WHITE
PAPER
TABLE OF CONTENTS
INTRODUCTION ................................................................................................................. 1
THE CASE FOR CONVENTION CENTER EXPANSION ................................................... 2
The Path to Success is Conventional ....................................................................... 2
THE CASE FOR COMMUNITY CENTER THEATER TRANSFORMATION ....................... 3
Setting the Stage Literally and Figuratively ........................................................... 3
Funding .................................................................................................................... 4
Sacramento 2030 General Plan ............................................................................... 5
PROPOSED SACRAMENTO CONVENTION CENTER/THEATER DISTRICT DESIGN ... 6
Proposed Meeting Space Design ............................................................................. 7
Open Space Conceptual Plan .................................................................................. 7
CONVENTION CENTER MARKET VALIDATION .............................................................. 8
Summary of Competitive Exhibit Space National Conventions & Tradeshows ...... 8
Summary of Exhibit Space Demand National Conventions & Tradeshows ........... 9
Summary of Meeting Space Demand National Conventions & Tradeshows ......... 9
Summary of Ballroom Space Demand National Conventions & Tradeshows ...... 10
Likelihood of Using the Sacramento Convention Center ........................................ 10
Image Assessment of Sacramento as a Convention Destination ........................... 11
DRIVING THE ECONOMY ................................................................................................ 12
Citywide Economic Engine ..................................................................................... 12
Impacts of a Convention Center/Theater District .................................................... 12
Visitor Spending ..................................................................................................... 12
Job Growth ............................................................................................................. 13
Sacramento County Hospitality Industry Travel Impacts: 2012-2014 ..................... 13
Sacramento International Airport Economic Contributions ..................................... 13
SACRAMENTO TRANSIENT OCCUPANCY TAX ............................................................ 14
TOT Contributions to General Fund ....................................................................... 14
Impacts of 1996 Convention Center Expansion...................................................... 14
PROPOSED DOWNTOWN HOTEL DEVELOPMENT ...................................................... 15
Convention Center Hotel Development .................................................................. 16
Outlook for Hotel Success ...................................................................................... 16
INTRODUCTION
The simple truth is that the Sacramento Convention Center (SCC) and the Community Center
Theater (CCT) are at a historic crossroads. Over the last 20 years, the SCC has made no major
physical improvements and like the SCC, the CCT has been neglected for several years as well.
Over the same period, cities like San Diego, Anaheim, San Jose, Phoenix, Long Beach, San
Francisco, as well as many other cities around the nation, have made significant investments in
their convention centers and theaters.
The Sacramento Convention & Visitors Bureau (SCVB) recognizes that the SCC is a significant
economic engine for the Sacramento region and we wholeheartedly agree that the CCT is also
a vital part of this communitys economic future. In line with that sentiment, we also believe that
we must think even bigger than just the transformation of these two venues if the goal is to
create opportunities that will shape our city for decades to come.
The real opportunity in maximizing the value of these venues rests in marrying the hundreds of
millions of dollars in economic impact thats produced annually by the SCC to the quality of life
and cultural juggernaut that should exist within the walls of the CCT.
Connecting the CCT and the SCC presents this community with an opportunity to transform our
theater that erases the current theaters shortcomings, expands the Convention Center to grow
the Citys tax base, and tie them together with the Memorial Auditorium, Wells Fargo Pavilion
and the surrounding restaurants and hotels to create a Convention Center/Theater District.
Thats the comprehensive downtown that so many have envisioned for so many years: a K
Street Mall with deep anchors on the east and west ends and bustling activity of commerce and
entertainment in between.
In an effort to learn the best options for transformation for the theater, we engaged several out-ofmarket experts and internationally renowned architects. Their conclusion was unanimous: a
transformation of the current CCT and the SCC offers Sacramento the opportunity to capitalize on
a downtown location, one thats supported by decades of infrastructure, to create a Convention
Center/Theater District that would be supported and enjoyed by local residents and visitors.
A transformed CCT will put Sacramento on the forefront of the regions art venues. ADA issues
will be resolved, the acoustics will be modernized and, steel and glass will create a new exterior
with a lush visual of Capitol Park. Simply put, it will look, feel and operate like a brand new theater.
If our elected officials determine that a transformation of the CCT and expansion of the SCC is
warranted, the resulting Convention Center/Theater District presents the opportunity to build a
modern-day product that offers this community a visionary solution to our performing arts future,
while expanding a building that attracts hundreds of millions of outside dollars annually directly
benefitting the residents of Sacramento. Further, utilizing existing buildings with existing
surrounding infrastructure to meet market demands is a fiscally responsible route to grow our
community assets while creating the best return on investments for our public stakeholders.
The accompanying study drills more deeply into the analysis that the SCVB believes validates
the case for developing a Convention Center/Theater District that will modernize and leverage
economic impact opportunities for decades to come, while significantly enhancing the quality of
life experiences for residents. We hope you find the study informative and were looking forward
to hearing your comments. You can share those with Steve Hammond, SCVB President and
CEO, at shammond@visitsacramento.com.
Richard Hill
SCVB Board Chair
Tony Giannoni
SCVB Infrastructure Committee Chair
1
Since it is an older building, it is likely that there will be unforeseen discoveries as interior
construction evolves discoveries that could extend a shutdown period with potentially
disastrous consequences for local performing arts. The local performing arts organizations are
just now beginning to recover from near collapse during the extended recession. California
Musical Theatre is currently operating with nearly 90 percent capacity audiences, the new
POPS series is helping to re-build the Symphonys base and the Nutcracker continues to
undergird the budget of the still struggling Sacramento Ballet.
There is no disagreement that the CCT is in desperate need of a transformation; however there
are two lines of thought on how and when the construction of that transformation should take
place. The performing arts organizations are advocating for a phased construction time line on
the interior of the theater and they believe they would have a difficult time remaining viable if the
CCT were shut down for even a year.
While the City Manager clearly understands the concerns and needs of the arts organizations, a
phased approach to construction would generate significant additional costs to the project so
the City Manager wants to explore other potential opportunities that would reduce the length of
construction, scale back costs and present a more cost-effective approach that will maximize
ROI for the public and stakeholders while still meeting the needs of the arts organizations.
As noted, the theater is an older building and it is likely that there will be unforeseen discoveries
that could extend a shutdown period causing adverse consequences. To not be prepared for
those potential consequences by exploring other opportunities for an alternative venue is
irresponsible and would be harmful to the arts organizations. One potential plan could include
some modest renovation to the Memorial Auditorium that would accommodate Broadway Shows
that need more modest stage sets and fewer space requirements.
However, there is still a lot of work ahead and before any construction plan is developed and
agreed upon, the City needs to engage an owners representative; rescope the project; identify
the associated time and cost estimates; and program the project to be inclusive of both the CCT
and SCC.
Funding
During the evaluation/planning process for the Convention Center/Theater District
transformation/expansion, the SCVB retained Tim Youmans of Economic & Planning Systems,
who worked with Brian Larson of Halo Hospitality Group, LLC (SCVB Board Member and
Infrastructure Committee Co-Chair) in 2012-2013 on evaluating the Transient Occupancy Tax
(TOT) revenue stream and the possibility of using that stream in the future as part of the
financing of the next transformation/expansion. Youmans and Larson developed the basic
structure of a financing plan which was originally reviewed by City staff. The City staff has that
analysis and is currently in the process of fully vetting all funding options.
Sacramentos local performing arts organizations, which depend on the continued use of the
CCT, including the California Musical Theatre, the Sacramento Opera/Philharmonic, the
Sacramento Ballet, the Sacramento Choral Society and Orchestra, and the Sacramento
Speakers Series are urging the fullest possible transformation of the facility which is perfectly
positioned adjacent to the SCC and would be a major component of the foundation of the
Convention Center/Theater District.
The CCT has collected in excess of $4,000,000 in facilities fees as surcharges on ticket sales,
and the City has already spent much of that on design and construction documents to prepare for
a partial transformation of the existing CCT in its current downtown location. Cost estimate work
has already been approved by the City Council and there should be enough remaining funds to
upgrade the current plans to reflect the complete transformation the City is looking for.
4
Earlier analysis for transformation of the existing facility has established that the bones of the
building are sound and the location is perfect as its entry faade faces the State Capitol. The
CCT has also become a vital component of restaurants and other local commerce and, when
transformed along with the SCC, the two facilities will become iconic anchors at the East end of
the K Street promenade extending west to the new Golden 1 Center and riverfront development.
While the risk has been minimized in some quarters, some are still very concerned that the CCT
could be shut down for failure to comply with ADA issues since the preparations for external
remediation, in particular, were stalled during the exploration of a new performing arts theater.
Current designs for the transformation of the CCT would alleviate any further concerns about
ADA compliance but renovations should commence as soon as possible to mitigate any
potential risk in this regard.
A majority of the SCC and CCT funding would be generated by the sale of new TOT bonds. The
current bond payments from the 1996 bonding for the Convention Center Expansion expire in
approximately 2021. The new TOT bonds will provide the backbone of financing for further
development and construction of the Convention Center/Theater District, possibly supplemented
by new markets tax credits, infrastructure grants/loans, and other financial sources. The project
would be completed in phases based on keeping portions of the CCT and SCC open during
construction, cost efficiency, and other factors.
The timing of each phase would be driven by the timing of the retirement of the 1996
Convention Center Bond, as well as the growth of gross TOT, which grew 46% in the five years
following the 1996 expansion. The enhanced TOT collections would service additional tranches
of bonds for construction as it progresses. Construction could commence earlier than the
expiration of the current bonds in 2021 using any number of financial mechanisms originally
identified by Economic & Planning Systems and Halo Hospitality Group. These financial
mechanisms are currently being reevaluated by the City Treasurers office.
All of these program elements are essential to elevate the SCCs space inventory to levels that
can attract and capture more market share by accommodating larger conventions. The addition
of a second main entrance on 15th Street, with adjoining food outlets, will also allow the SCC to
simultaneously host multiple large-scale events. The additional space inventory being asked for
by our clients, combined with the modern design and superior functionality and flexibility,
positions Sacramento to not only grow its convention business, but will elevate its standing as a
first-rate convention destination locally, regionally and nationally.
The expanded and renovated exhibit and meeting space will be designed to easily divide into
smaller space formats, as well as combine with the other spaces in the SCC to accommodate
multiple, concurrent events. By combining the primary exhibit space with the additional meeting
and ballroom space, the SCC will be positioned to offer two simultaneous meeting packages
with two separate entrances, each of which would cater to the requirements of small, medium
and large convention and tradeshow groups.
6
Moreover, site circulation also prioritizes the multiple modes of access to the Convention
Center/Theater District via proposed street car, light rail, local and regional bus routes, and
bicycle and pedestrian routes. The ultimate result will be an active, urban Convention
Center/Theater District that embraces a multi-modal environment.
7
Cities like San Francisco and Anaheim are currently under construction with expansion projects.
San Diego is expected to resolve political and legal debates and move forward with its own
expansion project. The convention center investments made by other West Coast cities, most
notably San Jose and Long Beach, Sacramentos most frequent competitors, should cause
alarm in Sacramento because these facilities were already larger than Sacramento and they are
simply moving the bar that much higher.
For the SCC to fill a more fitting role in the local economy and to better compete with peer cities,
it must address a shortage of facilities, infrastructure and state of the art technology required by
the contemporary convention and event planning industry. Without these improvements, not
only will the convention industrys economic impact growth be inhibited, but we are at risk of
losing current clients that have outgrown our current space. Weve been able to meet those
growing needs by being creative with flex space but our clients will eventually leave for the
newer and larger facilities being offered by the competition if we stand pat.
8
Average = 88,200
Median = 75,000
- - - - - - SCC (1) - - - - - - - - - - - - - - - - - - - - - -
The existing exhibit space can accommodate about 85 percent of the current event demand
specific to Sacramento. To reach 95 percent capture, a total of 200,000 square feet of exhibit
space would be needed. This space increase would generate a potential 10 percent increase in
capture rate. An increase in exhibit space would also maximize convention bookings by allowing
for multiple overlapping events, in addition to very large events.
(1) Represents the total amount of exhibit space currently available at the SCC.
The existing SCC meeting space only accommodates 40-45 percent of event demand specific to
Sacramento. The current inventory of meeting space is even more of a limiting factor to booking
conventions compared to exhibit space. Significant increases in meeting space would be needed to
accommodate a large majority of event demand.
(1) Represents the total amount of meeting space currently available at the SCC.
Note: Data includes all organizations with a potential interest in the Sacramento Convention Center.
Source: CSL Interviews
Average = 21,400
Median = 15,000
- - - - - - -SCC (1) - - - - - - - - - - - - - - - - - - -
Convention center ballrooms are often used for general sessions, presentations, food functions
and other events. Approximately 85 percent of the meeting planners interviewed with an
interest in the SCC require a ballroom for their event(s). The existing SCC ballroom space can
accommodate approximately 65 percent of event demand specific to Sacramento so additional
meeting space would be needed to accommodate event demand. Exhibit space can be used
occasionally for large general session/food functions.
(1) Represents the largest contiguous ballroom space currently available at the SCC.
Note: Data includes all organizations with a potential interest in the Sacramento Convention Center.
Source: CSL Interviews
The CS&L Study also asked current convention center users about their likelihood of using the
convention center in the future. Event planners that have used the SCC in the past said they
are very likely to use or consider using it again in the future. This base of potential repeat
business is imperative in supporting future expansion. This data also indicates support for the
desirability of the Sacramento convention package.
10
Source: RRC Associates / STR / Destination Meetings Assessment Program / Sacramento Special Report
11
Visitor Spending
As the capital of California and one of the worlds largest economies, Sacramento already benefits
from many of the fundamental elements necessary for a successful convention and tourism
industry. Moreover, Sacramentos charms go beyond matters of infrastructure and geography.
The 14.6 million visitors to the Gold Country Region/County of Sacramento spent $4.4 billion in
2015 and enjoyed a vibrant and growing city featuring great weather, affordable attractions,
dynamic art experiences, and a flourishing restaurant and entertainment scene.
Job Growth
In addition to the visitor spending, the leisure and hospitality industry is one of the largest and
fastest growing employment super-sectors in the Sacramento County economy, with total jobs
averaging 28,400 during the fiscal year 2014. Direct destination visitor spending totaled $3.4
billion and local tax receipts reached $89 million. Furthermore, the construction activity
associated with expanding and modernizing the SCC and CCT would also generate significant
full-time and part-time jobs for the duration of construction.
Creating a new and growing number of jobs at the SCC, CCT and its surrounding entertainment
and hospitality district, makes additional sense when considering the proximity of existing and
light rail, bus routes, and a potential street car line. These transit lines make it easier for diverse
populations from around the City, County and region to access this employment base and the
influx of new visitors, convention delegates and theater patrons will further enhance an already
vibrant and growing downtown.
2013
2014
2,516
742
2,594
738
2,672
738
3,258
3,333
3,409
16.1
7.0
2.3
1.3
0.3
1.4
26.6
27.5
28.4
82
148
89
150
231
239
216
* Other Travel includes resident air travel and ground transportation impacts for travel to other California destinations,
travel arrangement and reservation services, and convention and trade show organizers.
** Retail includes gasoline.
Source: Dean Runyon Associates 2015 study for Visit California
TOT
Growth
Notes
2014-2015
$23,810,447
+ 40.4%
2009-2010
$16,983,781
- 1.5%
2004-2005
$17,238,134
+ 24.5%
1999-2000
$13,841,754
+ 46.0%
1994-1995
$9,477,000
N/A
Depth of recession
5. This new supply drove TOT from the $16 million level to a peak of $23.8 million in 2014-15.
6. Select service hotels run an average of .4 full-time employees per room, while full service
hotels run an average of .7 FTE per room. The above new hotels created approximately 886
new direct jobs and supported indirect jobs in suppliers, surrounding restaurants and other
amenities, etc.
7. The TOT has run an average of $20.3 million over the past 5 years, as compared with the
average of $9 million in the 5 years previous to the 1996 expansion.
8. At present, there are approximately 600 new hotel rooms in late planning or under construction.
9. The convention center expansion would support a new supply of this 600, plus an additional
1,000-1,500 rooms. Each new room would support downtown businesses and amenities by
generating an average of approximately 1 guest per night per new room (1 hotel room X
72% average occupancy X 1.35 guests per occupied room).
With the overall economic recovery, and with the particularly strong growth in the leisure and
hospitality job sector, TOT is now one of the General Funds fastest growing revenues up
over 38% during the last 10 years, while still collecting the same rate of 12% and despite the
intervening Great Recession.
From its earliest inception, and with the support of the hospitality industry, TOT has been used
to support tourism-related infrastructure and has been allocated towards SCC debt service.
Sacramento hotels, restaurants, and the tourism industry are in strong support of the convention
center expansion. Convention center upgrades have demonstrated time and again that an
improved and expanded convention center will significantly increase the number of out-of-town
guests and have a direct impact on the Citys taxes, most notably TOT.
Note, however, that this TOT growth does not include various property and other taxes that are
positively impacted by the convention industry, and does not break out the significant private
sector affects that will also be generated. These private sector impacts include the significant
hotel, restaurant, retail and other ancillary industry profits generated as a result of theater
performances and convention industry activity.
14
Kimpton Hotel
J Street (Between 5th and 6th)
250 Rooms
Projected Completion Date: 2017
Hyatt Centric
(Formerly Marshall Hotel)
7th and L Streets
159 Rooms
Projected Completion Date: 2018
15
16