PROYEK PEMBANGUNAN SPBG CICURUG-SUKABUMI

PT. GAGAS ENERGi INDONESIA

ENGINEERING DOCUMENT LIST


CNG HYBRID STATION
Rev : 0 Approved For Construction

No

I
I.1
I.1.1
I.1.2
I.1.3
I.1.4
II.2
II.2.1
II.3
II.3.1
II.3.2
II.3.3

DOCUMENT NUMBER

WORK PLAN
CNG-WP-G-001
CNG-WP-G-002
CNG-WP-G-003
CNG-WP-G-004
CNG-WP-EG-001
CNG-WP-PR-001
CNG-WP-PR-002
CNG-WP-PR-003

II.1.2

General
Scope Of Work Package SPBG Sukabumi
Project Schedule
RKS (Rencana Kerja dan Syarat-syarat)
Rencana Anggaran Biaya
Engineering General
Engineering Deliverable List
Procedure
Document Control Procedure
Document Numbering Procedure
Communication and Correspondence Procedure

ENGINEERING DESIGN & PREPARATION WORKS


Process Engineering

II
II.1
II.1.1
II.1.1.1
II.1.1.2

DOCUMENT TITLE

CNG-EGD-PE-G-001
CNG-EGD-PE-G-002

Basic Design & General Specification


Process Description & Identification
Process Design Basis
List

No

DOCUMENT NUMBER

II.1.2.1
II.1.2.2

CNG-EGD-PE-L-001
CNG-EGD-PE-L-002

Equipment List
Line List

CNG-EGD-PE-D-001
CNG-EGD-PE-D-002
CNG-EGD-PE-D-004
CNG-EGD-PE-D-005
CNG-EGD-PE-D-006
CNG-EGD-PE-D-007
CNG-EGD-PE-D-008
CNG-EGD-PE-D-009
CNG-EGD-PE-D-011
CNG-EGD-PE-D-012
CNG-EGD-PE-D-013
CNG-EGD-PE-D-014
CNG-EGD-PE-D-015
CNG-EGD-PE-D-016
CNG-EGD-PE-D-017

Drawings
Drawing Index
Legend & Symbol
UFD (Utility Flow Diagram)
Process Flow Diagram For Mother Station (Hybrid)
PID Mother Station
PID For Air Instrument & Utility System
PID Gas Dryer
PID Dispenser
P & ID for Compressor Mother Station (Hybrid)
P & ID for Ground Storage
P & ID for Dispenser NGV
P & ID for Dispenser Mobile Storage
P & ID for Fuel Gas Generator
P & ID for Gas Venting & Drain Line Connection
P&ID for Fire Hydrant

II.1.3
II.1.3.1
II.1.3.2
II.1.3.3
II.1.3.4
II.1.3.5
II.1.3.6
II.1.3.7
II.1.3.8
II.1.3.9
II.1.3.10
II.1.3.11
II.1.3.12
II.1.3.13
II.1.3.14
II.1.3.15

II.2
Mechanical Engineering
II.2.1
CNG-EGD-ME-G-001
II.2.1.1
CNG-EGD-ME-G-002
II.2.1.2
CNG-EGD-ME-G-003
II.2.1.3
CNG-EGD-ME-G-004
II.2.1.4
CNG-EGD-ME-G-005
II.2.1.5

DOCUMENT TITLE

Mechanical Engineering
Basic Design & General Specification
Mechanical Basis of Design
CNG Storage Spec
Vehicle Filling System Spec
Mobile Storage Filling System Spec
Dryer Specification

No

DOCUMENT NUMBER

II.2.1.6
II.2.1.7
II.2.1.8
II.2.1.9

CNG-EGD-ME-G-006
CNG-EGD-ME-G-007
CNG-EGD-ME-G-008
CNG-EGD-ME-G-009

Gas Filter Specification


Gas Compressor Specification
Gas Engine Generator Specification
Painting Specification

CNG-EGD-ME-S-001
CNG-EGD-ME-S-002
CNG-EGD-ME-S-003
CNG-EGD-ME-S-004
CNG-EGD-ME-S-005
CNG-EGD-ME-S-006
CNG-EGD-ME-S-007

Datasheet
Datasheet Gas Compressor
Datasheet Air Compressor & Receiver Tank
Datasheet CNG Vessel
Datasheet Dryer Package C/w Filter
Datasheet Fuel Gas Filter
Datasheet Gas Genset (Gas Engine)
Datasheet Gas Scrubber

II.2.2
II.2.2.1
II.2.2.2
II.2.2.3
II.2.2.4
II.2.2.5
II.2.2.6
II.2.2.7

DOCUMENT TITLE

II.3
Piping Engineering
II.3.1
CNG-EGD-PP-G-001
II.3.1.1
CNG-EGD-PP-G-002
II.3.1.2

Piping Engineering

II.3.2
II.3.2.1

CNG-EGD-PP-C-001

Calculation
Pipe Thickness Calculation

II.3.3
II.3.3.1
II.3.3.2
II.3.3.3
II.3.3.4

CNG-EGD-PP-D-001
CNG-EGD-PP-D-002
CNG-EGD-PP-D-003
CNG-EGD-PP-D-004

Drawings
Drawing Index
Legend & Symbol
Low Pressure Piping Plan Layout & Detail Arrangement
High Pressure Piping Plan Layout & Detail Arrangement

Basic Design & General Specification


Basic Design Piping
Piping Material Data Sheet c/w : Fittings & Valves

No

II.3.4
II.3.4.1

DOCUMENT NUMBER

CNG-EGD-PP-T-001

DOCUMENT TITLE

Material Take Off


MTO piping

II.4
Civil Engineering & Architecture
II.4.1
CNG-EGD-CE-G-001
II.4.1.1
CNG-EGD-CE-G-002
II.4.1.2
CNG-EGD-CE-G-003
II.4.1.3
CNG-EGD-CE-G-004
II.4.1.4
CNG-EGD-CE-G-005
II.4.1.5
CNG-EGD-CE-G-006
II.4.1.6
CNG-EGD-CE-G-007
II.4.1.7
CNG-EGD-CE-G-008
II.4.1.8

Civil Engineering & Architecture

II.4.2
II.4.2.1
II.4.2.2

Calculation
Equipment Foundation Calculation
Steel work structure calculation

CNG-EGD-CE-C-001
CNG-EGD-CE-C-002

II.4.3
II.4.3.1

CNG-EGD-CE-D-001

II.4.3.2
II.4.3.3
II.4.3.4
II.4.3.5
II.4.3.6

CNG-EGD-CE-D-002
CNG-EGD-CE-D-003
CNG-EGD-CE-D-004
CNG-EGD-CE-D-005
CNG-EGD-CE-D-006

Basic Design & General Specification


Civil & Structural Design Criteria
Earth Work Specification (site preparation)
Concrete Work and Foundation Specification
Structural Steel Work Specification
Building & Arsitektur Specification
General Sewer and Drainage Specification
Road & Paving Specification
Fencing and Gate Specification

Drawings
General notes civil and structure, Architecture, abbreviations and
legend
Equipment Foundation Plan , Section and Detail
Standard Drawing
Layuot SPBG CNG Hybrdstation
Drainage System Layout
Filling Station - Plan

No

DOCUMENT NUMBER

II.4.3.7
II.4.3.8
II.4.3.9
II.4.3.10
II.4.3.11
II.4.3.12
II.4.3.13

CNG-EGD-CE-D-007
CNG-EGD-CE-D-008
CNG-EGD-CE-D-009
CNG-EGD-CE-D-010
CNG-EGD-CE-D-011
CNG-EGD-CE-D-012
CNG-EGD-CE-D-013

Filling Station - Elevations & Sections


Filling Station - Roof Plan & Foundations
Pavement Layout and Section
Office - Plan
Office - Elevations, Sections & Details
Office - Tie Beam Plan & Reinforcement
Office - Roof Plan & Reinforcement

II.4.3.14

CNG-EGD-CE-D-014

Equipment Shelter - Roof Plan, Frame Line 1,2,3 & Elevation

II.4.3.15
II.4.3.16
II.4.3.17
II.4.3.18
II.4.3.19
II.4.4
II.4.4.1

CNG-EGD-CE-D-015
CNG-EGD-CE-D-016
CNG-EGD-CE-D-017
CNG-EGD-CE-D-018
CNG-EGD-CE-D-019

Equipment Shelter - Plan & Detail of Foundation


Equipment Shelter - Plan, Section & Detail
Septic Tank - Plan & Layout
Septic Tank - Section & Detail
Topography Drawing - SPBG Cicurug Sukabumi
Material Take Off
Civil and structural Material Take Off

CNG-EGD-CE-T-001

II.5
Electrical Eng.
II.5.1
CNG-EGD-EE-G-001
II.5.1.1
CNG-EGD-EE-G-002
II.5.1.2
CNG-EGD-EE-G-003
II.5.1.3
CNG-EGD-EE-G-004
II.5.1.4
CNG-EGD-EE-G-005
II.5.1.5
CNG-EGD-EE-G-006
II.5.1.6
CNG-EGD-EE-G-007
II.5.1.7

DOCUMENT TITLE

Electrical Engineering
Basic Design & General Specification
Electrical Design Phylosophy
Electrical Equipment List
Grounding and Lightning Protection System Specification
LV Switchboards & Motor Control Center Specification
General Electrical Specification
UPS Specification
Construction Electrical Specification

No

II.5.2
II.5.2.1
II.5.3
II.5.3.1
II.5.3.2
II.5.3.3
II.5.3.4

II.5.4
II.5.4.1
II.5.4.2
II.5.4.3
II.5.4.4
II.5.4.5
II.5.4.6

DOCUMENT NUMBER

DOCUMENT TITLE

CNG-EGD-EE-C-001

Calculation
Electrical Load Calculation

CNG-EGD-EE-S-001
CNG-EGD-EE-S-002
CNG-EGD-EE-S-003
CNG-EGD-EE-S-004

Datasheet
Data Sheet MCC & Switchgear
Data Sheet 220 VAC Uninterruptible UPS & DC Baterry System
Data Sheet Earthing and Lightning Protection System
Data Sheet Lighting

CNG-EGD-EE-D-001
CNG-EGD-EE-D-002
CNG-EGD-EE-D-003
CNG-EGD-EE-D-004
CNG-EGD-EE-D-005
CNG-EGD-EE-D-006

Drawings
Symbol & Legend
Hazardous Area Clasification
Electrical Single Line Diagram
Single Line Diagram of UPS
General Electrical Drawing
Main Power Cable Lay Out

II.6
Instrument & Control Eng.
II.6.1
CNG-EGD-IC-G-001
II.6.1.1
CNG-EGD-IC-G-002
II.6.1.2
CNG-EGD-IC-G-003
II.6.1.3
CNG-EGD-IC-G-004
II.6.1.4
CNG-EGD-IC-G-005
II.6.1.5

Instrument & Control Engineering


Basic Design & General Specification
Instrumentation & Control Design Basis
General Instrument Specification
Instrument Architecture Diagram
ESD Specification
Fire & Gas Detection System Specification

No

DOCUMENT NUMBER

II.6.1.6

CNG-EGD-IC-G-006

DVR & CCTV System Specification

CNG-EGD-IC-C-001

Calculation
Pressure Regulator Calculation

CNG-EGD-IC-S-001
CNG-EGD-IC-S-002
CNG-EGD-IC-S-003
CNG-EGD-IC-S-004
CNG-EGD-IC-S-005
CNG-EGD-IC-S-006
CNG-EGD-IC-S-007
CNG-EGD-IC-S-008
CNG-EGD-IC-S-009
CNG-EGD-IC-S-010

Datasheet
Data Sheet Dispenser & Metering
Data Sheet Main Control Fire Alarm (MCFA) Panel
Data Sheet Gas Detectors
Data Sheet Heat Detectors
Data Sheet Pressure Indicator
Data Sheet Pressure Safety Valve
Data Sheet Emergency Shutdown Valves
Data Sheet Smoke Detectors
Data Sheet Temperature Indicator
Data Sheet Pressure Regulator

CNG-EGD-IC-D-001
CNG-EGD-IC-D-002

Drawings
Layout Fire & Gas Detection System
Layout CCTV

II.6.2
II.6.2.1
II.6.3
II.6.3.1
II.6.3.2
II.6.3.3
II.6.3.4
II.6.3.5
II.6.3.6
II.6.3.7
II.6.3.8
II.6.3.9
II.6.3.10

II.6.4
II.6.4.1
II.6.4.2

II.7
Safety System
II.7.1
CNG-SFT-SS-G-001
II.7.1.1
II.7.2

DOCUMENT TITLE

Safety System
Basic Design & General Specification

HSE Requirement
Drawings

No

DOCUMENT NUMBER

II.7.2.1
II.7.2.2

CNG-SFT-SS-D-001
CNG-SFT-SS-D-002

DOCUMENT TITLE

Fire Fighting & Protection Equipment Layout


Safety Sign System & Layout

PIC

HBO
AHS
ASW/AHS
AHS
HBO
HBO/ASW
HBO/ASW
HBO/ASW

N WORKS

HSN
HSN

PIC

HSN
HSN

HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL

SOL
SOL
SOL
SOL
SOL

PIC

SOL
SOL
SOL
SOL

SOL
SOL
SOL
SOL
SOL
SOL
SOL

SOL
SOL
SOL
SOL
SOL
SOL
SOL
SOL
SOL

PIC

SOL
SOL

VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN

VIN
VIN

VIN
VIN
VIN
VIN
VIN
VIN

PIC

VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN

ADB
ADB
ADB
ADB
ADB
ADB
ADB

PIC

ADB

ADB
ADB
ADB
ADB

ADB
ADB
ADB
ADB
ADB
ADB

MIQ
MIQ
MIQ
MIQ
MIQ

PIC

MIQ

MIQ

MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ

ADB
ADB

ASW

PIC

MIQ
VIN

PROYEK PEMBANGUNAN SPBG CICURUG-SUKABUMI


PT. GAGAS ENERGi INDONESIA

ENGINEERING DOCUMENT LIST


CNG HYBRID STATION
Rev : 0 Approved For Construction

No

I
I.1
I.1.1
I.1.2
I.1.3
I.1.4
II.2
II.2.1
II.2.2
II.3
II.3.1
II.3.2
II.3.3

DOCUMENT NUMBER

WORK PLAN
CNG-WP-G-001
CNG-WP-G-002
CNG-WP-G-003
CNG-WP-G-004
CNG-WP-EG-001
CNG-WP-EG-002
CNG-WP-PR-001
CNG-WP-PR-002
CNG-WP-PR-003

General
Scope Of Work Package SPBG Sukabumi
Project Schedule
RKS (Rencana Kerja dan Syarat-syarat)
Rencana Anggaran Biaya
Engineering General
Engineering Deliverable List
Vendor List
Procedure
Document Control Procedure
Document Numbering Procedure
Communication and Correspondence Procedure

ENGINEERING DESIGN & PREPARATION WORKS


Process Engineering

II
II.1
II.1.1
II.1.1.1
II.1.1.2

DOCUMENT TITLE

CNG-EGD-PE-G-001
CNG-EGD-PE-G-002

Basic Design & General Specification


Process Description & Identification
Process Design Basis

No

II.1.2
II.1.2.1
II.1.2.2
II.1.3
II.1.3.1
II.1.3.2
II.1.3.3
II.1.3.4
II.1.3.5
II.1.3.6
II.1.3.7
II.1.3.8
II.1.3.9
II.1.3.10
II.1.3.11
II.1.3.12
II.1.3.13
II.1.3.14
II.1.3.15

DOCUMENT NUMBER

DOCUMENT TITLE

CNG-EGD-PE-L-001
CNG-EGD-PE-L-002

List
Equipment List
Line List

CNG-EGD-PE-D-001
CNG-EGD-PE-D-002
CNG-EGD-PE-D-004
CNG-EGD-PE-D-005
CNG-EGD-PE-D-006
CNG-EGD-PE-D-007
CNG-EGD-PE-D-008
CNG-EGD-PE-D-009
CNG-EGD-PE-D-011
CNG-EGD-PE-D-012
CNG-EGD-PE-D-013
CNG-EGD-PE-D-014
CNG-EGD-PE-D-015
CNG-EGD-PE-D-016
CNG-EGD-PE-D-017

Drawings
Drawing Index
Legend & Symbol
UFD (Utility Flow Diagram)
Process Flow Diagram For Mother Station (Hybrid)
PID Mother Station
PID For Air Instrument & Utility System
PID Gas Dryer
PID Dispenser
P & ID for Compressor Mother Station (Hybrid)
P & ID for Ground Storage
P & ID for Dispenser NGV
P & ID for Dispenser Mobile Storage
P & ID for Fuel Gas Generator
P & ID for Gas Venting & Drain Line Connection
P&ID for Fire Hydrant

II.2
Mechanical Engineering
II.2.1
CNG-EGD-ME-G-001
II.2.1.1
CNG-EGD-ME-G-002
II.2.1.2
CNG-EGD-ME-G-003
II.2.1.3
CNG-EGD-ME-G-004
II.2.1.4

Mechanical Engineering
Basic Design & General Specification
Mechanical Basis of Design
CNG Storage Spec
Vehicle Filling System Spec
Mobile Storage Filling System Spec

No

DOCUMENT NUMBER

DOCUMENT TITLE

II.2.1.5
II.2.1.6
II.2.1.7
II.2.1.8
II.2.1.9

CNG-EGD-ME-G-005
CNG-EGD-ME-G-006
CNG-EGD-ME-G-007
CNG-EGD-ME-G-008
CNG-EGD-ME-G-009

Dryer Specification
Gas Filter Specification
Gas Compressor Specification
Gas Engine Generator Specification
Painting Specification

II.2.2
II.2.2.1
II.2.2.2
II.2.2.3
II.2.2.4
II.2.2.5
II.2.2.6
II.2.2.7

CNG-EGD-ME-S-001
CNG-EGD-ME-S-002
CNG-EGD-ME-S-003
CNG-EGD-ME-S-004
CNG-EGD-ME-S-005
CNG-EGD-ME-S-006
CNG-EGD-ME-S-007

Datasheet
Datasheet Gas Compressor
Datasheet Air Compressor & Receiver Tank
Datasheet CNG Ground Storage
Datasheet Dryer Package C/w Filter
Datasheet Fuel Gas Filter
Datasheet Gas Genset (Gas Engine)
Datasheet Gas Scrubber

II.3
Piping Engineering
II.3.1
CNG-EGD-PP-G-001
II.3.1.1
CNG-EGD-PP-G-002
II.3.1.2

Piping Engineering

II.3.2
II.3.2.1

Calculation
Pipe Thickness Calculation

CNG-EGD-PP-C-001

II.3.3
II.3.3.1
II.3.3.2
II.3.3.3

CNG-EGD-PP-D-001
CNG-EGD-PP-D-002
CNG-EGD-PP-D-003

Basic Design & General Specification


Basic Design Piping
Piping Material Data Sheet c/w : Fittings & Valves

Drawings
Drawing Index
Legend & Symbol
Low Pressure Piping Plan Layout & Detail Arrangement

No

DOCUMENT NUMBER

II.3.3.4

CNG-EGD-PP-D-004

High Pressure Piping Plan Layout & Detail Arrangement

CNG-EGD-PP-T-001

Material Take Off


MTO piping

II.3.4
II.3.4.1

DOCUMENT TITLE

II.4
Civil Engineering & Architecture
II.4.1
CNG-EGD-CE-G-001
II.4.1.1
CNG-EGD-CE-G-002
II.4.1.2
CNG-EGD-CE-G-003
II.4.1.3
CNG-EGD-CE-G-004
II.4.1.4
CNG-EGD-CE-G-005
II.4.1.5
CNG-EGD-CE-G-006
II.4.1.6
CNG-EGD-CE-G-007
II.4.1.7
CNG-EGD-CE-G-008
II.4.1.8

Civil Engineering & Architecture

II.4.2
II.4.2.1
II.4.2.2
II.4.2.2

Calculation
Equipment Foundation Calculation
Steel work structure calculation
Topography Survey Report

CNG-EGD-CE-C-001
CNG-EGD-CE-C-002
CNG-EGD-CE-C-003

II.4.3
II.4.3.1

CNG-EGD-CE-D-001

II.4.3.2
II.4.3.3
II.4.3.4

CNG-EGD-CE-D-002
CNG-EGD-CE-D-003
CNG-EGD-CE-D-004

Basic Design & General Specification


Civil & Structural Design Criteria
Earth Work Specification (site preparation)
Concrete Work and Foundation Specification
Structural Steel Work Specification
Building & Arsitektur Specification
General Sewer and Drainage Specification
Road & Paving Specification
Fencing and Gate Specification

Drawings
General notes civil and structure, Architecture, abbreviations and
legend
Equipment Foundation Plan , Section and Detail
Standard Drawing
Layuot SPBG CNG Hybrdstation

No

DOCUMENT NUMBER

II.4.3.5
II.4.3.6
II.4.3.7
II.4.3.8
II.4.3.9
II.4.3.10
II.4.3.11
II.4.3.12
II.4.3.13

CNG-EGD-CE-D-005
CNG-EGD-CE-D-006
CNG-EGD-CE-D-007
CNG-EGD-CE-D-008
CNG-EGD-CE-D-009
CNG-EGD-CE-D-010
CNG-EGD-CE-D-011
CNG-EGD-CE-D-012
CNG-EGD-CE-D-013

Drainage System Layout


Filling Station - Plan
Filling Station - Elevations & Sections
Filling Station - Roof Plan & Foundations
Pavement Layout and Section
Office - Plan
Office - Elevations, Sections & Details
Office - Tie Beam Plan & Reinforcement
Office - Roof Plan & Reinforcement

II.4.3.14

CNG-EGD-CE-D-014

Equipment Shelter - Roof Plan, Frame Line 1,2,3 & Elevation

II.4.3.15
II.4.3.16
II.4.3.17
II.4.3.18
II.4.3.19
II.4.4
II.4.4.1

CNG-EGD-CE-D-015
CNG-EGD-CE-D-016
CNG-EGD-CE-D-017
CNG-EGD-CE-D-018
CNG-EGD-CE-D-019

Equipment Shelter - Plan & Detail of Foundation


Equipment Shelter - Plan, Section & Detail
Septic Tank - Plan & Layout
Septic Tank - Section & Detail
Topography Drawing - SPBG Cicurug Sukabumi
Material Take Off
Civil and structural Material Take Off

CNG-EGD-CE-T-001

II.5
Electrical Eng.
II.5.1
CNG-EGD-EE-G-001
II.5.1.1
CNG-EGD-EE-G-002
II.5.1.2
CNG-EGD-EE-G-003
II.5.1.3
CNG-EGD-EE-G-004
II.5.1.4
CNG-EGD-EE-G-005
II.5.1.5
CNG-EGD-EE-G-006
II.5.1.6

DOCUMENT TITLE

Electrical Engineering
Basic Design & General Specification
Electrical Design Phylosophy
Electrical Equipment List
Grounding and Lightning Protection System Specification
LV Switchboards & Motor Control Center Specification
General Electrical Specification
UPS Specification

No

DOCUMENT NUMBER

II.5.1.7

CNG-EGD-EE-G-007
CNG-EGD-EE-G-008
CNG-EGD-EE-G-009
CNG-EGD-EE-G-010

Construction Electrical Specification


Design Basis Manual For Cathodic Protection
Material Specification For Cathodic Protection
Construction Specification For Cathodic Protection

CNG-EGD-EE-C-001

Calculation
Electrical Load Calculation

CNG-EGD-EE-S-001
CNG-EGD-EE-S-002
CNG-EGD-EE-S-003
CNG-EGD-EE-S-004

Datasheet
Data Sheet MCC & Switchgear
Data Sheet 220 VAC Uninterruptible UPS & DC Baterry System
Data Sheet Earthing and Lightning Protection System
Data Sheet Lighting

CNG-EGD-EE-D-001
CNG-EGD-EE-D-002
CNG-EGD-EE-D-003
CNG-EGD-EE-D-004
CNG-EGD-EE-D-005
CNG-EGD-EE-D-006

Drawings
Symbol & Legend
Hazardous Area Clasification
Electrical Single Line Diagram
Single Line Diagram of UPS
General Electrical Drawing
Main Power Cable Lay Out

II.5.2
II.5.2.1
II.5.3
II.5.3.1
II.5.3.2
II.5.3.3
II.5.3.4

II.5.4
II.5.4.1
II.5.4.2
II.5.4.3
II.5.4.4
II.5.4.5
II.5.4.6

II.6
II.6.1

Instrument & Control Eng.

DOCUMENT TITLE

Instrument & Control Engineering


Basic Design & General Specification

No

DOCUMENT NUMBER

II.6.1.1
II.6.1.2
II.6.1.3
II.6.1.4
II.6.1.5
II.6.1.6

CNG-EGD-IC-G-001
CNG-EGD-IC-G-002
CNG-EGD-IC-G-003
CNG-EGD-IC-G-004
CNG-EGD-IC-G-005
CNG-EGD-IC-G-006

Instrumentation & Control Design Basis


General Instrument Specification
Instrument Architecture Diagram
ESD Specification
Fire & Gas Detection System Specification
DVR & CCTV System Specification

CNG-EGD-IC-C-001

Calculation
Pressure Regulator Calculation

CNG-EGD-IC-S-001
CNG-EGD-IC-S-002
CNG-EGD-IC-S-003
CNG-EGD-IC-S-004
CNG-EGD-IC-S-005
CNG-EGD-IC-S-006
CNG-EGD-IC-S-007
CNG-EGD-IC-S-008
CNG-EGD-IC-S-009
CNG-EGD-IC-S-010

Datasheet
Data Sheet Dispenser & Metering
Data Sheet Main Control Fire Alarm (MCFA) Panel
Data Sheet Gas Detectors
Data Sheet Heat Detectors
Data Sheet Pressure Indicator
Data Sheet Pressure Safety Valve
Data Sheet Emergency Shutdown Valves
Data Sheet Smoke Detectors
Data Sheet Temperature Indicator
Data Sheet Pressure Regulator

CNG-EGD-IC-D-001
CNG-EGD-IC-D-002

Drawings
Layout Fire & Gas Detection System
Layout CCTV

II.6.2
II.6.2.1
II.6.3
II.6.3.1
II.6.3.2
II.6.3.3
II.6.3.4
II.6.3.5
II.6.3.6
II.6.3.7
II.6.3.8
II.6.3.9
II.6.3.10

II.6.4
II.6.4.1
II.6.4.2

DOCUMENT TITLE

No

DOCUMENT NUMBER

DOCUMENT TITLE

II.7
Safety System
II.7.1
CNG-SFT-SS-G-001
II.7.1.1

Safety System

II.7.2
II.7.2.1
II.7.2.2

Drawings
Fire Fighting & Protection Equipment Layout
Safety Sign System & Layout

CNG-SFT-SS-D-001
CNG-SFT-SS-D-002

Basic Design & General Specification

HSE Requirement

PIC
Completion

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

(Fastrack)

17-Apr-14
24-Apr-14
24-Apr-14
7-May-14

17-Apr-14
30-Apr-14

HBO
HBO

17-Apr-14
17-Apr-14

17-Apr-14
17-Apr-14

Revised

HSN
HSN
HSN

29-Apr-14
29-Apr-14
29-Apr-14

Revised
Revised

HSN
HSN

17-Apr-14
25-Apr-14

Approved
Revised
Revised
Revised
completed
completed
Revised
Revised

HBO
AHS
ASW/AHS
AHS

(Gagas)

IFA Rev.B
Submitted
Reviewed

(Fastrack)

25-Apr-14

N WORKS

17-Apr-14
30-Apr-14

6-May-14

(Gagas)

30-Apr-14

PIC
Completion

*sketch Gagas
*sketch Gagas

(Fastrack)
17-Apr-14
25-Apr-14

(Gagas)

Revised

HSN
HSN

Revised
Revised
Revised
Completed
Revised
Revised
Approved

HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL

30-Apr-14
2-May-14
30-Apr-14
17-Apr-14
17-Apr-14
2-May-14
25-Apr-14

Completed
Approved
Approved
Revised
Revised
Revised
Revised

HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL
HSN/SOL

17-Apr-14
24-Apr-14
25-Apr-14
30-Apr-14
30-Apr-14
30-Apr-14
30-Apr-14

17-Apr-14

Approved
Approved
Approved
Approved

SOL
SOL
SOL
SOL

29-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14

30-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14

Revised

*5sheets

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

17-Apr-14
30-Apr-14

17-Apr-14
17-Apr-14

IFA Rev.B
Submitted
Reviewed

(Fastrack)

(Gagas)

30-Apr-14
6-May-14

25-Apr-14

30-Apr-14

30-Apr-14
30-Apr-14

6-May-14
30-Apr-14
30-Apr-14
30-Apr-14

25-Apr-14

PIC
Completion

Approved
Approved
Approved
Approved
Approved

SOL
SOL
SOL
SOL
SOL

(Fastrack)
17-Apr-14
29-Apr-14
17-Apr-14
29-Apr-14
24-Apr-14

Approved
Approved
Approved

SOL
SOL
SOL
SOL
SOL
SOL

29-Apr-14
29-Apr-14
29-Apr-14
17-Apr-14
25-Apr-14
25-Apr-14

30-Apr-14

Approved

SOL
SOL

17-Apr-14
24-Apr-14

17-Apr-14
24-Apr-14

Revised

SOL

29-Apr-14

30-Apr-14

Revised
Revised
Revised

SOL
SOL
SOL

Approved

*minta Gagas
*minta Gagas

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

Approved
Approved

Approved

6-May-14
6-May-14
6-May-14

IFA Rev.B
Submitted
Reviewed

(Gagas)
17-Apr-14

(Fastrack)
30-Apr-14

17-Apr-14

7-May-14

30-Apr-14

30-Apr-14
17-Apr-14

7-May-14

6-May-14

(Gagas)

PIC
Completion
Revised

SOL

(Fastrack)
6-May-14

Revised

SOL

29-Apr-14

Completed

VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN

Completed
Completed
Completed
*transmittal

Completed
Completed
Completed

*transmittal

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

Completed

Revised
Revised
Approved

Revised
Revised
Revised
Revised

VIN
VIN
VIN

VIN
VIN
VIN
VIN

17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
24-Apr-14
17-Apr-14
17-Apr-14
24-Apr-14

2-May-14
2-May-14
29-Apr-14

17-Apr-14
26-Apr-14
25-Apr-14
17-Apr-14

(Gagas)

30-Apr-14

17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14

30-Apr-14

17-Apr-14

17-Apr-14

IFA Rev.B
Submitted
Reviewed

(Fastrack)

6-May-14

(Gagas)

PIC
Completion

VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN
VIN

(Fastrack)
26-Apr-14
25-Apr-14
25-Apr-14
25-Apr-14
6-May-14
25-Apr-14
25-Apr-14
25-Apr-14
25-Apr-14

Revised
Revised
Revised
Revised
Approved

VIN
VIN
VIN
VIN
VIN
VIN

25-Apr-14
25-Apr-14
25-Apr-14
2-May-14
2-May-14
24-Apr-14

Revised

VIN

25-Apr-14

Approved
Revised
Revised
Approved
Approved
Approved

ADB
ADB
ADB
ADB
ADB
ADB

Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised
Revised

*tunggu layout

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

17-Apr-14
30-Apr-14
17-Apr-14
24-Apr-14
24-Apr-14
26-Apr-14

(Gagas)

IFA Rev.B
Submitted
Reviewed

(Fastrack)

6-May-14

24-Apr-14
6-May-14

17-Apr-14
17-Apr-14
24-Apr-14
24-Apr-14
6-May-14

(Gagas)

PIC
Completion

*tunggu layout

Approved
Approved
Approved
Approved

ADB
ADB
ADB
ADB

(Fastrack)
24-Apr-14
25-Apr-14
25-Apr-14
25-Apr-14

Revised

ADB

2-May-14

Approved

ADB
ADB
ADB
ADB

24-Apr-14
25-Apr-14
24-Apr-14
24-Apr-14

24-Apr-14

ADB
ADB
ADB
ADB
ADB
ADB

17-Apr-14
29-Apr-14
24-Apr-14
17-Apr-14
17-Apr-14
29-Apr-14

17-Apr-14

Approved
Approved
Approved

Approved

*tunggu layout

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

Revised
Revised
Revised
Revised
Revised

(Gagas)
24-Apr-14

IFA Rev.B
Submitted
Reviewed

(Fastrack)

24-Apr-14
24-Apr-14

24-Apr-14
17-Apr-14
17-Apr-14
30-Apr-14

29-Apr-14
30-Apr-14
30-Apr-14

(Gagas)

PIC
Completion

Completed

MIQ
MIQ
MIQ
MIQ
MIQ
MIQ

(Fastrack)
17-Apr-14
17-Apr-14
24-Apr-14
25-Apr-14
17-Apr-14
17-Apr-14

Approved

MIQ

25-Apr-14

Approved

MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ
MIQ

21-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
21-Apr-14
21-Apr-14
17-Apr-14
17-Apr-14
25-Apr-14

MIQ
ADB

30-Apr-14
30-Apr-14

Approved
Approved
Approved
Approved
Completed

Completed
Completed
Approved
Approved
Completed
Completed
Approved
Approved

*tunggu layout
*tunggu layout

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

Revised
Revised

(Gagas)
17-Apr-14
17-Apr-14
24-Apr-14
30-Apr-14
17-Apr-14
17-Apr-14

21-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
17-Apr-14
24-Apr-14
17-Apr-14
17-Apr-14
30-Apr-14

IFA Rev.B
Submitted
Reviewed

(Fastrack)
25-Apr-14
25-Apr-14

(Gagas)
30-Apr-14
30-Apr-14

29-Apr-14

29-Apr-14

30-Apr-14

PIC
Completion

*tunggu layout

Deliverable Schedule :
IFA Rev.A
Submitted
Reviewed

(Fastrack)

completed

ASW

17-Apr-14

Revised

MIQ
VIN

26-Apr-14
26-Apr-14

Revised

(Gagas)

17-Apr-14

IFA Rev.B
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.C
Submitted
Reviewed

IFA Rev.D
Submitted
Reviewed

(Fastrack)

(Fastrack)

(Gagas)

(Gagas)

Approved For Construction


Submitted
Reviewed

(Fastrack)

(Gagas)

6-May-14
Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014
24-Apr-14
24-Apr-14
Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014

Submit Rev.0, >2hari, 8 Mei 2014

24-Apr-14
24-Apr-14

AFC Rev.1
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.C
Submitted
Reviewed

IFA Rev.D
Submitted
Reviewed

(Fastrack)

(Fastrack)

(Gagas)

(Gagas)

Approved For Construction


Submitted
Reviewed

(Fastrack)

(Gagas)

Submit Rev.0, >2hari, 8 Mei 2014

Submit Rev.0, >2hari, 8 Mei 2014


Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014
25-Apr-14

25-Apr-14

24-Apr-14
6-May-14
24-Apr-14

30-Apr-14

Submit Rev.0, >2hari, 8 Mei 2014


Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, Appv'd, 8 Mei 2014

Submit
Submit
Submit
Submit

Rev.0,
Rev.0,
Rev.0,
Rev.0,

>2hari,
>2hari,
>2hari,
>2hari,

8
8
8
8

Mei
Mei
Mei
Mei

2014
2014
2014
2014

Submit
Submit
Submit
Submit

Rev.0,
Rev.0,
Rev.0,
Rev.0,

Appv'd,
Appv'd,
Appv'd,
Appv'd,

8
8
8
8

Mei
Mei
Mei
Mei

201
201
201
201

8-May-14
8-May-14
8-May-14
8-May-14

AFC Rev.1
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.C
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.D
Submitted
Reviewed

Approved For Construction


Submitted
Reviewed

(Fastrack)
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,

(Gagas)
Appv'd, 8 Mei 201
Appv'd, 8 Mei 201
Appv'd, 8 Mei 201
Appv'd, 8 Mei 201

(Fastrack)
8-May-14
8-May-14
8-May-14
8-May-14
6-May-14

Submit
Submit
Submit
Submit
Submit
Submit

Appv'd,
Appv'd,
Appv'd,
Appv'd,
Appv'd,
Appv'd,

8-May-14
8-May-14
8-May-14
8-May-14
8-May-14
8-May-14

Rev.0,
Rev.0,
Rev.0,
Rev.0,
Rev.0,
Rev.0,

8
8
8
8
8
8

Mei
Mei
Mei
Mei
Mei
Mei

201
201
201
201
201
201

30-Apr-14
6-May-14

Submit Rev.0, >2hari, 8 Mei 2014

Submit Rev.0, >2hari, 8 Mei 2014


Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014

(Gagas)

AFC Rev.1
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.C
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.D
Submitted
Reviewed

(Fastrack)
(Gagas)
Submit Rev.0, >2hari, 8 Mei 2014

Approved For Construction


Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.1
Submitted
Reviewed

(Fastrack)

Submit Rev.0, >2hari, 8 Mei 2014

24-Apr-14
24-Apr-14
24-Apr-14
24-Apr-14
24-Apr-14
24-Apr-14

Submit Rev.0, >2hari, 8 Mei 201


Submit Rev.0, >2hari, 8 Mei 201

Submit
Submit
Submit
Submit

Rev.0,
Rev.0,
Rev.0,
Rev.0,

>2hari,
>2hari,
>2hari,
>2hari,

8
8
8
8

Mei
Mei
Mei
Mei

2014
201
2014
2014

8-May-14
8-May-14
7-May-14

6-May-14

30-Apr-14
30-Apr-14
30-Apr-14
30-Apr-14
30-Apr-14
30-Apr-14

6-May-14

30-Apr-14

6-May-14

6-May-14

(Gagas)

IFA Rev.C
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.D
Submitted
Reviewed

(Fastrack)
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,
Submit Rev.0,

(Gagas)
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014
>2hari, 8 Mei 2014

Submit
Submit
Submit
Submit
Submit
Submit

>2hari,
>2hari,
>2hari,
>2hari,
>2hari,
>2hari,

Rev.0,
Rev.0,
Rev.0,
Rev.0,
Rev.0,
Rev.0,

8
8
8
8
8
8

Mei
Mei
Mei
Mei
Mei
Mei

Approved For Construction


Submitted
Reviewed

(Fastrack)

2014
2014
2014
2014
2014
2014

Submit Rev.0, >2hari, 8 Mei 2014

6-May-14
Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014
6-May-14
6-May-14
7-May-14

(Gagas)

AFC Rev.1
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.C
Submitted
Reviewed

IFA Rev.D
Submitted
Reviewed

(Fastrack)

(Fastrack)

(Gagas)

(Gagas)

Approved For Construction


Submitted
Reviewed

(Fastrack)
6-May-14
6-May-14
6-May-14
6-May-14

Submit Rev.0, >2hari, 8 Mei 2014

6-May-14
6-May-14
6-May-14
7-May-14

30-Apr-14
Submit
Submit
Submit
Submit
Submit

Rev.0,
Rev.0,
Rev.0,
Rev.0,
Rev.0,

>2hari,
>2hari,
>2hari,
>2hari,
>2hari,

8
8
8
8
8

Mei
Mei
Mei
Mei
Mei

2014
2014
2014
2014
2014

(Gagas)

AFC Rev.1
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.C
Submitted
Reviewed

IFA Rev.D
Submitted
Reviewed

(Fastrack)

(Fastrack)

(Gagas)

(Gagas)

Approved For Construction


Submitted
Reviewed

(Fastrack)
6-May-14
6-May-14
24-Apr-14
6-May-14
24-Apr-14
24-Apr-14

(Gagas)

30-Apr-14
30-Apr-14

6-May-14

6-May-14
30-Apr-14
24-Apr-14
24-Apr-14

24-Apr-14
29-Apr-14
29-Apr-14

Submit Rev.0, >2hari, 8 Mei 2014


6-May-14
24-Apr-14
24-Apr-14
Submit Rev.0, >2hari, 8 Mei 2014
Submit Rev.0, >2hari, 8 Mei 2014

Submit Rev.0, >2hari, 8 Mei 2014


Submit Rev.0, >2hari, 8 Mei 2014

29-Apr-14
29-Apr-14

AFC Rev.1
Submitted
Reviewed

(Fastrack)

(Gagas)

IFA Rev.C
Submitted
Reviewed

IFA Rev.D
Submitted
Reviewed

(Fastrack)

(Fastrack)

(Gagas)

(Gagas)

Approved For Construction


Submitted
Reviewed

(Fastrack)

24-Apr-14

Submit Rev.0, >2hari, 8 Mei 2014


Submit Rev.0, >2hari, 8 Mei 2014

(Gagas)

29-Apr-14

AFC Rev.1
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

AFC Rev.3
Submitted
Reviewed

(Fastrack)

(Gagas)

JASA KONSULTAN PERENCAN


PROYEK PEMBANGUNAN SPBG Suk
PT. GAGAS ENERGI INDONESI

ENGINEERING DOCUMENT LIST FO

No

DOCUMENT NUMBER

I
II
II.1
II.1.1
II.1.1.2

GEI-BGR-EGD-PE-G-001

II.1.2
II.1.2.1
II.1.2.2

GEI-BGR-EGD-ME-S-001
GEI-BGR-EGD-ME-S-002

II.1.3
II.1.3.1
II.1.3.2
II.1.3.3
II.1.3.4

GEI-BGR-EGD-PE-D-001
GEI-BGR-EGD-PE-D-002
GEI-BGR-EGD-PE-D-003
GEI-BGR-EGD-PE-D-004

II.2.2
II.2.2.1

GEI-BGR-EGD-ME-S-001

II.3
II.3.1
II.3.1.1
II.3.1.2

GEI-BGR-EGD-PP-G-001
GEI-BGR-EGD-PP-G-002

II.3.2
II.3.2.1

GEI-BGR-EGD-PP-C-001

II.3.3
II.3.3.1
II.3.3.2
II.3.3.3
II.3.3.4

GEI-BGR-EGD-PP-D-001
GEI-BGR-EGD-PP-D-002
GEI-BGR-EGD-PP-D-003
GEI-BGR-EGD-PP-D-004

II.3.4

Page 49 of 63

No

DOCUMENT NUMBER

II.3.4.1

GEI-BGR-EGD-PP-T-001

II.4
II.4.1
II.4.1.1

GEI-BGR-EGD-CE-G-001

II.4.2
II.4.2.1
II.4.2.2

GEI-BGR-EGD-CE-C-001
GEI-BGR-EGD-CE-C-002

Page 50 of 63

No

DOCUMENT NUMBER

II.4.3
II.4.3.1

GEI-BGR-EGD-CE-D-001

II.4.3.2

GEI-BGR-EGD-CE-D-002

II.4.3.3
II.4.3.4

GEI-BGR-EGD-CE-D-003
GEI-BGR-EGD-CE-D-004

II.4.3.5

GEI-BGR-EGD-CE-D-005

II.4.4
II.4.4.1

GEI-BGR-EGD-CE-T-001

II.5
II.5.1
II.5.1.1
II.5.1.2
II.5.1.3
II.5.1.4
II.5.1.5

GEI-BGR-EGD-EE-G-001
GEI-BGR-EGD-EE-G-002
GEI-BGR-EGD-EE-G-003
GEI-BGR-EGD-EE-G-004
GEI-BGR-EGD-EE-G-005

II.5.2
II.5.2.1
II.5.2.2

GEI-BGR-EGD-EE-C-001
GEI-BGR-EGD-EE-C-002

II.5.3
II.5.3.1
II.5.3.2
II.5.3.3
II.5.3.4

GEI-BGR-EGD-EE-S-001
GEI-BGR-EGD-EE-S-002
GEI-BGR-EGD-EE-S-003
GEI-BGR-EGD-EE-S-004

II.5.4

GEI-BGR-EGD-EE-TB-001

Page 51 of 63

No

DOCUMENT NUMBER

II.5.4
II.5.4.1
II.5.4.2
II.5.4.3
II.5.4.4
II.5.4.5
II.5.4.6
II.5.4.7

GEI-BGR-EGD-EE-D-001
GEI-BGR-EGD-EE-D-002
GEI-BGR-EGD-EE-D-003
GEI-BGR-EGD-EE-D-004
GEI-BGR-EGD-EE-D-005
GEI-BGR-EGD-EE-D-006
GEI-BGR-EGD-EE-D-007

II.5.4.8

GEI-BGR-EGD-EE-D-008

II.5.4.9

GEI-BGR-EGD-EE-D-009

II.5.4.10

GEI-BGR-EGD-EE-D-0010

II.6
II.6.1
II.6.1.1
II.6.1.2
II.6.1.3
II.6.1.4

GEI-BGR-EGD-IC-G-001
GEI-BGR-EGD-IC-G-002
GEI-BGR-EGD-IC-G-003
GEI-BGR-EGD-IC-G-004

II.6.2
II.6.2.1
II.6.2.2
II.6.2.3
II.6.2.4

GEI-BGR-EGD-IC-S-001
GEI-BGR-EGD-IC-S-002
GEI-BGR-EGD-IC-S-003
GEI-BGR-EGD-IC-S-004

II.6.3
II.6.3.1
II.6.3.2

GEI-BGR-EGD-IC-L-001
GEI-BGR-EGD-IC-L-002

II.6.4
II.6.4.1
II.6.4.2
II.6.4.3
II.6.4.4

GEI-BGR-EGD-IC-D-001
GEI-BGR-EGD-IC-D-002
GEI-BGR-EGD-IC-D-003
GEI-BGR-EGD-IC-D-004

II.6.5
II.6.5.1

GEI-BGR-EGD-IC-D-001

II.6.6

GEI-BGR-EGD-IC-TB-001

Page 52 of 63

No

DOCUMENT NUMBER

Catatan :
Biru
Kuning
Kuning Tua

Page 53 of 63

JASA KONSULTAN PERENCANA


PROYEK PEMBANGUNAN SPBG Sukabumi
PT. GAGAS ENERGI INDONESIA

NGINEERING DOCUMENT LIST FOR CONTRACTOR

DOCUMENT TITLE

WORK PLAN
ENGINEERING DESIGN & PREPARATION WORKS
Process Engineering
Basic Design & General Specification
Process Design Basis
Specification
Specification for Gas Engine Generator
Specification for Painting
Drawings
Legend & Symbol
UFD (Utility Flow Diagram)
Process Flow Diagram
PID process
Datasheet
Datasheet Gas Engine Generator
Piping Engineering
Basic Design & General Specification
Basic Design Piping
Piping Material Data Sheet c/w : Fittings & Valves
Calculation
Pipe Thickness Calculation
Drawings
Legend & Symbol
High Pressure Piping Plan Layout & Detail Arrangement
Isometric Drawing Plan
Detail Pipe Support
Material Take Off

Page 54 of 63

DOCUMENT TITLE

MTO piping
Civil Engineering & Architecture
Basic Design & General Specification
General Specification for Civil and Structural
Calculation
GEG Foundation Calculation
Shelter structure calculation

Page 55 of 63

DOCUMENT TITLE

Drawings
General Layout Civil
General notes civil and structure, Architecture, abbreviations and
legend
GEG Foundation Plan , Section and Detail
Compressor Foundation Plan, Section and Detail
Shelter Structure and Foundation Plan, Section and Detail
Material Take Off
Civil and structural Material Take Off
Electrical Engineering
Basic Design & General Specification
Electrical Design Phylosophy
Electrical Equipment List
Grounding and Lightning Protection System Specification
LV Switchboards & Motor Control Center Specification
General Electrical Specification
Calculation
Electrical Load Calculation and GEG sizing
Cable sizing
Datasheet
Data Sheet LV Switchboards & Motor Control Center
Data Sheet 220 VAC Uninterruptible UPS & DC Baterry System
Data Sheet Earthing and Lightning Protection System
Data Sheet For Lighting
Technical Bid Evaluation (TBE) (if any)

Page 56 of 63

DOCUMENT TITLE

Drawings
Symbol & Legend
Hazardous Area Clasification
Electrical Single Line Diagram
General Electrical Drawing
Power Cable Lay Out
Lighting Layout
Lightning and grounding protection layout
Connection diagram lighting and receptacle panel for SPBG Sukabumi
Station
Electrical Equipment layout for Electrical Room
Panel Schedule Lighting and receptacle panel for SPBG Sukabumi
Station
Instrument & Control Engineering
Basic Design & General Specification
Instrumentation & Control Design Basis
General Instrument Specification
Instrument Architecture Diagram
Fire & Gas Detection System Specification

Datasheet
Data Sheet Main Control Fire Alarm (MCFA) Panel
Data Sheet Gas Detectors
Data Sheet Heat Detectors
Data Sheet Pressure Indicator
LIST
Instrument Index
Instrument Cable List Schedule
Drawings
Layout Fire & Gas Detection System
Sigle Line Diagram Fife and Gas System
Instrument wiring Diagram
Instrument Cable Routing
MTO
MTO Instrument
Technical Bid Evaluation (TBE) (if any)

Page 57 of 63

DOCUMENT TITLE

Tambahan EDL Usulan Gagas&Konsultan


EDL yang diajukan Kontraktor
EDL yang diajukan Kontraktor dengan koreksi Konsultan

Page 58 of 63

OR

REMARKS

###

###
###
###
###

###

###
###

###

###
###

Page 59 of 63

REMARKS

###

###

###
###

Page 60 of 63

REMARKS

###
###
###
###

###

###
###
###
###
###

###

###
###
###
###

Page 61 of 63

REMARKS

###
###
###
###
###

###
###
###
###

###
###
###
###

###

Page 62 of 63

REMARKS

###

315

Page 63 of 63