Sie sind auf Seite 1von 45

Excel 2000 or XP Users:

For full functionality, first save this datasheet onto your hard drive. When opening the Smart
Datasheet, make sure to select "Macros Enabled", if asked. If the Office Assistant is not visible, show
it by selecting the Show Office Assistant option under the Help menu. If you didnt see the message
of enabling Macros, set the security level to medium by going to Tools/Macro/Security then check
Medium. For help Contact:
mailto:hussain.hazza@aramco.com
NOTE TO THE MANUFACTURER ON SMART DATASHEET PROTOCOL:
The Saudi Aramco Smart Data Sheet Power Transformers 314-SAMSS-531 is provided to assist you in
developing your technical proposal. It is a Microsoft Excel based document that contains several
tools that offer on-line guidance to you. These include: hyper-linking capabilities to all relevant
technical requirements, tutorial assistance, automatic technical feedback on critical data entries and
an engineering dialogue function.
To be considered technically acceptable and/or to reduce the cycle time on the review of your
proposal, we ask that you fill out all the relevant color coded data entry cells; answer all questions
that are posed to you and submit any comments and exceptions that you may have as outlined in
the attached.
For full implementation of all on-line guidance tools, you must be logged onto the Internet. Within
all text highlighted in yellow, you will find Saudi Aramco's comments and exceptions to API-612,
Fourth Edition.

APPD.
CERT.

JOB NO.

SAUDI ARAMCO
DATA SCHEDULE - 1
14-SAMSS-531, POWER TRANSFORMERS
SUPPLIED BY BUYER AS PART OF SAMS SPECIFICATIONS

ITEM NO.

PURCHASE ORDER NO.


SPECIFICATION NO.

CHKD.

1 APPLICABLE TO:

PROPOSAL

PURCHASE

REVISION NO.
PAGE

PLANT NO

2 FOR

UNIT

3 SITE

SERIAL NO.
MODEL

6 OPERATION

STEP-UP

GENERATOR STEP-UP

PURCHASER

9 BUYER'S PURCHASE ORDER/QUOTATION REQUEST


10 BUYER'S BUDGET ITEM/JOB ORDER NUMBER
DESCRIPTION

11 BUYER'S LINE ITEM NUMBER


12 SAMSS ATTACHMENTS & SUPPLEMENTS

26-SAMSS-059

13 SUPPLEMENTAL PAGES TO DATA SCHEDULE 1


14

AUTO/MULTIWINDING TRANSFORMER

15

PARALLEL OPERATION

16
17 NUMBER OF PHASES
18 TEMPERATURE RISE

(C)

19 FREQUENCY

(Hz)

65C

20 TRANSFORMER TYPE
21 COOLANT
JO/EWO

22 ANGULAR DISPLACEMENT
23
24 IMPEDANCE

(% AT C ON OA BASE OF HIGH VOLTAGE WINDING)

BY

25 ANSI

OTHER

26 MULTI WINDING TRANSFORMERS

DATE

27 IMPEDANCE HV TO LV X (% AT 85C ON OA BASE OF X SECONDARY WINDING)


28 IMPEDANCE HV TO LV Y (% AT 85C ON OA BASE OF Y SECONDARY WINDING)
29 IMPEDANCE LV X TO LV Y (% AT 85C ON OA BASE OF X OR Y WINDING)
REV NO.

30 FORCED COOLING & CONTROLS


31 FAN OR PUMP MOTOR VOLTAGE & PHASES
32
33 LOSS EVALUATION CONSTANTS

DRAWN

34

CURRENCY OF EVALUATION

SYMBOL

BY

35

NO-LOAD LOSS CONSTANT A

Cost/Kw

DATE

36

LOAD LOSS CONSTANT B

Cost/kW

CHKD BY

37
38 HIGH VOLTAGE WINDING

BY

39 CONTINUOUS OA/FA/FOA RATINGS

(kVA)

DATE

40 VOLTAGE RATING

(kV)

41 WINDING CONNECTION
42 NEUTRAL GROUNDING

BY

43 WINDING BIL LEVEL

(kV)

DATE

44 NEUTRAL BIL LEVEL

(kV)

CONSTR.

45 SURGE ARRESTERS
46

BY

47

DATE

48
49

CERTIFIED

50

BY

51

DATE

52

OTHER

MANUFACTURER

SUPPLIED BY BUYER AS PART OF SAMS SPECIFICATIONS

APPD. FOR

DRAWING NO

DRIVEN EQ. ITEM NO.

STEP-DOWN

7 NOTE: INFORMATION TO BE COMPLETED BY:

ENG. DEPT.

BY
INDEX

NO. REQUIRED

5 MANUFACTURER

OPRG. DEPT.

AS-BUILT

4 SERVICE

REVISIONS

DATE
OF

MOUNTED COMPLETE

APPD.

JOB NO.

SAUDI ARAMCO

ITEM NO.

REVISION

DATE

PAGE

CERT.

PLANT NO
SITE

DATA SCHEDULE - 1 (CONT'D)

SERVICE

CHKD.

1 LOW-VOLTAGE WINDING
2 CONTINUOUS OA/FA/FOA RATINGS

(kVA)

3 VOLTAGE RATING

(kV)

4 WINDING CONNECTION
5 NEUTRAL GROUNDING
6 WINDING BIL LEVEL

(kV)

7 NEUTRAL BIL LEVEL

(kV)

MOUNTED COMPLETE

9
DESCRIPTION

10
11
12 HIGH VOLTAGE WINDING TERMINATION
13 TYPE
14

BUSHINGS

15

JUNCTION BOX

16

THROAT

17 POSITION

TOP COVER

TANK SIDE

18
19

OUTDOOR BUSHINGS

LINE-END BIL (kV)

JO/EWO

20

NEUTRAL-END BIL (kV)

21

TERMINAL TYPE

22

TAKE-OFF ANGLE

23

CONDUCTOR SIZE AND TYPE

STRANDED mm

24

BY

25
26

REV NO.

DATE

27

JUNCTION BOX TYPE


CABLE JUNCTION BOX

28

CABLE SIZE

29

CABLE TYPE

30

NUMBER OF CABLES

31

NUMBER OF POTHEADS

32
REVISIONS

TUBE IPS-in.
CONDUCTOR MATERIAL

33

NUMBER OF CONDUCTORS PER PHASE


CONDUIT JUNCTION BOX

DRAWN

34

CONDUIT SIZE

BY

35

NUMBER OF HUBS

DATE

36

ENTRY LOCATION

CHKD BY

37

CONDUCTOR SIZE

38

CONDUCTOR MATERIAL

OPRG. DEPT.

(mm)

(inch)

(mm)

BY

39

DATE

40

THROAT CONNECTION

41

*BUYER WILL SUPPLY FULL DETAILS AFTER AWARD OF CONTRACT

ENG. DEPT.
BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

SEPARABLE CONNECTORS

OF

8
INDEX

BY
DRAWING NO

APPD.

JOB NO.

SAUDI ARAMCO

ITEM NO.

REVISION
PAGE

DATE
3

OF

CERT.

PLANT NO

8
INDEX

SITE

DATA SCHEDULE - 1 (CONT'D)

SERVICE

CHKD.

1 LOW-VOLTAGE WINDING TERMINATION


2 TYPE
3

BUSHINGS

JUNCTION BOX

THROAT

6 POSITION

TOP COVER

TANK SIDE

7
8

OUTDOOR BUSHINGS

LINE-END BIL (kV)

DESCRIPTION

NEUTRAL-END BIL (kV)

10

TERMINAL TYPE

11

TAKE-OFF ANGLE

12

CONDUCTOR SIZE AND TYPE

STRANDED mm

13

TUBE IPS-in.

14

CONDUCTOR MATERIAL

15

JUNCTION BOX TYPE

16

CABLE JUNCTION BOX

17

CABLE SIZE

18

CABLE TYPE

19

NUMBER OF CABLES

20

NUMBER OF POTHEADS

21

NUMBER OF CONDUCTORS PER PHASE

BY

JO/EWO

22

CONDUIT JUNCTION BOX

23

CONDUIT SIZE

24

NUMBER OF HUBS

25

ENTRY LOCATION

26

CONDUCTOR SIZE

27

CONDUCTOR MATERIAL

28
DATE

(mm)

(inch)

(mm)

SEPARABLE CONNECTORS

29

THROAT CONNECTION

30

*BUYER WILL SUPPLY FULL DETAILS AFTER AWARD OF CONTRACT

REV NO.

31
32 TAP CHANGER TYPE
33 TYPE

REVISIONS
DRAWN

34 TAP kVA RATINGS

BY

35 LOCATION

DATE

36 NUMBER OF STEPS

CHKD BY

37

OPRG. DEPT.

39

DATE

40

ENG. DEPT.

BELOW

38 STEP SIZE

BY

ABOVE

PERCENT

MECHANICAL KEY INTERLOCK

41 LOAD TAP CHANGER CONTROL

COMPARTMENT PRESSURE-RISE RELAY

(IF APPLICABLE)

BY

42

DATE

43

LOCAL CONTROL

REMOTE CONTROL

44

MANUAL CONTROL

SUPERVISORY CONTROL

APPD. FOR

45

POSITION TELEMETERING

AUTOMATIC VOLTAGE CONTROL

CONSTR.

46

BY

47 AC REFERENCE VOLTAGE

DATE
CERTIFIED

48
49

PARALLEL OPERATION REQUIRED

BY

50

DATE

51 MOTOR SUPPLY VOLTAGE, PHASE RMS AC

LINE DROP COMPENSATOR

BY
DRAWING NO

APPD.

JOB NO.

SAUDI ARAMCO

ITEM NO.

REVISION
PAGE

DATE
4

OF

CERT.

PLANT NO

DATA SCHEDULE - 1 (CONT'D)

BY

INDEX

DRAWING NO

SITE
SERVICE

CHKD.

1 CURRENT TRANSFORMERS
2

HIGH-VOLTAGE WINDINGS/BUSHINGS

NUMBER REQUIRED PER PHASE

ACCURACY CLASS

STANDARD BURDEN

PRIMARY CURRENT RATING

Amperes

SECONDARY CURRENT RATING

Amperes

NUMBER OF RATIOS

CONT. THERMAL CURRENT RATING FACTOR

RELAYING

METERING

1.33

1.33

RELAYING

METERING

1.33

1.33

HV

LV

1.33

1.33

DESCRIPTION

10
11

LOW-VOLTAGE WINDINGS/BUSHINGS

12

NUMBER REQUIRED PER PHASE

13

ACCURACY CLASS

14

STANDARD BURDEN

15

PRIMARY CURRENT RATING

Amperes

16

SECONDARY CURRENT RATING

Amperes

17

NUMBER OF RATIOS

18

CONT. THERMAL CURRENT RATING FACTOR

19

DATE

BY

JO/EWO

20

WINDING NEUTRAL END/BUSHING

21

NUMBER REQUIRED

22

LOCATION (BUSHING/EXTERNAL

23

ACCURACY CLASS

24

STANDARD BURDEN

25

PRIMARY CURRENT RATING

Amperes

26

SECONDARY CURRENT RATING

Amperes

27

NUMBER OF RATIOS

28

CONT. THERMAL CURRENT RATING FACTOR

29
REV NO.

30 ADDITIONAL ANSI TEST REQUIREMENTS


31

ZERO SEQUENCE IMPEDANCE

32
REVISIONS

33 MISCELLANEOUS & ACCESSORIES

DRAWN

34

COMBUSTIBLE GAS DETECTOR (BUCHHOLZ RELAY)

BY

35

PADLOCKABLE DRAIN VALVE

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.

40
41

BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

APPD.

JOB NO.

SAUDI ARAMCO

ITEM NO.

REVISION

DATE

PAGE

CERT.

DATA SCHEDULE - 1
14-SAMSS-531, POWER TRANSFORMERS
SUPPLEMENTAL PAGE FOR MULTIWINDING OR AUTOTRANSFORMERS

PLANT NO

3 CONTINUOUS OA/FA/FOA RATINGS

(kVA)

4 VOLTAGE RATING

(kV)

6 NEUTRAL GROUNDING
7 WINDING BIL LEVEL

(kV)

8 NEUTRAL BIL LEVEL

(kV)

9 SIMULTANEOUS LOADING OF TERTIARY

(kVA)

10
DESCRIPTION

11 IMPEDANCE (% AT 85 C ON TERTIARY OA BASE)


12 HIGH VOLTAGE TO TERTIARY
13 LOW VOLTAGE TO TERTIARY
14
15 TERTIARY-VOLTAGE WINDING TERMINATION
16 TYPE
17

BUSHINGS

18

JUNCTION BOX

19

THROAT

20 POSITION

TOP COVER

TANK SIDE

21
JO/EWO

OUTDOOR BUSHINGS

LINE-END BIL (kV)

BY

23

NEUTRAL-END BIL (kV)

24

TERMINAL TYPE

25

TAKE-OFF ANGLE

26

CONDUCTOR SIZE AND TYPE

STRANDED mm

DATE

27

29
REV NO.

30

REVISIONS

TUBE IPS-in.
CONDUCTOR MATERIAL
JUNCTION BOX TYPE
CABLE JUNCTION BOX

31

CABLE SIZE

32

CABLE TYPE

33

NUMBER OF CABLES

DRAWN

34

NUMBER OF POTHEADS

BY

35

DATE

36

CHKD BY

37

CONDUIT SIZE

38

NUMBER OF HUBS

BY

39

ENTRY LOCATION

DATE

40

CONDUCTOR SIZE

41

CONDUCTOR MATERIAL

OPRG. DEPT.

ENG. DEPT.

(mm)

NUMBER OF CONDUCTORS PER PHASE


CONDUIT JUNCTION BOX
(inch)

(mm)

BY

42

DATE

43

THROAT CONNECTION

APPD. FOR

44

*BUYER WILL SUPPLY FULL DETAILS AFTER AWARD OF CONTRACT

CONSTR.

45

BY

46

DATE
CERTIFIED

47
48

BY

49

DATE

50

BY

INDEX

SERVICE

5 WINDING CONNECTION

28

SITE

2 TERTIARY-VOLTAGE WINDING

22

OF

SUPPLEMENTAL PAGE FOR MULTIWINDING OR AUTOTRANSFORMERS

CHKD.

SEPARABLE CONNECTORS

DRAWING NO

BY BUYER AS PART OF SAMS SPECIFICATIONS

PAGE FOR MULTIWINDING OR AUTOTRANSFORMERS

SAUDI ARAMCO

NOTE: Blue Font - indicates 32-SAMSS-010 paragraph not referenced on datasheet

Spec. No.

Status of
Compliance

Page 14 of 45

SAUDI ARAMCO

dicates 32-SAMSS-010 paragraph not referenced on datasheet

Comments / Exceptions

Page 15 of 45

SAUDI ARAMCO

Spec. No.

Status of
Compliance

Page 16 of 45

SAUDI ARAMCO

Comments / Exceptions

Page 17 of 45

APPD.

JOB NO.

SAUDI ARAMCO

ITEM NO.

PURCHASE ORDER NO.


SPECIFICATION NO.

CERT.

REVISION NO.
PAGE

DATE
OF

PLANT NO

CHKD.

1 APPLICABLE TO:

PROPOSAL

PURCHASE

UNIT

3 SITE

SERIAL NO.

4 SERVICE

NO. REQUIRED

5 MANUFACTURER

MODEL
COMPRESSOR

7 NOTE: INFORMATION TO BE COMPLETED BY:

PURCHASER

8
9
10
DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21

JO/EWO

22
23
24

BY

25
26

DATE

27
28
29
REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.

38

BY

39

DATE

40
41

ENG. DEPT.

42

BY

43

DATE

44

APPD. FOR

45

CONSTR.

46

BY

47

DATE

48
49

CERTIFIED

50

BY

51

DATE

52

DRIVEN EQ. ITEM NO.


GENERATOR

4.4

9.1

BY

INDEX

AS-BUILT

2 FOR

6 DRIVEN EQUIPMENT TYPE:

15

OTHER
MANUFACTURER

DRAWING NO

APPD.

JOB NO.

SAUDI ARAMCO

ITEM NO.

REVISION
PAGE

DATE
2

CERT.

PLANT NO
SERVICE

CHKD.

1
2
3
4
5
6
7
8
9

DESCRIPTION

10
11
12
13
14
15
16
17
18
20
21
JO/EWO

22
23
24

BY

25
26

DATE

27
28
29

REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.

40
41

BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

15
INDEX

SITE

19

OF

5.2

BY
DRAWING NO

APPD.

SAUDI ARAMCO

JOB NO.

ITEM NO.

REVISION

DATE

PAGE

CERT.

PLANT NO
SERVICE

CHKD.

1
2
3
4
5
6
7
9
10

DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21
22

JO/EWO

23
24
25

BY

26
27

DATE

28
29
30

REV NO.

31
32
33

REVISIONS
DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.

40
41

BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

15
INDEX

SITE

OF

5.2

BY
DRAWING NO

APPD.

SAUDI ARAMCO

JOB NO.

ITEM NO.

REVISION

DATE

PAGE
CERT.

PLANT NO
SITE
SERVICE

CHKD.

1
2
3
4
5
6
7
8
9
10

DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21

JO/EWO

22
23
24

BY

25
26

DATE

27
28
29

REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.

40
41

BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

OF

15
INDEX

BY
DRAWING NO

APPD.

JOB NO.

SAUDI ARAMCO

REVISION
PAGE

CERT.

PLANT NO
SITE
SERVICE

CHKD.

1
2
3
4
5
6
7
8
9
10

DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21

JO/EWO

22
23
24

BY

25
26

DATE

27
28
29

REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.
BY

40
41
42

DATE

43

APPD. FOR

44

CONSTR.

45

BY

46

DATE
CERTIFIED

47
48

BY

49

DATE

50

ITEM NO.
DATE
5

OF

15
INDEX

BY
DRAWING NO

DRAWING NO

DRAWING NO

DRAWING NO

DRAWING NO

DRAWING NO

APPD.

JOB NO.

SAUDI ARAMCO

ITEM NO.

PURCHASE ORDER NO.


SPECIFICATION NO.

CERT.

REVISION NO.
PAGE
PLANT NO

CHKD.

1
2
3
4
5
6
7
8
9
10

DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21

JO/EWO

22
23
24

BY

25
26

DATE

27
28
29
REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.

38

BY

39

DATE

40
41

ENG. DEPT.
BY

42
43

DATE

44

APPD. FOR

45

CONSTR.

46

BY

47

DATE

48
49

CERTIFIED

50

BY

51

DATE

52

DATE
OF

15

BY

INDEX

DRAWING NO

APPD.

JOB NO.

SAUDI ARAMCO

REVISION
PAGE

CERT.

PLANT NO
SITE
SERVICE

CHKD.

1
2
3
4
5
6
7
8
9

DESCRIPTION

10
11
12
13
14
15
16
17
18
19
20
21
JO/EWO

22
23
24

BY

25
26

DATE

27
28
29

REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.

40
41

BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

ITEM NO.
DATE
7

OF

15
INDEX

BY
DRAWING NO

APPD.

SAUDI ARAMCO

JOB NO.

ITEM NO.

REVISION

DATE

PAGE
CERT.

PLANT NO
SITE
SERVICE

CHKD.

1
2
3
4
5
6
7
8
9
10

DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21
22

JO/EWO

23
24
25

BY

26
27

DATE

28
29
30

REV NO.

31
32
33

REVISIONS
DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.

40
41

BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

OF

15
INDEX

BY
DRAWING NO

APPD.

SAUDI ARAMCO

JOB NO.

ITEM NO.

REVISION

DATE

PAGE
CERT.

PLANT NO
SITE
SERVICE

CHKD.

1
2
3
4
5
6
7
8
9
10

DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21

JO/EWO

22
23
24

BY

25
26

DATE

27
28
29

REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.

40
41

BY

42

DATE

43
44

APPD. FOR

45

CONSTR.

46

BY

47

DATE
CERTIFIED

48
49

BY

50

DATE

51

OF

15
INDEX

BY
DRAWING NO

APPD.

JOB NO.

SAUDI ARAMCO

REVISION
PAGE

CERT.

PLANT NO
SITE
SERVICE

CHKD.

1
2
3
4
5
6
7
8
9
10

DESCRIPTION

11
12
13
14
15
16
17
18
19
20
21

JO/EWO

22
23
24

BY

25
26

DATE

27
28
29

REV NO.

30
31
32
REVISIONS

33

DRAWN

34

BY

35

DATE

36

CHKD BY

37

OPRG. DEPT.
BY

38
39

DATE
ENG. DEPT.
BY

40
41
42

DATE

43

APPD. FOR

44

CONSTR.

45

BY

46

DATE
CERTIFIED

47
48

BY

49

DATE

50

ITEM NO.
DATE
10

OF

15
INDEX

BY
DRAWING NO

DRAWING NO

DRAWING NO

DRAWING NO

DRAWING NO

DRAWING NO

SAUDI ARAMCO

Comments

Links are to Current Saudi Aramco Standards


Project Inspection Requirements
Form 175-140500

Power Transformers

Saudi Aramco Materials System Specifications (SAMSS)


26-SAMSS-059

Insulating Oil

Saudi Aramco Forms and Data Sheets


Form NMR-7906

Non-Material Requirements for Transformers: Small, Medium & Large, Power


Distribution

Page 38 of 45

Exceptions

Page 39 of 45

SAUDI ARAMCO

Q#
1

Question

10

11

12

Page 40 of 45

SAUDI ARAMCO

13

14

15

16

17

18

19

20

21

22

23

24

25

Page 41 of 45

SAUDI ARAMCO

26

27

28

29

30

31

32

33

Page 42 of 45

SAUDI ARAMCO

Answer

Page 43 of 45

SAUDI ARAMCO

Page 44 of 45

SAUDI ARAMCO

Page 45 of 45

Das könnte Ihnen auch gefallen