) path pang tt
oT gest
AS
eiastnvone coeametanets BOJAMHOOR
Form No.0033,
] = TOSSED
rape |packace | Locarion REFERENCE peers
Dee Ne TIPNe, | BOQNe. |
INSPECTION | MECH, {Plumbing 1 ‘a peratoched| ‘illNoo2 | 28/12/2015
REQUEST drawing ern aan
‘CATEGORY GNOLOSED | INSPECTION REQUESTNO.__ [READY FOR INSPECTION
O Hola | OW O ves | \ BMECO/PDBC/IR/PLIO045 |_bare__| Tine
sue Pee PERE 7 29/12/2015 | w00 AM
GoNTEACT TTL | Ri Comatin ans Niinens of far line | & Pa T=
FROM (Contracton: | BOJAMHOOR TRADING & CONT.CO. W.L.L,
Ss : 4
TOGuryeon | Ico cONBULAING ENGINES a
TTEM 10 BE INSPECTED eh s/s
AOTIVITY 70 BH INSPECTED Installation & Pressure test of PPR Pipes including the concer
basin drainage in ‘T&B-03 & T&B-66 between grid line 6 to 18 and h’ to T at Building C Md rma ‘as per
attached highlighted drawings.
‘SUB CONTRACTOR NAMB: Engr. Sayed Sobhy SIGNATURE:
ISSUED BY::
MAIN CONTRACTOR | NAME: Engr.Mohamed Adel Badveldin SIGNATURE: Vat
MAIN CONTRACTOR QUALTY CONTROL ENGINEER REMAKRS s
QGE — Main Contractor
[amet Me. R Sivakumar
Signature Nop
awe 2 NES.
TRECD BY:CONSULTANT NAM SIGNATU DATE
‘CONSULTANT T0 ENTER ACTION CODE AND REMARKS AND RETURN TO CONTRACTO!
Cow | ce Dsiuctwe = OMech. C1 Plumbing ectrical Dlondscope Dotners
“CONSULTANT — Sito Tpeplctor
Bear 128 or pomsns...utean. anne’. CPP)
See PUP ic dee
ai INgpeecna. P PaRCe. Rest. sim
Dapproved (Bovwes aa Noted TINor Appaved J
‘SUPERVISION STAFF COMMENTS Signature
Architect
str
Mechanical | ae
Electrical
COPIES T0: CPso rm, Ci Contractor a Orie
ENCLOSURES
oF a a o
Form: Inspection Request Hi4