

High level alarm to be


provided on magnetic LG541 with switch

2. High level alarm to be


provided on magnetic LG541 with switch

14.2.4.1.2

3. PI-903 is provided with 14.2.4.1.3


high alarm.
3.

High Flow

1. FC 439 malfunctions to open 1. Column overhead temperature comes


FCV-439
down which lead to gas oil product off spec
(Flash point)

1.Low alarm at TI-192 is


provided.

14.3.1.1.1

1. LC-540 is provided
with low alarm.

14.3.1.2.1

2. FC 441 malfunctions to open 1. V-008 level may go down


FCV-441

1. LC-540 is provided
with low alarm.

14.3.2.1.1

3. LC-540 malfunction to open


LCV-540B/FCV-441

1. FC-441/FC-439 is
provided with Low alarm

14.3.3.1.1

2. V-008 level may come down and leading


to loss of reflux.

1. V-008 level may go down leading to loss


of reflux.

Page 87 of 136

SEI

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 14

Stripped overhead system, including corrosion inhibitor injection

DESIGN INTENTION

3. High Flow
To Supply Wild Naphtha to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0020, CS-140-PR-15-0021,CS-140-PR-15-0023

EQUIPMENT

Stripper Air Condenser(140-EA-002), Stripper Trim Condenser(140-EE-005),Stripper


Reflux Drum(140-V-008), Stripper Reflux Pumps(140-P004A/B)

STREAM DETAILS

Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-542,FC-439,FC-441,LC-540

Operating/Design Parameters

3. LC-540 malfunction to open


LCV-540B/FCV-441

SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.

Pressure ( bar g)

Flow rate (Kg/hr)

45/140
45/140

9.5-11.5/15
6.0-11/15

9105
2956

Note:
Node

Deviation

Causes

Consequences
2. Pump will loose suction.

Safeguards
1. Sufficient time is
available for V-008 to
loose liq. Level.

Ref. No.

NA

14.4

5.

1. D/S disturbance(PCV-394A/B 1. Carry over of diesel in stripper overhead. 1. LC-540 is provided


full open)
heavies in wild naphtha to unit -160/200.No
with high alarm
hazardous consequences.

14.5.1.1.1

6. High
Temperature

1. EA-002 partial failure

2. P-004 discharge pressure will come down 1. Low pressure alarm


leading to increase of level in V-008.
PI-999 is provided at LP
amine absorber outlet.

14.5.1.2.1

1. Heavier hydrocarbon carryover with Off


gas leading to foaming in C-003.

1.FI-438 is provide with


high alarm

14.6.1.1.1

2.TI-208 is provided with


high alarm.

14.6.1.1.2

2. Level of V-008 may come down which


leads to reflux failure,

Respons
ibility

Remarks

14.3.3.1.1

4. Reverse/Misdirected
Flow
Low Pressure

Recommendations

14.6.1.2

85.Consider Providing
independent level
transmitters with high
alarm and delete the high
alarm from LC-540

SEI

High level alarm to be


provided on magnetic LG541 with switch

1. PSV-319A/B is
14.6.1.2.1
designed for reflux failure
case
2. TI-208 is provided with 14.6.1.2.2
high alarm

Page 88 of 136

86.Provide high temp alarm


on TI-192

SEI

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 14

Stripped overhead system, including corrosion inhibitor injection

DESIGN INTENTION

To Supply Wild Naphtha to B/L.

DRAWINGS
EQUIPMENT

CS-140-PR-15-0017, CS-140-PR-15-0020, CS-140-PR-15-0021,CS-140-PR-15-0023


6. High
Temperature
Stripper Air Condenser(140-EA-002), Stripper Trim Condenser(140-EE-005),Stripper
Reflux Drum(140-V-008), Stripper Reflux Pumps(140-P004A/B)

STREAM DETAILS

Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-542,FC-439,FC-441,LC-540

Operating/Design Parameters
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.

Pressure ( bar g)

Flow rate (Kg/hr)

45/140
45/140

9.5-11.5/15
6.0-11/15

9105
2956

Note:
Node

Deviation

7. Low temp.

Causes

Consequences

9. Operation/Maintenance

Ref. No.

2.Reflux failure

1. Refer 14.6.1.2, 14.6.1.2.1 and 14.6.1.2.2

14.6.2.1

3. Cooling water failure in EE005

1. Refer 14.6.1.2, 14.6.1.2.1 and 14.6.1.2.2

14.6.3.1

1.U/S disturbances.

1. Lower temp at the top of stripper overhead 1.Corrosion inhibitor


line leading to Corrosion in stripper top trays. injection is provided.

14.7.1.1.1

2.Low alarm TI-192 is


provided.

2.Low temp. of feed


8. Problem/Requirements

Safeguards

Recommendations

Respons
ibility

14.7.2.1.2

1. Tube leak in EE-005

1. Stripper over head will ingress in cooling


water line

14.8.1.1

87.Confirm that
hydrocarbon detectors are
provided in cooling tower
area.

NOCL

1 Less corrosion inhibitor


injection

1. Corrosion of overhead line and


downstream air cooler

14.9.1.1

88.SOP to ensure that the


proper dosing rate is
maintained and confirmed
with proper lineup.

SEI/NOC
L

2. overdosing of corrosion
inhibitor

1. No major safety concerns.

14.9.2.1

Page 89 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 15

Makeup H2 Compressor System

DESIGN INTENTION

To supply Hydrogen to make-up Compressor supply from B/L.

DRAWINGS

CS-140-PR-15-0013, CS-140-PR-15-0014, CS-140-PR-15-0015

EQUIPMENT

Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)

STREAM DETAILS

Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES

Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.

Pressure ( bar g)

Flow rate (Kg/hr)

45 /120

20 /26

2457

Note:
Node
15. Makeup H2
Compressor system

Deviation
1.

Low/No Flow

Causes
1. U/S disturbance

Consequences

Safeguards

Ref. No.

1. Less/No hydrogen make up to reaction


section because compressor is in recycle
mode leading to low pressure in reaction
section.

1. FI-432 at hydrogen
makeup line from B/L, is
provided with low alarm.

15.1.1.1.1

2. Suction pressure of compressor may go


down

1. PC-383 is provided
with low alarm

15.1.1.2.1

2. PZ-385/PZ-956 LL
alarm will activate UZ707 to trip K-001A/B

15.1.1.2.2

Recommendations
89. Provide low alarm at PI358A on separator drum.

Responsibility
SEI

Remarks
P&ID is to be updated for
HydroCOM signals.

3.Note-13 is provided in 15.1.1.2.3


P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.

2. Running compressor K-001A/B trips

1. No hydrogen make up to reaction


section.

1.No safeguard till start


up of spare compressor
(spare compressor will
take time for startup).

15.1.2.1.1

90.Check the time required to SEI/NOCL


startup spare compressor .

1.DHU feed can be


maintained till hydrogen
pressure is available upto 63
bar. Meanwhile standby
compressor has to be started.
The start-up philosophy of
keeping the compressor in
standby condition accordingly.

2 Vendor P&ID is to be
updated for all operator
controls, DCS interfaces of
HydroCOM.
3. XZV-707 at compressor discharge line to
reaction section, malfunction to close

1. No hydrogen make up to reaction section 1. PC-974 is provided


with high alarm

15.1.3.1.1

2. Compressor discharge may experience


high pressure.

15.1.3.2.1

1. Spill back line is


provided.

2. FI-432 is provided with 15.1.3.2.2


low alarm
4. FC-431/PC-383/PC-974 malfunctions to
open FCV431(Makeup line)

1. Less hydrogen make up to reaction


section

1. FI-432 is provided
with low alarm

15.1.4.1.1

5. FC-431/ malfunctions to close FCV431(Spill back line)

1. System pressure may go high

1. PC-974 is provided
with high alarm

15.1.5.1.1

Page 90 of 136

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 15

Makeup H2 Compressor System

DESIGN INTENTION

To supply Hydrogen to make-up Compressor supply from B/L.

DRAWINGS

CS-140-PR-15-0013, CS-140-PR-15-0014, CS-140-PR-15-0015

EQUIPMENT

Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)

STREAM DETAILS

Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES

Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.

Pressure ( bar g)
20 /26

5. FC-431/ malfunctions to close FCV431(Spill back line)

Note:
Node

Flow rate (Kg/hr)

45 /120

Deviation

Causes

1. System pressure may go high


Consequences

Safeguards
2. PSV-316/317 is
provided.

6.PC-383 /PC-974 malfunctions to close FCV431(Spill back line)

1. Low pressure in suction

7. PC-922 malfunction to close,


PCV-922,at the inlet line to hydrogen cooler
(hydrogen to Unit2500)

1. No major concern as this line is


NNF.

8. PC-922 malfunction to open


PCV-922(Make up line)

1. System d/s PCV-922 may experience


high pressure.

9. Demister choke-up

2. Low/no flow(V),P&ID-0014

1. Pressure buildup in KO drum.

Ref. No.
15.1.5.1.2

Recommendations

Responsibility
VENDOR

1. Low low alarm at PZ- 15.1.6.1.1


901 is provided to trip the
compressor.
15.1.7.1

1. PSV-952A/B is
provided.

15.1.8.1.1

1. PC-383 is provided
with low alarm.

15.1.9.1.1

2. PSV-315 is provided.

15.1.9.1.2

3. PZ-901 is provided to
trip the compressor.

15.1.9.1.3

10. HydroCOM malfunctions to unload

1.Less flow to reaction section

1.U/S disturbances

1.Low suction pressure.

15.2.1.1

2.Compressor trip.

15.2.1.2

2.Suction strainer choking

2457

1.HydroCOM system can 15.1.10.1.1


be bypassed/spill back
system can operate with
100%

1.Low suction pressure.

1. PDI-901 is provided.

15.2.1.1

2. compressor trip., High rod load.

1. Low suction pressure


trip PZ-901 is provided.

15.2.2.2.1

3. High discharge temp.

1.High discharge temp.


alarm TIH-902 is
provided.

15.2.2.3.1

2. High discharge temp.


trip TIHH-903 is
provided.

15.2.2.3.2

Page 91 of 136

91.PT with high alarm is to be SEI


provided instead of PI-953.

92.Low pressure alarm at PC- SEI


358 is to be provided on V006.

Remarks
Vendor P&IDs are to be
updated for consistency in tag
no.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 15

Makeup H2 Compressor System

DESIGN INTENTION

To supply Hydrogen to make-up Compressor supply from B/L.

DRAWINGS

CS-140-PR-15-0013,
CS-140-PR-15-0014, CS-140-PR-15-0015
2. Low/no flow(V),P&ID-0014

EQUIPMENT

Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)

STREAM DETAILS

Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

2.Suction strainer choking

AVAILABLE CONTROL SCHEMES

Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.

Pressure ( bar g)

Flow rate (Kg/hr)

45 /120

20 /26

2457

Note:
Node

Deviation

Causes

Consequences
4. High motor current

Safeguards
1.Motor overload trip is
provided (from MCC).

5. High rod load.


3.

High Flow

1. FC-431/PC-383/PC-974 malfunctions to
close FCV431(Makeup line)

1. Refer 15.1.5.1.1 and 15.1.5.1.2

4. High flow(V),P&ID-0014

15.2.2.4.1

1.High alarm on PI-904 is 15.3.1.1.1


provided.

15.3.1.1.2

15.3.2.1

1. Refer 15.1.4.1.1

2. High suction pressure

1.Interstage PSVs are


provided for each stage.

15.3.2.2.1

3. PC-922 malfunction to open


PCV-922(hydrogen to Unit2500)

1. Refer 15.1.7.1

15.3.3.1

4. PC-922 malfunction to close


PCV-922(Make up line)

1. Refer 15.1.6.1.1

15.3.4.1

1. Loss of loop pressure

2. High upstream pressure.

1.Spillback valve FCV431 is provided.

15.4.1.1

1. High interstage discharge pressure leading 1.PC-974 is provided


to high rod load.

15.4.2.1.1

2.PSV-901 A/B/C are


provided.

15.4.2.1.2

3.PI-902 high alarm is


provided.

15.4.2.1.3

1.High discharge temp.


alarm TIH-902 is
provided.
2. High discharge temp.
trip TIHH-903 is
provided.

15.4.2.2.1

2. Increase in interstage discharge temp.

Recommendations

15.2.2.5

2.High alarm on PC358(at separator outlet)


is provided.
2. FC-431/PC-383 /PC-974 malfunctions to
open FCV-431(Spill back line)

Ref. No.

Page 92 of 136

15.4.2.2.2

SEI
93.Confirm that the suction
system can either withstand
with the high suction pressure
and PSV is designed for the
same.

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 15

Makeup H2 Compressor System

DESIGN INTENTION

To supply Hydrogen to make-up Compressor supply from B/L.

DRAWINGS

CS-140-PR-15-0013, CS-140-PR-15-0014, CS-140-PR-15-0015

EQUIPMENT

4. High flow(V),P&ID-0014
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)

STREAM DETAILS

Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES

Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.

Pressure ( bar g)

Flow rate (Kg/hr)

45 /120

20 /26

2457

Note:
Node

Deviation

5. Reverse/Misdirected
Flow

Causes

7.

Low Pressure

Safeguards

Ref. No.

3. HydroCOM failure to load the machine fully.

1.Low suction pressure, High flow due to


sudden loading of machine it is possible that
machine may trip due to low suction
pressure.

1.Spillback valve FCV431 is provided. PC974 ,PC-383 are


provided.

1. K-001A/B trips.

1. Recycle gas containing H2S as well as


HCs may backflow in the system and
eventually may flow to hydrogen bullet.

1. NRV is provided in
15.5.1.1.1
make up hydrogen line to
Recycle gas.

2. U/S disturbance at Unit


1500(start up line to V-008)

6. Reverse/Misdirected
Flow(V),P&ID-0014

Consequences

1. Off gas may back up in the system

2. UZ-707 will close


XZV- 707 when
compressor trips.

15.5.1.1.2

1.NRV is provided at the


junction of H-162 and P079 on line H-162.

15.5.2.1.1

Not applicable.

1. Compressor malfunctioning

15.4.3.1.1

16

1. Less makeup hydrogen flow to


Reaction section

1. PI-036/037 is
provided with low alarm

15.7.1.1.1

2. PZ-385A/956A is
15.7.1.1.2
provided with LL alarm to
activate UZ-707.

3. Note-13 is provided in 15.7.1.1.3


P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.

8. Low pressure (V),P&ID-0014 Same as low flow.

9.

High Pressure

15.8

same as high flow

15.9

Page 93 of 136

Recommendations

Responsibility

94. HydroCOM vendor to


SEI/NEA
clarify for the consequences
of sudden loading and how tp
prevent tripping of
compressor and implement
solution to provide the same.

95. Consider forced PCV-922 SEI


close when compressor trips.

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 15

Makeup H2 Compressor System

DESIGN INTENTION

To supply Hydrogen to make-up Compressor supply from B/L.

DRAWINGS

CS-140-PR-15-0013, CS-140-PR-15-0014, CS-140-PR-15-0015

EQUIPMENT

Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)

STREAM DETAILS

Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES

Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.

Pressure ( bar g)

Flow rate (Kg/hr)

45 /120

20 /26

2457

Note:
Node

Deviation

Causes

Consequences

Safeguards

10.High pressure(V),P&ID-0014 same as high flow


11. High
Temperature

1. Cooling water failure in EE008A/B

Ref. No.

Recommendations

Responsibility

15.1
1. Compressor may get damaged

1. TI-904/954 provided
with high alarm.

15.11.1.1.1

2. TZ-903/953 HH alarm 15.11.1.1.2


will activate UZ-707/708.

2. Compressor valve (K-001A/B)


malfunctions

1. Compressor may get damage

1. TI-904/954 is
15.11.2.1.1
provided with High alarm

2. TZ-903/953 HH alarm 15.11.2.1.2


will activate UZ-707/708.

3. Cooling water failure in EE-004

1. Compressor may get damage

1. TI-178 is provided
with
HH alarm

15.11.3.1.1

2. TI-901/951 is
15.11.3.1.2
provided with High alarm

3. TZ-903/953 HH alarm 15.11.3.1.3


will activate UZ-707/708.

4. Cooling water failure in EE-009

1. Hydrogen to B.L will go at High


temperature, possible damage in d/s

1. TI-211 is provided
with high alarm

15.11.4.1.1

5. U/S disturbance

1. Compressor may get damage

1. TI-231/233 is
15.11.5.1.1
provided with High alarm

2. TI-180/182 is
15.11.5.1.2
provided with High alarm.

3. TZ-181/183 HH alarm 15.11.5.1.3


will activate UZ-707.

4. TZ-232/234 HH alarm 15.11.5.1.4


Will activate UZ-707.

12. High temp. (V),P&ID-0014

1.U/S disturbance.

1.Interstage discharge temp. high.

1. TZ-181/183 HH alarm 15.12.1.1


will activate UZ-707.

Page 94 of 136

96. Confirm that hydrocarbon NOCL


detectors are provided in
cooling tower area.
97.Provide High alarm at TI176.

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 15

Makeup H2 Compressor System

DESIGN INTENTION

To supply Hydrogen to make-up Compressor supply from B/L.

DRAWINGS

CS-140-PR-15-0013, CS-140-PR-15-0014, CS-140-PR-15-0015

EQUIPMENT

Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B)

STREAM DETAILS

Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES

Operating/Design Parameters
SERVICE
Temperature(C)
Hydrogen from B.L.
.

Note:
Node

Pressure ( bar g)

Flow rate (Kg/hr)

45 /120

12. High temp. (V),P&ID-0014


Deviation

20 /26

Causes

1.Interstage discharge temp. high.


Consequences

2.Suction valve leakage.

13.

High Level

1. Tube leak in EE-004 when machine is


down and water collection in KOD.

Safeguards

Ref. No.

2457

Recommendations

Responsibility

2. TI-904 is provided with 15.12.2.2


high alarm.
1. Compressor may get damage due to
carryover of liquid.

1. LI-527 is
15.13.1.1.1
provided with High alarm.
2. LZ-529 HH
alarm will activate UZ707 to trip compressor.

15.13.1.1.2

15.14.1.1.1

14. High Level(V),P&ID-0014

1.High level in 2nd stage suction KO pot( Tube 1. Compressor may get damage due to
leak in interstage cooler EE-008A/B when
carryover of liquid.
machine is down and water collection in KOD).

1.LAH-901 is provided.

15. Problem/Requirements

1. Tube leak in EE- 004/008A/B/009 when unit 1. Hydrogen may ingress in cooling water.
is in running condition.
No major concern for
small leak. For major leak system will loose
hydrogen and compressor suction pressure
may go down.

1. PC-383 is provided
with low alarm

15.15.1.1.1

98.Provide High high level


NEA
compressor trip for 2nd stage
suction vessel

99.Confirm that hydrocarbon


detectors are provided in
cooling tower area.

NOCL

100. provide low point drain


SEI
valve at the shell side outlet
of EE-009 and SOP to
ensure checking of leakage of
cooling water after any
maintenance.

1.Tube leak in interstage cooler EE-008A/008B


16.
Problem/Requirements(V),P&ID0014

17. Operation/Maintenance

1.No purging facility

15.16.1

1.Contamination

1. No safeguard

Page 95 of 136

15.17.1.1.1

101. Inspection opening of


VENDOR/SEI
2nd stage suction vessel shall
be located closer to the
vanepack for inspection
purpose.
102. Venting/purge facility to
flare at EE-009 outlet is to be
provided near B/L.

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 16

Chemical Injection package (Only DMDS package is covered in HAZOP. All the applicable recommendations in this node are applicable to other injection packages.

DESIGN INTENTION

Chemical injection to prevent Corrosion/undesirable upsets in process.

DRAWINGS

CS-140-PR-15-0023, CS-140-PR-15-0025

EQUIPMENT

Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System

STREAM DETAILS

Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL
SCHEME

Operating/Design Parameters
Temperature(C)

Pressure ( bar g)

Flow rate (Kg/hr)

SERVICE
Sulfiding Agent
Antifoulant
Corrosion Inhibitor Antifoaming
Anti Oxidant

Ambient/65
Ambient /65
Ambient /65
Ambient/65
Ambient/65

1.5-7.5/13
0.0-4.0/6
0-10.8/13
0-11/12
0-7.5/10

1600
14.0
1.6
0.34/0.11
6.0

Note:
Node

Deviation

16. Chemical Injection System

1.

Low/No Flow

Causes
1. P-007A trips( during
sulfidation)

Consequences
1. Discharge pressure will go down.
Delaying in sulfiding process.

Safeguards
1. Sulfiding process is
attended activity, LG549 is provided for
monitoring.

Ref. No.

Recommendations

16.1.1.1.1

Responsibility

Remarks
1. Licensor recommends to
have flow meter in DMDS
supply line from pump
discharge.
2. It is suggested to have
installed spare for DMDS pump
as to ensure continuous
operation of pump during
startup period of 26 hrs.
Reliability is to be ensured if
ware

2. Stop alarm in DCS is


provided for DMDS injection
pumps.
2.

High Flow

3. Reverse/Misdirected
Flow

4. Low pressure

5.

High Pressure

16.1.1.1.2

1. High stroke in P-007A

1. No significant consequences

1. Reverse flow from unit 400

1. possible contamination

1.NRV is provided on line


CC020 near B.L.

16.2.1.1
16.3.1.1.1

2. Reverse flow from P-001


suction line.

1. Reactor circuit may get fouled.

1. NRV is provided on the


line

16.3.2.1.1

2. Delay in sulfiding process (during


sulfiding operation)

1. NRV is provided on the


line

16.3.2.2.1

1.Same as no/low flow(*)

16.4.1

2. PCV-332 B failure to close

1. No nitrogen supply to tank leading to low


pressure.

1. PCV-332 A failure to close in


flare line.

1. Overpressurization of DMDS tank.

16.4.2.1

1. PI-304 with high alarm is


provided overhead of tank.

16.5.1.1.1/2

2. PSV-303 A/B are


provided.

2. External fire

1. Draining of the OSBL line to


be reviewed during detail
engineering of Unit 400.

16.5.2

Page 96 of 136

103. PI-304 to be provided SEI


with low pressure alarm.

16. Chemical Injection System

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 16

Chemical Injection package (Only DMDS package is covered in HAZOP. All the applicable recommendations in this node are applicable to other injection packages.

DESIGN INTENTION

Chemical injection to prevent Corrosion/undesirable upsets in process.

DRAWINGS

CS-140-PR-15-0023, CS-140-PR-15-0025

EQUIPMENT

Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System

STREAM DETAILS

Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL
SCHEME

Operating/Design Parameters
Temperature(C)

Pressure ( bar g)

Flow rate (Kg/hr)

SERVICE
Sulfiding Agent
Antifoulant
Corrosion Inhibitor Antifoaming
Anti Oxidant

Ambient/65
Ambient /65
Ambient /65
Ambient/65
Ambient/65

1.5-7.5/13
0.0-4.0/6
0-10.8/13
0-11/12
0-7.5/10

1600
14.0
1.6
0.34/0.11
6.0

Note:
Node

Deviation
6.

Low Level

7.High level

Causes

Consequences

Safeguards

1. No significant cause as the


operation is required during
startup only

Ref. No.

Recommendations

Responsibility

16.6.1

1. Continuous filling from tanker 1.Over filling of drum leading to


overpressurization of DMDS tank.

1. PI-304 is provided with


high alarm.

16.7.1.1.1/2

2. PSV-303A/B design covers


overfill case.

8. Low temperature

No major issues.

16.8

9. High temperature

No major issues.

16.9

10. Composition

No major issues.

16.1

11. Others

1.Blockage of carbon canister in


the vent line.

1.Over pressurization of chemical injection


drums.

16.11.1.1

Page 97 of 136

104. Ensure that blockage NOCL


of carbon canister is not
possible.

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 17

Fuel oil, Fuel gas and Heater Firing system.

DESIGN INTENTION

To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.

DRAWINGS

CS-140-PR-15-0024, CS-140-PR-15-0026

EQUIPMENT

Hydro treating reactor feed Heater (140-H-001)

STREAM DETAILS

Heater is Dual fired

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-820,PC-823,UC-001


Operating/Design Parameters

SERVICE
Temperature(C)
Fuel Gas
Fuel Oil

Pressure ( bar g)

Flow rate (Kg/hr)

25/70
180/210

3.5/5
11/18

416
615

Note:
Node
17. Fuel oil, Fuel gas and
Heater Firing System

Deviation
1.

Low/No Flow (Fuel Gas)

Causes
1. PC -820 malfunctions to
close
PCV-820(fuel gas line)

Consequences

Safeguards

Ref. No.

1. Loss of firing of fuel gas leading to


process upset/Heater shut down.

1. PZ-821 (2oo3) is provided


with low low alarm to activate
UZ-718.

17.1.1.1.1

2. Fuel gas pressure will come down.

1. PZ-821 is low low alarm to


activate UZ-718.

17.1.1.2.1

2. XZV-718A/C malfunctions to
close (fuel gas line)

1. Refer 17.1.1.1.1 and 17.1.1.2.1

3.PCV-830 in pilot line


malfunctions to close

1.Loss of pilot gas to all the burners.

1. PZ-823 (2oo3) is provided


with low low alarm to activate
UZ-718.

17.1.3.1.1

4. XZV-718E/F malfunctions to
close (pilot gas line)

1. Pilot flame loss, leading to heater trip.

1. Pilot flame scanner (BZS001/002/003) is provided with


scanner alarm. Also if all the
pilots are off, heater trip is
provided through UZ-718.

17.1.4.1.1

Recommendations

Responsibilit
y

Remarks

17.1.2.1

2. PZ-823 is provided with low 17.1.4.1.2


low alarm to
activate UZ-718.
3. Deviation alarm is provided
for XZV-718 E/F.
5. PC-823 malfunctions to close 1. Loss of firing of fuel oil may lead to
PCV-823A(Fuel oil line) ,during
startup operation upset
startup case .

17.1.4.1.3

1. Low-oil pressure alarm at PI- 17.1.5.1.1


869 is provided.

Page 98 of 136

Fuel gas is provided as


alternate fuel to provide
adequate firing from
UC-001.

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 17

Fuel oil, Fuel gas and Heater Firing system.

DESIGN INTENTION

To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.

DRAWINGS

CS-140-PR-15-0024, CS-140-PR-15-0026

EQUIPMENT

Hydro treating reactor feed Heater (140-H-001)

STREAM DETAILS

Heater is Dual fired

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-820,PC-823,UC-001


Operating/Design Parameters

SERVICE
Temperature(C)
Fuel Gas
Fuel Oil

Pressure ( bar g)

Flow rate (Kg/hr)

25/70
180/210

3.5/5
11/18

416
615

5. PC-823 malfunctions to close


PCV-823A(Fuel oil line) ,during
startup case .

Note:
Node

Deviation

Causes

Consequences
2. Fuel oil pressure may come down.

6. XZV-718N malfunctions to
close (Fuel oil line)

Safeguards

Ref. No.

17.1.6.1

7. PDC-826(on fuel oil and


1. Loss of fuel oil flame due to failure of
atomizing steam) malfunctions to atomizing steam.
close
PCV-826
2. Fuel oil spillage in heater leading to
burner tip choking.

1. PDZ-860 is provided with


low low alarm to activate UZ718.

8. Strainer choking.

1. PDI -827 is provided with


high alarm (Fuel gas line)

17.1.8.1.1

2. PDI-857 is provided with


high alarm (Fuel oil line)

17.1.8.1.2

3. All strainers are provided


with spare for change over.

17.1.8.1.3

9. PC-899/HCV-830
malfunctions to close.

1. Box pressure will increase.

Responsibilit
y

1. PZ-858 is provided with low 17.1.5.2.1


low alarm to
activate UZ-718.

1. Refer 17.1.4.1.1 ~ 3

1. Possible loss of fuel gas/oil leading to


flame failure.

Recommendations

17.1.7.1.1

17.1.7.2.1

1. PZ-900 (2oo3) is provided


17.1.9.1.1
with HH alarm to activate to trip
UZ-718.

105.Provide additional
flushing oil return taping
upstream of XZV-718 M
for flushing.

SEI

106. Damper open/close


indications are provided
(P&ID is to be updated
accordingly).

SEI

107. Startup and shut


down overrides for
damper control will be
included in P&ID note.

Page 99 of 136

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 17

Fuel oil, Fuel gas and Heater Firing system.

DESIGN INTENTION

To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.

DRAWINGS

CS-140-PR-15-0024, CS-140-PR-15-0026

EQUIPMENT

Hydro treating reactor feed Heater (140-H-001)

STREAM DETAILS

Heater is Dual fired

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-820,PC-823,UC-001


9. PC-899/HCV-830
malfunctions to close.
Temperature(C)

SERVICE
Fuel Gas
Fuel Oil

Operating/Design Parameters
Pressure ( bar g)

Flow rate (Kg/hr)

25/70
180/210

3.5/5
11/18

416
615

Note:
Node

Deviation

Causes

10. 180-FA-001C/D Choking

2.

High Flow

Consequences

3. PDC-826 malfunctions to
open
PCV-826

Ref. No.

2. Less air flow may lead to incomplete


combustion.

1. AI-004 provided for


monitoring.

17.1.9.2.1

3. Box temperature likely to increase

1. TI-102 is provided with high


alarm.

17.1.9.3.1

1. Unit 1800 may get disturbed (No


consequence related to DHU).

1. PDI-010 is provided with


high alarm

17.1.10.1.1

2. Spare Flame arrestor is


provided.

17.1.10.1.2

1. PDZ-860 with LL alarm will


activate UZ-718.

17.2.1.1.1

2. HH oil pressure trip is


provided(UZ-718.)

17.2.1.1.2

1. Hard firing may occur, leading to higher


Tube metal temperature.

1. Skin temp. indications are


provided with high alarm.

17.2.2.1.1

2. Fuel gas line operating pressure will


increase

2. PZ-821 HH alarm will


activate UZ-718 to trip heater.

17.2.2.2.2

1. Flame lifting/improper atomization may


occur, leading to higher Tube metal
temperature.

1. Skin temp. indications are


provided.

17.2.3.1.1

1. PC-823 malfunctions to open 1. Possible Improper atomization may lead


PCV-823A(Fuel oil line), during
to flame loss.
start up operation only.

2. PC -820 malfunctions to
open PCV-820(fuel gas line)

Safeguards

Page 100 of 136

Recommendations
108. Low oxygen alarm at
AI-004 is to be provided

Responsibilit
y
SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 17

Fuel oil, Fuel gas and Heater Firing system.

DESIGN INTENTION

To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.

DRAWINGS

CS-140-PR-15-0024, CS-140-PR-15-0026

EQUIPMENT

Hydro treating reactor feed Heater (140-H-001)

STREAM DETAILS

Heater is Dual fired

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-820,PC-823,UC-001


Operating/Design Parameters

SERVICE
Temperature(C)
Fuel Gas
Fuel Oil

Pressure ( bar g)

Flow rate (Kg/hr)

25/70
180/210

3.5/5
11/18

416
615

Note:
Node

Deviation

Causes

4. PC-899/HCV-830
malfunctions to open.

3. Reverse/Misdirected flow

4.

Low Pressure

5. High pressure

1.High fuel oil pressure.

Consequences

Safeguards

Ref. No.

2. Steam line operating pressure will


increase

2. High alarm at PI-863 is


provided.

17.2.3.2.2

1. Fuel efficiency may decrease.

1. Oxygen analyzer AI-004 is


provided for monitoring

17.2.4.1.1

2. Draft will be increased, no major safety


concern.

1. Damper open/close
indications are provided.

17.2.4.2.1

1.Fuel oil back flow in steam line as the


steam pressure is constant.

1. PZ-858 with HH alarm will


activate UZ-718.

17.3.1.1.1

2.Check valve in steam line is


provided for individual burner.

17.3.1.1.2

1. Flame Arrester 180-FA001 is provided.

17.4.1.1.1

1. U/S disturbance (off gas


from
LPG Merox)

1. Flame may propagate back to line

2. PC -820 malfunctions to
close
PCV-820(fuel gas line)

1. Refer 17.1.1.1.1 and 17.1.1.2.1

17.4.2.1

3. PC-823 malfunctions to close


PCV-823A(Fuel oil line) ,during
startup case .

1. Refer 17.1.1.1.1 and 17.1.1.2.1

17.4.3.1

1. Refer 17.2.1.1.1 and


17.2.1.1.2

17.5.1

2. Refer 17.2.2.1.1 and


17.2.2.2.2

17.5.2

3. Refer 17.2.3.1.1 and


17.2.3.2.2

17.5.3

Page 101 of 136

Recommendations

Responsibilit
y

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 17

Fuel oil, Fuel gas and Heater Firing system.

DESIGN INTENTION

To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.

DRAWINGS

CS-140-PR-15-0024, CS-140-PR-15-0026

EQUIPMENT

Hydro treating reactor feed Heater (140-H-001)

STREAM DETAILS

Heater is Dual fired

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-820,PC-823,UC-001


Operating/Design Parameters

SERVICE
Temperature(C)
Fuel Gas
Fuel Oil

Pressure ( bar g)

Flow rate (Kg/hr)

25/70
180/210

3.5/5
11/18

416
615

Note:
Node

Deviation
6. Low
Temperature

Causes
1. U/S disturbance (fuel gas
line)

2. U/S disturbance (fuel oil line)

Consequences
1. Carryover of condensate with
fuel gas line leading to backfiring in the
furnace.
1. Increase in fuel oil viscosity leading to
improper atomization and sooty flame.

Safeguards
1. Fuel gas KOD is provided
and Steam tracing is also
provided d/s V-025.

17.6.1.1.1

1.Low alarm at TI-832 is


provided.

17.6.2.1.1

3. Steam tracing failure in fuel


oil line.
7. High
Temperature

1. U/S disturbance (Fuel oil


supply)

8. Low level

No new cause.

9.

1. High level in V-025

High Level

Ref. No.

Recommendations

Responsibilit
y

17.6.3

1. Fuel oil temp increases leading to


vaporization of low boiling point components
may result in vapor lock in the burner.

17.7.1.1

109.Ensure that upstream


system is properly
monitored to avoid any
vaporization.

NOCL

17.8

1. Liquid may carry over with fuel gas

10. Problem/Requirements (Soot 1. Low/No flow of M.P steam to 1. Soot blowing will not be possible leading
blower)
soot blower(Fuel oil operation
to lower heat transfer.
only).

1. LI-807 is provided with


High alarm

17.9.1.1.1

2. LZ-810 HH alarm will


activate UZ-718.

17.9.1.1.2

1. PI-730 is provided with low


low alarm.

17.10.1.1.1

2. Low low temp. alarm at TI725 is provided.

17.10.1.1.2

Page 102 of 136

110.MP steam for soot


blower tapping to be
downstream of FI-409.
(P&ID to be updated).

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 17

Fuel oil, Fuel gas and Heater Firing system.

DESIGN INTENTION

To Supply fuel gas/fuel oil (during startup only) to reactor fire heater.

DRAWINGS

CS-140-PR-15-0024, CS-140-PR-15-0026

EQUIPMENT

Hydro treating reactor feed Heater (140-H-001)

STREAM DETAILS

Heater is Dual fired

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-820,PC-823,UC-001


Operating/Design Parameters

SERVICE
Temperature(C)
Fuel Gas
Fuel Oil

Pressure ( bar g)

Flow rate (Kg/hr)

25/70
180/210

3.5/5
11/18

416
615

Note:
Node

Deviation

Causes

Consequences

Safeguards

11. Operation/Maintenance
(Decoking system is not
HAZOPed as it is manual &
attended operation)
12. Operation/Maintenance
(heater maintenance)

Ref. No.
17.11

1.Provide spectacle blind at the


inlet of Fuel gas KOD to ensure
positive isolation.

Page 103 of 136

17.12.1

Recommendations

Responsibilit
y

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 18

HP/MP Steam & MP BFW

DESIGN INTENTION

To supply HP steam ,MP steam and MP BFW

DRAWINGS

CS-140-PR-15-0030

EQUIPMENT

Distribution system, 140-DS-001

STREAM DETAILS

HP steam, MP Steam and MP BFW will be supplied from B/L to Unit.

AVAILABLE CONTROL SCHEMES

TCV-239

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW

Pressure ( bar g)

388/405
184/252
128/150

Flow rate (Kg/hr)


53.5/58
10/12
24/35

27437
1500
7687

Note:
Node
18.

HP/MP Steam
& MP BFW

Deviation
1.

Low/No Flow

Causes
1. U/S disturbance (HP Steam supply
failure)

2. U/S disturbance (MP Steam supply


from OSBL fails)

Consequences

Safeguards

Ref. No.

1. KT-002 trips

1. PI-810 is provided
with low alarm.

2. MP steam not available to stripper


leading to poor stripping and off spec
product.

1. Low flow alarm at FI- 18.1.1.2.1


804A/B is provided.

3 No MP steam available to DS-001.

1. XZV-835 in MP
boiler feed water line
closes if RGC turbine
trips(UZ-705)

1. No supply of atomization steam to fuel oil


in Fired heater

18.1.1.1.1

18.1.1.3.1

18.1.2.1.1

1. FI-804A is provided
with low alarm
2. PI-808 is provided
with low alarm.
2. No supply of MP steam to soot-blower
when required.

18.1.2.2.2

Page 104 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 18

HP/MP Steam & MP BFW

18. HP/MP Steam


DESIGN INTENTION
& MP BFW

1.
Low/No
To supply
HPFlow
steam ,MP steam and MP BFW

DRAWINGS

CS-140-PR-15-0030

EQUIPMENT

Distribution system, 140-DS-001

STREAM DETAILS

HP steam, MP Steam and MP BFW will be supplied from B/L to Unit.

AVAILABLE CONTROL SCHEMES

TCV-239

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters
2. U/S disturbance (MP Steam supply
from OSBL fails)
Temperature(C)

SERVICE
HP STEAM
MP STEAM
MP BFW

Pressure ( bar g)

388/405
184/252
128/150

Flow rate (Kg/hr)


53.5/58
10/12
24/35

27437
1500
7687

Note:
Node

Deviation

Causes

Consequences

Safeguards

Ref. No.

3. No MP steam supply leading to lube oil


pump turbine (of RGC) trip.

1.It will automatically


changeover to motor
operated lube oil
pump.

4. RGC turbine back pressure reduces ,


leading to turbine failure.

1. HH turbine speed
18.1.2.4.1
trip SZ-002 is provided.

Page 105 of 136

Responsibility

111.HH pressure trip PZ678A/B/C requirement is to


be reviewed from vendor
in view of turbine back
pressure.

BHEL/SEI

18.1.2.3.1

18.1.2.4.2
2. Low low back
pressure trip PZ678A/B/C is provided.

Recommendations

Remarks

18.

HP/MP Steam
& MP BFW

1.

Low/No Flow

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 18

HP/MP Steam & MP BFW

DESIGN INTENTION

To supply HP steam ,MP steam and MP BFW

DRAWINGS

CS-140-PR-15-0030

EQUIPMENT

Distribution system, 140-DS-001

STREAM DETAILS

HP steam, MP Steam and MP BFW will be supplied from B/L to Unit.

AVAILABLE CONTROL SCHEMES

TCV-239

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW

Pressure ( bar g)

388/405
184/252
128/150

Flow rate (Kg/hr)


53.5/58
10/12
24/35

27437
1500
7687

Note:
Node

Deviation

Causes

Consequences

Safeguards

Ref. No.

3. U/S disturbance (MP BFW supply


from OSBL fails)

1. MP steam temp. will be high. No major


consequence as the design temp. takes care
of turbine exhaust.

18.1.3.1

4. TC-239 malfunctions to close


TCV-239

1. Refer 18.1.3.1

18.1.4.1

1. TC-239 malfunctions to open


TCV-239

1. BFW may enter MP steam line header


leading to hammering.

1. Steam trap is
provided.

18.2.1.1.1

3. Reverse/Misdirected flow.

1.Turbine trip.

1.Header steam will come back to turbine


and stripper.

1.Check valves are


provided.

18.3.1.1.1

4.

Low Pressure

1. Same as low/no flow

18.4.1

5.

High Pressure

1. Refer 18.2.1.1.1

18.5.1

2.

High Flow

Page 106 of 136

Recommendations

112.Line from
Desuperheater
downstream upto steam
trap is to be designed for
two phase flow.

Responsibility

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 18

HP/MP Steam & MP BFW

DESIGN INTENTION

To supply HP steam ,MP steam and MP BFW

DRAWINGS

CS-140-PR-15-0030

EQUIPMENT

Distribution system, 140-DS-001

STREAM DETAILS

HP steam, MP Steam and MP BFW will be supplied from B/L to Unit.

AVAILABLE CONTROL SCHEMES

TCV-239

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating/Design Parameters

SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW

Pressure ( bar g)

Flow rate (Kg/hr)

388/405
184/252
128/150

53.5/58
10/12
24/35

27437
1500
7687

Note:
Node

Deviation
6. Low temp.

Causes
1.Upset in U/S desuperheater

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility
BHEL

1.Steam turbine efficiency reduces.

18.6.1.1

113. Vendor to provide


min. temp. of steam
acceptable at turbine inlet,
irrespective of min.
operating temp. specified
in B/L condition.

2.Low temp may lead to less superheat


steam to turbine likely to condense within the
turbine and damage the blades

18.6.1.2

114. TI-627 is to be
provided with low temp.
alarm in DCS.

7. High temp.

No significant cause.

18.7

8. Composition

NA

18.8

9. Others

NA

18.9

Page 107 of 136

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 19

Cooling Water System

DESIGN INTENTION

Cooling water supply to exchangers

DRAWINGS

CS-140-PR-15-0032

EQUIPMENT

Cooling water distribution

STREAM DETAILS

Cooling water is supplied to all cooling water exchangers from B/L and similarly cooling water return from all exchangers to header

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE
Temperature(C)
Cooling water supply
Cooling water return

Pressure ( bar g)

Flow rate (Kg/hr)

33/70
44/70

4/7
3/7

688411
688411

Note:
Node
19. Cooling water system

Deviation
1.

Low/No Flow

Causes

Consequences

Safeguards

Ref. No.

1. U/S disturbance

1. Cooling water exchangers will be starved 1. PI-816 is provided


leading to high run down/downstream temp. with low alarm

2.High flow

1. U/S disturbance

1. No major safety consequences.

3.Reverse/Misdirected flow

1. No significant causes
identified.

19.3.1

4.Low pressure

1. Refer 19.1.1.1.1

19.4.1

5.High pressure

1. Refer 19.2.1.1

19.5.1

2. Blockage in return line of


individual heat exchangers.

1.Return line may see high pressure due to


thermal expansion.

6.Low temp.

1. No significant causes
identified.

7. High
Temperature

1. High inlet temp.

1. Desired cooling of process stream is not


achieved in water cooled exchangers

2. High return temp.

1. Expected high return temperature of


cooling water

19.1.1.1.1

19.2.1.1

1. TSVs are provided on


return line of individual
exchangers.

19.5.2.1.1

19.6.1

1. High temp. alarm on


process outlet side is
provided on all critical
cooling water
exchangers

19.7.1.1.1

2. TI-816 is provided for


monitoring.

19.7.1.1.2

1. TI-818 is provided with 19.7.2.1.1


high alarm

Page 108 of 136

Recommendations

Responsibility

Remarks

7. High
Temperature

Node

Deviation

2. High return temp.


Causes

Consequences

Safeguards

2. Individual cooler outlet temp. can be high 1. High temp. alarm on


because of the fouling of cooler.
process outlet side is
provided on all critical
cooling water
exchangers

Ref. No.

Recommendations

Responsibility

19.7.2.2.1

8.Low level

NA

19.8

9. High level

NA

19.9

10. Problem/Requirements

1. Possibilities of cooling water


misdistribution

1. Insufficient cooling in some exchangers

11.Composition

1. Water going to process side.

1. Possible process feed contamination

19.11.1.1

115. SOP to ensure checking of


leakage of cooling water after any
maintenance.

SEI/NOCL

2. process feed going to water


side

1. Process fluid may ingress in cooling


water. No major concern for
small leak. For major leak system will loose
process fluid/HC will go to cooling tower area
leading to fire and explosion.

19.11.2.1

116.Confirm that hydrocarbon


detectors are provided in cooling
tower area.

NOCL

1.Hydraulic Check is
carried out based on
actual plant layout.

12.Others
13. Operation/Maintenance

19.10.1.1.1

19.12
1. Unit shut down, cooling water
header maintenance.

1. Loss of circulation may lead to loss of


protective coating in cooling water line.

19.13.1.1

Page 109 of 136

117. Provide 3" jumpover


connection line (with valve and
spec. blind) between cooling water
supply and return headers near
dead end. Jumpover will be used
for initial passivation during
commissioning.

SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 20

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DESIGN INTENTION

To supply Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DRAWINGS

CS-140-PR-15-0031, CS-140-PR-15-0033, CS-140-PR-15-0034

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

EQUIPMENT
STREAM DETAILS

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.

AVAILABLE CONTROL SCHEMESPC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,FCV-436


Operating/Design Parameters

SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen

Pressure ( bar g)

152/200
Amb. /65
Amb./65
Amb./66
Amb./66
Amb/65

Flow rate (Kg/hr)


4/6
3/8
3/8
4.9/9
6.1/10
8/10

2818
1000(1)
1000(1)
518
215
430(2)

Note:1- Confirmed by DEC


2. Flow rate is based on startup and shutdown requirement

Node
20. Portable/Service Water, LP
Steam,
Plant/Instrument Air
and Nitrogen

Deviation
1.

Low/No Flow

Causes

Consequences

Safeguards

Ref. No.

1. U/S disturbance (Potable


water)

1. No significant consequences

20.1.1.1

2. U/S disturbance (Service


water)

1. No significant consequences

20.1.2.1

3. U/S disturbance (Plant Air)

1. No significant consequences

4. U/S disturbance (Instrument 1. Instrument air pressure will come down


Air)
leading to unit shut down

20.1.3.1
1. PI-802 is provided 20.1.4.1.1
with low alarm.
2. Instrument air
backup for 20 min. is 20.1.4.1.2
provided from OSBL.
3. All instruments will
go to fail safe mode.
20.1.4.1.3

5. U/S disturbance (Nitrogen)

1. No/low pressure of nitrogen for blanketing 1. PI-806 is provided 20.1.5.1.1


and purging (refer individual nodes for
with low alarm.
possible consequences).

Page 110 of 136

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 20

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DESIGN INTENTION

To supply Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DRAWINGS
20.
Portable/Service Water, LP
Steam,
Plant/Instrument
Air
EQUIPMENT
and Nitrogen

CS-140-PR-15-0031,
CS-140-PR-15-0033, CS-140-PR-15-0034
1.
Low/No Flow

STREAM DETAILS

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,FCV-436


Operating/Design Parameters

SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen

Pressure ( bar g)

152/200
Amb. /65
Amb./65
Amb./66
Amb./66
Amb/65

Flow rate (Kg/hr)


4/6
3/8
3/8
4.9/9
6.1/10
8/10

2818
1000(1)
1000(1)
518
215
430(2)

Note:1- Confirmed by DEC


2. Flow rate is based on startup and shutdown requirement

Node

Deviation

Causes
6.

Consequences

U/S disturbance (LP Steam) 1. No/Low flow in header will result in low
pressure of snuffing/purging steam available
when required

Safeguards

Ref. No.

1. PI-846 is provided 20.1.6.1.1


with low alarm.

2. High flow

1. No significant cause

20.2.1

3. Reverse/misdirected flow

1. No significant cause

20.3.1

4. Low pressure

1. Same as low/no flow

20.4.1

5. High Pressure

1. No significant cause

20.5.1

6. Low level

1. NA

7. High level

1. NA

8. Composition

1. NA

Page 111 of 136

Recommendations

Responsibility

Remarks

20. Portable/Service Water, LP


Steam,
Plant/Instrument Air
and Nitrogen

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 20

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DESIGN INTENTION

To supply Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DRAWINGS

CS-140-PR-15-0031, CS-140-PR-15-0033, CS-140-PR-15-0034

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

EQUIPMENT
STREAM DETAILS

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.

AVAILABLE CONTROL SCHEMESPC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,FCV-436


Operating/Design Parameters

SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen

Pressure ( bar g)

152/200
Amb. /65
Amb./65
Amb./66
Amb./66
Amb/65

Flow rate (Kg/hr)


4/6
3/8
3/8
4.9/9
6.1/10
8/10

2818
1000(1)
1000(1)
518
215
430(2)

Note:1- Confirmed by DEC


2. Flow rate is based on startup and shutdown requirement

Node

Deviation
9. Others

Causes
1. wrong connection for hoses

Consequences
1. Hazardous consequence if nitrogen is
connected when air is required.

Safeguards

Ref. No.
20.9.1.1

Page 112 of 136

Recommendations
118. Ensure different
connections are available
for air and nitrogen hose
stations to avoid wrong
connections.

Responsibility
SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 21

Flare System

DESIGN INTENTION

To vent PSV discharge gases to main flare header

DRAWINGS

CS-140-PR-15-0037, CS-140-PR-15-0038

EQUIPMENT

Flare K.O drum(140-V-023), Flare K.O drum pump(140-P-015A/B)

STREAM DETAILS

PSV discharge collected in Flare K.O drum (140-V-023) where liquid and gaseous phase is separated .Liquid HC is sent to slop header through flare K.O. drum pump (140-P-015A/B) and gaseous HC is sent to main flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE
Temperature(C)
Flare Gas From Flare
KOD to Flare header
Flare KOD/CBD Pump to
Slops Tank

Flare system

1.

Low/No Flow

2. High flow

45

57/250

5.5/14.5

57

Causes

Consequences

Safeguards

Ref. No.

1. U/S disturbance(No flow of


fuel gas to flare header)

1. No purge available to dead end of flare


header leading to possible air ingress into
flare header.

2. LS-806 malfunctions and P015A/B is not started when


required.

1. V-023 level may increase leading to liquid 1. LI-805 provided with


overloading in flare header and downstream high high alarm.
system.

21.1.2.1.1

1. PSV pop up,depressurization

1. More flaring,condensation in flare KOD


leading to high level.

1. Pump to autostart on
high level.

21.2.1.1.1

2. LI-805 provided with


high high alarm.

21.2.1.1.2

3. Low pressure

1. No significant causes identified

4. High pressure

1. Refer 21.2.1.1.1 and


21.2.1.1.2
1. LS-806 malfunctions ,not
stopping the pump-015A/B.

5. Low Level

Flow rate (Kg/hr)


0.25/3.5

Note:1- Confirmed by DEC


2. Flow rate is based on startup and shutdown requirement
Node
Deviation
21.

Pressure ( bar g)

45/250

1.Low alarm at PI-854


(located at Fuel gas B.L.)
is provided.

21.1.1.1.1

2. Nitrogen backup is
available.

21.1.1.1.2

Recommendations

Responsibility

21.3.1

21.4.1
1. Pump will run dry.

1. LI-805 is provided with 21.5.1.1.1


LL alarm.

6. High level

1. Refer 21.1.2.1.1, 21.2.1.1.1


and 21.2.1.1.2

21.6.1

7. Low temp.

1. No significant causes identified

21.7.1

8. High temp.

1. No significant causes identified

21.8.1

119. SOP to ensure Manual


intervention of HS-908

SEI/NOCL

Remarks

21.

Flare system

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 21

Flare System

DESIGN INTENTION

To vent PSV discharge gases to main flare header

DRAWINGS

CS-140-PR-15-0037, CS-140-PR-15-0038

EQUIPMENT

Flare K.O drum(140-V-023), Flare K.O drum pump(140-P-015A/B)

STREAM DETAILS

PSV discharge collected in Flare K.O drum (140-V-023) where liquid and gaseous phase is separated .Liquid HC is sent to slop header through flare K.O. drum pump (140-P-015A/B) and gaseous HC is sent to main flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE
Temperature(C)
Flare Gas From Flare
KOD to Flare header
Flare KOD/CBD Pump to
Slops Tank

Pressure ( bar g)

Flow rate (Kg/hr)

45/250

0.25/3.5

45

57/250

5.5/14.5

57

Note:1- Confirmed by DEC


2. Flow rate is based on startup and shutdown requirement
Node
Deviation
9. Composition

1. NA

10.Others

1. NA

Causes

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 22

Amine System

DESIGN INTENTION

To collect drained Amine

DRAWINGS

CS-140-PR-15-0043, CS-140-PR-15-0044

EQUIPMENT

Amine drain drum (140-V-022), Amine drain drum pump (140-P-014A/B)

STREAM DETAILS

Amine effluent collected in Amine drain drum (140-V-022) where liquid and gaseous phase is separated .Liquid HC is sent to ARU Unit through amine drain pump( 140-P-014A/B) and gaseous HC is sent to flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

57/120

Amine

Flow rate (Kg/hr)

0.25/3.5

27634

Note:
Node
22. Amine drain system

Deviation

Causes

Consequences

Safeguards

Ref. No.

1. Low/No Flow of drained amine 1. LS-801 malfunctions, not


starting P-014A

1. Level of V-022 will increase

22.1.1.1

2. Low/No flow of nitrogen

1. U/S disturbance

1. Loss of nitrogen blanketing leading to likely 1. Low pressure alam 22.2.1.1.1


degradation of amine.
at PI-806 is provided.

3. High flow of nitrogen

1. U/S disturbance

1. Pressure is likely to increase.

1. RO-801 is
provided.

22.3.1.1.1

2. Vessel is floating
with flare header.

22.3.1.1.2

4. Reverse/Misdirected
Flow

1. No new cause

5. Low Level

1. LS-801 malfunctions ,not


stopping the pump-014A

6. High level

1. Refer 22.1.1.1

7. Low temp.

1.No significant cause

8 .High temp.

1. U/S disturbance

9.Low pressure

1. No significant cause

22.9.1

10.High pressure

1. Refer 22.3.1.1.1 and


22.3.1.1.2

22.10.1

11.Composition

1. No significant cause

Recommendations

Responsibility

120. Provide high high alarm at


LI-800

SEI

121. Provide low low alarm at


LI-801

SEI

22.4.1

1. Pump may run dry

22.5.1.1

22.6.1
22.7.1
1. Likely to degrade amine.

1. TI-813A is provided 22.8.1.1.1


with high alarm.

Remarks

22. Amine drain system

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 22

Amine System

DESIGN INTENTION

To collect drained Amine

DRAWINGS

CS-140-PR-15-0043, CS-140-PR-15-0044

EQUIPMENT

Amine drain drum (140-V-022), Amine drain drum pump (140-P-014A/B)

STREAM DETAILS

Amine effluent collected in Amine drain drum (140-V-022) where liquid and gaseous phase is separated .Liquid HC is sent to ARU Unit through amine drain pump( 140-P-014A/B) and gaseous HC is sent to flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

57/120

Amine

Flow rate (Kg/hr)

0.25/3.5

27634

Note:
Node

Deviation

Causes

12. Others

1. No significant cause

13. Problem/Requirements

1. No significant cause

14. Operation/Maintenance

1. No significant cause

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 23

Hydrocarbon drain system

DESIGN INTENTION

To collect drained hydrocarbon from different equipments

DRAWINGS

CS-140-PR-15-0039, CS-140-PR-15-0040

EQUIPMENT

Hydrocarbon drain drum (140-V-021), Closed drain drum pumps (140-P-013A/B)

STREAM DETAILS

HC effluent collected in HC drain drum 140-V-021 where liquid and gaseous phase is separated .Liquid HC is sent to SLOP through closed drain pump 140-013A/B and gaseous HC is sent to flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE

Temperature(C)

Hydrocarbon

Pressure ( bar g)
40/150

Flow rate (Kg/hr)


0.25/3.5

7500

Note:
Node
23. Hydrocarbon drain system

Deviation

Causes

Consequences

Safeguards

1. Low/No Flow of HC from


pump discharge

1. LS-802 malfunctions, not


starting P-013A

1. Level of V-021 will increase

2. Low/No flow of nitrogen

1. U/S disturbance

1. Loss of nitrogen blanketing leading to likely 1. Low pressure alam 23.2.1.1.1


ingress of air.
at PI-806 is provided.

3. High flow of nitrogen

1. U/S disturbance

1. Pressure is likely to increase.

4. Reverse/Misdirected
Flow

1. Possible backup of CBD pump


discharge to flare KOD via
pump(P-015) min. flow line

23.4.1

5. Low temp.

1. No significant cause

23.5.1

6. High
Temperature

1. Draining hot HC material

1. System may experience higher than the


design temperature

2. Steam coil operation

1. LI on V-021 is
provided.

Ref. No.

1. RO-802 is
provided.

Responsibility

122. Provide high high alarm at


LI-902

SEI

123. Provide NRV in the flare


KOD pump discharge line no.
P803 near to tie in point to slop
header.

SEI

124. Operating procedure


should prevent draining of hot
hydrocarbon in Hydrocarbon
drain drum.

SEI/NOCL

Remarks

23.3.1.1.1

1. TI-820 is provided 23.6.1.1.1


with high alarm

1. Cooling water
provision is there.

1. Pump may run dry

23.1.1.1.1

Recommendations

23.6.2.1.1

7. Low Level

1. LS-802 malfunctions ,not


stopping the pump-013A

23.7.1.1

8. High level

1. Refer 23.1.1.1.1

23.8.1

9. Low pressure

1. No significant cause

23.9.1

Flushing oil return


connection is to be relocated
on line P-803.

Cooling water permanent


piping is to be removes as
per project philosophy
125. Provide low low alarm at
LI-902

SEI

23. Hydrocarbon drain system

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 23

Hydrocarbon drain system

DESIGN INTENTION

To collect drained hydrocarbon from different equipments

DRAWINGS

CS-140-PR-15-0039, CS-140-PR-15-0040

EQUIPMENT

Hydrocarbon drain drum (140-V-021), Closed drain drum pumps (140-P-013A/B)

STREAM DETAILS

HC effluent collected in HC drain drum 140-V-021 where liquid and gaseous phase is separated .Liquid HC is sent to SLOP through closed drain pump 140-013A/B and gaseous HC is sent to flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE

Temperature(C)

Hydrocarbon

Pressure ( bar g)
40/150

Flow rate (Kg/hr)


0.25/3.5

7500

Note:
Node

Deviation

Causes

10. High pressure

1. Refer 23.3.1.1.1

11. Composition

1. No significant cause

12. Others

1. No significant cause

13 . Problem/Requirements

1. No significant cause

14. Operation/Maintenance

1. No significant cause

Consequences

Safeguards

Ref. No.
23.10.1

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 24

Condensate collection system

DESIGN INTENTION

To collect condensate from different traps

DRAWINGS

CS-140-PR-15-0041

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

EQUIPMENT
STREAM DETAILS

Condensate from steam traps is collected in LP/MP/HP headers & drained to ND after cooling

AVAILABLE CONTROL SCHEMES


Operating/Design Parameters

SERVICE

Temperature(C)

Pressure ( bar g)

Flow rate (Kg/hr)


1030

Condensate (Water) in LP/MP


condensate header
Condensate (Water) in HP
condensate header

102/252

0.1/3.5

102/405

0.1/3.5

350

Note:
Node
24. Condensate Collection
system

Deviation

Causes

1. Low/No Flow

1. No new cause

2. High flow

1. No new cause

3. Low pressure

1. No new cause

4. High pressure

1. No new cause

5. Low Level

1. No new cause

6. High level

1. No new cause

7. Low temp.

1. No new cause

8. High temp.
1. Coolling water failure
9. Composition

1. No new cause

10.Others

1. No new cause

Consequences

1. High temp condensate routed to storm


sewer.Possible damage to coating inside the
headers.

Safeguards

Ref. No.

1. Low pressure alarm


24.8.1.1.1
at PI-816 is provided

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 25

Makeup H2 Compressor-Lube oil System

DESIGN INTENTION

To supply lube oil to cylinders and packings

DRAWINGS

CS-140-PR-D-06600002

EQUIPMENT

140-K-001A/B

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)
50

Lube oil
.
Note:
Node
25. Makeup H2
Compressor -Lube oil system

Flow rate (Kg/hr)

a} 3 barg for bearings and cross head.

Deviation

Causes

Consequences

1. Low/No Flow

1. Crank case main lube oil


pump failure.

1. Less lube oil flow and pressure.

Safeguards

Ref. No.

1. Aux. pump with auto


start is provided.

25.1.1.1.1

2. PI-908 is provided with


low alarm.

25.1.1.1.2

3. Low low pressure (PT905A/B/C, 2 out of 3) trip


the compressor.

25.1.1.1.3

2. Suction strainer upstream of


aux. pump choking.

1. Less lube oil flow and pressure leading to


compressor damage.

25.1.2.1

3. Cooler leak

1. Less lube oil flow and pressure leading to


compressor damage.

1. Cooler is designed
following API 10/13 rule.

25.1.3.1.1

4. TCV-901 failure close

1. Less lube oil flow and pressure leading to


compressor damage.

1. Thermostatic self
actuating type of
valve,During any type of
failure two ports are
available.

25.1.4.1.1

5. PCV-901 failure close

1. Less lube oil flow and pressure leading to


compressor damage.

1. PI-908 is provided with 25.1.5.1.1


low alarm.

Recommendations

126. Provide differential


pressure gauge across the
suction strainer.

Responsibility

NEA

Remarks

25. Makeup H2
Compressor -Lube oil system

1. Low/No Flow

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 25

Makeup H2 Compressor-Lube oil System

DESIGN INTENTION

To supply lube oil to cylinders and packings

DRAWINGS

CS-140-PR-D-06600002

EQUIPMENT

140-K-001A/B

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)
50

Lube oil
.
Note:
Node

Deviation

Causes

Flow rate (Kg/hr)

a} 3 barg for bearings and cross head.

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

2. Low low pressure (PT- 25.1.5.1.2


905A/B/C, 2 out of 3) trip
the compressor.

6. Lube oil filter choked

1. Less lube oil flow and pressure leading to


compressor damage.

1.PDI 903 is provided


with high alarm.

25.1.6.1.1

2. Spare filter is provided 25.1.6.1.2


3. PI-908 is provided with 25.1.6.1.3
low alarm.
4. Low low pressure (PT- 25.1.6.1.4
905A/B/C, 2 out of 3) trip
the compressor.

2.

High Flow

7. Lubricator failure

1. No supply of lube oil to cylinders.

1. PCV-901 failure to open

1. No significant consequances.

1.FAL-901 is provided.

25.1.7.1.1

25.2.1.1

3. Reverse/Misdirected
Flow

1. No significant causes.

25.3.1

4.

Low Pressure

1. Same as No/low flow

25.4.1

5.

High Pressure

1. Any blockage in the system

6. High
Temperature

1. Cooling water to lube oil


cooler failure.

1. PSV-907/908 is
provided
1. Reduced lubrication effect leading to
damage to compressor parts at high temp.
(beyond 60 C).

25.5.1.1

1. TI-935 with high alarm 25.6.1.1.1


is provided.

127. Consider set point


change to 8.7 barg as per
project philosophy.

NEA

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 25

Makeup H2 Compressor-Lube oil System

DESIGN INTENTION

To supply lube oil to cylinders and packings

DRAWINGS

CS-140-PR-D-06600002

EQUIPMENT

140-K-001A/B

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)
50

Lube oil
.
Note:
Node

6. High
Temperature
Deviation

Causes

Consequences

Safeguards

2. Malfunction of TCV-901

7.

High Level

8. Low level

Ref. No.

Recommendations

Responsibility

128. Trip of aux. pump with


time delay is to be ensured
when compressor is
tripped(refer vendor cause
and effect diagram).

NEA

NEA

25.6.2

1. No significant causes.
1. Low level in oil reservoir
due to leakage in lube oil
system.

Flow rate (Kg/hr)

a} 3 barg for bearings and cross head.

25.7.1
1. Less lube oil flow and pressure leading to
compressor damage.

1.Low level alarm LAL902 is provided.

25.8.1.1.1

2. Low low pressure (PT- 25.8.1.1.2


905A/B/C, 2 out of 3) trip
the compressor.

1.Low level alarm LAL903 is provided.

2. Low level in cylinder


lubricator

1. Reduced supply of lube oil to cylinders.

10. Composition

1. Lube oil cooler tube leak.

1. Lube oil leak to cooling water

25.10.1.1

129. Manual sampling


arrangement is to be
provided.

11. Operation/Maintenance

1. Improper Oil specification


(Compatibility with Process)

1. Poor Lubrication.
Leakage of Oil to Process may contaminate
the process fluid leading to off spec. product.

25.11.1.1

130. Provide prossible


leackage quantity of oil to
process gas and oil
specification, including all
impurities in the oil used for
cylinder lubrication.Axens
will confirm the acceptence.

9. Problem/Requirements

25.8.2.1.1
25.9

NEA/Axens

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 26

Makeup H2 Compressor- Closed cooling water System

DESIGN INTENTION

To supply cooling water to compressor cylinders jackets and packings.

DRAWINGS

CS-140-PR-D-06600006

EQUIPMENT

140-K-001A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

cooling water

Flow rate (Kg/hr)

50

Note:
Node
26. Makeup H2
Compressor -Closed cooling water system

Deviation
1.

Low/No Flow

Causes
1. main cooling water pump
failure.

Consequences
1.Less cooling water flow and pressure
leading to higher process gas temp.

Safeguards
1. Cooling water pump
with auto start though
PT-912 is provided.

26.1.1.1.1

2. High high discharge


temp trip TIHH-903 &
906 is available.

26.1.1.1.2

2. Piston rod packing temp. likely to go high. 1. Rod packing high


temp. alarm TI-917 &
924 available.

2. cooling water pump suction


strainer choking.

1. Less cooling water flow and pressure


leading to compressor damage.

3. Cooler leak

1. No significant consequences.

4. Discharge filter blockage

1. Less cooling water flow and pressure


leading to high process gas temp.

Ref. No.

Recommendations

Responsibility

26.1.1.2.1

2. High temp. alarm TI933 & 934 is available.

26.1.1.2.2

1. Spare pump with


strainer is available.

26.1.2.1.1

26.1.3.1
1.Bypass will be used
26.1.4.1.1
during filter maintinance.

131. Vendor operation


manual should mention
bypass operation.

NEA

2.Low pressure alarm PI- 26.1.4.1.2


913 is provided.

132. Vendor operating


manual should mention
closing of manual isolation
valve located in pump
minimum circulation line in
case both compressors are
in operation during
changeover.

NEA

Remarks

26. Makeup H2
Compressor -Closed cooling water system

1.

Low/No Flow

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 26

Makeup H2 Compressor- Closed cooling water System

DESIGN INTENTION

To supply cooling water to compressor cylinders jackets and packings.

DRAWINGS

CS-140-PR-D-06600006

EQUIPMENT

140-K-001A/B

Nagarjuna Oil Corporation Ltd

Project :

STREAM DETAILS

Diesel hydro Desulphurization unit

1. Less cooling water flow and pressure


leading to high process gas temp.

AVAILABLE CONTROL SCHEMES


Operating Parameters

SERVICE
Temperature(C)
cooling water

2.Low pressure alarm PI913 is provided.


Pressure ( bar g)

Flow rate (Kg/hr)

50

Note:
Node

Deviation

Causes

5. Less cooling water flow to


cooling water cooler.

2.

High Flow

Consequences

1. Cooling water temp will increase leading


high process gas temp.

Safeguards

1.High temp. alarm TI932 ia provided.

Ref. No.

Recommendations

Responsibility

133. Gate valve in min


circulation line to be
changed to globe valve.

NEA

134. Vendor to recheck


requirement of low temp
alarmTI-932 and
compressor start
permissive(refer vendor
cause & effect page 4).

NEA

26.1.5.1.1

1. No significant cause.

26.2.1

3. Reverse/Misdirected
Flow

1. No significant causes.

26.3.1

4.

Low Pressure

1. Same as No/low flow

26.4.1

5.

High Pressure

1. Any blockage in the system

1. System is designed for 26.5.1.1


pump max. pressure.

6. High
Temperature

1.Cooling water to CW cooler


cooler failure.

1. Closed cooling water temp. will increase


leading high process gas temp.

7. Low temp.

1. Winter season

1. Likely condensation of process gas in


cylinder.

1. TI-932 with high alarm 26.6.1.1.1


is provided.

26.7.1.1

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 26

Makeup H2 Compressor- Closed cooling water System

DESIGN INTENTION

To supply cooling water to compressor cylinders jackets and packings.

DRAWINGS

CS-140-PR-D-06600006

EQUIPMENT

140-K-001A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
7. Low temp.

cooling water

Temperature(C)
1. Winter season

Pressure ( bar g)
50

Flow rate (Kg/hr)

1. Likely condensation of process gas in


cylinder.

Note:
Node

Deviation

8.

High Level

Causes

Consequences

Safeguards

1. No significant causes.

Ref. No.

Recommendations

Responsibility

135. Gas dew point to be


confirmed.

SEI

26.9.1.1.1

136. Suitable makeup water


connection to cooling water
tank is to be provided.

NEA

26.10.1.1

137. Cooling water tank


vent should be provided at
safe location.

NEA

26.8.1

9. Low level

1. Low level in closed cooling


1. Less cooling water flow and pressure
water tank due to leakage in CW leading to compressor damage.
system.

10. Problem/Requirements

1. Packing leakage/failure.

11. Composition

1. Not applicable

12. Operation/Maintenance

1. No significant causes.

1. Process gas will leak to closed cooling


water circuit.

1.Low level alarm LAL905 is provided.

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 27

Makeup H2 Compressor- Distance piece/packing purge

DESIGN INTENTION

To supply Nitrogen purge to distance piece and packing

DRAWINGS

CS-140-PR-D-06600003

EQUIPMENT

140-K-001A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

Nitrogen

Flow rate (Kg/hr)

Amb.

1.5(packing)
1(distance piece)

Note:
Node
27. Makeup H2
Compressor -Distance piece/packing purge

Deviation
1. Low/No Flow

Causes
1. External nitrogen supply
failure

Consequences
1. Hydrogen accumulation.

Safeguards
1. Vent is connected to
flare.Not affecting the
environment.

Ref. No.
27.1.1.1.1

2. High alarm TI-907/908 27.1.1.1.2


is available.

2.

High Flow

1.PCV-902/903 fail to open

1. Loss of nitrogen to flare.

3. Reverse/Misdirected
Flow

1.Compressor packing leaks

1. Loss of nitrogen to flare.

4.

Low Pressure

1. Refer 27.1.1.1.1 and


27.1.1.1.2

5.

High Pressure

1. Refer 27.2.1.1

Recommendations

Responsibility

138. PCV-902/903 set


points to be reviewed in
view of max. flare back
pressure of 2 barg(during
general power failure).

NEA/SEI

139. Isolation valve in vent


line to flare is to be LO.

NEA

27.2.1.1
1.NRVs are provided in
upstream and
downstream of distance
piece.

27.3.1.1.1

27.4.1

1. Rod packing damage.

1. PSV-909/910 are
provided.

27.5.1.1.1

6. High
Temperature

1. No significant causes.

27.6.1

7. Low temp.

1. No significant causes.

27.7.1

140. PSV discharge and


NEA
Goose neck provided on
distance piece,to be routed
to safe location.

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 27

Makeup H2 Compressor- Distance piece/packing purge

DESIGN INTENTION

To supply Nitrogen purge to distance piece and packing

DRAWINGS

CS-140-PR-D-06600003

EQUIPMENT

140-K-001A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

Nitrogen

Flow rate (Kg/hr)

Amb.

1.5(packing)
1(distance piece)

Note:
Node

Deviation
8.

High Level

Causes

Consequences

1. High level in packing drain pot.

1. High level leading to liquid carryover to


flare.

9. Low level

1. Not applicable

10. Problem/Requirements

1. No significant causes.

11. Composition

1. Not applicable

12. Operation/Maintenance

1. No significant causes.

Safeguards

Ref. No.

1. Very unlikely as dew


point of gas is low.

27.8.1.1.1

2. LG-904 is provided
for monitoring.

27.8.1.1.2

Recommendations
141. Drain line from
packing drain pot to be
routed to CBD

Responsibility
NEA/SEI

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 27

Makeup H2 Compressor- Distance piece/packing purge

DESIGN INTENTION

To supply Nitrogen purge to distance piece and packing

DRAWINGS

CS-140-PR-D-06600003

EQUIPMENT

140-K-001A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

Nitrogen

Flow rate (Kg/hr)

Amb.

1.5(packing)
1(distance piece)

Note:
Node

Deviation
13. Others

Causes
1. Nitrogen Mode

Consequences

Safeguards

Ref. No.
27.13.1

Recommendations

Responsibility
NEA

Remarks
1. Machine needs separate
control and trip set points for
nitropgen case
2.Separate modes of
operation to be pragrammed
in DCS and in safeguarding
system.
3. Pressure can be developed
up to 24 barg with suction
pressure of 7 barg.
4. Flow rate of nitrogen

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 27

Recycle Compressor- Lube oil (No HAZOP was done except for deviation 1 & 2. The same need to be carried out later with the vendor).

DESIGN INTENTION

To supply lube oil to turbine and compressor bearings

DRAWINGS

0-336-00-32088

EQUIPMENT

140-K-002A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)
Lube Oil

Pressure ( bar g)

Flow rate (Kg/hr)

Amb.

1.5(packing)
1(distance piece)

Note:
Node
28. Recycle
Compressor -Lube Oil

Deviation

Causes

Consequences

Safeguards

Ref. No.

1.

Low/No Flow

1. Main Lube Oil Pump failure


2. Suction strainers blockage.
3. Lube oil filter blockage.
4. Lube oil cooler leak.
5. PCV 602 malfunction to
close.

1&2. Turbine trips


3, 4 & 5. Lube oil pressure falls to turbine &
compressor bearings & turbine trips.

1&2. Auxilliary pump is


available.
3,4 & 5. Lube oil
pressure low alarm is
available & lube oil
overhead tank will take
care of the oil
requirement to bearings.

2.

High Flow

1. PCV 602 malfunction.


2. PCV 601 malfunction.
3. Turbine high speed.

1. More flow through the bearings.

1. PSV is available in
28.2.1.1.1
pump discharge.
2. PCV 602 will maintain
the bearing header
pressure.
3. PCV 601 will maintain
the pump discharge
pressure.

1. N/A

1. N/A

1. N/A

3. Reverse/Misdirected Flow

4.

Low Pressure

5.

High Pressure

6.

High Temperature

7. Low temp.

28.1.1.1.1

28.3.1.1.1

Recommendations

Responsibility

Remarks

28. Recycle
Compressor -Lube Oil

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 27

Recycle Compressor- Lube oil (No HAZOP was done except for deviation 1 & 2. The same need to be carried out later with the vendor).

DESIGN INTENTION

To supply lube oil to turbine and compressor bearings

DRAWINGS

0-336-00-32088

EQUIPMENT

140-K-002A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)
Lube Oil

Pressure ( bar g)

Flow rate (Kg/hr)

Amb.

1.5(packing)
1(distance piece)

Note:
Node

Deviation
8.

High Level

9. Low level

10. Problem/Requirements

11. Composition

12. Operation/Maintenance

13. Others

Causes

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 29

Recycle Compressor- Seal Gas ( Vendor is expected to revise the seal gas system P&ID,Accordingly no HAZOP was done. The same need
to be carried out later once the design is firmed up by the vendor).

DESIGN INTENTION

To supply Seal gas to primary and secondary seals

DRAWINGS

1-336-00-31116

EQUIPMENT

140-K-002A/B

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)
Nitrogen

Pressure ( bar g)

Flow rate (Kg/hr)

Amb.

1.5(packing)
1(distance piece)

Note:
Node
29. Recycle
Compressor -Seal Gas

Deviation
1.

Low/No Flow

2.

High Flow

3. Reverse/Misdirected
Flow
4.

Low Pressure

5.

High Pressure

6. High
Temperature
7. Low temp.
8.

High Level

9. Low level
10. Problem/Requirements
11. Composition
12. Operation/Maintenance
13. Others

Causes

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

Nagarjuna Oil Corporation Ltd

PROJECT NO

: SO 2331

Project :

Diesel hydro Desulphurization unit

NODE NO: 32

Recycle Compressor- Steam &


drain

DESIGN INTENTION

To supply HP steam ,MP steam

DRAWINGS

CS-140-PR-15-0011,CS-140-PR-15-0030,1-336-00-33049(BHEL)

EQUIPMENT

Recycle Compressor Steam Turbine (140-KT-002)

STREAM DETAILS

HP Steam will be supplied from B/L to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP. MP steam is
supplied to main lube oil pump from where it converts to LP steam

AVAILABLE CONTROL SCHEMES

SCV-002A
Operating Parameters

SERVICE
Temperature(C)
HP STEAM
MP STEAM

Pressure ( bar g)

388
184

Flow rate (Kg/hr)


53.5
10

33000
1500

Note:
Node
30.

Recycle Compressor- Steam & drain 1.

Deviation
Low/No Flow

Causes
1. U/S disturbance (HP Steam
Failure)

2. PIC-691 malfunctions to close PCV691.

Consequences
1. KT-002 trips

Safeguards

Ref. No.

1. PI-810 is provided
with low alarm.

30.1.1.1.1

2. FI-805 is provided.

30.1.1.1.2

Recommendations

1. HP steam supply to gland steam


condensor ejector failure.

30.1.2.1

142. All drains to be


properly routed.

2.Steam leaks from gland causing unsafe


work environment.

30.1.2.2

143. All condensate


collections having
temp<70 C will be routed
to ND syatem and others
having temp.> 70 C will be
routed to condensate
collection system.

3. Potential contamination of lube oil by


steam condensate.

1.Oil clarifier is
available.

30.1.2.3.1

144. BHEL confirmed that


PCV-691 is fail to close.
145. Standby PSV
requirement for PSV-691 is
to be checked as per
project standards
(considering PSV-691
failure).

3. 1. U/S disturbance (MP Steam


Failure)

1. Main Lube Oil Pump turbine Failure

1.Aux. pump is
available.

30.1.3.1.1

Responsibility

BHEL/SEI

Remarks

30.

Recycle Compressor- Steam & drain 1.

Low/No Flow

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

Nagarjuna Oil Corporation Ltd

PROJECT NO

: SO 2331

Project :

Diesel hydro Desulphurization unit

NODE NO: 32

Recycle Compressor- Steam &


drain

DESIGN INTENTION

To supply HP steam ,MP steam

DRAWINGS

CS-140-PR-15-0011,CS-140-PR-15-0030,1-336-00-33049(BHEL)

EQUIPMENT

Recycle Compressor Steam Turbine (140-KT-002)

STREAM DETAILS

HP Steam will be supplied from B/L to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP. MP steam is
supplied to main lube oil pump from where it converts to LP steam

AVAILABLE CONTROL SCHEMES

SCV-002A
Operating Parameters

SERVICE
Temperature(C)
HP STEAM
MP STEAM

Pressure ( bar g)

388
184

Flow rate (Kg/hr)


53.5
10

33000
1500

Note:
Node

Deviation

Causes
4. No flow of cooling water to gland
steam condensor

Consequences
1. Steam does not condense as in normal
operation.Steam leaks from gland causing
unsafe work environment.

Safeguards

Ref. No.

1. BHEL confirmed that 30.1.4.1.1


steam going out of
glands

Recommendations

Responsibility

146. All condensate


collections having
temp<70 C will be routed
to ND syatem and others
having temp.> 70 C will be
routed to condensate
collection system.

BHEL/SEI/NOCL

147. SOP to ensure


mentioning of gland steam
condensor isolation and
steam is to be vented out
through local vent.
2.

High Flow of HP steam

1. No New Cause

30.2.1

3. Reverse/Misdirected
Flow

1. No New Cause

30.3.1

4.

1. U/S disturbance (HP Steam


Failure)

Low Pressure

1. KT-002 may get tripped

1. PI-810 is provided
with low alarm.

30.4.1.1.1

2. Shutdown of DS-001 30.4.1.1.2


is considered when
KT-002 trips

5.

High Pressure

1. U/S disturbance (HP Steam high


header pressure)

6. High
Temperature

1. No New Cause

7. Low temp.

1. No New Cause

1. KT-002 may get tripped

1. PI-810 is provided
with high alarm.

30.5.1.1.1

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

Nagarjuna Oil Corporation Ltd

PROJECT NO

: SO 2331

Project :

Diesel hydro Desulphurization unit

NODE NO: 32

Recycle Compressor- Steam &


drain

DESIGN INTENTION

To supply HP steam ,MP steam

DRAWINGS

CS-140-PR-15-0011,CS-140-PR-15-0030,1-336-00-33049(BHEL)

EQUIPMENT

Recycle Compressor Steam Turbine (140-KT-002)

STREAM DETAILS

HP Steam will be supplied from B/L to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP. MP steam is
supplied to main lube oil pump from where it converts to LP steam

AVAILABLE CONTROL SCHEMES

SCV-002A
Operating Parameters

SERVICE
Temperature(C)
HP STEAM
MP STEAM

Pressure ( bar g)

388
184

Flow rate (Kg/hr)


53.5
10

33000
1500

Note:
Node

Deviation
8.

High Level

Causes
1. NA

9. Low level

1. NA

10. Problem/Requirements

1. NA

11. Composition

1. NA

12. Operation/Maintenance

1. NA

13. Others

1. NA

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 26

Recycle Compressor- cooling water System (No HAZOP was done. The same need to be carried out later with the vendor).

DESIGN INTENTION

To supply cooling water to gland steam condensor, lube oil coolers and lube oil pump turbine bearings

DRAWINGS

3-336-00-34042

EQUIPMENT

140-K-002A/B

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

Flow rate (Kg/hr)

cooling water

Note:
Node
31. Recycle compressor-cooling water
system

Deviation
1.

2.

Low/No Flow

High Flow

3. Reverse/Misdirected
Flow
4.

Low Pressure

5.

High Pressure

6. High
Temperature
7. Low temp.
8.

High Level

9. Low level
10. Problem/Requirements

Causes

Consequences

Safeguards

Ref. No.

1. Less cooling water flow to


Gland Steam Condenser.

31.1.1

2. Less cooling water flow to


Lube Oil Cooler.

31.1.2

3. Less cooling water flow to lube


oil pump turbine bearings

31.1.3

Recommendations

Responsibility

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 26

Recycle Compressor- cooling water System (No HAZOP was done. The same need to be carried out later with the vendor).

DESIGN INTENTION

To supply cooling water to gland steam condensor, lube oil coolers and lube oil pump turbine bearings

DRAWINGS

3-336-00-34042

EQUIPMENT

140-K-002A/B

Project :

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

STREAM DETAILS
AVAILABLE CONTROL SCHEMES
Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

Flow rate (Kg/hr)

cooling water

Note:
Node

Deviation
11. Composition
12. Operation/Maintenance

Causes

Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

Remarks