TABLE OF CONTENTS
A 3
1 6
A 3
3 6
1
6
D 1
1 6
PERSPECTIVE
PERSPECTIVE
SITE DEVELOPMENT PLAN
A 3
2 6
D 1
1 6
ARCHITECTURAL
CIVIL / STRUCTURAL
SECTION
SCHEDULE OF WINDOW
SCHEDULE OF DOORS & VENTS
STAIR DETAIL
ELECTRICAL
MECHANICAL
SANITARY
PLUMBING
GEODETIC
ELECTRONICS
VICINITY MAP
PREPARED BY :
LOCATION PLAN
PROJECT TITLE / LOCATION :
REVIEWED / CHECKED BY :
RECOMMENDING APPROVAL :
APPROVED BY :
PROPOSED :
JUVY S. CHING
MUNICIPAL ENGINEER
HERMINA BACALSO
MPDO / LPRAP
SHEET CONTENT:
PERSPECTIVE
LOCATION MAP
VICINITY MAP
SHEET NO :
A 3
1 6
4
2
3
SPECIFICATIONS
PLAN
Z
M
SECTION
2
3
PLAN
AIR SPACE
SCUM LEVEL
DIGESTION CHAMBER
LEACHING WELL
SECTION
REVIEWED / CHECKED BY :
RECOMMENDING APPROVAL :
APPROVED BY :
PROPOSED :
JUVY S. CHING
MUNICIPAL ENGINEER
HERMINA BACALSO
MPDO
SHEET CONTENT:
CLEAN WATER LAY-OUT
WASTE WATER LAY - OUT
CATCH BASIN DETAIL
SEPTIC TANK DETAIL
SHEET NO :
D 2
1 6
CLINIC BEDROOM
2
3
MALE T & B
FEMALE T & B
NURSE STATION
FRONT ELEVATION
FLOOR PLAN
REAR ELEVATION
1
2
4
REVIEWED / CHECKED BY :
RECOMMENDING APPROVAL :
APPROVED BY :
PROPOSED :
JUVY S. CHING
HERMINA BACALSO
SHEET CONTENT:
FLOOR PLAN
FRONT ELEVATION
REAR ELEVATION
RIGHT SIDE ELEVATION
LEFT SIDE ELEVATION
SHEET NO :
A 3
2 6
SCHEDULE OF LOADS :
ELECTRICAL NOTES
DESCRIPTION
1.0
NO.
VOLTS
WATTS
CURRENT
RATING
WIRE SIZE
L. O.
11
230
600
2.61
L. O.
11
230
600
2.61
C. O.
230
1080
4.70
C. O.
230
1080
4.70
SPARE
230
1080
SPARE
230
1080
SERVICE ENTRANCE FROM
SORECO II 240V
M
CIRCUIT BREAKER
RISER DIAGRAM
2.0
LIGHTING OUTLET
LIGHTING OUTLET
POWER OUTLET
POWER OUTLET
SPARE
SPARE
LIGHTING FIXTURES
4.0
SWITCHES SYMBOLS
1
2
3.0
2
3
2
3
EARTH GROUND
PREPARED BY :
REVIEWED / CHECKED BY :
RECOMMENDING APPROVAL :
APPROVED BY :
PROPOSED :
POWER LAYOUT
LIGHTING LAYOUT
REPUBLIC OF THE PHILIPPINES
PROVINCE OF MASBATE
MUNICIPALITY OF PIO V. CORPUS
DEPARTMENT OF INTERIOR AND LOCAL
GOVERNMENT
JUVY S. CHING
MUNICIPAL ENGINEER
HERMINA BACALSO
MPDO
SHEET CONTENT:
LIGHTNING LAY-OUT
POWER LAY-OUT
RISER DIAGRAM
SHEET NO :
1
6
CF1
L/4
L/4
L/4
L/4
L/4
L/4
2
3
SECTION
SLAB DETAIL
SCALE :
FOOTING DETAIL
1 : 100 m
PLAN
CF2
RB2
WF1
SECTION
2
3
CF2
CF1
CF1
CF1
CF1
CF2
CF2
CF2
CF1
CF1
CF1
CF1
CF1
PLAN
WF2
1.2
1.5
0.3
1.0
1.2
0.3
FOOTING SCHEDULES
TB
0.3
0.3
1.0
WF
0.4
0.20 0.8
FOUNDATION PLAN
PREPARED BY :
CF1
REVIEWED / CHECKED BY :
RECOMMENDING APPROVAL :
APPROVED BY :
PROPOSED :
JUVY S. CHING
MUNICIPAL ENGINEER
HERMINA BACALSO
MPDO / LPRAP
SHEET CONTENT:
SLAB DETAIL
TYPICAL BEAM DETAIL
FOOTING SCHEDULES
TIE BEAM SCHEDULES
FOOTING DETAIL
ROOF SLAB & FOUNDATION PLAN
SHEET NO :
A 3
3 6
FLUSH DOOR
4 SETS
PREPARED BY :
STAIR DETAIL
REVIEWED / CHECKED BY :
RECOMMENDING APPROVAL :
APPROVED BY :
PROPOSED :
JUVY S. CHING
MUNICIPAL ENGINEER
HERMINA BACALSO
MPDO / LPRAP
SHEET CONTENT:
DOORS
WINDOW
SECTION THRU
STAIR DETAIL
SHEET NO :
D 2
2 6