Sie sind auf Seite 1von 3

Kickoff Meeting Agenda

Job Name:
Job #:
Proj. Manger:
Customer:
Owner:
Detailer:
PROJECT DESCRIPTION

FABRICATION SPECIFICATIONS

PROJECT STATUS
Shop Drawings

Welding Procedures

Tentative Start Date

Tentative Completion Date

MATERIAL
Grades (CVNs, Fracture Critical, Heat Treatment, Buy America?)

Traceability

Subcontractors

Tentative Delivery

Weight:
Fab Hours:
Mach Hours:

Kickoff Meeting Agenda


COATINGS
Specifications

Types (Powder Coating, Galvanizing, Paint?)

Areas

Repair

Hold Points

Subcontractors

BOLTS
Grades

Pre-Installation Testing

Installation Methods

MACHINING
Drill Line

Machine Shop

FABRICATION
Fixtures

Assembly Plan

Kickoff Meeting Agenda


QC INSPECTION
NDE (UT, MT, X-Ray, Visual?)

Hold Points

SHOP INSPECTION
Dimensional

Hold Points

SHIPPING
Method

Engineering

Subcontractors

Das könnte Ihnen auch gefallen