Sie sind auf Seite 1von 8

THRUST BLOCK DESIGN DETAILS

TRUST DEVELOPED (PER 80 PSI PRESSURE) IN POUNDS FORCE


PIPE SIZE (NOM. DIAMETER)

TEES, PlUG, VALVE

90 BEND

45 BEND

6"
3"

2992
1448

4232
2048

2288
1112
MINIMUM BEARING SURFACE AREA ( IN SQUARE FEET)

6"
3"

2.99
1.45

4.23
2.05

2.29
1.11
SUGGESTED THRUST BLOCK DIMENSIONS

6"
3"

21" X 21"
15" X 15"

25" X 25"
18" X 18"

19" X 19"
13" X 13"

NOTE: ALL DIMENSIONS ARE 6" DEEP (SEE ATTACHED DETAIL), AND CROSS THRUST BLOCKS DIMENSIO
OF THE CROSS
SUGGESTED THRUST BLOCK VOLUME (ft^3)
PIPE SIZE (NOM. DIAMETER)

TEES, PLUG VALVE

90 BEND

45 BEND

6"
3"

1.53
0.78

2.17
1.13

1.25
0.59

Thrust Block Costs


Thrust Block Type
TEES
PLUG
90 BEND
45 BEND
22 1/2Bend
11 1/4 Bend
CROSS

Pipe Size (in.)


3
6
3
3
6
3
6
3
6
3
6
3
6

QTY.
12
20
53
34
4
3
1
8
6
0
3
0
41

Concrete Needed Per Block (ft^3)


0.78
1.53
0.78
1.13
2.17
0.59
1.25
0.28
0.59
0.28
0.42

Notes: 1) Cost of Concrete (28 day pressure rating of 2500 PSI) = $180.65 per yd^3 (Includes: material, labor, and equimpment)
2) Pipe size is the biggest pipe size involved in the fitting.
3) Above cost estimate includes the four 90
blocks of the pump house (use 6" pipe block).
4) A 6" Tee thrust block was added to account for fitting to connect pumphouse to mainline.

CSI 03-363, Specially placed concrete


CSI 03-363

Craft@Hrs

Unit

Material

Using a portable 55 KW 120/240 volt generator, a 25" diameter concrete vibrator and small tools.
3,000 PSI
bq@3.20
CY

LENGTH OF PIPE (FT.)


27,600
5,823

PIPE SIZE (IN.)


3
6

90.5

GN DETAILS

ER 80 PSI PRESSURE) IN POUNDS FORCE


22 1/2Bend

11 1/4 Bend

CROSS

1144
556

572
-

748
362

0.57
-

0.75
0.36

9" X 9"
-

11" X 11"
8" X 8"

G SURFACE AREA ( IN SQUARE FEET)


1.14
0.56
THRUST BLOCK DIMENSIONS
13" X 13"
9" X 9"

ETAIL), AND CROSS THRUST BLOCKS DIMENSIONS ARE FOR EACH CORNER
OF THE CROSS

THRUST BLOCK VOLUME (ft^3)


22 1/2Bend

11 1/4 Bend

CROSS

0.59
0.28

0.28
-

0.42
-

Total Concrete Needed (yd^3)


0.35
1.13
1.53
1.42
0.32
0.07
0.05
0.08
0.13
0.03
2.55

Cost
62.63
204.74
276.60
257.06
58.08
11.84
8.36
14.99
23.69
5.62
460.86

Total Cost =
1384.45
ludes: material, labor, and equimpment)
ved in the fitting.
3) Above cost estimate includes the four 90 bend thrust

fitting to connect pumphouse to mainline.

Labor

Equip

Total

85.8

4.35

180.65

Thrust Block Costs


Thrust Block Type
TEES
PLUG
90 BEND
45 BEND
22 1/2Bend
11 1/4 Bend
CROSS

Pipe Size (in.)


3
6
3
3
6
3
6
3
6
3
6
3
6

QTY.
12
20
53
34
4
3
1
8
6
0
3
0
41

Concrete Needed
Per Block (ft^3)
0.78
1.53
0.78
1.13
2.17
0.59
1.25
0.28
0.59
0.28
0.42

Total Concrete Needed


(yd^3)
0.35
1.13
1.53
1.42
0.32
0.07
0.05
0.08
0.13
0.03
2.55

Total Cost =
Notes: 1) Cost of Concrete (28 day pressure rating of 2500 PSI) = $180.65 per yd^3 (Includes: material, labor, and equimpment)
2) Pipe size is the biggest pipe size involved in the fitting.
3) Above cost estimate includes the fo
bend thrust blocks of the pump house (use 6" pipe block).
4) A 6" Tee thrust block was added to account for fitting to connect pumphouse to mainlin

Costs ($)
62.63
204.74
276.60
257.06
58.08
11.84
8.36
14.99
23.69
5.62
460.86

1384.45
and equimpment)

stimate includes the four 90


pumphouse to mainline.

Das könnte Ihnen auch gefallen