Sie sind auf Seite 1von 10

For Pile Cap PC-1

Lateral Load Analysis By Characteristic Load Method (CLM)


Define Parameters:
Undrained shear strength, Su
Width of Pile, D
Applied Load, Pt
Modulus of Pile, Ep
Moment of Inertia of Pile, Ip
Moment of Inertia Ratio, RI

=
20
kN/m2
=
1.20 m
=
534 kN
= 4700 34.5 MPa
= 27606.25
= D4/64
=
0.102
= 64 Ip/ D4
=
1.00

Deflection due to Applied Lateral Load


y =

y =

27.48

Pt
Pc ( D,Ep,RI,Su)

v4,v3,

Maximum Moment due to Loads Applied at Ground Line


Mmax =
Mmax =

Mc(D,Ep,RI,Su)
2.568

x 103 kN-m

v9,v7,

Pt
Pc ( D,Ep,RI,Su)

For Pile Cap PC-1


Analysis of Groups of Pile by Group Amplification Procedure
No. of Piles, Npiles =
Spacing Between Piles, S =
Average Pile Load, Ps =
Group Displacement
Cy =
5.5 x
Cy =

2.96

yg = Cy (y)
= 81.39
Compute Maximum Moment:
Ps
150 Su D2

n =
=

0.374

CM = Cyn
=

1.500

Mg = CM x Mmax
= 3.852601747 x

16 + Npiles

32
3.00
534

m
kN

16 + Npiles
S
+
D

Ps
150 Su D2

Ps
3 Su D2

+ 0.25

103 kN-m

0.5

Project
Location
Flr./Level
Designed by

:
:
:
:

4 STOREY MIX USED BUILDING


Bacolod City
Footing Mark PC-1
Footing
Date : 3-Oct-04
afv
Checked by:

DESIGN OF PILE CAPS


INPUT DATA
Concrete strength, (Fc') =

TRIAL FOOTING THICKNESS

Yield strength, (Fy) =


Pile working capacity =
Column size, X-axis,(CX) =

27.60 Mpa

Footing thk., (H) =

414.00 Mpa
784.80 Kpa

Deformed Bar, () =
Depth., (d) =

800.0 mm

Thickness Ok

mm
25
712.5 mm

400.00 mm
600.00 mm
2.50

Column size, Y-axis,(CY) =


Pile factor of safe =

Bending Moment along X-Axis


Mu = Pu[(L/2)-(Cx/2)]

LOADS
Dead load, (PD) =
Live load, (PL) =
PT = 1.10PD + PL =

843.11 Kn
260.28 Kn
1,187.70 Kn

Required no. of Piles=

X = (L/2)-(Cx/2)
0.90
X=

Mu =

1.51
2.00

Say
Length (L) =
Width (W) =

2.20 m
1.00 m

Dead load, (PD) =

309.14 Kn

Live load, (PL) =

86.76 Kn

Pu = 1.4PD + 1.7PL=

580.29 Kn

CHECKING BEAM SHEAR


Effective depth,(de)=
712.50 mm
WCRITICAL=
1,000.00 mm

Vcp =

fc'

bod

6
Vu < Vc, Thickness Ok

Kn.m

REINFORCEMENT DESIGN

R=
=

Vup =70%Pu =

522.26

435.2

Kn

Mu
bde2

0.85fc'

1-

Fy

522.26
4.57E+05
12R
0.85fc'

1.143074

min

0.002832
P < Pmin, Use Pmin

530.28

As = *B*de
=
USE

4.91

2,409.42

m2

pcs
5-

AsT = *B*de

25
=

mmMain bars
5,300.72

m2

= 10.798548 pcs
USE

11-

25

mmTransverse bars

1.4
Fy

= 0.00338

Project
Location
Flr./Level
Designed by

:
:
:
:

4 Stroey Building w/ Mezz.


Bangbang
Footing
afv

Footing Mark PC-3


Date : 7-Mar-05
Checked by:

DESIGN OF PILE CAPS


INPUT DATA
Concrete strength, (Fc') =

TRIAL FOOTING THICKNESS

Yield strength, (Fy) =


Pile working capacity =
Column size, X-axis,(CX) =

27.60 Mpa

Footing thk., (H) =

414.00 Mpa
833.85 Kpa

Deformed Bar, () =
Depth., (d) =

800.0 mm

Thickness Ok

mm
25
687.5 mm

400.00 mm
600.00 mm
2.50

Column size, Y-axis,(CY) =


Pile factor of safe =

Bending Moment along X-Axis

Mu = Pu(1.20-Cy/2)
LOADS

Dead load, (PD) =


Live load, (PL) =
PT = 1.10PD + PL =

Required no. of Piles=

Mu =

Dead load, (PD) =

458.32 Kn

Live load, (PL) =

195.08 Kn

Pu = 1.4PD + 1.7PL=

973.28 Kn

WCRITICAL=

Kn.m

1,780.00 mm

CHECK BEAM SHEAR


Effective depth,(de)=

687.50 mm

REINFORCEMENT DESIGN

1,780.00 mm

R=
=

Vup =75%Pu =
Vcp =

389.31

2.35
3.00

Say

WCRITICAL=

X = (1.20-Cy/2)-0.50
X=
0.40
m

1,249.95 Kn
585.24 Kn
1,960.19 Kn

fc'

bod =

6
Vu < Vc, Thickness Ok

730.0

Kn

Mu
bde2

0.85fc'

1-

Fy

389.31
7.57E+08
12R
0.85fc'

0.514

min

0.001256
P < Pmin, Use Pmin

910.78

As = *B*de
=
USE

8.43

4,138.29

m2

pcs
9-

25

mmars three ways

1.4
Fy

= 0.00338

Project
Location
Flr./Level
Designed by

:
:
:
:

4 Stroey Building w/ Mezz.


Bangbang
Footing
afv

Footing Mark PC-2


Date : 7-Mar-05
Checked by:

DESIGN OF PILE CAPS


INPUT DATA
Concrete strength, (Fc') =

TRIAL FOOTING THICKNESS

Yield strength, (Fy) =


Pile working capacity =
Column size, X-axis,(CX) =

27.60 Mpa

Footing thk., (H) =

414.00 Mpa
833.50 Kpa

Deformed Bar, () =
Depth., (d) =

800.0 mm

Thickness Ok

mm
25
712.5 mm

400.00 mm
600.00 mm
2.50

Column size, Y-axis,(CY) =


Pile factor of safe =

Bending Moment along X-Axis


Mu = Pu[(L/2)-(Cx/2)]

LOADS
Dead load, (PD) =
Live load, (PL) =
PT = 1.10PD + PL =

1,064.90 Kn
370.08 Kn
1,541.47 Kn

Required no. of Piles=

X = (L/2)-(Cx/2)
0.85
X=

Mu =

1.85
2.00

Say
Length (L) =
Width (W) =

2.10 m
0.95 m

Dead load, (PD) =

234.28 Kn

Live load, (PL) =

74.02 Kn

Pu = 1.4PD + 1.7PL=

453.82 Kn

CHECKING BEAM SHEAR


Effective depth,(de)=
712.50 mm
WCRITICAL=
950.00 mm

Vcp =

fc'

bod

6
Vu < Vc, Thickness Ok

Kn.m

REINFORCEMENT DESIGN

R=
=

Vup = Pu =

385.74

453.8

Kn

Mu
bde2

0.85fc'

1-

Fy

385.74
4.34E+05
12R
0.85fc'

0.888717

min

0.002189
P < Pmin, Use Pmin

503.77 Kn

As = *B*de
=
USE

4.66

USE

m2

pcs
5-

AsT = *B*de
=

2,288.95

25
=

mmMain bars
5,059.78

m2

10.31 pcs
11-

25

mmTransverse bars

1.4
Fy

= 0.00338

CENTURY PARK HOTEL

INVESTIGATION OF FOOTING ON PILES


INPUT DATA:
Concrete Strength,
Steel Yield Strength,
Reduction factor,
Column width,
Column depth,
No. of Piles,
Main bar diameter,
Area of bar,
Pile cap width,
Dist. from center of pile
to face of column,
Depth of pile cap,

SW-1
f'c
fy

b
h
n
d1
As1bar
W

=
=
=
=
=
=
=
=
=

x
d

=
=

LOADS:
Concentrated deadload,
Concentrated liveload,
Ultimate Load,

PDL
PLL
PU

=
=
=

81997 kN
34712.42 kN
222538.35 kN

Reaction per Pile,

Ru

616.44972 kN

REQUIRED DEPTH OF PILE CAP:


By Punching Shear:
Vp = Pu - Ru =
vp = f'c/3 =
vp

1900 d
Required depth,
By Beam Shear:

28
414
0.85
1860
1900
361
36
1017.8784
2300

MPa
MPa
mm
mm
mm
mm2
mm

250 mm
2900 mm

221921.9 kN
1.764 MPa
Vp
bo d
+ d2 -

5206.928 mm

Vu = 3Ru =
vp = f'c/6 =

1849.3492 kN
0.882 MPa

Vp
bd

Required depth,

1072.616 mm

Design Moment,

Mu
reqd
min

=
=
=

0.4623373 N-mm
6.41E-008
0.0034

Asreqd

22555.556 mm2

309164144.xls

= 1.764

37005262.09738 = 0

vp

221921900.277008
0.85( 1900 + d ) d (4)

1849349.16897507
0.85( 2300 ) d

= 0.882

03/11/2016

No. of bars =

309164144.xls

22.2

USE

22

36

03/11/2016

309164144.xls

03/11/2016

mm bars

309164144.xls

03/11/2016

Das könnte Ihnen auch gefallen