Beruflich Dokumente
Kultur Dokumente
b)Costo/da de combustible
c) Cantidad del condensado en % al final de la tubera (1000')
Datos Combustible
Costo ($/L)
P.C (Btu/lb)
S gr (g/mL)
TFA (F)
mc (lb/h)
Datos Horno
Altura (m)
espesor (ft)
rea(m^2)
rea (ft^2)
Datos Agua (bomba)
patm(lb/ft^2)
Pm(lb/ft^2)
mH20 (lb/h)
(Btu/lb)
Teb (F)
Cp H2O
Datos Tuberia
L(ft)
Dimetro nominal (in)
Dimetro interno (in)
Dimetro externo (in)
Text (F)
Text (R)
Tint (F)
Datos aislante
espesor nominal (in)
Tprom
k
Ladrillo refractario
T
15
1550
0.8
1.76
2200
1531.5117
4
1
16
172.1344
14.7
100
1000
880.75
337.81
1
1000
2
2.067
2.38
151.846464
612.516464
337.81
0.5
244.828232
0.05876565
399
1600
aislante
T
0.2018
0.8023
k
20
300
700
0.0136
0.0668
0.1428
Ladrillo Refractario
k (Btu/h ft F)
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
Column C
Linear (Column C
Tamb (F)
tubera (1000')
Cara Vertical
Temperaturas (F)
Text
Tint
Tprom
k
385.91587
2200
1292.95794
0.64877897
(R)
368.23075
828.9007509067
2200
2660.67
1284.11538
0.64435769
410.39152
2200
1305.19576
0.65489788
(R)
846.5858707721
2660.67
(R)
871.0615240864
2660.67
RESPUESTAS
Pregunta a
=QH2O/Qtotal x100%
Pregunta b
Costo/da
Pregunta c
% mcondensado/mtotal
actario
Aislante
Column C
Linear (Column C)
60
520.67
48.8052469093
313263.755932413
22.2253992035
1176.939628669 C.O
1176.939740336
-0.00011167
1180.314597795 C.O
1180.314597795
1.2960E-011
1172.010798734 C.O
1172.009754684
0.00104405
1215283.128288
880750
277810
2373843.128288
lante
Column C
Linear (Column C)
222.25399
Disipacin
ha=hr+hc
hr
hc
2.40854326
1.26696303
1.14158023