Sie sind auf Seite 1von 5

Statistics

Lama masa KPD


N

Valid
Missing

80
0

Mean

1.13

Std. Error of Mean

.037

Median

1.00

Std. Deviation

.333

Range

Minimum

Maximum

Sum

90

Lama masa KPD


Cumulative
Frequency
Valid

Percent

Valid Percent

Percent

kurang dari 12 jam

70

87.5

87.5

87.5

lebih dari sama 12 jam

10

12.5

12.5

100.0

Total

80

100.0

100.0

Statistics
Skor APGAR
N

Valid
Missing

80
0

Mean

2.03

Std. Error of Mean

.018

Median

2.00

Std. Deviation

.157

Range

Minimum

Maximum

Sum

162

Skor APGAR
Cumulative
Frequency
Valid

Sedang (4-6)

Valid Percent

Percent

78

97.5

97.5

97.5

2.5

2.5

100.0

80

100.0

100.0

Berat (0-3)
Total

Percent

Case Processing Summary


Cases
Valid
N
Lama masa KPD * Skor
APGAR

Missing

Percent
80

100.0%

Total

Percent
0

.0%

Percent
80

100.0%

Lama masa KPD * Skor APGAR Crosstabulation


Skor APGAR

Lama masa

kurang dari 12 jam

KPD

Sedang (4-

Berat (0-

6)

3)

Count
Expected Count
% within Lama masa

Total

69

70

68.3

1.8

70.0

98.6%

1.4%

100.0%

10

9.8

.3

10.0

90.0%

10.0%

100.0%

78

80

78.0

2.0

80.0

97.5%

2.5%

100.0%

KPD
lebih dari sama 12

Count

jam

Expected Count
% within Lama masa
KPD

Total

Count
Expected Count
% within Lama masa
KPD

Chi-Square Tests

Value
Pearson Chi-Square
Continuity Correctionb
Likelihood Ratio

df

Asymp. Sig.

Exact Sig. (2-

Exact Sig. (1-

(2-sided)

sided)

sided)

2.637a

.104

.293

.588

1.721

.190

Fisher's Exact Test


Linear-by-Linear

.236
2.604

.107

Association
N of Valid Cases

80

a. 2 cells (50.0%) have expected count less than 5. The minimum expected count is .25.
b. Computed only for a 2x2 table

.236

Risk Estimate
95% Confidence Interval
Value
Odds Ratio for Lama masa

Lower

Upper

7.667

.440

133.540

1.095

.889

1.349

.143

.010

2.108

KPD (kurang dari 12 jam /


lebih dari sama 12 jam)
For cohort Skor APGAR =
Sedang (4-6)
For cohort Skor APGAR =
Berat (0-3)
N of Valid Cases

80

Das könnte Ihnen auch gefallen