Sie sind auf Seite 1von 5

Project No.

Unit

Doc. T.

Material Code

Serial No.

Rev.

Page

5143

000

MR

1330

003

SIRTE OIL COMPANY - TP 9308Z


MODERNIZATION OF FIRE FIGHTING SYSTEM - ZELTEN FIELD
FACILITIES

EQUIPMENT / BULK MATERIAL : FITTINGS FOR MANIFOLD

REQUISITION FOR INQUIRY / PURCHASE


This requisition is composed of the documents hereafter listed:
Description

Reference

Rev.

Date of
attachment

5143-000-SR-1330-003

4. Nov 2013

Date of
cancellation

1. SCOPE OF SUPPLY
FITTINGS FOR MANIFOLD
Notes:

Pages modified under this revision:

4. Nov 2013

Issued for Inquiry

Muhamed Zimic

Elvedin Buljubasic

Adnan Ibisevic

REV

DATE

STATUS

WRITTEN BY

CHECKED BY

APPROVED BY

DOCUMENT REVISIONS
Section changed in last revision are identified by a vertical line in the right margin
MR -ENG - rev. 0

Project No.

Unit

Doc. T.

Material Code

Serial No.

Rev.

Page

5143

000

SR

1330

003

SIRTE OIL COMPANY - TP 9308Z


MODERNIZATION OF FIRE FIGHTING SYSTEM - ZELTEN FIELD FACILITIES

EQUIPMENT / BULK MATERIAL : FITTINGS FOR MANIFOLD

SCOPE OF SUPPLY

The supply is composed of two parts:


PART I:

EQUIPMENT / BULK MATERIAL

PART II:

DOCUMENTS AND DRAWINGS SUPPLY

Pages modified under this revision:

4. Nov 2013

Issued for Inquiry

Muhamed Zimic

Elvedin Buljubasic

Adnan Ibisevic

REV

DATE

STATUS

WRITTEN BY

CHECKED BY

APPROVED BY

DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the right margin
SR - ENG - rev. 0

Project No.

Unit

Doc. T.

Material Code

Serial No.

Rev.

Page

5143

000

SR

1330

003

SIRTE OIL COMPANY - TP 9308Z


MODERNIZATION OF FIRE FIGHTING SYSTEM - ZELTEN FIELD FACILITIES

EQUIPMENT / BULK MATERIAL : FITTINGS FOR MANIFOLD

PART I: EQUIPMENT / BULK MATERIAL SUPPLY

Pos.

Size

End

8"

BW

Rating /
Schedule

SCH 40
(8,179 mm)

Qty.

Description

6
pcs

Elbow 90
Material: ASTM A234 Gr WPB
Hot Dip Galvanized, Seamless
Size acc. to ASME B16.9
LR

6"

BW
SCH 40
(7,112 mm)

10
pcs

Elbow 90
Material: ASTM A234 Gr WPB
Hot Dip Galvanized, Seamless
Size acc. to ASME B16.9
LR

2"

NPT

3000 lbs

2
pcs

Elbow 90
Material: ASTM A105, FS
Hot Dip Galvanized
Size acc. to ASME B16.11

8"

BW
SCH 40
(8,179 mm)

6
pcs

Tee Straight
Material: ASTM A234 Gr WPB
Hot Dip Galvanized, Seamless
Size acc. to ASME B16.9

2"

NPT

3000 lbs

6
pcs

Tee Straight
Material: ASTM A105, FS
Hot Dip Galvanized, Seamless
Size acc. to ASME B16.11

8"x6"

BW
SCH 40

5
pcs

Tee Reducing
Material: ASTM A234 Gr WPB
Hot Dip Galvanized, Seamless
Size acc. to ASME B16.9

SR - ENG - rev. 0

Project No.

Unit

Doc. T.

Material Code

Serial No.

Rev.

Page

5143

000

SR

1330

003

SIRTE OIL COMPANY - TP 9308Z


MODERNIZATION OF FIRE FIGHTING SYSTEM - ZELTEN FIELD FACILITIES

EQUIPMENT / BULK MATERIAL : FITTINGS FOR MANIFOLD

Pos.

Size

End

Rating /
Schedule

2"

NPT

3000 lbs

Qty.

Description

1
pcs

Threadolet on 8" pipe


Material: ASTM A105, FS
Hot Dip Galvanized
Threaded acc. to ASME B1.20.1
Size acc. to ASME B16.11

1"

NPT

3000 lbs

1
pcs

Threadolet on 8" pipe


Material: ASTM A105, FS
Hot Dip Galvanized
Threaded acc. to ASME B1.20.1
Size acc. to ASME B16.11

2"

NPT

3000 lbs

5
pcs

Threadolet on 6" pipe


Material: ASTM A105, FS
Hot Dip Galvanized
Threaded acc. to ASME B1.20.1
Size acc. to ASME B16.11

10

3/4"

NPT

3000 lbs

5
pcs

Threadolet on 6" pipe


Material: ASTM A105, FS
Hot Dip Galvanized
Threaded acc. to ASME B1.20.1
Size acc. to ASME B16.11

A = Added

SR - ENG - rev. 0

M = Modified

X = Cancelled

D = Cancelled on a previous revision

Project No.

Unit

Doc. T.

Material Code

Serial No.

Rev.

Page

5143

000

SR

1330

003

SIRTE OIL COMPANY - TP 9308Z


MODERNIZATION OF FIRE FIGHTING SYSTEM - ZELTEN FIELD FACILITIES

EQUIPMENT / BULK MATERIAL : FITTINGS FOR MANIFOLD

PART II: DOCUMENTS AND DRAWINGS SUPPLY

Pos./
Doc. DESCRIPTION OF DOCUMENTATION
Code

DELIVERY
WITH
OFFER

DELIVERY AFTER ORDER


For approval

Number of Number of
copies/type copies/type
(2)

(2)

For information

Final

Number of
days

Number of
copies/type

Number of
days

Number of
copies/type

Number of
days

(1)

(2)

(1)

(2)

(1)

GENERAL DOCUMENTATION
1

Procurement and fabrication schedule


(Production plan)

1/C/E

3W

Progress report of the supply

1/C/E

3W

Certificate of compliance and declaration


of conformity

1/C/E

3W

Packing list provisional showing number of


cases, dimensions and weights

1/C/E

BEFORE
SHIPPING

1/C/E

TECHNICAL DOCUMENTATION
5

Information on corrosive protections

1/C/E

1/C/E

3W

Catalogues

1/C/E

1/C/E

3W

INSPECTION DOCUMENTS
7

Inspection book

1/C/E

WITH
SUPPLY

Certificate of work tests including data and


results of such tests

1/C/E

3W

Material certificate

1/C/E

3W

1/C/E

NOTES:
ISSUE DATE : number of D = Days / W = Weeks / M = Months after purchase order effective date (unless otherwise specified)
(1)
QUANTITY : per type TYPE : C = Copy T = Transparency P = Polyester M = Microfilm E = Electronic file CD = CD ROM
(2)

SR - ENG - rev. 0

Das könnte Ihnen auch gefallen