EQUIPMENT

No.

Name

No.

SU-F46S05
SU-F46S06
SU-F46S07
SU-F46S08
SU-F46S09
SU-F46S11
SU-P46S27
SU-P46S28
SU-P46S35
SU-P46S36
SU-V46S02
SU-V46S02
SU-V46S02
SU-V46S02

Pre-Filter
Pre-Filter
Carbon-Filter
Carbon-Filter
Post-Filter
Post-Filter
PUMP
PUMP
PUMP
PUMP
Flash Drum
Flash Drum
Flash Drum
Flash Drum

N5
N5
N5
N5
N5
N5
N2
N2
SN
SN
N1
N2
N3
N5

NOZZLE
Load Check
Size
Status
50
Done
50
Done
50
Done
50
Done
50
Ongoing
50
Ongoing
100
100
50
50
80
Done
80
Done
80
Done
50
Done

SU-V46S13

Still Column

N15

150

Done

N15

50

Done

N1
N4

100
100

Ongoing
Ongoing

N5

400

Done

N2
N3
N10
N9

100
200
300
300

Ongoing
Ongoing
Ongoing
Ongoing

SU-V46S32
SU-X46S12
SU-X46S12

Lean/Rich Exchanger
Lean/Rich Exchanger

SU-X46S13
SU-X46S14
SU-X46S14
SU-X46S14
SU-X46S14

Reboiler
Reboiler
Reboiler
Reboiler

RESULT

Remarks

Passed
Passed
Passed
Passed

Nozzle Loads incorporated. Report Generated and


passed to MEL

Action By

AUH
AUH
Not in AUH Scope
Not in AUH Scope
Not in AUH Scope
Not in AUH Scope
Passed
Passed
Passed
Passed

Nozzle Loads incorporated. Report Generated and


passed to MEL

Loads within Allowables. No Calculation required


Loads within Allowables. No Calculation required
AUH
AUH
Loads within Allowables. No Calculation required
AUH
AUH
AUH
AUH