Sie sind auf Seite 1von 3

2a)

Pile Length
Shaft resistance (kN)
Base resistance (kN)
Total Load Capacity (kN)
2b)

Bored Pile
Combination1 Combination2
49.969
49.969
5948.11
3717.57
1363.23
681.61
7311.34
4399.18

Test Pile Shaft Resistance (kN/m2)


Combination 1
0

20

40

Combination 2
60

80

100 120 140 160

10

20
Depth (m) 30

40

50

60

Test Pile Cumulative Resistance (kN)


Combination 1
0

1000

2000

3000

Combination 2
4000

5000

6000

7000

8000

10
20
Depth (m)

30
40
50
60

2c)
2d) Rmb to explain despite the discrepancy between our assumed Kspt and the
actual one, they are still in similar trend. That proves we are in the right track of
assumptions.

2e)

Model
Factor
yb
ys

Without Pile Load


With Pile Load Test
Test
Driven
Bored
Driven
Bored
1.4
1.4
1.2
1.2
1.7
2
1.7
Pile Length
(m) 1.5
1.5
1.6
Without Pile Load
With1.3
Pile Load 1.4
Test
Test
Comb
Comb1
Comb2
1
Comb2

Driven Pile

48.43

51.73

43.05

46.64

Bored Pile

48.43

53.79

43.05

47.87

Das könnte Ihnen auch gefallen